Pipe Bending
Pipe Welding
Pipe Stringing
Motor Driven Welding Machine
CHECK TRANS ADRIATIC PIPELINE CLIENT:
DATE
REV
Integrated ESIA Greece Annex 3.4 - Technical Drawings - Construction Activities
Pipe Stringing, Bending and Welding
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4-13 2/5
SPP RIA RAB
Size:A4
Trans Adriatic Pipeline (TAP)
Integrated ESIA Greece
0C 06/06/2013 Issued for Information
SOURCE: ERM SpA (December 2011)
SOURCE: ERM SpA (December 2011) SOURCE: ERM SpA (December 2011)
Source: Timberpro.com 2012 (retrieved November 2012)
CHECK TRANS ADRIATIC PIPELINE CLIENT:
DATE
REV
PROJECT:
Onshore Pipeline Construction Typical Trench for 48” Pipeline
ISSUE, SCOPE OF REVISION PREP. APR.
Integrated ESIA Greece Annex 3.4 - Technical Drawings - Construction Activities
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4-14 3/5
SPP RIA RAB
Size:A4
Trans Adriatic Pipeline (TAP)
Integrated ESIA Greece
Typical Trench for 48” Pipeline
SOURCE: CPL00-ENT-100-F-DFT-0008_0B
00 06/06/2013 Issued for Information
NOTES: A: ANGLE OF REPOSE OF SLOPE OF PIPE TRENCH DEPENDING ON SOIL CONDITIONS 80° IN ROCKS. 60° IN LEAST STIFFNESS COHESIVE SOIL LAYER 45° IN NON COHESIVE OR SOFT COHESIVE LAYER B: HAS TO BE ADVISED BY CONSTRUCTION SUPERVISOR.
Example of Ripper attached to back of Bulldozer
Examples of Trenchers
Examples of Hydraulic Breakers
Examples of Excavators
CHECK TRANS ADRIATIC PIPELINE CLIENT:
DATE
REV
Trenching Equipment
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4-15 4/5
SPP RIA RAB
Size:A4
Trans Adriatic Pipeline (TAP)
Integrated ESIA Greece
Wheel Trencher
Chain Trencher
Integrated ESIA Greece Annex 3.4 - Technical Drawings - Construction Activities
SOURCE (All images):: ILF (2012) Generic Description of Excavation Methods – 2012-02-10 – Ref. CPL00-ILF-100-F-TRS-0001_0D
00 06/06/2013 Issued for Information
Pipe Trench Backfilling Pipe Lowering
Motor Driven Welding Machine (Pay-welder)
CHECK TRANS ADRIATIC PIPELINE CLIENT:
DATE
REV
PROJECT:
Pipe Lowering, Trench Backfilling and Restoration
ISSUE, SCOPE OF REVISION PREP. APR.
Integrated ESIA Greece Annex 3.4 - Technical Drawings - Construction Activities
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4-16 5/5
SPP RIA RAB
Size:A4
Trans Adriatic Pipeline (TAP)
Integrated ESIA Greece
Pipeline Re-instatement and Restoration
SOURCE: All photos ERM SpA (December 2011)
00 06/06/2013 Issued for Information
Date 06/2013
Copyright Reserved: This document may not be copied, shown to or placThe latest version of the document is registered in the TAP Project's Data
Trans Adriatic Pipeline AG – Greece (Branch Office)21st Floor, Athens Tower, 2-4 Messogion Ave., 11527
Athens GreeceAthens, GreecePhone.: + 30 210 7454613
Fax: + 30 210 7454300
ced at the disposal of third parties without prior consent of TAP AG.abase.