DWG # DRAWING NAME TOTAL
SHEETS DRAWING TITLE
01 HA2019-CV 1 COVER SHEET02 HA2019-FP 1 FOUNDATION PLAN03 HA2019-EP 1 ELECTRICAL PLAN04 HA2019-E5 1 26KV ELEVATIONS05 HA2019-ED 1 ELECTRICAL DETAILS06 HA2019-CP 1 CONDUIT & GROUNDING PLAN07 HA2019-CS 1 CONDUIT SCHEDULE08 HA2019-CT 1 CABLE SCHEDULE09 HA2019-LV 1 STATION SERVICE & ELECTRICAL PANELS
INDEX TO DRAWINGS
--
-
-
-
------
------
------
-
-
-
- HA2019-FP
02
- - - - -
- - - - -
- - - - -
- - - - -
-
- SUBSTATION & TRANSMISSION PROJECTS 20410
HA2019
09
8005239
BLS
BLS
HAMILTON STREET SUBSTATION
N
CABLE TRENCH
T1
T2
25
T2
25
T1
PANEL "YP"
BK
R
64
6B
KR
663
BKR 6T1T2
307
308
312
31
03
11
(S
PA
RE)
30
9
FOUNDATION PLAN & DETAILS
FOUNDATION PLANEXISTING FOUNDATION
CL
3' - 10 1/2"
2'-6" 2'-6"
5'-0"
2'-6"
2'-6"
5'-0"
3' - 10 1/2"
FDN& BKR
LEGEND:
FOUNDATION DETAILS
SCALE: „" = 1'-0"
AS SHOWN
SCALE: 1" = 1'-0"
(4 PLACES)
& PAINT WITH EPOXY COATING
FLUSH WITH CONCRETE SURFACE
EXISTING ANCHOR BOLTS, GRIND
CONTRACTOR SHALL CUT OFF
IN BREAKERCONDUIT WINDOW
CLFDN& BKR
CONSTRUCTION NOTES
FOUNDATION (TYP.)
EXISTING 5' X 5'
BREAKER 307, 308, 310, 311, & 312 REPLACEMENTS
7-23-2019
7-23-2019
SCALE: PROJ #:
DRAWING #:
DRAWING NAME:ENGINEERING
DATE
BY
REVIEW
DRAFTING
REVISION DESCRIPTIONREV DATE PROJ # BY REVIEW
JE
A A
RC
H-D 2
4X36 (02/1
7)
OF
DATE
BY
REVIEW
PE:
DATE:
LIC. NO.:
STATE:
THE RESPONSIBLE SUPERVISION OF
ORIGINALLY PREPARED UNDER
LATEST REVISION
ENGINEER'S SEAL
PROFESSIONAL
DRAWING SET
ISSUED FOR BID
JACKSONVILLE, FLORIDA 32202
21 W CHURCH ST.
16:0
5 -
2017-6-2
3
HR
172E
D1.d
gn
PROJECTION.
WASHER PER BOLT W/ 2 1/2"
HEX NUT & ONE (1) 2" DIAM. FLAT
WEDGE ANCHORBOLTS W/ ONE (1)
FOUR (4) 1" DIAM. X 10" LONG S.S.
CONTRACTOR TO PROVIDE & INSTALL
2. FOR PROPER BUSHING ORIENTATION, SEE ELECTRICAL DETAIL DWG.
FOR THE BREAKERS AS SHOWN.1. THE CONTRACTOR SHALL REUSE THE EXISTING FOUNDATIONS
--
-
-
-
------
------
------
-
-
-
-
03
- - - - -
- - - - -
- - - - -
- - - - -
-
- SUBSTATION & TRANSMISSION PROJECTS 20410
HA2019
098005239
BLS
BLS
BREAKER 307, 308, 310, 311 & 312 REPLACEMENTS
HAMILTON STREET SUBSTATION
8-12-2019
8-12-2019
SCALE: PROJ #:
DRAWING #:
DRAWING NAME:ENGINEERING
DATE
BY
REVIEW
DRAFTING
REVISION DESCRIPTIONREV DATE PROJ # BY REVIEW
JE
A A
RC
H-D 2
4X36 (02/1
7)
OF
DATE
BY
REVIEW
PE:
DATE:
LIC. NO.:
STATE:
THE RESPONSIBLE SUPERVISION OF
ORIGINALLY PREPARED UNDER
LATEST REVISION
ENGINEER'S SEAL
PROFESSIONAL
DRAWING SET
ISSUED FOR BID
JACKSONVILLE, FLORIDA 32202
21 W CHURCH ST.
14:3
2 -
2017-6-2
2
HR
172
CV1.d
gn
1" - 6' - 0"
ELECTRICAL PLANHA2019-EP
TO 6
9K
V Y
AR
DT
O 6
9K
V Y
AR
D
ELEVATIONS.
2. REFER TO DRAWING HA2019-E5 FOR SECTION
LIST & SHALL BE DISREGARDED FOR THIS PROJECT.
SHOWN REFER TO THE ORIGINAL PROJECT MATERIAL
(REF. DWG # HA712EP1) NUMERICAL CALLOUTS
1. THIS DRAWING IS FOR REFERENCE ONLY
NOTES:
6'-0" 6'-0"
~12'-2"
9'-8"
(TYP.)NOTE 1
MECHANISM SIDE TYPICAL SECTION VIEW
3'-0"3'-0"
--
-
-
-
------
------
------
-
-
-
-
04
- - - - -
- - - - -
- - - - -
- - - - -
-
- SUBSTATION & TRANSMISSION PROJECTS 20410
HA2019
098005239
BLS
BLS
BREAKER 307, 308, 310, 311 & 312 REPLACEMENTS
HAMILTON STREET SUBSTATION
8-12-2019
8-12-2019
SCALE: PROJ #:
DRAWING #:
DRAWING NAME:ENGINEERING
DATE
BY
REVIEW
DRAFTING
REVISION DESCRIPTIONREV DATE PROJ # BY REVIEW
JE
A A
RC
H-D 2
4X36 (02/1
7)
OF
DATE
BY
REVIEW
PE:
DATE:
LIC. NO.:
STATE:
THE RESPONSIBLE SUPERVISION OF
ORIGINALLY PREPARED UNDER
LATEST REVISION
ENGINEER'S SEAL
PROFESSIONAL
DRAWING SET
ISSUED FOR BID
JACKSONVILLE, FLORIDA 32202
21 W CHURCH ST.
14:3
2 -
2017-6-2
2
HR
172
CV1.d
gn
1" - 4' - 0"
9'-8"
7'-6"
(TYP.)NOTE 1
26KV ELEVATIONSHA2019-E5
FOR THIS PROJECT.
SHOWN REFER TO THE ORIGINAL PROJECT MATERIAL LIST & SHALL BE DISREGARDED
VARY WITHIN A FEW INCHES AND MUST BE FIELD VERIFIED. NUMBERICAL CALLOUTS
3. THIS DRAWING WAS REPRODUCED FROM DRAWING HA712E51. DIMENSIONS MAY
2. ELEVATIONS SHOWN ARE TYPICAL - NOT EVERY BREAKER IS SHOWN ON THIS DWG.
TO FINAL PLACEMENT OF BREAKER.
SHALL CONTRACT PROJECT REPRESENTATIVE FOR REVIEW AND APPROVAL PRIOR
PART IS >9'6" ABOVE GRADE. SHOULD ADJUSTMENT(S) BE REQUIRED, CONTRACTOR
1. CONTRACTOR SHALL PLACE NEW BREAKERS SO THAT LOWEST ENERGIZED
CONSTRUCTION NOTES:
--
-
-
-
------
------
------
-
-
-
- HA2019-ED
05
- - - - -
- - - - -
- - - - -
- - - - -
-
- SUBSTATION & TRANSMISSION PROJECTS 20410
HA2019
8005239
BLS
BLS
N.T.S.
ELECTRICAL DETAILS
1288.1
MAX.
967.7
MAX.
2
4
6
BUSHING NUMBER
MECHANISM SIDE
CONTROL SIDE
1
3
5
SWING
97.0° APPROX. DOOR
BB
SECTION B-B
17.68"
449
60.34"
1532.7
[50.71"]
MIN.
[17.25"]
438.1
[38.10"]
MIN.
[4.63"]
117.7
[51.52"]
1308.7
[57.37"]
1457.2
FOR BUSHING REMOVALDISTANCE REQUIRED
2.50"
63.546.52"
1181.751.52"
1308.7
23.26"
590.9
10.21"
259.3
1.74"
44.2
46.52"
1181.7
51.52"
1308.7
12.0
1"
12.01"
124.84"
3170.8
CONSTRUCTION NOTES:
BREAKER INFORMATION:22.4
6"
HAMILTON STREET SUBSTATION
INSTRUCTION BOOK POCKET,
BCT NAMEPLATE,
(MOUNTED ON POCKET)
INSIDE
MAX.
MAX.
5 3 1
MAX.
MIN.
78.22"
111.64"
128.98"
MIN.
95.17"
34.87"
MIN.
1.41"
01
03
02
19.50"19.50"
SIDECONTROL
0505
0404
SPACESVENT/FILTER
INSIDE
TYP. 2 PLACES
NOTE 3
NOTE 4
71" 5'-11"
50" 4'-2"
25" 2'-1"
13" 1'-1"
7" 0'-7"
(in) (ft-in)
Min. Phase-Ground
89" 7'-5"
63" 5'-3"
31" 2'-7"
18" 1'-6"
12" 1'-0"
(in) (ft-in)
Min. Phase-Phase
14'-10" 27'
12'-2" 25'
10'-5" 23'
9'-6" 22'
9'-0" 21'
Personnel (ft-in) Roadway (ft)
Min. Above Grade
900
650
350
200
110
(kV)
BIL
230
138
69
34.5
13.2
(kV)
Voltage
16'
14'
12'
10'
10'
Horizontal (ft)
Min. to Fence
11'-0"
8'-0"
5'-0"
3'-0"
2'-0"
(ft-in)
Phase Spacing
Reference RUS Bulletin 1724E-300 (2001), & NESC (2007)
BREAKER 307, 308, 310, 311, & 312 REPLACEMENTS
6. CONTRACTOR SHALL LABEL THE NEW BREAKERS.
MANUFACTURER'S INSTRUCTIONS.
PLUS MOLDS MANUFACTURED BY CADWELD. INSTALLATION SHALL STRICTLY FOLLOW
SHALL BE INSTALLED FROM THE GROUND GRID USING APPROVED EXOTHERMIC CADWELD
- IF EXISTING GROUND TAIL CANNOT REACH EQUIPMENT, THEN A NEW 7#5 COPPERWELD
BREAKER AS SHOWN
5. BOND EXISTING COPPER FROM GROUND GRID TO EQUIPMENT ON EACH SIDE OF THE
4. INSTALL JUMPERS AND TERMINALS AS SHOWN.
WHERE CLEARANCES ARE AN ISSUE.
THIS IS THE RECOMMENDED HEIGHT, BUT MAY NEED TO BE ADJUSTED FOR LOCATIONS
3. SET BOTTOM OF BREAKER CABINETS TO HEIGHT OF ~29" FROM TOP OF FOUNDATION
BREAKERS SHALL BE SET AT CENTER OF EXISTING FOUNDATIONS.
2. INSTALL BREAKERS TO MATCH BUSHING NUMBERS RELATIVE TO NORTH ARROW.
WITH SOCC AND SUB/RELAY O&M.
TO JEA'S WESTSIDE SERVICE CENTER HAZMAT BUILDING DURING SCHEDULED OUTAGES
1. CONTRACTOR SHALL REMOVE FROM FOUNDATION AND TRANSPORT EXISTING BREAKERS
7-23-2019
7-23-2019
SCALE: PROJ #:
DRAWING #:
DRAWING NAME:ENGINEERING
DATE
BY
REVIEW
DRAFTING
REVISION DESCRIPTIONREV DATE PROJ # BY REVIEW
JE
A A
RC
H-D 2
4X36 (02/1
7)
OF
DATE
BY
REVIEW
PE:
DATE:
LIC. NO.:
STATE:
THE RESPONSIBLE SUPERVISION OF
ORIGINALLY PREPARED UNDER
LATEST REVISION
ENGINEER'S SEAL
PROFESSIONAL
DRAWING SET
ISSUED FOR BID
JACKSONVILLE, FLORIDA 32202
21 W CHURCH ST.
16:0
5 -
2017-6-2
3
HR
172E
D1.d
gn
09
--
-
-
-
------
------
------
-
-
-
- HA2019-CP
06
- - - - -
- - - - -
- - - - -
- - - - -
-
- SUBSTATION & TRANSMISSION PROJECTS 20410
HA2019
09
8005239
BLS
BLS
HAMILTON STREET SUBSTATION
LEGEND
7
N
CABLE TRENCH
T1
T2
25
T2
25
T1
345 126
CONTROL PANELS
RTUPANEL
RELAY
DA
OVERHEAD CABLE TRAY
PANEL
CONTROL
COMMUNICATION RACK
9 8
EXISTING CONDUIT
EXISTING 7#5 COPPERWELD GROUND CABLE
NEW 7#5 COPPERWELD GROUND CABLE
NEW EXOTHERMIC GROUND CONNECTION
NEW MECHANICAL GROUND CONNECTION
307
308
312
31
03
11
(S
PA
RE)
30
9
NOTE 6
CONDUIT & GROUNDING PLAN
SCALE: „" = 1'-0"
N.T.S.
AS SHOWN
~80' TO CNTRL HSE
EQUIPMENT LOCATION DETAILCONTROL HOUSE
CONSTRUCTION NOTES:
BREAKER 307, 308, 310, 311, & 312 REPLACEMENTS
DETAIL 1
26KV CONDUIT, CABLE TRENCH, AND PARTIAL GROUNDING PLAN
CONNECTION
TYPICAL GROUND
COPPERWELD
7 #5
COPPERWELD
7 #5
& SUBPANEL
PANEL "YP"
7-23-2019
7-23-2019
SCALE: PROJ #:
DRAWING #:
DRAWING NAME:ENGINEERING
DATE
BY
REVIEW
DRAFTING
REVISION DESCRIPTIONREV DATE PROJ # BY REVIEW
JE
A A
RC
H-D 2
4X36 (02/1
7)
OF
DATE
BY
REVIEW
PE:
DATE:
LIC. NO.:
STATE:
THE RESPONSIBLE SUPERVISION OF
ORIGINALLY PREPARED UNDER
LATEST REVISION
ENGINEER'S SEAL
PROFESSIONAL
DRAWING SET
ISSUED FOR BID
JACKSONVILLE, FLORIDA 32202
21 W CHURCH ST.
16:0
5 -
2017-6-2
3
HR
172E
D1.d
gn
THE SAME DAY.
MECHANICALCONNECTORS. ALL EQUIPMENT AND STRUCTURES ERECTED IN THE SUBSTATION MUST BE GROUNDED
TRANSFORMERS, BREAKERS, LIGHTNING ARRESTERS, ETC. SHALL BE CONNECTED USING OWNER FURNISHED
8. ALL ABOVE GRADE CONNECTIONS OF GROUND CONDUCTOR TO STRUCTURES AND EQUIPMENT, SUCH AS
TO STRUCTURES AND EQUIPMENT IS ABOVE GRADE.
AND SHALL BE INSTALLED 24" BELOW GRADE (28" BELOW ROCK SURFACE) EXCEPT WHERE CONECTION
ALL GROUND GRID CONDUCTORS AND TAPS SHALL BE CONNECTED USING CADWELD EXOTHERMIC CONNECTIONS
7. ALL 7#5 COPPERWELD CONDUCTOR SHALL BE FURNISHED BY JEA AND INSTALLED BY THE CONTRACTOR.
WITHIN WORK AREA IS SHOWN ON THIS DRAWING.
6. EXISTING GROUND GRID IS 7#5 COPPERWELD PER SUBSTATION RECORD DWGS. ONLY GROUND GRID
LENGTHS AND LOCATIONS.
5. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL CONDUIT, CABLE, AND GROUND CONDUCTOR
TO THE CABLE TRENCH. ALL CONDUIT RUNS SHALL ALSO BE CLEARLY LABELED AT BOTH ENDS.
4. ALL CABLES SHALL BE CLEARLY LABELED AT BOTH ENDS AND AT ALL ENTRANCE AND EXIT POINTS
TRIPPING HAZARDS WHILE WORKING IN THE CONTROL CABINET.
CONFORM TO THE FOUNDATION AND STRUCTURE TO WHICH IT IS TO BE MOUNTED AND TO MINIMIZE
RESISTANT PVC, SCHEDULE 40. ABOVE GRADE CONDUIT SHALL BE INSTALLED TO CLOSELY
3. ALL ABOVE GRADE CONDUIT SHALL BE EITHER RIGID GALVANIZED STEEL OR ULTRA-VIOLET
IN THE NEW GAS CIRCUIT BREAKER CONTROL PANEL. JEA WILL TERMINATE IN CONTROL HOUSE PANELS.
ALL CABLES LISTED IN THE CABLE SCHEDULE. THE CONTRACTOR SHALL ONLY TERMINATE CABLES
AS LISTED IN THE CONDUIT SCHEDULE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PULLING
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL CONDUIT
BACK/CAP ANY UNUSED CONDUITS BELOW GRADE.
1. THE CONTRACTOR SHALL REUSE EXISTING CONDUITS PER THE CONDUIT SCHEDULE AND CUT
--
-
-
-
------
------
------
-
-
-
- HA2019-CS
07
- - - - -
- - - - -
- - - - -
- - - - -
-
- SUBSTATION & TRANSMISSION PROJECTS 20410-
HA2019
098005239
BLS
BLS
CONDUIT SCHEDULE
PROTECTION, WITH PENETRATION PROPERLY SEALED.BLOCK WALL SHALL UTILIZE PVC COATED ALUMINUM TO PROVIDE SUFFICIENT ALKALI CORROSION ALL RUNS WITHIN BATTERY ROOM SHALL UTILIZE ALUMINUM CONDUIT. PENETRATIONS THROUGH THE 4.
SHALL NOT CONCEAL ALUMINUM CONDUIT RUNS.HOUSE CONDUIT WITHIN BLOCK WALLS UNLESS STATED OTHERWISE IN THE DRAWINGS. CONTRACTOR CONTROL HOUSE CONDUIT EXPOSED RUNS SHALL BE EMT. CONTRACTOR MAY CONCEAL CONTROL 3.
LENGTHS ARE APPROXIMATE.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL CONDUIT LENGTHS. CONDUIT 2.
FITTINGS.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL NECESSARY CONDUIT MATERIALS, INCLUDING 1.
CONDUIT NOTES:
SQAURE WIREWAYWWLIQUID-TIGHT FLEXIBLE METALLIC CONDUITLFMINTERMEDIATE METALLIC CONDUITIMCRIGID METALLIC (GALVANIZED STEEL) CONDUITRMCELECTRICAL METALLIC TUBINGEMTUV RESISTANT PVC CONDUIT, SCH 40UV
CONDUIT LEGEND:
CONDUIT SCHEDULE
BREAKER 307, 308, 310, 311, & 312 REPLACEMENTS
HAMILTON STREET SUBSTATION
BREAKER 307CONSTRUCTION NOTES:
BREAKER 308
BREAKER 310
BREAKER 311
BREAKER 312
1. USE EXISTING 3" AND 5" CONDUITS; INSTALL LB AND/OR FLEX TO NEW BREAKER CONDUIT OPENING
SCALE: PROJ #:
DRAWING #:
DRAWING NAME:ENGINEERING
DATE
BY
REVIEW
DRAFTING
REVISION DESCRIPTIONREV DATE PROJ # BY REVIEW
JE
A A
RC
H-D 2
4X36 (02/1
7)
OF
DATE
BY
REVIEW
PE:
DATE:
LIC. NO.:
STATE:
THE RESPONSIBLE SUPERVISION OF
ORIGINALLY PREPARED UNDER
LATEST REVISION
ENGINEER'S SEAL
PROFESSIONAL
DRAWING SET
ISSUED FOR BID
JACKSONVILLE, FLORIDA 32202
21 W CHURCH ST.
14:3
2 -
2017-6-2
2
HR
172
CV1.d
gn
7-23-2019
7-23-2019
--
-
-
-
------
------
------
-
-
-
- HA2019-CT
08
- - - - -
- - - - -
- - - - -
- - - - -
-
- SUBSTATION & TRANSMISSION PROJECTS 20410-
HA2019
098005239
BLS
BLS
CABLE SCHEDULE
LENGTHS ARE APPROXIMATE.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL CABLE LENGTHS. CABLE 3.
THE CONTRACTOR SHALL FURNISH ALL OTHER CABLE, AS SPECIFIED.2.
TYPE B, BS, F, AND FO CABLE SHALL BE FURNISHED BY THE OWNER, UNLESS OTHERWISE SPECIFIED.1.
CABLE NOTES:
CABLE TRENCHTRENCHCONTROL HOUSE CABLE TRAYTRAYSINGLE CONDUCTORSMULTIPLE CONDUCTORMFIBER OPTIC CABLEFOINSTRUMENT CABLEFRHW, THHW, OR THWN INSULATED COPPER CONDUCTORCSHIELDED CONTROL CABLEBSCONTROL CABLEBTHHN INSULATED COPPER CONDUCTORA
CABLE LEGEND:
CABLE SCHEDULE
BREAKER 307, 308, 310, 311, & 312 REPLACEMENTS
HAMILTON STREET SUBSTATION
BREAKER 307
BREAKER 308
BREAKER 310
BREAKER 311
BREAKER 312
SCALE: PROJ #:
DRAWING #:
DRAWING NAME:ENGINEERING
DATE
BY
REVIEW
DRAFTING
REVISION DESCRIPTIONREV DATE PROJ # BY REVIEW
JE
A A
RC
H-D 2
4X36 (02/1
7)
OF
DATE
BY
REVIEW
PE:
DATE:
LIC. NO.:
STATE:
THE RESPONSIBLE SUPERVISION OF
ORIGINALLY PREPARED UNDER
LATEST REVISION
ENGINEER'S SEAL
PROFESSIONAL
DRAWING SET
ISSUED FOR BID
JACKSONVILLE, FLORIDA 32202
21 W CHURCH ST.
14:3
2 -
2017-6-2
2
HR
172
CV1.d
gn
7-23-2019
7-23-2019
--
-
-
-
------
------
------
-
-
-
- HA2019-LV
09
- - - - -
- - - - -
- - - - -
- - - - -
-
- SUBSTATION & TRANSMISSION PROJECTS 20410
HA2019
09
8005239
BLS
BLS
N.T.S.
TO 25KV BUS TO 25KV BUS
1
3
5
2
4
6
15A15A
40A
87
40A
125 V.D.C.
BATTERY BANK
100A
EMERGENCY LTG.
S/N
1 2
60A3 4
225 AMP
MAIN
AC PANEL "YP-3P"
BREAKER 307, 308, 310, 311, & 312 REPLACEMENTS
HAMILTON STREET SUBSTATION
CONNECTED WYE DELTA
1-50 & 1-25KVA 14,400 - 120/240V
STATION SERVICE TRANSFORMERS
DISCONNECTS
FUSED
DISCONNECTS
FUSED
400A 400A
AUTOMATIC TRANSFER SWITCH
60A
30A
60A
60A1
3
5
2
4
6
30A
60A
S/N
SPARE
SPARE
YARD RECPT. #1
YARD RECPT. #2
SPARE
SPARE
225A MAIN
70A 70A
30A
30A
30A
15A
15A
6
UNKNOWN
BKR 307
UNKNOWN
BKR 311
BKR 312
8
10
12
AC T2 CNTRL PNLUNKNOWN
30A
15A
15A
15A
15A
UNKNOWN
UNKNOWN 5
7
9
UNKNOWN
11
13
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
BLANK
HIGH LEG
S/N
60A
20A
20A
20A
30A
15A
BATTERY CHARGER 11
13
15
17
19
SPACE
SPACE
HIGH LEG
SPACE 1
3
5
7
20A
9 20A
21
23
25
27
29
20A
20A
20A
20A
60A
20A
20A
AIR CONDITIONER
SPACE
20A
20A
20A
20A
20A
20A
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
SPACE FOR FUTURE SPACE FOR FUTURE
20A
30A
30A
CONTROL HOUSE LIGHTING
PROBE POLE LIGHTS (NE)
25KV SWITCHYARD RECP
CONTROL HOUSE RECP (WEST)
PANEL HEATERS
AIR CONDITIONING STRIP HEATERS
CONTROL PANEL HEATERS
SPACE
PROBE POLE LIGHTS (SE)
PROBE POLE LIGHTS (CENTER)
SPACE
OUTDOOR LIGHTING ON CONTROL HOUSE
PROBE POLE LIGHTS (NW)
69KV SWITCHYARD RECP
CONTROL HOUSE RECP (E)
SPARE
PANEL HEATERS
SPARE
SPARE
PROBE POLE LIGHTS (SW)
SPACE
SPACE
SPARE
SPARE
20A 20A
15A 15A
PANEL (FUTURE)SUPERVISORY CONTROL
SPARE SPARE
69KV CONTROL PANEL
(FUTURE) CONTROL PANELS
(FUTURE)CONTROL PANELS
SPARE
SPACE ONLY
UNKNOWN SOURCE
AC PANEL "CH"
MOUNTED IN CONTROL HOUSE
GENERAL ELECTRIC TYPE "NAB" ORAPPROVED EQUAL,
THREE PHASE 4 WIRE S/N NEMA-1 SURFACE MOUNTED
APPROVED EQUAL, MOUNTED ON 25KV STRUCTURE COLUMN
SURFACE MOUNTED GENERAL ELECTRIC TYPE "NAB" OR
THREE PHASE 4 WIRE S/N NEMA-3 OUTDOOR ENCLOSED
EQUAL, LOCATED IN CONTROL HOUSE
GENERAL ELECTRIC TYPE "NAB" ORAPPROVED
125V DC 2 WIRE NEMA-1SURFACE MOUNTED
APPROVED EQUAL, MOUNTED ON 25KV STRUCTURE COLUMN
SURFACE MOUNTED GENERAL ELECTRIC TYPE "NAB" OR
THREE PHASE 4 WIRE S/N NEMA-3 OUTDOOR ENCLOSED
9
SUB AC PANEL
D.C. PANEL "EM"
(CONFIGURATION UNKNOWN)
JUNCTION BOX
BKR 308
BKR 309
BKR 310
7-23-2019
7-23-2019
SCALE: PROJ #:
DRAWING #:
DRAWING NAME:ENGINEERING
DATE
BY
REVIEW
DRAFTING
REVISION DESCRIPTIONREV DATE PROJ # BY REVIEW
JE
A A
RC
H-D 2
4X36 (02/1
7)
OF
DATE
BY
REVIEW
PE:
DATE:
LIC. NO.:
STATE:
THE RESPONSIBLE SUPERVISION OF
ORIGINALLY PREPARED UNDER
LATEST REVISION
ENGINEER'S SEAL
PROFESSIONAL
DRAWING SET
ISSUED FOR BID
JACKSONVILLE, FLORIDA 32202
21 W CHURCH ST.
16:0
5 -
2017-6-2
3
HR
172E
D1.d
gn
SEE NOTES
SEE NOTES
BREAKER #.
3) CONTRACTOR SHALL LABEL ALL 30A FEEDS WITH RESPECTIVE VACUUM
REMOVE OLD CONDUCTORS AND INSTALL NEW 3C #8 IN EXISTING CONDUIT.
AND INSTALL NEW 30A DOUBLE POLE BREAKER. CONTRACTOR SHALL
VACUUM BREAKER. IF SMALLER THAN 30A, CONTRACTOR SHALL PROVIDE
FROM EXISTING AC PANEL "YP-3P" ARE PROVIDING 120/240V TO EACH 28KV
2) CONTRACTOR SHALL VERIFY 30 AMP BRANCH CIRCUIT BREAKERS
VERIFIED
AND VISIBLE FIELD CONDITIONS. PANEL "CH" CONFIGURATION NOT FIELD
EXISTING STATION SERVICE CONFIGURATION BASED ON DWG HA712LV1
1) THIS DRAWING IS BEING PROVIDED TO SHOW THE SUBSTATION'S
NOTES:
STATION SERVICE & ELECTRICAL PANELS