REAL ESTATE DEVELOPMENTS AND CONSTRUCTION
CONSTRUCTION PROJECTS
INDEX 1. PRESENTATION
2. LOCATION
3. CONTACT
4. CLASSIFICATION OF THE COMPANY
5. MANAGEMENT SYSTEMS IMPLEMENTED IN THE COMPANY
5.1. Company policies and management systems
5.2. Integrated Quality and Environment Policy
5.3. Certificates
6. HUMAN AND TECHNICAL RESOURCES
6.1. Organization chart
6.2. Organizational structure
6.3. Auxiliary means
7. PROJECT DEPARTMENT
8. CONSTRUCTION WORKS
8.1. Completed construction works
8.2. New construction works
9. PAINTING WORKS DEPARTMENT
10. FOMOBRA-INTERSA JOINT VENTURE
11. GENERAL CONSTRUCTION
12. KEY FIGURES AND PROJECTS
4
5
1. PRESENTATION
FOMOBRA, S.L.U. is a company
established in 1999 whose activity is the
development and construction of all kind of
properties, having, furthermore, an
autonomous department for painting works.
With dedication and effort FOMOBRA has
become a consolidated and expanding
company.
At present, the organization employs
about 50 people in the top-responsibility
positions, and other 600 people in different
works and crafts, due to the policy of
outsourcing specialized companies for each
phase of the works. The headquarters are
located in La Candelaria Industrial Park of
Fuente Álamo, Murcia. This is the center
from which we coordinate the activities of
development and construction of homes,
offices and warehouses, and where are also
located part of the warehouses and the
machine pool.
The organization management
pledges its firm commitment to the
prevention and the improvement as the solid
foundations to reach the set goals, aiming at
being positioned in the market as a reference
company both in the real estate and in the
painting sectors, adapting in advance to the
needs required by the environment, and
being its main goal to achieve its clients’
satisfaction. The organization throws all its
efforts in this goal.
In FOMOBRA we use the most state-
of-the art tools and machines in the carrying
out of our activities and services, and have a
highly qualified interdisciplinary staff whose
main goal is the top quality of our products
and services and the effective protection of
the environment, assuring this way its clients’
satisfaction.
6
2. LOCATION
FOMOBRA headquarters are located in La
Candelaria Industrial Park, calle Potasio, parcela
2.11, nave 9, in Fuente Álamo, Murcia. Spain.
The premises cover a 1,055.17 built sqm plot, with
the following use:
836.17 sqm for covered warehouse for materials.
438 sqm for two-story offices.
7
8
3. CONTACT
FOMOBRA, S.L.U.
La Candelaria Industrial Park
Calle Potasio, parcela 2.11, nave 9
30320 Fuente Álamo. Murcia
P.O. Box 146
T +34 968 597242
F +34 969 597340
Website: www.fomobra.es
9
4. CLASSIFICATION OF THE COMPANY
10
11
5. MANAGEMENT SYSTEMS IMPLEMENTED IN THE COMPANY
5.1. Company policy and management systems
5.2. Integrated Quality and Environmental Policy
5.3. Certificates
12
5.1. Company policy and management systems
Our goal in FOMOBRA is achieving the client’s total
satisfaction, offering him a range of efficient
quality products and services, at the same time that
we pledge our commitment to work methods
adapted to quality and environmental criteria.
With this principle, the organization adapts their
work systems to the requirements of the standards
UNE-EN ISO 9001: 2000 y UNE-EN ISO 14001:
1996, defining an Integrated Management System
that considers quality and environmental
requirements; this management system is currently
in its implementation and certification process.
13
5.2. Integrated quality and environment policy
The integration of the quality and environmental
management systems with the rest of the
organization’s systems and their adjustment to
these standards, is not merely to obtain a
prestigious certification, but, furthermore to
achieve that the system is efficient, getting closer
to the market and environment needs by the
continuous review and improvement of the
processes and services.
Operating in a competitive market, FOMOBRA
offers products and services with the required
quality, within the stipulated times and at the most
suitable prices, assuring this way the long-term
continuity.
Our quality and environment policy is based on
three basic commitments:
TOWARDS THE CLIENT
With the commitment of putting our efforts into
getting our clients satisfaction, promoting the
quality in all the levels of the company.
TOWARDS THE STAFF
We are committed in the satisfaction of the
organization staff. Due to the activity in which we
perform, we are unreservedly committed in safety
and health matters protecting both the company
and the employees’ interests.
TOWARDS THE ENVIRONMENT
We are committed in the prevention of the
pollution that our activities or products may cause
in our environment.
These three basic commitments are complementary
to the strict compliance of the current quality and
environmental legislation.
In order to comply with these three basic
commitments, we are determined to:
Manage the integrated quality and environmental
system to keep the future, preserving the
environment and collaborating so as it can be
enjoyed by the future generations.
Provide the necessary resources to achieve the
goals and the efficiency of the integrated
management system.
Focus the efforts on the prevention and the
continuous improvement of the processes and
services aiming at a better quality and
environment.
The training and the raising of the staff awareness
in the aspects connected with the carrying out of
its duties, ensuring the compliance of the strategic
and system goals.
All the organization staff is responsible for the
quality of its work and for preserving the
environment, controlling the aspects of its activity
related with it.
Quality consists in offering products and services
with the features required by the clients, including
those connected with the environment and
applicable legislation.
14
5.3. Certificates
5.3.1 Certificate of Corporate Responsibility
5.3.2 Certificate of registration in the Registry of Accredited Companies.
Construction sector.
15
5.3.1. Certificate of Corporate Responsibility
16
5.3.2. Certificate of registration in the Registry of Accredited Companies.
Construction sector.
17
6. HUMAN AND TECHNICAL RESOURCES
6.1. Organization chart
6.2. Organizational structure
6.3. Auxiliary means
18
6.1. Organization chart
19
6.2. Organizational structure
FOMOBRA has six functional departments in which
several interconnected organizational areas are
managed. The employees in these departments
have a bachelor or associate’s bachelor degree
academic profile in the high responsibility positions
in the Administration, Purchasing and Security and
Health Departments. The employees in the Project
and Production Departments, included the Site
Managers, have a bachelor or associate’s bachelor
degree, mainly in Architecture, but also in other
disciplines such as Industrial Engineering.
ADMINISTRATION DEPARTMENT
Financial and Sales Area: In charge of all the
accounting and tax operations of the company, the
sales operations as well as the proceedings with
the public and private administrations.
PURCHASING AND HUMAN RESOURCES
DEPARTMENT
With three areas in charge of the duties of the
management of the organization resources and
logistics.
PRODUCTION DEPARTMENT
Construction area: Is involved in the main activity
of the organization, the construction of buildings.
The main mission is to produce, optimizing the
available resources, controlling costs, times and
quality with the intention of offering the client a
competitive product as we make our organization
competitive in the sector. In this area are all the
jobs directly connected with the production.
Economic Studies Area: In this area we deal with all
the quote requests for new works, both our own
and our clients’. We do the global economic
planning of the ongoing works and the following-
up of its accomplishment.
WORK SAFETY AND HEALTH DEPARTMENT
Ensures the company’s compliance in occupational
health and safety both in documents and on site.
In this area we verify the legal status of each of the
subcontracting companies that are going to take
part in each of our works, we draw up and sign
the contracts that state the business agreements,
we give the approval for the works
commencement and we supervise and assist on
site in occupational health and safety matters.
PROJECT DEPARTMENT
Project area: In this department are carried out the
feasibility studies for new projects and, if feasible,
the design development drawings and the
construction documents.
In this department we manage all the matters
concerning the “developer” and its deals with the
different public and private bodies.
This department has qualified staff for both the
design of building projects and the land
management.
PAINTING WORKS DEPARTMENT
This department is exclusive for the painting and
coating works, carrying out its activity with the
collaboration of the rest of the departments.
20
6.3. Auxiliary means
FOMOBRA defines, procures and keeps the
necessary infrastructure to be able to carry out the
production of its products and the delivery of its
services consistently with the Integrated
Management System, and always aiming at
offering efficient quality products and services to
its clients to satisfy their needs and requirements.
FOMOBRA analyses regularly which are the needs
for improvement, changes or increase of its
infrastructure aiming at improving its services and
positioning itself in the market as a leading
company in the sector always in expansion and
renewal.
One of the key aspects in the FOMOBRA
infrastructure is the equipment and machinery
necessary to delivery its services in an efficient
manner, fulfilling the quality and environmental
standards, and to improve continuously its
development.
Relying on the document system set for its
Integrated Management System, FOMOBRA
ensures the appropriate maintenance and control
of all its tools, equipment and machinery to be able
to offer the client fast, quality and on time services
committed with the environment and preventing
hazards due to the use of this infrastructure by its
staff.
All the staff in FOMOBRA is duly trained and
prepared for the efficient use of the equipment.
21
At present, FOMOBRA has the appropriate and
necessary means for the carrying out of its
activities:
TOPOGRAPHICAL EQUIPMENT
Laser level Rugby 200 no. 20,555.
Total station.
VEHICLES
Tractor Volvo FH12 4X2.
Gondola semitrailer Trabosa.
Tipper semitrailer Montenegro SVF-2G-20S.
Box semitrailer TIR Prim Ball SF 3 axles.
7 Peugeot Partner Combi plus HDI.
1 Peugeot 307 HDI 90.
1 Peugeot 207 urban 1.4.
Trailer AG-750 RB 2 axles 900 kg.
MACHINERY AND HARDWARE
6 46 m-jib tower cranes (Sáez).
Drills for concrete.
Wet mortar spraying machines.
Formwork (Model Forza 2000) for 6000 sqm, with the necessary materials (props, panel formworks, etc.)
Concrete mixers.
Machinery to handle steel (rebar producing).
Air compressors and jackhammers.
Power generators.
Equipment for electric welding.
Scaffolding.
Mechanical scissors and arm.
Grinders.
5 meter-needle Enarco vibrators.
Sanders.
Disc cutting machines.
Cutting chambers.
Pans.
Pallet truck.
Props.
340-liter stackable containers.
Platforms for the downloading of the materials.
22
7. PROJECT DEPARTMENT
FOMOBRA has its own Project Department in
charge of all the necessary phases for the
execution of construction works: study of the
urban planning conditions of the plot, preliminary
study and schematic design to determine the best
architectonic solution, design development
drawings, construction documents, etc.
The Project Department is managed by a
professional with a Bachelor’s Degree in
Architecture, specialized in construction. This way
FOMOBRA has always developed its construction
projects by this own department, and has also
been able to design several construction
documents for other real estate developers.
This department is also in charge of dealing with
the different public and private administrations for
the necessary procedures to obtain the compulsory
permits for commencing the works, and managing
the procedures at the end of their execution,
obtaining the certificates of installations and first
occupation license for the built homes.
23
PROJECT 9 warehouses and headquarters for FOMOBRA, S.L.U. CLIENT FOMOBRA, S.L.U. LOCATION La Candelaria Industrial Park. Fuente Álamo. Murcia
PROJECT 51 homes, retail units and garage CLIENT FOMOBRA, S.L.U. LOCATION Fuente Álamo. Murcia.
24
PROJECT 11 homes and commercial premises CLIENT FOMOBRA, S.L.U. LOCATION Barrio del Progreso. Murcia
PROJECT 3 homes, commercial premises and garage CLIENT PEDRO Y FRANCISCO ORTIZ LOCATION Fuente Álamo. Murcia
25
PROJECT 9 homes, local premises and garage CLIENT EQUIPAMIENTOS Y PROMOCIONES IDEALIA, S.L. LOCATION Espinardo. Murcia
P PROJECT 144 homes, commercial premises and garage CLIENT PROMOCIONES Y EQUIPAMIENTOS URBALIA, S.L. LOCATION Jumilla. Murcia
26
PROJECT 21 homes, store rooms and garage CLIENT EQUIPAMIENTOS Y PROMOCIONES IDEALIA, S.L. LOCATION Lorquí. Murcia
27
PROJECT Partial Urbanization Plan S.U.E.S.1 No. 20 CLIENT FOMOBRA, S.L.U. LOCATION Fuente Álamo. Murcia
28
PROJECT 25 homes, commercial premises, store rooms and garage CLIENT FOMOBRA, S.L.U. LOCATION Fuente Álamo. Murcia
29
8. CONSTRUCTION WORKS
8.1. Completed construction works
8.2. New construction works
30
8.1. Completed construction works
WORKS 9 warehouses and headquarters for FOMOBRA, S.L.U. CLIENT FOMOBRA, S.L.U. LOCATION La Candelaria Industrial Park. Fuente Álamo. Murcia
31
WORKS 17 homes, commercial premises and garage CLIENT FOMOBRA, S.L.U. LOCATION Fuente Álamo. Murcia
32
WORKS 38 homes, store rooms and garage CLIENT FOMOBRA, S.L.U. LOCATION Fuente Álamo. Murcia
33
WORKS 51 homes, commercial premises and garage CLIENT FOMOBRA, S.L.U. LOCATION Fuente Álamo. Murcia
34
WORKS 11 homes and commercial premises CLIENT FOMOBRA, S.L.U. LOCATION Barrio del Progreso. Murcia
35
WORKS 12 homes and garage CLIENT RIO COFIO, S.L. LOCATION Fuente Álamo. Murcia
36
WORKS 3 homes, commercial premises and garage CLIENT PEDRO Y FRANCISCO ORTIZ LOCATION Fuente Álamo. Murcia
37
WORKS 9 homes, commercial premises and garage CLIENT EQUIPAMIENTOS Y PROMOCIONES IDEALIA, S.L. LOCATION Espinardo. Murcia
38
WORKS 20 homes, store rooms and garage CLIENT GAM 2005, S.L. LOCATION El Albujón (Cartagena). Murcia
39
WORKS 22 homes and garage CLIENT QUEEN HOUSES CLASIC, S.L. LOCATION Pilar de la Horadada. Alicante
40
WORKS 23 homes, commercial premises and garage CLIENT COOPERATIVA VIA NORTE, S.L. LOCATION Espinardo. Murcia
41
WORKS 32 homes, store rooms and garage CLIENT COOPERATIVA DE VIVIENDAS CASINO, S.L. LOCATION Los Alcázares. Murcia
42
WORKS 69 homes, store rooms and garage CLIENT BOREAL, S.L. LOCATION Cabezo de Torres. Murcia
43
WORKS Office building CLIENT EQUIPAMIENTOS Y PROMOCIONES HOGALIA, S.L. LOCATION Lorquí. Murcia
44
8.2. New construction works
WORKS 144 homes, commercial premises and garage CLIENT PROMOCIONES Y EQUIPAMIENTOS URBALIA, S.L. LOCATION Jumilla. Murcia
45
WORKS 21 homes, store rooms and garage CLIENT EQUIPAMIENTOS Y PROMOCIONES IDEALIA, S.L. LOCATION Lorquí. Murcia
46
WORKS Building for 107 homes, commercial premises, store rooms and garage CLIENT PROCONSPOR, S.L. LOCATION Molina de Segura. Murcia
47
9. PAINTING WORKS DEPARTMENT
FOMOBRA has an exclusive department for
the management of the painting works, for
its own developments and for other
developers and construction companies.
All the painters are direct employees of
FOMOBRA, although sometimes this
department subcontracts other painting
companies.
This department has been part of the
company since its foundation, aiming at the
achieved goal of managing and controlling
directly the workforce and the materials used
in one of the main finishes of the buildings:
the paints and other similar coatings in walls,
ceilings and floors.
48
COMPLETED PAINTING WORKS
PROJECT CLIENT CONTRACT DATE
DETAILS
CONSTRUCTION OF THE NEW CUSTOMS ARE IN THE INTEGRATED TRANSPORTATION CENTER “CITMUSA”
Sangonera la Verde. Murcia
INFRAESTRUCTURAS TERRESTRES, S.A.
04/2009 Polyurethane varnishing on metal surfaces.
LAS TERRAZAS DE LA TORRE
Roldán. Torre Pacheco. Murcia POLARIS DESARROLLO, S.L. 2008
PHASES 1A, 1B y 1C. Smooth plastic paint and slightly texture in interior surfaces. Smooth coating in facades. Enamel paints on metal elements, electrolytic lead paint and ferro type of paint. PHASE 1D. Repairs on painting works executed by other companies. GOLF COURSE PUMPING STATION. Smooth plastic paint.
REPAIRS IN THE MUSEUM OF THE UNIVERSITY OF ALICANTE
Alicante
GRUPO GENERALA 12/2007 Smooth plastic paint coating.
49
CONDADO DE ALHAMA GOLF RESORT
Alhama de Murcia. Murcia POLARIS DESARROLLO, S.L.
Several phases
( 2007 - 2009)
LOS NARANJOS DE ALHAMA. Phases I, II y VIII. White and color smooth paint in interiors and smooth coating in facades.
GARDENS. Phases I, II, IV, V, VI y VII. White and color smooth paint in interiors and smooth coating in facades.
SHOW ROOM. Stucco works on vaulted ceilings and synthetic enamel paints on metal elements.
OUTER ROAD URBANIZATION. Painting of the smooth stone coating on concrete walls.
SPORTS COMPLEX. Acrylic paint on facades, plastic paint in interiors and in snack bar. Vinyl wallpaper coatings in snack bar.
150 HOMES, GARAGE AND STORE ROOM
Altorreal Residential Development. Murcia
OICI MEDITERRANEA, S.L. 02/2008 Painting of the interior of the building, including homes, common areas and basement.
160 INDEPENDENT HOMES
La Ñora. Murcia.
OICI MEDITERRANEA, S.L.
12/2007
White and color smooth painting in interiors, enamels on metal elements and sealing of joints.
50
CONSTRUCTION OF THE PAVILLION OF THE REGION OF MURCIA IN ZARAGOZA-2008 EXPOSITION
Zaragoza
INFRAESTRUCTURAS TERRESTRES, S.A.
04/2008 Smooth acrylic plastic paint. Synthetic enamel paint with nitrocellulose lacquer in web areas. Gloss finish nitrocellulose lacquer on woodwork.
CONSTRUCTION OF THE PAVILLION OF ANGOLA IN ZARAGOZA-2008 EXPOSITION
Zaragoza
INFRAESTRUCTURAS TERRESTRES, S.A.
04/2008 Smooth acrylic plastic paint. Synthetic enamel paint with nitrocellulose lacquer in web areas. Gloss finish nitrocellulose lacquer on woodwork.
PHASE II, EL TIRO SHOPPING MALL
Murcia
INFRAESTRUCTURAS TERRESTRES, S.A.
07/2008 Smooth plastic paint on plaster surfaces.
BUILDING GOLF HACIENDA DEL ÁLAMO
Fuente Álamo. Murcia
INFRAESTRUCTURAS TERRESTRES, S.A.
07/2007 Smooth acrylic plastic paint. Plastic paint and signalling in garage. Whitewash paint. Paints on metalwork.
CASA CLUB DE RODA
Roda. San Javier
CASA CLUB DE RODA U.T.E.
(INFRAESTRUCTURAS TERRESTRES, S.A. – CALIDONA)
10/2007 Stony paint coating on facades. Enamel paint on metalwork.
51
PLAZA EUROPA RESIDENTIAL COMPLEX
Molina de Segura. Murcia
INFRAESTRUCTURAS TERRESTRES, S.A.
04/2008
Color smooth paint in homes, slightly textured paint in common areas. Enamel on metalwork. Smooth temper paint.
LA ISLA
Alhama de Murcia. Murcia POLARIS DESARROLLO, S.L. 10/2008
PHASE I. BLOCKS 1, 2 and 3. White and color smooth plastic paint. Smooth acrylic coating on facades.
MEDITERRANEAN LANDS.
Torre Pacheco. Murcia POLARIS DESARROLLO, S.L. 09/2008
PHASE I. BUILDINGS MASTIL AND POPA. Matt white smooth paint. Smooth stone coating in facades.
EL VALLE GOLF RESORT
Baños y Mendigo. Murcia POLARIS DESARROLLO, S.L.
SEVERAL
(2006 - 2008)
PHASES 1A and 2A. White and color plastic paint in interiors.
BUILDINGS ALCAZABA, ALMUDAINA and PHASE 1A. Stone waterproof coatings and resin coatings in facades. Oak and walnut flooring. Enamel on metalwork. Paint in the garage.
PHASES 2A and 2B. Waterproof stone coating.
EL VALLE VILLAS
Baños y Mendigo. Murcia
INFRAESTRUCTURAS TERRESTRES, S.A.
06/2006 VILLAS ALCOR, ALGABA y ADARGA. Smooth paint in interiors.
52
42 SINGLE FAMILY HOMES IN TORREGUIL 5th PHASE
Sangonera la Verde. Murcia
OICI MEDITERRANEA, S.L. 01/2006 Stony painting on facades. Hammered painting in handrails. White textured paint in interiors.
BULDING III POLARIS WORLD INDUSTRIAL PARK
Balsicas. Murcia
POLARIS DESARROLLO, S.L. 05/2007 Special anti-dust varnish on concrete floors and plaster walls.
LA TORRE GOLF RESORT
Roldán. Torre Pacheco. Murcia POLARIS DESARROLLO, S.L.
SEVERAL
(2005 - 2007)
PHASES I, II. IV y V-B. VILLAS AND SEMI-DETACHED HOMES. Plastic paint in interiors and enamels on metalwork.
PHASE III. BUILDINGS PALMERAL, ALCORNOCAL and ROBLEDAL. White and color smooth plastic paint. Black enamels. Painting and signaling of the garages.
PHASE VIII – PLOT C5. PHASE IX - PLOT C6. Slightly textured plastic paint, smooth paint, enamels on metalwork. Painting and signaling of the garages.
CONVENTION CENTER. Stone coating, fire resistant coatings, enamel paints, stucco coating. Smooth plastic paint.
53
HACIENDA RIQUELME GOLF RESORT
Sucina. Murcia POLARIS DESARROLLO, S.L.
SEVERAL
(2006 - 2007)
PHASE I, II, III, IV, VI y VII. BUILDINGS MEJORANA, AJEDREA, ROMERO, JARA, JENGIBRE, CILANTRO, ESTRAGON, TOMILLO, ALBAHACA y ENELDO. Slightly textured plastic paint. Smooth color paint. Painting and signaling of the garages.
POLARIS WORLD FUTBOL SALA HEADQUARTERS
Cartagena. Murcia POLARIS DESARROLLO, S.L. 03/2006
White smooth and slightly textured paint on walls and false ceilings. Rustic special caulking in office. Smooth stone coating in band of the facade. Varnishing of wooden canopy.
54
JOINT VENTURE
In order to strengthen its experience and building capacity, FOMOBRA has signed an agreement with the INTERSA GROUP to jointly build schools in Irak. The INTERSA GROUP is the first company of the Region of Murcia by turnover in the Building Sector, having carried out among others, projects with shopping centres, hospitals, roads, hydraulic works and more than 40 schools and training centres. The INTERSA GROUP has projects all across Spain and affiliated enterprises in SAUDI ARABIA, BRAZIL AND QATAR.
GENERAL CONSTRUCTION
4
61
HIGH-END RESIDENTIAL DEVELOPMENTS
TIMELESS DESIGNS
REPUTATION FOR QUALITY
360O COMFORT AND ELEGANCE
BUILDING IN ALL SCALES
OUTSTANDING FINISHES
We design and build exclusive luxury homes and high-end residential
developments.
Our homes follow premium specifications and boast a complete spectrum
of luxury amenities, indoor swimming pools, sports and playground areas,
etc., all accentuated by breathtaking landscaping.
Our design team analyzes, plans and monitors the execution of our
clients’ vision going always beyond the most demanding expectations.
62
AFFORDABLE HOUSING DEVELOPMENTS
EXPERIENCE IS THE MOST IMPORTANT FACTOR OF COST CONTROL
We have successfully delivered more than 17,000 residential units in a 2,500,700
sqm total built area.
With this leading experience in affordable housing developments for both private
and public initiatives, our team is firmly committed to add value at every stage of
the project and deliver improvements based on clients’ feedback and our
demonstrable experience.
This valuable experience and insight enables us to offer innovative solutions to
maximize our clients’ ROI while minimizing costs by reassessing each phase.
Our global housing construction services include project management, cost
management, building surveying, planning, etc.
63
EDUCATIONAL FACILITIES
UNIVERSITIES
TEAMWORK TO COORDINATE EVERY STEP OF THE PROCESS
Over the years, our company has worked on an assortment of educational projects
from universities and technical vocational institutes to libraries, student housing
and other educational facilities including advanced research laboratories and
centers.
Our education construction projects include many different structures, each with its
own unique set of challenges to maintain costs and within the given time frame.
This extensive experience, together with our in-house staff of skilled mechanical
and electrical specialists, provide us with the ability to manage any project despite
its complexity.
Some of the buildings are equipped with a large number and complexity of
facilities, especially in electrical installation and voice-data network as well as their
security service and access control system.
64
SCHOOLS
LABORATORIES, TECHNICAL INSTITUTES AND LIBRARIES
We have built educational facilities such as
universities, high schools, primary schools,
kindergartens, etc.
The facilities in campus include several student
housing buildings, dining facilities, libraries,
laboratories, classrooms, stadiums, parking lots,
technology institute buildings, training centers
for specialized careers, conservatories,
auditoriums, libraries and research centers.
SCHOOLS
LABORATORIES, TECHNICAL INSTITUTES AND LIBRARIES
65
HOSPITALITY, LEISURE AND SHOPPING MALL PROJECTS
COMMITMENT TO EXCELLENCE, CONSTANT COMMUNICATION AND FLEXIBILITY TO MEET OUR CLIENTS’ NEEDS
We have successfully designed and built both functional business hotels and exquisite 5-
star ones.
Our 4-star business hotels and our 5-star luxury hotels and resorts include convention halls,
ballrooms, sports facilities, all of them constructed to meet the highest international
standards of quality and excellence.
Our golf resorts include private and public swimming pools, fine restaurants, full spa
services and other high-end amenities.
Our sports complexes offer a wide range of leisure activities for more than 13 sport
disciplines at one place designed to offer world class sporting events and tournaments,
conference and recreational facilities along with swimming pools, saunas, etc.
66
OFFICE BUILDING “SENA” + 36 RESIDENTIAL UNITS IN CARTAGENA
“LA FLOTA” SPORTS CENTER IN MURCIA
“LA NORIA” SHOPPING MALL IN LA ÑORA
SPORTS CENTER WITH HEATED SWIMMING POOL IN ALICANTE
SHOPPING MALL IN USERA, MADRID
“EL TIRO” SHOPPING MALL IN MURCIA
67
INFRASTRUCTURE PROJECTS
Infrastructure works for partial urbanization plan “Mar de Plata” in Puerto de Mazarrón. 5 million sqm residential area with all infrastructure services: roads, accesses, street lighting, electricity, water, sewerage, telecommunications, etc.
Infrastructure works for “El Valle Golf Resort” in Baños y Mendigo. 60.2 ha residential development with all the infrastructure services
Infrastructure works for “Hacienda El Álamo” in Fuente Álamo. 5.5 million sqm residential development with 2 golf courses and all the infrastructure services
68
INDUSTRIAL PROJECTS
10,000 sqm hydrocarbon plant in Cartagena constructed for Carthago Terminal Hydrocarbon Ltd. The project included earthworks, infrastructures, steel frames, construction of oil storage tanks and other facilities.
Fish factory in Alicante. Complete turnkey project for a fish processing and canning factory. The project execution covered from the earthworks for the foundations to the provision of the machinery and electromechanical devices.
10,000 sqm optical industry factory constructed for Indra in an optical technology park. The project execution covered from the earthworks for the foundations to the provision of the machinery and electromechanical devices.
77,300 sqm waste treatment plant serving for 30,000 residents in the area of Cartagena. Turnkey project including sewerage, drainage, water supply network, 210 sqm reinforced concrete structure for storage control and the fully automated distribution network.
69
HEALTHCARE PROJECTS
Santa Lucía University Hospital Of Cartagena. 160,000 sqm built area on a 58,000 sqm plot. 633 beds, with capacity for 1,000 beds, 14 operating rooms and the most advanced technology.
70
WALK-IN CLINIC IN USERA WALK-IN CLINIC
AND SENIOR APARTMENTS IN ALICANTE
WALK-IN CLINIC IN BENICARLÓ WALK-IN CLINIC IN ELCHE
No matter how demanding or complex the project, our company has the technical ability and expertise to undertake and deliver any healthcare construction project. The design and construction teams work closely with key members of the hospital staff to assure the project complete success. We combine hands-on expertise and cutting-edge technology to carry out the most challenging healthcare construction projects.
KEY FIGURES AND PROJECTS
73
KEY FIGURES FOR NATIONAL AND INTERNATIONAL PROJECTS
TURNOVER PROJECT PORTFOLIO
YEAR AMOUNT (million €) YEAR AMOUNT (million €)
2005 111,111 2005 333,421
2006 395,912 2006 426,269
2007 389,507 2007 530,000
2008 390,477 2008 689,100
2009 298,976 2009 791,200
2010 234,816 2010 422,300
PRE-TAX PROFITS HUMAN RESOURCES
YEAR AMOUNT (million €) YEAR AMOUNT (employees)
2005 12,477 2005 329
2006 47,378 2006 440
2007 29,285 2007 740
2008 19,809 2008 1.137
2009 9,601 2009 1083
2010 1,279 2010 807
CAPITAL (net assets)
YEAR AMOUNT (million €)
2005 12,822
2006 41,442
2007 52,987
2008 47,622
2009 48,913
2010 36,607
74
PROJECT PORTFOLIO
INFRASTRUCTURE PROJECTS
RAILWAY
NO.
NAME AND DESCRIPTION OF THE PROJECT
COMMENCEMENT DATE
COMPLETION DATE
CONTRACT SUM
(million €)
1 North-Northeast high speed railway. Section: Palencia - León. Sub-section: Santas Martas - N 601. 8.7 km (LEÓN)
10/09 12/12 32.13
2
Elimination of the level crossings in the line Alcantarilla - Lorca, km markers 9/233 and 11/128, 12/410 and 13/359 (Librilla); 17/164 (Alhama de Murcia); 41/630 (Totana) and 42/800 (Lorca); and in the Lorca – Baza line, km marker 8/854 (Puerto Lumbreras) in the Region of Murcia
02/04 11/04 3.29
3 Elimination of the level crossings in 19+850 km marker in Sueca, Valencia (Silla –Cullera – Gandía line)
05/03 01/05 2.99
4 Elimination of the level crossings in 512/473 km marker (type c) of the Chinchilla –Cartagena line in the municipality of Cartagena
10/09 11/10 2.43
5
Elimination of the level crossings in the Cartagena – Chinchilla line, in the km markers 495/494 y 497/432 (Murcia); 498/745 and 505/628 (Torre Pacheco); and 510/786 and 517/976 (Cartagena) in the Region of Murcia
03/04 12/04 2.24
6
Vehicle underpass in 24/303 km marker and pedestrian underpass in 24/529 km marker for the elimination of level crossings in the 24/225 and 24/ 525 km markers in the Alicante – Alquerías line. Municipality of Elche (Alicante)
03/05 03/06 2.21
7
Construction of 4 overpasses and connection paths for the elimination of level crossings in the Ávila – Salamanca line. Municipalities of Aveinte, San Pedro del Arroyo, Albornos, Muñogrande and Viñegra de Moraña, Ávila
03/05 03/06 2.20
8
Works for the cost and performance optimization of stations, railway premises and closure in the urban area of the Medina del Campo – Salamanca section. Medina del Campo – Fuentes de Oñoro line (Salamanca)
08/05
08/06
2.12
9 Elimination of the level crossings in the Madrid-Valencia de Alcántara line, 30+377 km marker. Cubas de la Sagra (Madrid)
01/06 03/07 1.24
10
Construction of an overpass in the 7/585 km marker for the elimination of the level crossings in the km markers 7/402 (type c) and 7/748 (private) in the Lorca – Baza line. Municipality of Lorca (Murcia)
01/06 03/07 1.01
75
ROADS
NO.
NAME AND DESCRIPTION OF THE PROJECT
COMMENCEMENT DATE
COMPLETION DATE
CONTRACT SUM
(million €)
1 Public works concession contract for the maintenance and the operation of the Bonete -Alicante section of the A31 highway (Alicante)
04/09 12/12
(concesssion for 19 years)
281.85
2 Highway connecting the A-7 highway in Alhama with the Campo de Cartagena region (Murcia)
11/05
03/08
117.75
3 A-23 highway, Levante – Aragón - Somport. Section: Palancia River - Viver (Castellón)
10/04
06/07
67.52
4 SE-40 highway. Section: SE-648 connection (Almensilla) - A-49 connection (Huelva). Seville
02/09
Ongoing
59.83
5
South of Elche beltway, kilometer marker 722.000 of the N-340 road. Section: N-340 intersection – CV-81 road -former AP-3061 road- intersection (Alicante)
10/08
Ongoing 43.80
6 A-66 Ruta de la Plata highway from Gijón to Seville. Section: Duero River – South of Zamora (Zamora)
04/06
06/09
41.57
7 A-40 Castilla La Mancha highway. Section: Santa Cruz de la Zarza - Tarancón (Cuenca)
08/07 04/10 38.26
8 A-7 Ruta del Mediterráneo Highway. Section: Second beltway of Tarragona (Tarragona)
12/05
08/09
31.96
9 Highway duplication. N-340 Highway. Section: Puerto Lumbreras relief road (Murcia)
11/93
03/96
31.82
10 N-332 parkway road. Section: Torrevieja - Pilar de la Horadada (Alicante)
07/07
02/10
21.31
76
PORTS
NO.
NAME AND DESCRIPTION OF THE PROJECT
COMMENCEMENT DATE
COMPLETION DATE
CONTRACT SUM
(million €)
1 Santa Pola Marina (Alicante) 01/06 03/07 14.30
2 New drawbridge over El Estacio channel in La Manga del Mar Menor (Murcia)
05/02
05/03
5.54
3 Extension of the cruise liner berths in the Alfonso XII Quay of the Port of Cartagena (Murcia)
04/03
04/04
5.48
4 Juan Aparicio Promenade and restoring to its useable use in the coast of Torrevieja (Alicante)
09/98
10/99
4.19
5 Urbanization of the C-4 plot in the Alfonso XII Quay. (Murcia)
05/01
12/02
3.77
6 Environmental restoration and pedestrian connection between Cala Mosca and Cala Capitán, Orihuela (Alicante)
06/05
06/07
3.47
7 Construction of a promenade in the Tamarit beach of Santa Pola (Alicante)
03/08
02/09
2.21
8 Reinforcement of slopes, 2nd phase, in the Javea Port (Alicante)
10/10 06/11 1.69
9 Promenade of Mojácar, 1st phase (Almería)
03/96
06/98
1.59
10 Environmental restoration of the swimming area between Molino de San Quintín and Molino de la Calcetera in San Pedro del Pinatar (Murcia)
09/02
09/03
1.14
77
HYDRAULICS
NO.
NAME AND DESCRIPTION OF THE PROJECT
COMMENCEMENT DATE
COMPLETION DATE
CONTRACT SUM
(million €)
1
Completion of the modernization of the hydraulic infrastructures of the sector VIII of the irrigable areas of Lorca and Valle del Guadalentín region (Murcia)
09/07 03/10 20.01
2 Denitrification Plant in L’Eliana (Valencia) 06/08 12/10 13.75
3 Channeling of the Rambla de Benipila watercourse of Cartagena (Murcia)
10/02
03/04
7.09
4
Improvement and modernization of the irrigation system in the Irrigation Users Association of Canal del Páramo. Sectors V and VII. Water intake works and pumping station of sector VII (León)
12/07
05/09 5.14
5 Execution of the works for the project of the use of recycled water for the irrigation supply in the municipality of Getafe (Madrid)
12/06 12/07 4.35
6
Construction of the works for the project or the water transfers authorized by the article 13 of the Law 10/2001 of 5 July, Spanish National Hydrological Plan. Section 41, sub-section 1: end of Sifón Segura to beginning of Aqueduct of Campos del Río (Murcia)
03/04 03/05 4.33
7 Sewage drainage System of Guadalupe and Senda de Granada in Murcia
06/05 07/06 4.00
8 Hydropower Plant of Berberín, Calasparra (Murcia)
09/04 07/05 3.83
9 Works for use for irrigation of the water treated by the WWTP of Orgegia, section Pantanet -Etasa. Municipalities of Mutxamel and Alicante
04/04 09/05 3.50
10
Improvement and modernization of the irrigating lands of the point 120 of the Irrigation Users Association of Campo de Cartagena Region and improvement of rural service roads in the municipality of Albudeite (Murcia)
04/08 11/09 3.01
78
BUILDING PROJECTS
NO.
NAME AND DESCRIPTION OF THE PROJECT
COMMENCEMENT DATE
COMPLETION DATE
CONTRACT SUM
(million €)
1 Santa Lucía University Hospital of Cartagena (Murcia)
07/05 01/10 120.20
2
El Tiro shopping mall. Earthworks, foundation works and framework (phase I). Architecture and finishes (phase II). Urbanization (phase III). Albañilería Hipercor lot (Murcia)
12/06
11/09
64.38
3 El Valle residential development in Baños y Mendigo (Murcia)
06/05 07/07 50.81
4
Auditorium and Convention Center of Cartagena, including the complementary works for the stage equipment and the acoustics improvement (Murcia)
02/04 05/11 39.79
5
Public works concession for the design of the construction project for Juan Carlos I Business and Leisure Park and its subsequent management of the services for 40 years (Murcia)
12/06 04/09 31.98
6 Plaza Europa residential complex in Molina de Segura (Murcia)
03/06 04/08 27.04
7 186 apartments in El Valle residential development, in Baños y Mendigo (Murcia)
06/05 09/07 27.01
8 Raúl Vázquez Integrated Professional Training Center for Transportation and Logistics in La Celsa (Madrid)
03/05 01/08 18.57
9
Administrative concession for the construction of “La Flota” Sports Complex and its subsequent management of the services for 40 years (Murcia)
03/05 10/06 18.38
10
Office building and Tomás Guillén Peugeot car dealer facilities (Murcia)
08/05 12/07 14.29
4
FOMOBRA, S.L.U. Polígono industrial La Candelaria, parcela 2.11, nave 9 30320 Fuente Álamo. Murcia. Spain. EU T + 34 968 597242 www.fomobra.es