UNCLASSIFIED
UNCLASSIFIED
Joint Theater Level Simulation (JTLS) International Users Conference
25 – 27 October, 2011
Don WeterJCS DDJ7 JCWSynchronization & IntegrationJOSE / Environment DevelopmentJTLS & JCATS Program Manager
Next Generation M&S Architecture
UNCLASSIFIED
UNCLASSIFIED
Director J7 Vision
We will maintain interoperability with our coalition and interagency partners.
2
UNCLASSIFIED
UNCLASSIFIED
DD J7 Joint and Coalition Warfighting Mission
“On behalf of the CJCS, the Deputy Director J7 Joint and Coalition Warfighting supports the training and development of Joint, interagency and multinational capabilities in order to meet the present and future operational needs of the Joint and Coalition force.”
3
DD J7 JCW 100 Day PlanCoalition Integration. Joint Warfighters will continue to operate as part of both standing and ad hoc Coalition Forces. Coalition integration is an embedded aspect of everything we do. We will take full advantage of our unique opportunity to collaborate, train, and develop capability with our Coalition partners.
UNCLASSIFIED
UNCLASSIFIED
M&S Architecture Objectives
1) Provide a production level Live, Virtual and Constructive (LVC) architecture that can support Joint, Coalition and Service level training exercises at reduced cost– Capitalize on existing capabilities and it must support
immediate exercise requirements as well as long range goals
2) Provide a useful technical specification to support efforts across the training community– Enable Home Station LVC Training– Support Cross-Service Training– Support Coalition Training
4
UNCLASSIFIED
UNCLASSIFIED
Lower Enclave – Collateral Secret
Current JLVC EnterpriseDRRS
ReadinessReporting
JTIMSTraining Objectives
JMSELMSEL Development
JDLMLogistics
Model
DESSTRANSCOM
LogisticsFederation
Logistics Models
ABSLogistics
Model
TENA InstrumentedRanges
GamingVBS2
JLVCCore Simulations &
Support Tools
JMECSMovement/Attrition Orders
MSEL Injects
J-EDITScenario Editor
JECSJECS-NS
LOTSCOP Feed w/o Sim
JAWSSituational Awareness
Event Analysis
JSPAData Analysis
JMEMJoint Master
Enumeration Mgr
JTEN
/ D
IS N
etw
ork RTI (JLVC/ERF FOM)
JLODConstructive Wrapper
Entity-Based
JLVC Bridge
JTDSScenario
Generation
JCATSJoint Combat Model
Entity-Based
JAAR-RLAAR Tool
JTLSJoint Combat Model
Aggregate-Based
LEGENDAir ForcePrimarily Army & SharedNavy
Marine Corps
NRO
Primarily Joint & Shared
NSA
FY11-13
C2 Network
WIMIntel
Model
Intel Models
BEServer
ACE-IOSIntel Model
NWARS-NGNational IMINT
Model
IWMDT
DTRA
MDA
JLCCTCWARSIMArmy ServiceCombat Model
OneSAFArmy ServiceCombat Model
AWSIMUSAF ServiceCombat Model
NCTEJSAFUSN Service
Combat Model MTWSUSMC ServiceCombat Model
Service Combat Models
VirtualsB-52 JSTARS
Virtual Simulators MUSEVirtual ISR
ImageryWESVRSG
MUSE-CSSViPRS
DVTE
MH-53 AC-130 EP-3 TUAV AWACS SSE F-16 F-15
C-17 F/A-18 A-10
V Bridge
COCOM Click open / Close
ACE-IOSSIGINT Model
NSANetJWICS
Upper Enclave - TS / SCIJCMSSIGINT Model
RadiantMercury
DE-SimMDST
IAMD Model
TIU Ballistic
Missile Sim
IAMD & Space Models
SSG/GEGGPS Simulation
TDACS Ballistic
5
UNCLASSIFIED
UNCLASSIFIED
FY10/11 Joint Event Support
USJFCOMCAPSTONE 10/11-1/2/3/4PINNACLE 10/11-1/2KEYSTONE 10/11-1/2UE 09-3 OIF MRXUE 10-1 OEF 10-11 MRXUE 11-2 OEF 11-12 MRXJTF 435 OEF MRXCJTF-HOA 10-1 MRXCJTF-HOA 11-1 MRXUE 10-3 OEF MRX (RC-S)UE 11-1 OIF MRX
NORTHCOMVigilant Shield 10Ardent Sentry 10Vigilant Shield 11Ardent Sentry 11
STRATCOM Global Lightning 10 Global Thunder 10 Global Lightning 11 Global Thunder 11
SOUTHCOMFA Panamax 10
Integrated Advance 10FA Panamax 11
Integrated Advance 11
EUCOM Austere Challenge 10 Austere Challenge 11
CENTCOM Bright Star 10
Internal Look 10 Internal Look 11
Internal Advance 11
PACOM Terminal Fury 10 Cobra Gold 10
Talisman Saber 11 Terminal Fury 11
TRANSCOM Turbo Distribution 10
JLOTS 10 Turbo Challenge 11
Ultimate Caduceus 11
SOCOMAble Warrior 10-1Able Warrior 11-1
AFRICOM Africom Staffex 10
Judicious Response 10 Judicious Response 11
Total: 587 MRXs
35 COCOM Events16 Senior leader Seminars
USFKUlchi Freedom Guardian 10
Key Resolve 10Ulchi Freedom Guardian 11
Key Resolve 11
JLVC Supported Exercise 6JTLS Supported Exercise
UNCLASSIFIED
UNCLASSIFIED
Challenges with Current M&S Approach
• Federation becoming increasingly large and unmanageable
• Costs increasing to upgrade existing and new federates• Resource-intensive integration of new federates and
support• Tightly-coupled simulations• Bridges and gateways often required to integrate new
and emerging technologies• Many redundancies and inconsistencies in data
representation
7
UNCLASSIFIED
UNCLASSIFIED
Next-Generation M&S Capability• Rapidly utilize real-world source data
– Cloud-based Rapid Data Generation (RDG) and distribution capability– Support operational Courses Of Actions (COA) development– Support Concept Development with Training
• Make simulations smarter / more capable– Open Architecture Principles– Navigate terrain / interpret physical environment and effects– Attempt to apply orders more effectively– Allow faster than real-time simulation without intervention– Dynamic Intelligent Control Agent (scalable in cloud)– Reduce role-player dependency
• Abstract User Interfaces to lower the barrier to use– Invoke only services needed by user– On demand access to scenario repositories– Users interact with common terms and symbols (Military & Civilian
systems) – Interact with C2 systems
8
UNCLASSIFIED
UNCLASSIFIED
Fundamental Precepts
• Apply Open Architecture Principles• Provide incremental yearly deliveries with the ability to roll
back to a previous year’s increment.• Interoperability is Not Free• Provide Central Management / Governance• Synergy and efficiencies gained by aligning current efforts
– Service Oriented Architecture (SOA) Prototype • Using JTLS, JCATS, JLOD and VBS2• Demonstrate Operational, Tactical & Virtual/Gaming Training
Capabilities– US Forces Korea (KORCOM) project – Rapid Data Generation (RDG) project– NATO Training Federation (NTF) Objectives (MSG-106)– SEESIM Experiment (FY12)
9
UNCLASSIFIED
UNCLASSIFIED10
• Dynamic Link Compatibility – That means federates can switch which RTI they use without recompiling/relinking their application.
• Modular FOMs – Modular FOMs allow federation developers to break up their object model into useful parts (called FOM Modules). Then each federate only needs to know about the FOM Modules it uses.
• Update Rate Reduction – Allows federates to tell the RTI they can only handle data updates below a certain rate. This allows update rate constrained federates to participate in busy federations without bogging down.
• Better Fault Tolerance – HLA now has a mechanism for notifying Federates when another Federate becomes disconnected from the network. It means when something goes wrong, everyone will understand what went wrong quickly.
• WEB Services API (WSDL) - The HLA Standard now defines a Web Service Description Language (WSDL) “binding”. This is similar to the C++, or Java bindings, but for the Web.
Based on the WSDL code, it is possible to generate code in different programming languages. It is transparent to a federation whether a specific federate uses the C++, Java or WSDL API.
Major benefits of the WSDL API include the support for numerous newer and older languages as well as the ease of deployment across wide area networks.
The major long term benefit of the WSDL API is that it promotes and supports the concept of simulations as readily available services provided within and between enterprises.
HLA 1516 Evolved Terms of Reference
The Future of M&S -- Service Oriented Architecture (SOA)
Phase 2: FY14 – 15 JLVC 8 & 9COMPOSABLE SOA- ESTABLISH SOA GOVERNANCE - RAPID DATA GEN (RDG)- COMPOSABLE SIMS & MODELS- DEVELOP SOA SERVICES- WEB ONTOLOGY - DISTRIBUTION METHODS- ANALYZE AND REFINE SOA
Phase 1 : FY12 – 13 JLVC 6 & 7HYBRID SOA ARCHITECTURE - HLA IEEE 1516-2010 (RTI SELECTION) - NEW MODULAR FED OBJ MODEL (FOM) - SOA XML/WEB SERVICES - INITIATE SOA GOVERANCE - INITIAL DECOOUPLING OF DATA / APPS - DEVELOP SOA SERVICES - TEST & EVALUATE
Phase 3: FY16 – 17 JLVC 10 COMPOSABLE JOINT ENVIRONMENT - SERVICE BASED M&S ARCHITECTURE - INTELLEGENT SERVICES - COMPOSABLE SIMS / MODELS - SIMULTANEOUS, MULTIPLE ON-DEMAND CAP - IMMERSIVE TRAINING - ADAPTIVE LEARNING
New SOA Services
HLA
DIS TENA
Tightly-Coupled Architecture
JLVC EN
VIRO
NM
ENT
EDU
CATIO
N A
ND
TRA
ININ
G
Intelligent Services - distributed data, logic and architecture
Select Desired Model, Simulation or Service
Design to support Joint Training and Experimentation for the Joint and Coalition Warfighter
MaximizeComposability & Reusability
Design/Prototype
JLVC & KORCOM
Model-Based & Services Framework
LINE OF SIGHT
JTLS JCATS
SOA
VBS2
TERRAINWEATHER
MAINTENANCE
ORDER OF BATTLE
C2 (AFATDS)
Joint Theater Level Simulation
Joint Conflict and Tactical Simulation
Virtual Battlespace 2Gaming / Virtual
AutonomousIntelligent Services
- On Demand- Home
Station
Driven by Model-based & Services Architecture
SeamlessIntegrationAutomatic code generation based on metadata
CURRENT STATE: TIGHTLY COUPLED RTI; COMPLEX; EXPENSIVE INTEGRATION & EXECUTION
LINE OF SIGHT
Coalition
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
Objective Korean Architecture
Korea Hier. FOM
Korea Internal FOM
CI
CI
ROK ROK ROKROK
KORCOM FOC Architecture (FY16)
• Enhancements (Delivered in JLVC Version 10.0)– Implement Korean Hierarchical Federation– Modified JLVC Bridge to support Korean Hier FOM– KBSC Requested Mods– Enhanced Interoperability with Korean Models– WARSIM-JLVC Bridge– MRF-W Option for Time Managed Policies
JLVC REL ROK
AWSIM
IOS
JLOD JDLM
MTWS
JLVC FOM & Mature Services
DISRTI 1516 Evolved; Mix Rel/Unrel; RT
WARSIM FOM
Bridge
WARSIM WIM
Virtual
Bridge
NCTETerrain
Log
Agg-CBT
OB Data
Sensors
UNCLASSIFIED
UNCLASSIFIED12
Services
UNCLASSIFIED
UNCLASSIFIED
NATO Training Federation (NTF 2.0)
JTLS JCATS
RTI(1516-2010)
VBS2
NATO C2Link 1, Link 16 (RAP)
OTH Gold (RMP)AdatP-3 (ATO, ACO, RGP)
National C2MIP
NETNFOM
FLAMES
13
UNCLASSIFIED
UNCLASSIFIED
Multinational Engagement
14
FinlandSweden
Norway
Ukraine
Romania
Belarus
Estonia
Latvia
LithuaniaDenmark
Poland
CzechRep
Slovakia
HungaryAustria
Germany
Netherlands
Belgium
France
Italy
Spain
Portugal
UnitedKingdom
Ireland
Iceland
Greece
Bulgaria
Luxembourg
SwitzerlandMoldova
Albania
Macedonia
Serbia
Montenegro
Bosniaand
Herzegovina
CroatiaSlovenia
Liechtenstein
USA
Turkey
106
Consumer-ProviderService
LogisticsOwnershipTransfer
Agg/ Deagg
RealtimePlatform
Reference 2.0(RPR 2.0)
ACT/SEESIM Experiment
Development Work Needed
HLA 1516 Evolved
ACT: Allied Command TransformationSEESIM: Southeastern European Simulation
UNCLASSIFIED
UNCLASSIFIED15
FY2012
JLVC Vr 7.0 (HLA 1516-2010 w/Mod FOM)
JTDS 3.2 > 4.0
AFMSTT Data Align HLA 1516 (Evolved)
ERF-ONESAFLVCIA (Incr I)
JLCCTC Single Architecture Alignment (MRF/ERF/JLVC)
MTWS Data Alignment MTWS HLA 1516 (Evolved) JLVC Development
JLVC Vr 8.0
Shared Joint Coalition Technical Standards (Joint & NATO)
JTLS 4.0
JCATS 11.0HLA 1516 SOA Proof of Concept
VBS2
JLOD
FY2013 FY2014 FY2015 FY2016
Service Oriented Architectures (SOA / Semantic Web Tech)
Joint & Coalition Modular FOM
JLVC Vr 6 .0
TechnicalConcepts
&Solutions
Rapid Data Generation (RDG)
JLVC Vr 10.0
Cloud Computing (JTDS/JTLS/JCATS/VBS2)
JLVC Vr 9.0
JTLS Vr 5.0
JCATS Vr 12.0
JTLS Vr 5.x
JCATS Vr 13.0 JCATS Vr 14.0JTLS Vr 5.x
JTDS 4.x JTDS 5.0 JTDS 6.0 JTDS 7.0
JLVC
Joint & Coalition
WARSIM Integration With JLVC (HLA 1516-Evolved)
JLCCTC-ERF 8.0JLCCTC-ERF 7.0ERF-ONESAFLVCIA (Incr 2)
NCTE 6.0 NCTE 8.0NCTE 7.0 NCTE 10.0NCTE 9.0
MRF-W Sustainment
JSAF-Unclass Naval Mines
AFMSTT Bridge (KORCOM)
Cross Domain Guard & HLA Rule Set (1516)
KORCOM IOCUSG -14
JSAF HLA 1516 (Evolved) JLVC Development
Modular FOM Updates for JLVC 1516
Service Models
JLVC SOA Proof of Concept
Cloud Computing (JLVC)
Data JTDS Terrain Storage & Service- GSE Prototype Suite JTDS Terrain Storage & Service Upgrades
AFMSTT Sustainment
HLA 1516-2010 (Evolved) SOA
AAR JAAR-RL Vr 4.0JAAR-RL Vr 3.0
KO
RC
OM
FOC
JAAR-RL Vr 5.0 JAAR-RL Vr 6.0 JAAR-RL Vr 7.0
JCW M&S Five Year Roadmap
UNCLASSIFIED
UNCLASSIFIED
M&S Future Service Oriented Architecture (SOA) Implementation
KORCOM FOC
JLVC SOA Proof of Concept
KORCOM IOC (Unified Arch)
Terra
in Service
Weather
Service
BML Service
Order of B
attle
Service
AFATDS Serv
ice (C
2)
Maint /
Repair
Service
PHASE 1HYBRID SOA
ARCHITECTURE JLVC 6 & 7
PHASE 2COMPOSABLE MODELS
JLVC 8 & 9
PHASE 3COMPOSABLE JOINT
ENVIRONMENT JLVC 10 Autonomous Intelligent Services
FOC
*Decompose M&S
* Joint Theater Level Simulation* Joint Conflict and Tactical Simulation* JCATS Low Overhead Driver* Joint Exercise Control Station (JECS)
Virtual Battlespace 2 (VBS2)
Line of S
ight Serv
ice
USMC Service Model
USA Service Model
USAF Service Model
USN Service ModelEstablish SOA Governance
FY2013FY2012 FY2015FY2014 FY2017FY2016
NATO NTF V2.0
IOC
Initiate SOA Governance
Web Ontology Methodology
Autonomous Intel Services
IOC
Distribution Methods
Live InterfacesHLA 1516-2010
RTI & Modular FOM
Dynam
ically
Create
& Discove
r
Objects
Durin
g Runtime
Cloud Computing (lim
ited)
FOC
Rapid Data Generation (RDG)
IOC
JLVC SOA
Framework
Virtual Interfaces
Test, Evaluate & Refine
Composable M&S Integration
New Services Added
Synergy and Efficiencies Gained Through Aligning SOA Prototype, KORCOM Project, Rapid Data Generation (RDG) project, NATO
Training Federation (NTF) Objectives (MSG-105) & SEESIM Experiment
16
SEESIM 12
UNCLASSIFIED
UNCLASSIFIED
Joint Staff Joint & Coalition Warfighting M&S - Future
2011 2020
Join
t Tra
inin
g
Ente
rpris
e
Netw
ork V
er 2.
-0
• Integrated training and experimentation • Open Architecture • Service oriented architecture• Full Interagency & Coalition integration• Learn from results of simulation• Seamless multi-level training• Rapid scenario generation• Cost effective business model• Routinely accessible from anywhere
2015 20182013
Coali
tion
M&S
Info
rmat
ion
Shar
ing
KORC
OM FOC
20162014
Join
t-Ser
vice
SOA
Gover
nanc
e
JLVC
SOA
Proo
f of C
once
pt
KORC
OM IOC
(Uni
fied
Arch
)
Wire
less
Si
mul
atio
nDi
strib
utio
n
2012
Sim
ulat
ion
as
Serv
ices
On-De
man
d
Sim
ulat
ion
Dyna
mic
JELC
Sim
ulat
ion
for C
ours
e of
Actio
n De
velo
pmen
t
Rapi
d Sc
enar
io
Gen S
ervi
ces
(Aut
omat
ed)
On De
man
d
Multi-
Leve
l Tra
inin
g
(Inte
grat
ed G
amin
g)
JTEN
in th
e
Natio
nal C
apito
l
Regi
on
Pers
isten
t Coa
litio
n
train
ing
netw
ork
JLVC
5.0
USMC
inte
grat
ed
17
UNCLASSIFIED
UNCLASSIFIED
FY12 Development (Task Order #8)• Service Oriented Architecture (SOA) and associated web services
application programming interface (API) in accordance with HLA 1516-2010 to support a JTLS, Joint Conflict and Tactical Simulation (JCATS) and Virtual Battlespace 2 (VBS2) federation.
• Conduct research for interfacing JTLS with a Terrain service (initialization and runtime).
• Provide an interface to exchange information with the HUMINT On-Line Tasking and Reporting (HOTR) system.
• Provide a user-friendly database development tool based on the Web Hosted Interface Program (WHIP) to assist database developers in updating a database from an earlier version.
• Provide reengineering of high resolution units (HRU) to represent current real-world capabilities.
• Provide for the modeling of Tomahawk® Land Attack Missile (TLAM) – E.• Provide an interface to Advanced Field Artillery Tactical Data Systems
(AFATDS).• Provide maintenance and repair of objects/entities as a service.• Provide for smooth movement of ground, air, surface and subsurface
objects in JTLS. 18
UNCLASSIFIED
UNCLASSIFIED
FY 12 Development (Task Order #9)• Develop JTLS from the current hex-based terrain into a more detailed and flexible
grid-based terrain– Represent the terrain, atmosphere, ocean and space domains. Within each domain, provide
the capability to retrieve, modify, update and delete various types of information, including during runtime.
– Represent natural and some man-made features.– React to events that occur in the battlespace, including weather/weather effects and
nuclear, chemical and biological contamination. – Operate with a global playbox, employing multiple and simultaneous active engagement
Areas of Responsibilities (AOR) and Areas of Interests (AOI) around the globe. The design must incorporate the ability to have general terrain areas, AORs and AOIs at various resolutions (grid sizes) simultaneously and be completely interoperable.
• Develop JTLS to support terrain services SOA and associated web services in accordance with HLA 1516-2010.
• Develop multi-threading/simultaneous multithreading (SMT) capability for JTLS XML Message Service (XMS) component and evaluate other key components for SMT.
• Provide interface with UAV Simulator Multiple Unified Simulations Environment (MUSE) using HLA and/or DIS
• Develop a JTLS interface with Air Force Air Operations Center (AOC) Command and Control Theater Battle Management Core System (TBMCS) and associated components.
• Provide for Google Earth (or like service) to be a map service for the Web Hosted Interface Program (WHIP). 19
UNCLASSIFIED
UNCLASSIFIED
Questions ?
20
UNCLASSIFIED
UNCLASSIFIED21
FY 10 FY 11 FY 12 FY 13Q1
Oct – DecQ2
Jan - MarQ3
Apr - JunQ4 Jul - Sep
Q1 Oct – Dec
Q2 Jan - Mar
Q3 Apr - Jun
Q4 Jul - Sep
Q1 Oct – Dec
Q2 Jan - Mar
Q3 Apr - Jun
Q4 Jul - Sep
Q1 Oct – Dec
Q2 Jan - Mar
Q3 Apr - Jun
Q4 Jul - Sep
`
JLVC KORCOM Project Timeline (IOC)
Release/Delivery
JLVC Version 5.0JLVC Version 6.0
JLVC Version 7.0 (1516 Evolved)
Milestone
MTWS JLVC IntegrationUSMC IOC
KORCOM IOC software delivered Sep 13 after UFG 13
NET/Fielding
MRF-W Implementation
Decision PointKey
JLVC-NCTE Data alignment
JLVC KSIMS Integration (JLVC-MRF Bridge)
JLVC Aggregate Combat Service (JLCCTC ENG)
Releasable JSAF-REL ROK/NATO
CoalitionActivity
WARSIM Scalability Enhancements
NATO/Coalition HLA specification design (1516)
MRF-W FOC UFG13
Coalition HLA Sustainment
ServiceActivity
MTWS 1516 DevMTWS Data AlignmentUSMC FOC
JSAF Naval Mines
JLVC-MRF Bridge (LANL)
Cross Domain Guard & HLA Rule Set (1516)
JSAF KBSC Delivery Early look
JLCCTC JLVC Data AlignmentAFMSTT 1516 ImplementationAFMSTT Data Alignment
JLVC Version 4.0
PrototypingActivity
JointActivity JLVC Modular FOM Design
Terrain Services Prototype (Cloud Computing)Dynamic JELC –Process Model
ExperimentsJoint Model Web-Service Experiments (1516 HLA Evolved)Joint Model Development –Simulation of Multiple
Timescales
RDG Prototype
UNCLASSIFIED
UNCLASSIFIED22
FY 14 FY 15 FY 16 FY 17Q1
Oct – DecQ2
Jan - MarQ3 Apr - Jun
Q4 Jul - Sep
Q1 Oct – Dec
Q2 Jan - Mar
Q3 Apr - Jun
Q4 Jul - Sep
Q1 Oct – Dec
Q2 Jan - Mar
Q3 Apr - Jun
Q4 Jul - Sep
Q1 Oct – Dec
Q2 Jan - Mar
Q3 Apr - Jun
Q4 Jul - Sep
`
Release/Delivery
JLVC Version 9.0JLVC Version 10.0
Capability Sustainment
Milestone/Event NET/Fielding
Decision PointKey
UFG 14IOC First Use
KR 15
FOC FIELDING (KSIMS Final KSIMS Integration)
JLVC KORCOM Project Timeline (FOC)
KR 15
WARSIM JLVC Integration
CoalitionActivity
MRF-W Capability Sustainment
Coalition HLA Sustainment
JLVC Continued Web-services Development
UFG 17FOC First Use
JointActivity
ServiceActivityServiceActivity
JLVC-MRF Bridge Modified for final KSIMS Architecture
AFMSTT Bridge
JSAF/NCTE KBSC Enhancements
KSIMS Led Federation Design
Version 8.0
UFG 15
UNCLASSIFIED
UNCLASSIFIED
JTLS 2009 CCB Results
ECP Number Team Area Team Sub-Area Title PriorityJTLS-0507 Model Intel Intelligence Imagery Collection 1JTLS-2005-1553 Model General Develop Polygonal Rivers & Roads In JTLS 2JTLS-0172 Model HRU Transport Of HRUs 3JTLS-0014 Model Air Model Runway Use By Friendly Sides 4JTLS-2007-2088 C4 Adapter Interface Identical Name Air Missions Causes Track Symbols To Jump On COP 5JTLS-2007-2070 Model Air Add BDA To Multi-Target Attack Missions 6JTLS-2006-1661 Database XML Data Imported And Exported Between JTLS And CT/UGU 7JTLS-0103 Model Naval Snorkel Times For Diesel Submarines 8JTLS-2007-2049 Administrative Develop Software Install Script For JTLS 9JTLS-2008-10020 Model General More Detailed Combat System Damage Reports 10JTLS-0409 Model Air JTLS Splitting And Merging of Flights 11JTLS-0287 Model Ground Capture And Surrender Capability (Includes 3 Other ECPs) 12JTLS-0095 Model Intel Negative Report For IPIR & RECCEEXREP That Don't See Anything 13JTLS-2007-2012 ATOG Integrate ATOG Functionality Into WHIP 14JTLS-2006-1828 Model HRU Effective Time For HRUs Very Confusing 15JTLS-2009-10301 Model HRU HRU Detection and Destruction 16JTLS-2008-10080 Model HRU HRUs Should Always Collect Information 17JTLS-2008-10101 Model Air Multiple Orbit Points 18JTLS-2009-10271 Model Air Allow Player To Turn Off Air Mission Sensors 19JTLS-2006-1714 Model Air Delivery Item List Not Available To Operator 20JTLS-0170 Model Air IMT Air Mission Destination 2 Location Field 21JTLS-0197 model Air Enhance Close Air Support Current Operations 22JTLS-0186 Model Air Insert/Extract Missions Should Be Included On Lift/Drop Report 23JTLS-2006-1630 Model Air Multiple Mission Air Orders 24JTLS-0435 Model Air Optional Refueling 25JTLS-0076 Model Air Airlift Supply Alternative Landing Location Logic 26JTLS-0226 Model Naval Naval Units Are Unable To Engage Friendly ASM 27JTLS-2008-10032 Model General Relate Messages To Orders 28JTLS-2008-10019 Model Intel Use IMINT National Image Interpretability Rating Scaled (NIIRS) 29JTLS-2009-10277 Model Ground Detach By Combat System Days Of Supply Option 30JTLS-2006-1668 Model Naval Current Drift When System/Unit Is In The Water But Not Moving 31
23NOTE: Open spreadsheet to view “comments” in Title column