4 Chaplin Rd Illovo
Pvt Bag x60 000, Houghton, 2041
South Africa
Tel: +27 (0)11 268 6090
Fax: +27 (0)11 268 6091
www.svarchitects.com
Stauch Vorster Architects (Gauteng) (Proprietary) Ltd. Reg No 1995/001856/07 Directors: COYM Debaveye; K Moses (MD); MR Rossiter; PR Symondson*
Associates: JP Anstey; LD Dukes; GE Faller; TLM Landman; RD Shaw*; M Walker*
Stauch Vorster Group: JD Adler**; JP Anstey; PC Bakker (Chairman); FV Coppola; COYM Debaveye; LD Dukes; R du Preez; GE Faller; GS Hamilton; C Karenyi; TLM Landman; L Makhaola; AJ Mentz;
R Momberg;K Moses; SJ O’Reilly; RFD Phillip**; S Ravat; L Rose; MR Rossiter; RD Shaw*;
MA Steenkamp;AJ Strong; PR Symondson*; G Teltschik; T van der Westhuizen; J van Tonder; M Walker*
* British ** Consultant
Offices: Cape Town Durban Johannesburg Maputo Mauritius Port Elizabeth Pretoria Windhoek
COYMD cv
28 June 2012
TO WHOM IT MAY CONCERN:
This serves to confirm that Jayesh Dayabhai has been employed as Architect in our Johannesburg office from March 2006 till date.
Jayesh has worked on a broad spectrum of large projects such as office complexes, hotels, clinics, retail centres etc...
As a team player his role varied from project to project.
Jayesh has excellent knowledge of the usage of various architectural software packages. He recently fulfilled the role of Revit Building Information Manager and Document Controller as well as being one of the lead architects responsible for the technical documentation on a 3 5000 m² shopping centre.
Jayesh is a very hard worker with a pleasant personality and was always willing to assist others and share his knowledge with his colleagues.
Jayesh effectively scheduled and managed his time to achieve the required work delivery times.
Although still young and with limited exposure to the design element of architecture, but greatly ambitious.
We believe that Jayesh will be an asset to any architectural practice.
We thank him for his contribution to the company and wish him and his family all the success in pursuing his dreams on a new continent.
Yours sincerely,
Conrad Debavaye Director: Stauch Vorster Architects (Gauteng) (Pty) Ltd
“God is in the details.”- Mies van der Rohe
Jayesh Dayabhai is an architect who has excellent proven skills using Revit as well as Sketchup and AutoCad in implementing high performance and dedication at the workplace.
Areas of expertise include leisure, commercial and residential architecture. He is proficient in all stages of a project from design development through to actualization.
Phone: 647.739.3111 Email: [email protected]
Leisure
Gbedeze Hotel, Conference Center and Entertainment Pavilion
Taitan Lodge conceptsA Resort located on the shores of the lake, providing a getaway break as well as for facilitating conference/seminar facilities. The building tries to minimise the damage to the natural surroundings by avoiding excessive cut & fill.
Levels of Responsibilities: Converting sketches into design development, drawing up a working Revit model,contributing to the architecture, area schedules, presentation material.
Taita
n Lo
dge
• Lak
e Ba
bo G
aya,
Eth
iopi
a
UP
UP
UP
UP
UP
UP
UP
UP
UP
UPUP
UP
UP
UP
UP
UPUP
UPUP
UP
UP
1' 2' 3' 4' 5' 7'6' 8' 9' 10' 11' 12' 13' 14' 15' 16'17' 18' 19'
C'
B'
A'
D'
30'
EE
31' 32' 33' 34'
DD
BBCC
AA
35'
FF
36'37'
38'39'
GG
JJHH
KK
25'
RR
26' 27' 28' 29'
PP
NN
LL
SS'
TT'
VV'UU'
E'
F'12 m²
Transformer Room12 m²
Switch Room
27 m²Standby Generator
8 m²Wet Refuse
8 m²Refuse
40 m²Holding
26 m²Delivery
6 m²Security
7 m²Buyer 20 m²
Bottle Store
13 m²Passage 02
36 m²Passage 01
78 m²Delivery Yard
1024 m²Parking Level 0
51 m²Lobby Level 0
42 m²Standard Room45 m²
Standard Room
11 m²Balcony
11 m²Balcony
45 m²Standard Room
42 m²Standard Room
11 m²Balcony
11 m²Balcony
42 m²Standard Room
11 m²Balcony
11 m²Balcony
45 m²Standard Room
11 m²Balcony
45 m²Standard Room
11 m²Balcony
43 m²Standard Room
12 m²Store
298 m²External Walkways
1' 2' 3' 4' 5' 7'6' 8' 9' 10' 11' 12' 13' 14' 15' 16'17' 18' 19'
C'
B'
D'
30'
EE
31' 32' 33' 34'
DD
BBCC
AA
35'
FF
36'37'
38'39'
GG
JJHH
KK
25' 26' 27' 28' 29'
MMLL
SS'
TT'
VV'UU'
WW'
E'
F'
71 m²Store 01
22 m²Store 02
15 m²Store 03
46 m²Boardroom
23 m²Business Centre
45 m²Passage
33 m²Store 04
14 m²Meeting Room 11 m²
Office 01
9 m²Office 029 m²
Office 03
117 m²Lobby
9 m²Kitchen
8 m²Store 05
23 m²Store 06
42 m²Standard Room
11 m²Balcony
45 m²Standard Room
11 m²Balcony
11 m²Balcony
45 m²Standard Room
11 m²Balcony
42 m²Standard Room
43 m²Standard Room
45 m²Standard Room45 m²
Standard Room42 m²
Standard Room
11 m²Balcony
11 m²Balcony
11 m²Balcony
11 m²Balcony
42 m²Standard Room
45 m²Standard Room45 m²
Standard Room43 m²Standard Room
11 m²Balcony
11 m²Balcony
11 m²Balcony
11 m²Balcony
42 m²Standard Room
45 m²Standard Room
45 m²Standard Room
42 m²Standard Room
11 m²Balcony
11 m²Balcony
11 m²Balcony
11 m²Balcony
826 m²Podium (Parking Level 1)
6 m²Planter6 m²
Planter
53 m²Planter
3 m²Planter
5 m²Planter
415 m²External Walkways
1' 2' 3' 4' 5' 7'6' 8' 9' 10' 11' 12' 13' 14' 15' 16'17' 18' 19'
C'
B'
A'
D'
30'
EE
31' 32' 33' 34'
DD
BBCC
AA
35'
FF
36'37'
38'39'
GG
JJHH
KK
25'
RR
26' 27' 28' 29'
PP
MMNN
LL
SS'
TT'
VV'UU'
WW'
E'
F'
49 m²Laundry
23 m²Linen
46 m²Canteen/Training Room
4 m²Chemicals
44 m²passage 03
27 m²House Keeping
36 m²Male Changerooms
15 m²Engineering Store
18 m²Engineer
35 m²Female Changerooms
262 m²Passage 05
32 m²Pool Bar
112 m²Spa
91 m²Gym
12 m²Male Toilets
9 m²Female Toilets
42 m²Standard Room
45 m²Standard Room45 m²
Standard Room
42 m²Standard Room
11 m²Balcony
10 m²Balcony
10 m²Balcony
11 m²Balcony
43 m²Standard Room
45 m²Standard Room45 m²
Standard Room42 m²Standard Room
11 m²Balcony
9 m²Balcony
9 m²Balcony
11 m²Balcony
45 m²Standard Room
45 m²Standard Room
45 m²Standard Room
45 m²Standard Room
11 m²Balcony
11 m²Balcony
11 m²Balcony
11 m²Balcony
261 m²Pool
3 m²Planter
471 m²External Walkways
281 m²Timber Decking
19 m²Planter
60 m²Planter
1' 2' 3' 4' 5' 7'6' 8' 9' 10' 11' 12' 13' 14' 15' 16'17' 18' 19'
C'
B'
A'
D'
30'
EE
31' 32' 33' 34'
DD
BBCC
AA
35'
FF
36'37'
38'39'
GG
JJHH
KK
25'
RR
26' 28' 29'
PP
MMNN
LL
SS'
TT'
VV'UU'
WW'
E'
F'
102 m²Kitchen.
21 m²Male Toilets
15 m²Female Toilets
3 m²Passage 06
18 m²Coldroom
18 m²Dry Store
150 m²Coffee Lounge
23 m²Terrace
10 m²Passage 07
3 m²Store
176 m²Restaurant
41 m²Lobby level 03
320 m²Passage 08
119 m²Games Room
45 m²Standard Room
45 m²Standard Room
45 m²Standard Room
45 m²Standard Room
11 m²Balcony
11 m²Balcony
11 m²Balcony
11 m²Balcony
45 m²Standard Room
45 m²Standard Room
10 m²Balcony
10 m²Balcony
62 m²Roof Garden
24 m²Planter
2 m²Planter
2 m²Planter
30 m²Planter
277 m²External Walkways
93 m²External Dining Area
24 m²Timber Decking
1' 2' 3' 4' 5' 7'6' 8' 9' 10' 11' 12' 13' 14' 15' 16'17' 18' 19'
C'
B'
A'
D'
30'
EE
31' 32' 33' 34'
DD
BBCC
AA
35'
FF
36'37'
38'39'
GG
JJHH
KK
25'
RR
26' 27' 28' 29'
PP
MMNN
LL
SS'
TT'
VV'UU'
WW'
E'
83 m²Equipment Store
Balcony
Boardroom
Bottle Store
Business Centre
Buyer
Canteen/TrainingRoom
Chemicals
Coffee Lounge
Coldroom
Delivery
Delivery Yard
Dry Store
Engineer
Engineering Store
Equipment Store
External DiningArea
External Walkways
FemaleChangerooms
Female Toilets
Games Room
Gym
Holding
House Keeping
Kitchen
Kitchen.
Laundry
Linen
Lobby
Lobby Level 0
Lobby level 03
Male Changerooms
Male Toilets
Meeting Room
Meeting Room 01
Meeting Room 02
Meeting Room 03
Meeting Room 04
Office 01
Office 02
Office 03
Parking Level 0
Passage
Passage 01
Passage 02
passage 03
Passage 05
Passage 06
Passage 07
Passage 08
Passage 09
Planter
Podium (Parking Level 1)
Pool
Pool Bar
Refuse
Restaurant
Roof Garden
Security
Spa
Standard Room
StandbyGenerator
Store
Store 01
Store 02
Store 03
Store 04
Store 05
Store 06
SubdivisibleConference Room
Switch Room
Terrace
Timber Decking
TransformerRoom
Wet Refuse
51 m²Kitchen
21 m²Male Toilets
15 m²Female Toilets
30 m²Meeting Room 04
23 m²Meeting Room 03
9 m²Store
34 m²Meeting Room 02
27 m²Meeting Room 01
23 m²Passage 08 146 m²
Subdivisible ConferenceRoom
23 m²Terrace
205 m²Passage 09
22 m²Terrace
1 : 300
Level 01
1 : 300Level 1
2
1 : 300Level 2
3
1 : 300
Level 34
1 : 300Level 4
5
Area Schedule (Rentable)Number Name Area Level
160 Balcony 10 m² Level 353 Coffee Lounge 150 m² Level 351 Coldroom 18 m² Level 352 Dry Store 18 m² Level 3182 External Dining Area 93 m² Level 3181 External Walkways 277 m² Level 349 Female Toilets 15 m² Level 360 Games Room 119 m² Level 347 Kitchen. 102 m² Level 358 Lobby level 03 41 m² Level 348 Male Toilets 21 m² Level 350 Passage 06 3 m² Level 355 Passage 07 10 m² Level 359 Passage 08 320 m² Level 3170 Planter 24 m² Level 3171 Planter 2 m² Level 3172 Planter 2 m² Level 3173 Planter 30 m² Level 357 Restaurant 176 m² Level 3161 Roof Garden 62 m² Level 3149 Standard Room 45 m² Level 3150 Standard Room 45 m² Level 3151 Standard Room 45 m² Level 3152 Standard Room 45 m² Level 3157 Standard Room 45 m² Level 3158 Standard Room 45 m² Level 356 Store 3 m² Level 354 Terrace 23 m² Level 3185 Timber Decking 24 m² Level 3
1865 m²61 Equipment Store 83 m² Level 464 Female Toilets 15 m² Level 462 Kitchen 51 m² Level 463 Male Toilets 21 m² Level 469 Meeting Room 01 27 m² Level 468 Meeting Room 02 34 m² Level 466 Meeting Room 03 23 m² Level 465 Meeting Room 04 30 m² Level 470 Passage 08 23 m² Level 473 Passage 09 205 m² Level 467 Store 9 m² Level 471 Subdivisible Conference
Room146 m² Level 4
72 Terrace 23 m² Level 474 Terrace 22 m² Level 4
711 m²Grand total: 181 9877 m²
Area Schedule (Rentable)Number Name Area Level
137 Balcony 9 m² Level 2138 Balcony 9 m² Level 2139 Balcony 11 m² Level 2144 Balcony 11 m² Level 2145 Balcony 11 m² Level 2146 Balcony 11 m² Level 2147 Balcony 11 m² Level 233 Canteen/Training Room 46 m² Level 234 Chemicals 4 m² Level 239 Engineer 18 m² Level 238 Engineering Store 15 m² Level 2180 External Walkways 471 m² Level 240 Female Changerooms 35 m² Level 246 Female Toilets 9 m² Level 244 Gym 91 m² Level 236 House Keeping 27 m² Level 231 Laundry 49 m² Level 232 Linen 23 m² Level 237 Male Changerooms 36 m² Level 245 Male Toilets 12 m² Level 235 passage 03 44 m² Level 241 Passage 05 262 m² Level 2179 Planter 3 m² Level 2184 Planter 19 m² Level 2186 Planter 60 m² Level 2148 Pool 261 m² Level 242 Pool Bar 32 m² Level 243 Spa 112 m² Level 2124 Standard Room 42 m² Level 2125 Standard Room 45 m² Level 2126 Standard Room 45 m² Level 2127 Standard Room 42 m² Level 2132 Standard Room 43 m² Level 2133 Standard Room 45 m² Level 2134 Standard Room 45 m² Level 2135 Standard Room 42 m² Level 2140 Standard Room 45 m² Level 2141 Standard Room 45 m² Level 2142 Standard Room 45 m² Level 2143 Standard Room 45 m² Level 2183 Timber Decking 281 m² Level 2
2560 m²153 Balcony 11 m² Level 3154 Balcony 11 m² Level 3155 Balcony 11 m² Level 3156 Balcony 11 m² Level 3159 Balcony 10 m² Level 3
Area Schedule (Rentable)Number Name Area Level
121 Balcony 11 m² Level 1122 Balcony 11 m² Level 1123 Balcony 11 m² Level 119 Boardroom 46 m² Level 120 Business Centre 23 m² Level 1178 External Walkways 415 m² Level 128 Kitchen 9 m² Level 127 Lobby 117 m² Level 123 Meeting Room 14 m² Level 124 Office 01 11 m² Level 125 Office 02 9 m² Level 126 Office 03 9 m² Level 121 Passage 45 m² Level 1163 Planter 6 m² Level 1164 Planter 6 m² Level 1169 Planter 53 m² Level 1176 Planter 3 m² Level 1177 Planter 5 m² Level 1162 Podium (Parking Level 1) 826 m² Level 192 Standard Room 42 m² Level 194 Standard Room 45 m² Level 197 Standard Room 45 m² Level 199 Standard Room 42 m² Level 1100 Standard Room 43 m² Level 1101 Standard Room 45 m² Level 1102 Standard Room 45 m² Level 1103 Standard Room 42 m² Level 1108 Standard Room 42 m² Level 1109 Standard Room 45 m² Level 1110 Standard Room 45 m² Level 1111 Standard Room 43 m² Level 1116 Standard Room 42 m² Level 1117 Standard Room 45 m² Level 1118 Standard Room 45 m² Level 1119 Standard Room 42 m² Level 116 Store 01 71 m² Level 117 Store 02 22 m² Level 118 Store 03 15 m² Level 122 Store 04 33 m² Level 129 Store 05 8 m² Level 130 Store 06 23 m² Level 1
2633 m²128 Balcony 11 m² Level 2129 Balcony 10 m² Level 2130 Balcony 10 m² Level 2131 Balcony 11 m² Level 2136 Balcony 11 m² Level 2
Area Schedule (Rentable)Number Name Area Level
77 Balcony 11 m² Level 078 Balcony 11 m² Level 081 Balcony 11 m² Level 082 Balcony 11 m² Level 084 Balcony 11 m² Level 085 Balcony 11 m² Level 087 Balcony 11 m² Level 089 Balcony 11 m² Level 010 Bottle Store 20 m² Level 09 Buyer 7 m² Level 07 Delivery 26 m² Level 013 Delivery Yard 78 m² Level 0175 External Walkways 298 m² Level 06 Holding 40 m² Level 015 Lobby Level 0 51 m² Level 014 Parking Level 0 1024 m² Level 012 Passage 01 36 m² Level 011 Passage 02 13 m² Level 05 Refuse 8 m² Level 08 Security 6 m² Level 075 Standard Room 42 m² Level 076 Standard Room 45 m² Level 079 Standard Room 45 m² Level 080 Standard Room 42 m² Level 083 Standard Room 42 m² Level 086 Standard Room 45 m² Level 088 Standard Room 45 m² Level 090 Standard Room 43 m² Level 03 Standby Generator 27 m² Level 091 Store 12 m² Level 02 Switch Room 12 m² Level 01 Transformer Room 12 m² Level 04 Wet Refuse 8 m² Level 0
2108 m²93 Balcony 11 m² Level 195 Balcony 11 m² Level 196 Balcony 11 m² Level 198 Balcony 11 m² Level 1104 Balcony 11 m² Level 1105 Balcony 11 m² Level 1106 Balcony 11 m² Level 1107 Balcony 11 m² Level 1112 Balcony 11 m² Level 1113 Balcony 11 m² Level 1114 Balcony 11 m² Level 1115 Balcony 11 m² Level 1120 Balcony 11 m² Level 1
schedule of accommodation
Taita
n Lo
dge
• Lak
e Ba
bo G
aya,
Eth
iopi
aRevit rendered imagery
Tukhela Resort perspective & plansA Resort located on the shores of the lake, providing a getaway break as well as facilitating conferences/seminars. The building tries to minimise the damage to the natural surroundings by avoiding excessive cut & fill.
Levels of Responsibilities: Found solution connecting the building via “link bridges” across the sloping landscape, converting sketches into design development, drawing up a working Revit model, contributing to the architecture, rationalizing design, area schedules, presentation material.
Tukh
ela
Reso
rt • D
urba
n, S
outh
Afri
ca
hotel rooms - standard guest rooms (ground & first floor)
hotel rooms - suites (ground and first floor)
villa perspective and plan
tiered layout planssite & hotel plans
Revit imagery & 3D sections
Tukh
ela
Reso
rt • D
urba
n, S
outh
Afri
ca
Gbedeze Hotel & Conference Center
Located in Gebdeze, a town near Liberia’s capital of Monrovia, comprising a total area of 15,000 is a Park Inn Hotel and Conference facility with an Entertainment Pavilion for tourists and high profile locals as well. The hotel comprises 4 storeys with a total of 128 Standard sized rooms. The conference facility has a maximum number of 9 sub-divisible conference rooms. The 6,500 s.qm Entertainment Pavilion hosts a bar, a restaurant as well as family entertainment facilities with swimming pools right next to the river.
Levels of Responsibility: Modelled up project comprising the 3 above mentioned components in their entirety for conceptual design development purposes & went though several iterations before final results were accepted, in a personal record time of just 3 weeks from very basic sketches to a fully modelled up presentation as shown.
Gbe
deze
Hot
el &
Con
fere
nce
Cent
er • M
onro
via,
Lib
eriaperspective & plans
site location & floor plans Revit 3D views
Gbe
deze
Hot
el &
Con
fere
nce
Cent
er • M
onro
via,
Lib
eria
Gbe
deze
Hot
el &
Con
fere
nce
Cent
er • M
onro
via,
Lib
eria
Radisson BluCampismo
A new & beautiful 153 key 12 storey 5 star Hotel overlooking the shores of the Indian Ocean, comprising retail, conference rooms and resident accommodation, wedge shaped to optimize the brilliant views of the ocean and golden sandy beaches.
Levels of Responsibility: Involved from the start with almost every aspect of the project, including design, drawing and analysis of perimeter strip sections, room loading data sheets, details, floor plans, elevations, sections at varying scales and levels of detail. Constant multi-disciplinary consultant co-ordination, rationalizing and implementation of information regarding Structural, Civil, HVAC, Electrical, CCTV and Electronics, Security, Fire and Sprinkler systems, Wet Services, Hotel Kitchen Consultants and Interior Design specifications.
Rad
isso
n Bl
u Ca
mpi
smo
• Map
uto,
Moz
ambi
quesite & Revit 3D views
Rad
isso
n Bl
u Ca
mpi
smo
• Map
uto,
Moz
ambi
quesite & Revit 3D views floor layout plans
1st Floor Layout PlanGround Floor Layout Plan
Typical Floors, 3rd to 9th Typical Floors, 10th to 11th
Rad
isso
n Bl
u Ca
mpi
smo
• Map
uto,
Moz
ambi
quedetail calloutsroof & capping details
detail callouts
Rad
isso
n Bl
u Ca
mpi
smo
• Map
uto,
Moz
ambi
quedetail callouts
Rad
isso
n Bl
u Ca
mpi
smo
• Map
uto,
Moz
ambi
que
Commercial
New SVA Offices • 8 Melville Rd.Johannesburg, South Africa
Dashen Bank
New 18 storey plus 3 underground basement Office building.
Levels of Responsibility: Coordinating a team on the project to get the drawings out to tender. Drawing up the plans and elevations and model on Revit for construction. Coordinating a team of 6 technicians and 1 architect, drawing up façade cladding and curtain walling information, 1:25 perimeter sections, 1:10 details 1:50, 1:100 technical documentation sets, applying structural columns and slabs from structural set. Worked on modules for curtain walling for discussion. Perspectives for client and consultant information. Submitting plans to site for construction with Site Instructions.
concept & Revit 3D
Das
hen
Bank
• Add
is Ab
aba,
Eth
opia
MEZ
ZAN
INE
GRO
UN
D F
LOO
R
typical floor plans
Das
hen
Bank
• Add
is Ab
aba,
Eth
iopi
a
2ND
FLO
OR
3RD
- 15
TH
FLO
OR
16TH
FLO
OR
elevations & sections
Das
hen
Bank
• Add
is Ab
aba,
Eth
iopi
acurtain walling typical baysrandom pattern schematic
Das
hen
Bank
• Add
is Ab
aba,
Eth
opiaperimeter sections typical details
Tubatse MallA landmark 35,000 sq.m shopping center located in a boom town where platinum deposits were recently discovered in Burgersfort, Mpumalanga.
Levels of Responsibility: Revit Building Information Manager and Document Controller as well as being one of the lead architects responsible for the technical documentation and presentation materials.
concepts
Tuba
tse
Mal
l • B
urge
rsfo
rt, S
outh
Afri
ca
site & Revit 3D views floor layout plans
Tuba
tse
Mal
l • B
urge
rsfo
rt, S
outh
Afri
ca
technical drawings
Tuba
tse
Mal
l • B
urge
rsfo
rt, S
outh
Afri
ca
Tuba
tse
Mal
l • B
urge
rsfo
rt, S
outh
Afri
ca
Tuba
tse
Mal
l • B
urge
rsfo
rt, S
outh
Afri
ca
Residential
House Faizel AbooBlantyre, Malawi
Addis AbabaFamily Estate
A high cost house for a Sheik in Addis Ababa in Ethiopia based on a Tuscan / Florida mansion style. Levels of responsibility: Extensive design and development based on simple floor plan sketches. Modeling and rendering in Revit.
Add
is A
baba
Fam
ily E
stat
e • A
ddis
Abab
a, E
thio
piaz
Revit 3D sections & renders
Layoutground floor
Add
is A
baba
Fam
ily E
stat
e • A
ddis
Abab
a, E
thio
piaLayout
1st floor
Add
is A
baba
Fam
ily E
stat
e • A
ddis
Abab
a, E
thio
pia
work history05/2006 - 06/2012 – STAUCH VORSTER ARCHITECTS (GAUTENG) (Pty) Ltd
DASHEN BANK HEAD OFFICE BUILDING – ADDIS ABABA, ETHIOPIA New 18 storey plus 3 underground base-ment Office building. Levels of Responsibility: Coordinating a team on the project to get the drawings out to tender. Drawing up plans, elevations and model on Revit for construction. Coordinating a team of 6 people and drawing up façade cladding and curtain walling information, applying structural columns and slabs from struc-tural set. Worked on modules for curtain walling for discussion. Perspectives for client and consultant informa-tion. Submitting plans to site for construction with Site Instructions.
RADISSON BLU CAMPISMO HOTEL - MAPUTO, MOZAMBIQUE New 153 key 12 storey 5 star Hotel in Maputo, Mozambique overlooking the shores of the Indian Ocean, comprising retail, conference rooms and resident accommodation, wedge shaped to maximize views to sea. Levels of Responsibility: Involved from the start with almost every aspect of the project, including design, drawing and analysis of perimeter strip sections, room loading data sheets, details, floor plans, elevations, sections at varying scales and levels of detail. Constant multi-disciplinary consultant co-ordination, rationalizing and implementation of information regarding Structural, Civil, HVAC, Electrical, CCTV and Electronics, Security, Fire and Sprinkler systems, Wet Services, Hotel Kitchen Consultants and Interior Design specifications.
ADDIS ABABA FAMILY ESTATE – ADDIS ABABA, ETHIOPIA New high cost double storey house based on a tuscan/florida mansion style. Levels of Responsibility: Drawing up plans based on brief. Preparation of set for presentation to client for approval and sign off.
BURGERSFORT HOTEL – BURGERSFORT, SOUTH AFRICA New 127 key 4 storey plus 1 basement hotel across a steep sloped site in a mining town. Levels of Responsibility: Drawing up the hotel plans, sections elevations and perspectives for costing by Quantity Surveyor and presentation purposes to client.
RADISSON BLU INTABA HOTEL – CAPETOWN, SOUTH AFRICA New hotel for Radisson in Capetown with mixed use development on site with 356 keys over 10 storeys for hotel component and 5 storeys of office/con-ference spaces in separate building shared by a common 2 storey basement facility below ground. Levels of Responsibility: Drawing up and rationalizing plans to maximize the efficient use of site and building areas.
HOTEL HODEIDAH – HODEIDA, YEMEN New 10-storey Hotel in Hodeidah, a port on the Red Sea, Republic of Yemen for client, Goldenleaves Hotels and resorts. Levels of Responsibility: Concept through to Design Devel-opment, Co-ordination of drawings between consultants, preparation of technical documentation on working sections, elevations, and floor plans.
CELTEL HEADQUATERS – LUSAKA, ZAMBIA New 9000sqm Headquarters for a cellular phone service provider in Lusaka In addition to a 800sqm clinic and a 1200 sqm “Switch” CenterLevels of Responsibility: Design Development, 3d SketchUp Model for client Presentation purposes, Technical Documentation for Custom Design Screen feature.
ELANDSHEUWEL SHOPPING CENTER - KLERKSDORP New 5,195sqm Shopping Center, located in Klerksdorp. Levels of Responsibility: Design Development, SDP Submission.
BROADACRES SHOPPING CENTER, PHASE 2 - JOHANNESBURG Extension to existing Shopping Center, Additional Observatory to Spar Restaurant. Levels of Responsibility: Design Development, SDP Submission, technical Documentation.
BRYANSTON WEGE POST HOUSE - JOHANNESBURG Extensions & renovations to existing restaurant on 1st floor. Levels of Responsibility: Working drawing set for Extension of existing post house to accommodate Lord Prawn restaurant, preparation of documentation for new parking deck.
NONGOMA SHOPPING CENTRE - NONGOMA, (PAST MARBLE HALL) New 12,000sqm Shopping Centre in Nongoma, Kwazulu Natal. Levels of Responsibility: Design Development, SDP Submission, Sections, Elevations and floor plans.
MOROKA TOWN SQUARE - KAMEELRIVIER New 15,000sqm Shopping Centre, KameelrivierLevels of Responsibility: Design Development preparation of SDP submission set.
SANAA HOTEL - REPUBLIC OF YEMEN New Hotel, Al Amundi, Sanaa Levels of Responsibility: Conceptual Design and technical documentation for 1.3km Contoured Boundary wall fencing.
BLUE NILE HOTEL - BAHIR-DAR, ETHIOPIA New extensions and extensive refurbishments to Hotel on Lake Hora, Bahir-dar, Ethopia. Levels of Responsibility: Design development through to construction set of extension new extension block.
WIPHOLD CAPITAL OFFICE BUILDING - JOHANNESBERG New 2 storey plus basement, Offices for Wipcapital Investments, Houghton Estate. Levels of Responsibility: Design and technical documentation, coordination of working drawing set with project team.
BOLE BLOCK A & B (APARTMENTS AND DASHEN BANK - ADDIS ABABA, ETHIOPIA Multistorey mixed used facility comprising 2 buildings next to each other. Block A has 10 floors and 3 basements. Block B has 4 floors and 2 basements. The 2 buildings collectively contain a bank, gym, beauty salon, restaurants and 1, 2 & 3 bed-room apartments. Levels of Responsibility: Updating drawings with revisions and amendments on existing live project. Comparing and implementing consultant drawings, e.g. Interior designer drawings, structural, HVAC etc. with architectural set and making relevant changes and consolidating variances and differences.
BOLE BLOCK C – CINEMA & SHOPS – ADDIS ABABA, ETHIOPIA Phase 2 of the Bole set, Block C is one of 2 latest additions and sits next to Bole Block B, which is under construction. The multistory building comprises 7 floors and 3 basements, with 5 cinemas, shops, restaurants and multi-floored offices. Levels of Responsibility: Converting sketch drawings into presentation drawings in Revit and rationalizing plans. Implementing structural information. Internal space planning.
BOLE BLOCK D – OFFICE BLOCK - ADDIS ABABA, ETHIOPIA Phase 3 of the Bole set, Block D is the latest addi-tion and sits next to Bole Block A, which is under construction. The multistory building comprises 7 floors and 5 basements floors with retail/restaurants on ground and multi-floored offices. Levels of Responsibility: Convert-ing sketch drawings into presentation drawings in Revit and rationalizing plans.
INDABA HOTEL – SANDTON, JOHANNESBURG. New 177 key 2 storey hotel for Indaba Hotel (Pty) Ltd. Levels of Responsibility: Preparation of 95% of the working drawings, including site plan, floor plans, sections eleva-tions, detail sheets, SDP as well as Council submission sets for approval. Coordinating and implementing infor-mation received from structural engineer, fire services, HVAC etc.
NIGERIA CLINIC – NIGERIA New 150 bed clinic Nigeria for Hospital Assist Levels of Responsibility: Implemen-tation of hospital consultant sketches into AutoCad drawings for presentation purposes.
RADISSON BLU ACCRA – GHANA New150 Key 7 storey hotel and 1 basement for hoteliers Radisson comprising conference facilities, shopping arcade and restaurants. Levels of Responsibility: Involved from the start with modeling up the plans, sections & elevations in Revit and implemented changes to the design from scratch.
HARARE MIXED USED DEVELOPMENT – HARARE, ZIMBABWE New mixed used development comprising shops, office, restaurants, conference rooms and a 77 key hotel Levels of Responsibility: Drew up AutoCad drawings as well as a Sketchup model for presentation purposes
ENUGU HOTEL, ENUGU NIGERIA Refurbishment of an existing dilapidated 100 key hotel Levels of Respon-sibility: incorporated Interior designers information as well as changes involved with the reconfiguration of existing structure.
ONIRU RADISSON BLU HOTEL – LAGOS, NIGERIA New 227 key 14 storey 5 star hotel for Radisson Hotel group. Levels of Responsibility: 15 storey 5 star hotel proposal. Involved in the preparation and documentation of drawings including floor plans, and rationalizing information both in AutoCAd and Revit.
MADAGASCAR SCHOOL, ANTANANARIVO – MADAGASCAR New 3 storey school comprising 63 classrooms on 3 floors, administration block and science labs. Levels of Responsibility: Implementation of sketches into plans, sections, elevations for a 2 storey primary school.
SAMBIRI HOTEL – ZIMBABWE Levels of Responsibility: Implemented and revised floor plan layouts and cre-ated Area layouts and schedules.
ODA TOWERS – ADDIS ABABA, ETHIOPIA Levels of Responsibility: Drawing up floor plans, 3d models, sec-tions, elevation and Room data loading sheets as well as Preliminary Finishes schedules for a 10 storey building with underground basements, conference facilities, restaurants, and double storey penthouse apartment on the roof.
ARBA MINCH HOTEL – ETHIOPIA Levels of Responsibility: Revising 3d model based on amends to floor plans.
EDGE HEAD OFFICE – BRYANSTON, JOHANNESBERG An exciting wedge shaped new headquarters for the above mentioned comprising 2 blocks, 1 2 storey and the other 4 storey plus 3 basement levels. Levels of Re-sponsibility: Creating a 3d model, floor plans sections and elevations from sketch for presentation purposes.
HOLIDAY INN LUBUMBASHI – LUBUMBASHI ,DEMOCRATIC REPUBLIC OF CONGO A 4 storey153 key hotel in Karavia, Lubumbashi for Holiday Inn. Levels of Responsibility: Creating and updating floor plan layouts for presentation and discussion purposes.
NUMBER 1. STATION PLACE – SANDTON, JOHANNESBERG A 16 storey mixed use building comprising 6 base-ment levels, 2 retail floors, 7 storeys of office space, 5 storeys comprising a hotel and a penthouse on the top floor. Levels of Responsibility: Creating and updating floor plan layouts for construction purposes.
CAMPISMO OFFICES – MAPUTO, MOZAMBIQUE Scheme comprising two 22 storey office towers with retail and parking on the lower floors, adjacent to the Radisson Blu Hotel Maputo site. Levels of Responsibility: Draw-ing up and updating floor plan layouts and area schedules.
RIVONIA BOULEVARD HOTEL – RIVONIA, JOHANNESBERG Levels of Responsibility: Creating a 3d model, floor plans sections and elevations from sketch for presentation purposes.
KAMPALA APARTMENTS – KAMPALA, UGANDA Levels of Responsibility: Amending floors plans on 4 blocks of apartments.
09/2004 – 04/2006 ATELIER & ASSOCIATES (Pty) Ltd (Architects)
HOUSE OMAR ESSAK New 280sqm residence situated at Waterstone Estate - Sandton. Levels of Responsibility: Project Management and Site supervision and attendance of meetings, chairing meetings and rationalizing of minutes at progress meetings, working drawings, Preparation of snag lists, coordination of work and sourc-ing appointments of sub-contractors, Stage 5 work and seeing construction through to final completion and handover.
SUMMERCON - BROADACRES COUNRTY ESTATE Double storey estate housing based at Broadacres, Johan-nesburg. Levels of Responsibility: preparation of tender documentation, council submission sets, working drawings for various unit types.
SUMMERCON - TEZULA Double storey estate housing along Uranium Street, Witkoppen.Levels of Responsibility: Preparation of Marketing and Presentation drawings for 21 unit types, floor plans and elevations, setting out 165 units across the site, preparation of Site Development Plans and site elevations.
SUMMERCON – CASTELLET COUNTRY ESTATE Double storey estate housing along Syringa Avenue, Broad-acres. Levels of Responsibility: preparation of Marketing and Presentation drawings for several unit types, floor plans and elevations, preparation of Site Development Plan for 122 stands.
DUMON - LA’ PROVANCE Double storey estate housing at Willowbrook Extension 3. Levels of Responsibility: Preparation of Presentation drawings for 4 unit types on 78 stands, floor plans and elevations, preparation of Site Development Plan and orientation of plans on stands.
DUMON - MANKWE ESTATE Double storey estate housing at Anslow Crescent, Bryanston. Levels of Responsi-bility: Production of Presentation drawings unit types, floor plans and elevations, preparation of Site Develop-ment Plan and orientation of plans on 18 stands.
DUMON – ECCLESTON CRESCENT Double storey estate housing located at ERF 1025, Bryanston Township Lev-els of Responsibility: Production of Presentation drawings unit types, floor plans and elevations of 2 unit types, preparation of Site Development Plan and orientation of plans on 19 stands.
DUMON – ZIMBALI GARDENS Double storey estate housing at Northriding Extension 87. Levels of Responsi-bility: Production of working drawings, council submission drawings, electrical layouts for unit types, floor plans and elevations, preparation of Site Development Plan and orientation of plans on 42 stands.
HOUSE MANDY WILJA Double storey house in Entebbe. Levels of Responsibility: Design of house elevations and floor plans, liaising with client about design issues.
HOUSE SANDY VAN DER WESTHUYZEN Double storey house on ERF 1118, Featherbrooke Estate, Uitbreiding. Levels of Responsibility: Production of Council Submission and Construction drawings on a sloping site.
RIVERSONG Housing estate Levels of Responsibility: Preparation of a Presentation Site Plan indicating 115 units on 1 acre stands.
RANELLO ESTATES Housing estate located on the Farm Drienfontein, Comet Extension 4 Township. Levels of Responsibility: Preparation of Presentation drawings which include floor plans, and typical elevations for 3 typi-cal units to fit the stands on the site.
PROJECT AT ZIMBALI COASTAL ESTATE Housing, on ERF 39 and ERF 20, Phase 3 (approx. 350sqm. each) Levels of Responsibility: Preparation of Presentation, SDP and Council Submission sets and working drawings which include floor and site plans, elevations, sections.
06/2002 – 08/2004 HMV ARCHITECTS
JOHANNESBURG INTERNATIONAL AIRPORT New Domestic Terminal & Passenger Transfer Facility (DOMTEX)- Johannesburg. Levels of Responsibility: All Balustrade & Stair details, Door Schedules, Working Sections, Tiling Patterns & layouts, Bulkhead Details, Hoarding Layouts.
CAR SHOWROOMS Bruma & Boksburg - Johannesburg. Levels of Responsibility: Design, Taking Site Levels, Site Development Plans, Council/Municipal Submission sets, All Working Drawings on both projects.
AMKA WAREHOUSE & FACTORY Sunderland Ridge - Johannesburg. Levels of responsibility: Planning Factory Equipment Layouts.
MARLBORO MADRESSA Sandton Muslim Jamat - Johannesburg. Levels of responsibility: Site Slope Sections & Analysis, Municipal Submission Drawings, Working Drawings, Electrical Layouts, Water Reticulation Drawings.
COMMUNICA OFFICES & WAREHOUSE Samrand-Kosmosdal Ext. 11 - Johannesburg. Levels of responsibility: Custom Furniture & Tiling Layouts, Balustrade & Stair Details.
CYRILDENE MASJID Cyrildene Township - Johannesburg. Levels of responsibility: Working Sections, Electrical Layouts.
TURKISH ISLAMIC CENTRE Bez Valley - Johannesburg. Levels of responsibility: Parking Layouts.
TOWNHOUSE COMPLEXES FOR: Crown North, Sarbas & Claudius - Johannesburg. Levels of responsibility: Design, Council/Municipal Submission Sets, Working Drawings, Electrical Layouts.
HOUSE ALTERATIONS FOR: Ayob, Shaboodin, Pahad, Amod - Johannesburg. Levels of responsibility: Design, Alterations, Working Drawings
TEMBISA MAGISTRATES COURT Tembisa - Johannesburg. Levels of responsibility: Amends to Working Draw-ings.
KUALITY WAREHOUSE & FACTORY Tayob - Johannesburg. Levels of responsibility: Layouts of Equipment and Machinery.
TRIPLE 4, FORDSBURG Shops, Warehouse & Apartments - Johannesburg. Levels of responsibility: Working drawings of Apartments & shop Layouts.
LAST PROJECT AT HMV ARCHITECTS: NIGEL PRISON Located in Nigel, preliminary discussions and logistics.