Canopy Areaexcluded from GIA(2.20)
FrontEntrance
Shutter Door
Shutter Door
Shutter Door
Shutter Door
Shutter Door
Shutter Door
Shutter Door
Shutter Door
Shutter Door
Shutter Door
Shutter Door
Shutter Door
Shutter Door
Warehouse
Canopy Area162.79 sq m1782 sq ft
Copy Point
FrontEntrance
Fire Exit
Fire ExitFire Exit
FrontEntrance
Fire Exit Fire Exit Fire Exit
Fire Exit Fire Exit Fire Exit Fire Exit
Fire ExitFire ExitFire Exit
Fire Exit
Fire Exit
L Twr
TX
EXT3
EXT4
EXT1
EXT2
LV01
Proposed DNOSubstation
Proposed1MVA TransformerGRP transformer housing3000 x 3000 x 2400
6xØ100Ducts
1xØ100Ducts
1xØ100Ducts
2xØ100Ducts 1xØ100
Ducts
450x450mmDraw Pit
1xØ100Ducts
600x600mmDraw Pit
450x450mmDraw Pit
450x450mmDraw Pit
1xØ100Ducts
1xØ100Ducts
1xØ100Ducts
1xØ100Ducts
2xØ100Ducts
4xØ100Ducts
600x600mmDraw Pit
2xØ100Ducts
1xØ100Ducts
3xØ100Ducts
4xØ100Ducts 1xØ100
Ducts1xØ100Ducts
3xØ100Ducts
3xØ100Ducts
600x600mmDraw Pit
2xØ100Ducts
1xØ100Ducts
600x600mmDraw Pit
RCD
RCD
RCD
RCDRCD
RCD
RCD
RCD
RCD
450x450mmDraw Pit
450x450mmDraw Pit
450x450mmDraw Pit
1xØ100Ducts
1xØ100Ducts
8xØ150Ducts
1xØ100Ducts
1xØ100DuctsExisting Private
transformer415V - 33KV 1xØ100
DuctsH
EVC2
1xØ100Ducts
1xØ100Ducts
1xØ100Ducts
1xØ100Ducts
450x450mmDraw Pit
1xØ100Ducts
1xØ100Ducts
Redundantincoming BT supplyto be removedRedundant incoming MCW mains to
be disconnected and removed
L
Redundant incoming LVsupply to be disconnectedand removed
H
8xØ150Ducts
450x450mmDraw Pit
450x450mmDraw Pit
450x450mmDraw Pit
450x450mmDraw Pit
1xØ100Ducts
1xØ100Ducts
1xØ100Ducts
1xØ100Ducts
600x600mmDraw Pit
10xØ150Ducts
600x600mmDraw Pit
LIncoming LVsupply to bedisconnectedand removed
BT
M
Incoming MCW mains to be retainedExisting supply capacity to be confirmedNew MCW meter to be installed
Incoming LP Gas to be retainedExisting supply capacity to be confirmed
Incoming BT to be retained
10xØ150Ducts
DNO Substation
MDPE Barrier Pipe Mains Cold Water proposed route.
Medium Pressure Gas Main proposed route.BT ducts proposed route.Ducts proposed route (sized as shown)
Low Pressure Gas Main proposed route.
H Proposed Hydrant Position.
TP+N isolator (rated as shown)
SP+N isolator (rated as shown)
SP+N distribution board
TP+N distribution board
HPPE Barrier Pipe Hydrant Main proposed route
TX 3m x 3m Transformer compound.
Proposed Precast Trench with composite lid.
Precast Concrete Trench cable Feeder PitsFFP
Proposed HV Turning PitH
LPotential Future LV Sub feederLeft as Turning Pit
Indicative position of CCTV exterior camera mountedon column by end user's contractor. Main Contractorto provide containment, Twin 13A RCD metal cladsocket, column & base to each location (column &base to be confirmed by end user).(Final number, type and direction to be decidedby end user's Security contractor).
Twin 13A Metalclad RCD Socket for CCTVmedia converter (exact position on column TBC).
RCD
DrawpitSize as noted
150mm underground LV Duct(No. INDICATED)
Proposed MCW Valve Pit (Unless noted otherwise)
Proposed Hydrant Valve Pit (Unless noted otherwise)
Proposed Inspection Pit. (Size as noted)
Proposed BT chamber.
LEGEND:-
BT
M Proposed MCW Meter
Proposed 13A Fused Spur
Thrust BlockT
Column mounted light.(See drawing '10252-PL-100' for moreinformation.)
Feeder Pillar for EVCFP (EVC .NO)
Notes:
1. Existing Incoming Utility services connection points for
Gas/Water/Telecoms & Electricity to be confirmed by developer.
2. Location of Transformers and LV Panels to be carefully
coordinated with MHE and operations layout.
3. Main Contractor to be responsible for any concrete
bases/Builderswork required for Utility meters.
4. External Lighting to be carefully coordinated with HGV /Car
parking and Landscaping layouts.
5. Transformer compound to be Fenced with Double Lockable gates.
6. Electrical Contractor to provide Lighting column details
to Main Contractor to enable sleeves/concrete to be designed/installed.
7. Draw Pit to be included at all CCTV locations.
8. Main Contractor to allow additional 1x100mm duct from
nearest Draw Pit to serve CCTV cameras on Lighting columns.
9. Main Contractor to provide power for CCTV camera media
converters at positions indicated on drawing.
10. Main Contractor to confirm with End user's security
contractor, suitability of lighting columns for camera mounting.
TP&N ISOLATOR (Rated as shown)??ATP&N
2x100mm Underground CCTV Duct
2xCOMPARTMENT CCTV CABLE TRUNKINGSIZE AS INDICATED ON LAYOUT
CCTV ELECTRICAL RISER
CCTV STAINLESS STEEL CONDUIT
2x100mm UNDERGROUND CCTV DUCT
3 x 150mm Underground LV Generator Duct
EARTH NEST
1000mm x 500mm Cable Trench complete with cover suitable forheavy vehicle crossing
Active Charger Location
CABLE TRAY UNDER CANOPY SIZE AS INDICATED
13A MASTERSEAL TSSO, 30mA RCD
Column mounted light.(See drawing '10351-PL-100' for more information.)
Passive Charger Location
2000
350
900
600
250
60045
0
430
690
960
1255
1550
1720
280 430260270295295170
Footpath(mm)
350900600450600
1.
Carriageway(mm)750600
900750
600
3.
GasWaterBT
Electric HVElectric LV
Information Concerning Depth and line of existing infrastructure serviceshas been extracted from relevant Statuatory Authority Ordinance Surveymaps and is given without Obligation or warranty and its accuracy cannotbe guaranteed. Exploration trial holes must be hand dug as must anyexcavation to relocate or otherwise modify existing live services.Adequate protection is to be provided during all site works.
All new services to be installed to the following minimum depths of cover.
Other Telecom Providers 600 350
4. Exact/final points of entry of all new incoming utility services to be agreedwith the Employer. All incoming electricity & water services shall as/whereapplicable be ducted under all floor slabs & concrete service yards tomeet the requirements of the particular utility company, with electricitycables also ducted under any road crossings.
5. All existing above or below ground redundant 'public/utility' or 'private'electrical, gas, telecom or water services within the site demise shall beidentified & safely disconnected, removed and disposed off from site (orotherwise left abandoned underground) to meet Construction needs.
2. This information is issued for information purposes. No design intent isimplied and the actual position of all new services and the constructionsequence must be determined by the Contractor and/or his HighwaysContractor.
Contractor to provide coordination of all services with EVC services6.
NOTES:
H
A
F
150
ED
350
150
65
C
Base
Door
B
G
COLUMNS SPECIFICATION
· Stepped tubular galvanised steel columns, to BS EN 40-2:2004· Mounting accesories are hot dip galvanised to BS EN ISO 1461:2009· Supplied with wooden baseboard for mounting cable connection accessories· Accessories are easily fixed with stainless steel grub screws and have an internal stop to ensure cable exit
COLUMN RANGE
NOMINALHEIGHT CAT.No. PLANTING
DEPTH BASE HEIGHT DOOR HEIGHT DOOR DIMENSIONS BASE DIAMETER SHAFTDIAMETER
APPROX. kg BASEBOARD SIZE
A B C D E F G H
Single and Twin Starbeam Standard Columns
6m FC6 1000 925 300 500 100 140 76 44 89(w) x 500 (h)
8m FC8 1200 1200 400 600 115 168 114* 100 89(w) x 600 (h)
10m FC10 1500 1300 500 600 115 168 114* 142 89(w) x 600 (h)
* Reduced at top to 101mm to accept accessories.
4m FC4 800 925 300 500 100 140 76 33 89(w) x 500 (h)
Range of ornatearms available
Conduit glandM25 threaded entry
Tube to wiperspray nozzle
Venting asstandard
Outline of customerCCTV camera
Decorative banding
Cabinet size options325 / 400 / 500
Fan assisted cooling Double door accessfor partitioned cabinet
OptionCondensation driptray with outlet pipe
400 Sq. cabinet
Removable access door
CCTV equipment mountedonto marine ply backboard
Tamperproofmicro switch
Access door forwash bottle
5 litre wash bottle
342
746
x 31
2
Stan
dard
ape
rture
Cable duct
325 x 325Cable access
645 x 645
Ø219
MAIN CONTRACTOR TO PROVIDE FOLLOWINGCONCRETE BASES TO SUB-CONTRACTOR DESIGN· TRANSFORMER· LIGHTING FEEDER PILLAR· MOBILE GENERATOR
MAIN CONTRACTOR TO PROVIDE PROTECTION TOALL INTERNAL DISTRIBUTION BOARDS & IDFBOARDS
Typical Arrangement of 2 No. Water Connections to Site
Meter
Single CheckValve
Sluice Valve
Customers PotableWater Supply
Customers FireMain/Hydrant Supply
Broken lines denote outline ofvalve/ meter pit sized to suit.
Site
Boun
dary
Denotes R.W.Cpipework installation
Denotes Customerpipework installation
HydrantWashout
Non-ReturnValve
Sluice valve(at site boundary)
Suitably sized HPPEpipes connect to water main.
RWCWaterMain
Suitably sized MDPEpipes connect to water main.
GC8 Housing Base Typical DetailTypical Gas Meter/governor basedetail for costing purposes only.Exact detail to be provided by Gasself lay contractor
-
4 DETAILTYPICAL TRANFORMER BUILDERSWORK WITH FULLY BUNDED PIT NTS
BUNDED PITTO SUIT TX SIZEBY CONTRACTOR
EARTH PIT
TRANSFORMER BUILDERSWORKWITH FULLY BUNDED PIT30
00
3000
TRANSFORMER ENCLOSURE
EARTH TAPE
CABLE IN CABLE OUT
TO DRAINAGESYSTEM
TX
PLAN VIEWSIDE VIEW
PRECAST CONCRETE BASETO LOAD 20 TONS
GENERATORCONNECTION BOARD
CABLE ENTRYFROM MAINLV PANEL
Ø150 CABLE DUCT
MOBILE GENERATORCABLE ENTRY
EARTH PIT
-
3 DETAILTYPICAL GENERATOR CONNECTION DETAIL FOR MAIN BUILDING MAIN LV PANEL
NTS
TYPICAL-1 TRANSFORMER DETAIL (TX)
TYPICAL-2 MP/LP GAS METER HOUSING TYPICAL-3 PACKAGED ELECTRICAL SUBSTATION
ADAPTABLE WAREHOUSE BOXFIXED WITH TAMPER PROOF SCREWBY MAIN CONTRACTOR
MEDIA CONVERTORBY SECURITY CONTRACTOR
BY SECURITY CONTRACTOR
-
2 DETAIL
TYPICAL CCTV CABLINGTHROUGH CONVERTOR FROM TRUNKING
NTS-
1 DETAIL
TYPICAL CAMERA COLUMN WITH BASE NTS
Drawing no.
Scale
Drawn by
Rev.
Date
Checked by
Drawing Title
Project Address
Architect
Client
The copyright of this document is vested solely in Kelly Taylor & Associates.
Reproduction of this document, in whole or in part, is prohibited other thanwith the express permission of the above company.
This drawing to be read in conjunction with all relevant architects, consultants,sub-contractors and specialist drawings, and should not be scaled from in anyway.
Rev. By Date Description
Revisions
E-MAIL [email protected]
K E L L Y T A Y L O R & A S S O C I A T E SENGINEERING & ENVIRONMENTAL CONSULTANTS
1 ASHLEIGH WAY, LANGAGE BUSINESS PARK,PLYMOUTH, DEVON, PL7 5JX.
FAX. +44(0)1752 344282TEL. +44(0)1752 332890
Authorised by
Chk
Size
A0
THAMES ROAD,BARKING
CDM DESIGNER RISK INFORMATION
In addition to the hazards/risks normally associated with the typesof work detailed on this drawing NOTE THE FOLLOWING:
· CONSTRUCTION
N/A
· MAINTENANCE/CLEANING
N/A
· DECOMMISSIONING/DEMOLITION
N/A
It is assumed that all works will be carried out by a contractorcompetent under CDM 2015 working to an approved methodstatement
External Services Layout
10365-EXT-100 -
PLANNING
1:350 Feb '21
YJ YJ GPH