Subject
Ref.
Sir,
Expansion of Steel (4.0 MTPA to 10.0 MTPA) at Vijayanagar, Toranagallu,Bellary, Karnataka by MIS JSW Steel Ltd.Your letter no. nil dated 3rd and 26th April, 2008.
Kindly refer your letter no. nil dated 3rd and 26th April, 2008 wherein you have proposedfor the substantial changes in the capacity of the different plants without changing overallcapacity of the Steel Plant (10.0 MMTPA).
The changes proposed in the capacity of the shall be as follows:
S.N. Name of the Plants OriginalfacilitiesasperProposed ChangesforEnvironmental Clearance for
expansion (4.0 to 10.0 MTPA)expansion (4.0 to 10.0 MTPA)1
Ore beneficiation Plant, 2 x 3.0 MTPA1 x 2.5 ; 1 x 7.5 & 1 x 5.0 MTPAproduct 6.0 MTPA
15.0 MTPA2
Pellet Plant No addition1 x 5.0 MTPA
3
Sinter Plant 204 M2 2X204 m21X204 m2 & 1 X 496 m<4.6 MTPA
8.05 MTPA4
Coke Oven - NR No additionNo addition
5
Coke Oven -Recovery 8 X 55 oven batteries4X 55 & 4X72 oven batteries3.0 MTPA
3.5 MTPA6
Hot metal - Corex No additionNo addition
7
Hotmetal-Blast 2 X 4019 m3 BF2 X 4019 mJ BFFurnace
Upqrade BF-Ho 1650 m3Upqrade BF-Ho 1650 m36.0 + 0.43
6.0 + 0.438
Pig Casting Machines 2 X 1400 TPD2 X 3600 TPD2800 TPD
7200 TPD
9Crude steel - BOF & 3 X 170 converter4 X 175 converterauxiliaries 6.16
6.1610
Lime Kilns 8X300 TPD4 X 300 TPD and 4 X 600 TPD2400 TPD
3600 TPD11
Slab Caster 2 X 2100 slab casters3 X 2200 slab casters3.2 MTPA
4.5 MTPA12
Billet caster 2 X 8 strand1X 8 strand2.3 MTPA
1.5 MTPA13
HSM 1 new 2000 mm wide HSM1 new 2000 mm wide 5.0 MTPAHSMUpgrade HSM-1 to 3.2 MTPA &
Upgrade HSM-1 to 3.2 MTPA &
4.3 MTPA (New)5.0 MTPA (New)
14Plate mill 1 unitNil
1.0 MTPA0
15Pipe mill -1 unit
-0.4 MTPA
16Wire rod mill 1 unit1 unit
0.750.6
17Rebar mill 1 unit1 unit
0.8 MTPA1.0 MTPA
18Cold RollingMill1 x 1.0 MTPA and 1x 2.0 MTPA1 x 1.0 MTPA and 1 x 2.0 MTPA
Complex 3.0 MTPA3.0 MTPA
19Galvanizing Lines 4 units4 units
1.0 MTPA1.0 MTPA
20Color Coating Line 1 unit1 unit
0.5 MTPA0.5 MTPA
21Power Plant and process Gas basedGas & coal based
steam boilers 260 MW + 4 boilers2 X 300 MW + 4 boilers
22Incinerator 1 unitI unit
250 kg/h250 kQ/h
23Slag Grinding and mixing 2 x 2.0 MTPA Grinding Plant2 x 2.0 MTPA Grinding Plant
unit 4.0 MTPA4.0 MTPA
24Oxygen Plant 2X 1800 TPD2X1800 TPD +1X900
3,6004,500
1. 'Consent for Establishment' as per the revised facilities and capacities shall be obtainedfrom the Karnataka State Pollution Control Board.
2. No change in the overall capacity of the plant (10 MTPA) and further expansion ormodifications in the plant shall be carried out without prior approval of the Ministry ofEnvironment and Forests.
3. All the standards prescribed for the coke oven plants shall be followed as per the latestguidelines. Proper and full utilization of coke oven gases in power plant using waste heatrecovery steam generators shall be ensured and no flue gases shall be discharged intothe air.
2
4. Proper and full utilization of coke oven gases in power plant using heat recovery steamgenerators shall be ensured and no flue gases shall be discharged into the air.
5. Total water requirement from Tungbhadra dam and Krishna River (Almatti Dam) shallnot exceed 6,508 m3/day.
6. Continuous monitoring of Total Organic Compounds (TOe) shall be done at the outlet ofETP (BOD plant) and wastewater shall be used for wet quenching.
7. All the recommendations made in the Charter on Corporate Responsibility forEnvironment Protection (CREP) for the Coke oven plants shall be implemented.
8. As proposed, total cost of the project will be Rs. 16,454.00 Crores. Rs. 1,400.00 Croresearmarked towards the environmental pollution control measures shall be judiciouslyused to implement the conditions stipulated by the Ministry of Environment and Forestsas well as the State Government. The funds so provided shall not be diverted for anyother purpose.
9. All the other specific and general conditions shall remain as mentioned in theenvironmental clearanceJetter no. J-11011/364/2006- IA II (I) dated th May, 2007.
10. Regular submission of compliance report to this Ministry including its Regional Office atBangalore, Karnataka State Pollution Control Board (KPCB) and Central PollutionControl Board (CPCB) shall be ensured.
11. A copy of this letter shall be attached with the original clearance letter no. J11011/364/2006- IA II (I) dated th May, 2007.
This letter is issued with the approval of the Competent Authority.
(Dr. P. B. Rastogi)Director
Copy to :
1. The Chairman, Central Pollution Control Board, Parivesh Bhavan, CBD-cum-OfficeComplex, East Arjun Nagar, Delhi -110032.
2. The Chairman, Karnataka State Pollution Control Board, Parisar Bhavan, No. 49, 4th &5th Floor, Church Street, Bangalore - 560 001, Karnataka.
3. The Chief Conservator of Forests (Central), Regional Office (SZ), Kendriya Sadan, IVthFloor, E&F Wing, 17th Main Road, Koramangala, Bangalore-560034, Karnataka.
4. The Secretary, Department of Environment & Forests, Government of Karnataka,Bangalore, Karnataka.
5. Adviser lA-II (I), Ministry of Environment and Forests, Paryavaran Bhavan, CGOComplex, New Delhi- 110003.
6. Monitoring Cell, Ministry of Environment and Forests, Paryavaran Bhavan, CGOComplex, New Delhi- 110003.
7. Guard file.
8. Monitoring file. {L ~.Ir~9. Record file. U a1'-"''':.-r
(Dr. P. B. Rastogi)f)\rL~
3