• What’s new after October’05 Collaboration
Meeting
– LARP Org Chart changes, communication, DocDB, Web
– FY06 Budget – spending to date
– DoE Review Nov’05; RC review + Lumi Review
– LARP Collaboration Meeting Apr’06 @ LBL
• Accelerator Systems Progress Highlights
• New proposals
– “hard deliverables” vs new proposals
– “Gang of 5+1”
– Stream of consideration & approval process
LARPAC 05/11/2006 - Shiltsev 3
Accelerator Systems Org Chart
V.ShiltsevAccelerator Systems
Instrumentation:A.Ratti
Tune Feedback(P.Cameron)
Luminometer(A.Ratti)
Schottky Monitor(A.Jansson)
Commissioning:M.Syphers
Beam Commiss-ing(E.Harms)
IR Coms-ing(M.Lamm)
Collimators R&D:T.Markiewicz
Efficiency Studies(A.Drees)
Rotating Collim.(T.Markiewicz)
Tertiary Collim(N.Mokhov).
Irradiation Studies(N.Simos)
Accel Physics:W.Fischer
E-cloud(M.Furman)
IR & Beam-Beam(T.Sen)
Wire Compens’n(T.Sen)
Recent Changes:
Wolfram Fischer (BNL) to lead AP
LARPAC 05/11/2006 - Shiltsev 4
Communication/Coordination
• Communication within LARP: – VideoConf of all AS L2s+Steve ~once/mos
– One-on-one meetings (site visits, reviews, etc) ~once/qrtr
– Collaboration meetings ~twice/year
• Communication with CERN– First “long-termers” (P.Limon et al)
– Visits (HC, BC, Instr, etc) >1/mos
– Workshops (e.g. TAN) and reviews (e.g. RC) ~once/qrtr
– LARP Collab Meetings ~twice/yr
– US-CERN meetings ~ once/yr
• LARP Doc DB is functioning:– ~280 docs uploaded from Oct’05-Apr’06
LARPAC 05/11/2006 - Shiltsev 5
• Introduced in Oct’05 Collab Mtg (FNAL)
• Main tool at the Apr’06 Collab Mtg (LBL)
• Management of– Agenda
• Anyone can/may do it, but should be “convener” or session chair
• No need to keep agenda externally
– Talks/documents• The speaker is
responsible for maintaining the integrity of his/her document
https://larpdocs.fnal.gov/LARP-private/DocDB/https://larpdocs.fnal.gov/LARP-private/DocDB/
LARPAC 05/11/2006 - Shiltsev 6
• USLARP.org web site– Uses Plone
• A widespread wiki implementation
– Elliott McCrory is working on making this site useful• Jump point to other web resources
– Anyone can modify the content/layout• You have your own username/password
• There are lots of LARP web sites– LBNL– BNL– Fermilab
• AD & TD
– SLAC• ?
Web pages
LARPAC 05/11/2006 - Shiltsev 7
FY06 Accelerator Systems Budget
Pete got extra 150k$ to cover past investments BNL BC funds
redistributed to FNAL and LBL -60k$
RC hardware start delayed -350k$
Nick got extra +50k$ for PhII irradition
extra +30k$To build BB-Wires
LARPAC 05/11/2006 - Shiltsev 8
Accel.Syst. Spendings
1.2M/3.6M=33%thru ½ year
Mar.31, 2006
LARPAC 05/11/2006 - Shiltsev 9
Topics
• Make sure that we achieve all milestones– And spend $$ approx as planned
• Reviews– Be prepared and pass numerous reviews (small and big one)
• Next year planning/budget– Have clear understanding of what will we do next year
• New initiatives– Should always have a healthy pressure of new proposals– Now anticipate some $$ to be freed after diagnostics
development and fabrication finished in 2007
LARPAC 05/11/2006 - Shiltsev 10
DoE Review of LARP November 2005
• “The review committee was very pleased with the presentations on beam instrumentation and accelerator physics. In addition, they found the idea of participation in the development of a remote control room a very interesting possibility for enhancing interactions with CERN from afar via the Fermilab project “LHC@FNAL”.
• Plans for commissioning of LHC hardware are already being implemented, with the first U.S. staff member (Peter Limon) already stationed at CERN. It was reported by management that U.S. laboratories will provide staffing for this effort, and, in fact, FNAL has committed seven persons to this task. LARP and CERN will cover costs of travel and additional living expenses in the Geneva area.
• Finally, the committee again emphasized its displeasure with the lack of formality in dealings of LARP, and strongly recommended a more effective bookkeeping system for managing expenses and progress on all active tasks, and a person who would be responsible for implementing such a system”.
LARPAC 05/11/2006 - Shiltsev 11
Task Sheets
• Task Sheets are written by L2s and approved by L2s and L1s and L0
• Most useful documents
• Objective, milestones, funds and personnel resources – all can be found on one page
• Semi-annual reports are lined up along these Task Sheets
LARPAC 05/11/2006 - Shiltsev 12
Reporting
LARPAC 05/11/2006 - Shiltsev 13
Fixing “…lack of formality…” : RLS
LARPAC 05/11/2006 - Shiltsev 14
Other Directive Documents
LARPAC 05/11/2006 - Shiltsev 15
Another Concern: Sign-Offs
• Alex Ratti developed an acceptable – for both US and CERN – 6-item SignOff Documentatation scheme
• Now – for instrumentation only• It’s model for other tasks
(Collimators, Wires, etc)
LARPAC 05/11/2006 - Shiltsev 16
Internal Reviews
• Rotating Collimator-1 CDR Review – December 2005, chaired by W.Turner– OK, advised to design jaw support before “cut iron”
• Luminsity Monitor Final Design Review– April 2006, chaired by T.Shea– All positive, technical risks low to medium
• Schottky Monitor Final Design Review– June 2006, at CERN
• Tune FB Final Design Review– Before FY’07, m.p. at BNL
LARPAC 05/11/2006 - Shiltsev 17
TCFB on RHIC ramp
P.Cameron
Good publicity is part of
LARP success measure–
we need to get more
articles like that!
LARPAC 05/11/2006 - Shiltsev 18
Luminosity Monitor
• The only real-time bunch-by-bunch luminosity measurement in the LHC
– 25 ns bunch spacing, 1% resolution
• R&D phase has been completed– Demonstrated 40 MHz performance
using ALS X-ray beamline• Technical Challenges
– Extremely high radiation levels • up to ~250 Grad
– Signal processing to avoid pileup• 25 ns bunch spacing
• Project Milestones:– Final Design Review (Apr 06)– System test at RHIC (Summer 06)– Four systems complete (Winter 06-07)– Installation and integration support (07)
DAQ
TAN
FE electronics
LARPAC 05/11/2006 - Shiltsev 19
LHC 4.8 GHz Schottky DesignLHC 4.8 GHz Schottky Design
R.PasquinelliA.Jansson
• Remarkable Progress: – Final drawings ready for CERN
inspection– Final Design Review 06/19/06 at
CERN– Will be the first LARP “thing”
delivered to CERN– Plan to be one of anchors for BC– LHC@FNAL for monitoring
LARPAC 05/11/2006 - Shiltsev 20
• LARP commissioners receive “Project Associate” status, join a CERN group (AT/ACR or AT/MEL) for nominally one year and contribute to the groups general HC responsibilities as well as US deliverables.
Proposed Profile for LARP Hardware Commissioners
0
1
2
3
4
5
6
7
8
Months Nov 2005-Dec 2007
FTE/
Mon
th
CRYO
MAGNET
• One commissioner stationed at CERN now. 3-4 additional to follow in the fall of 2006. Peak participation in Summer’07
Commissioning of US Deliverables and General HC
Since Nov’05 DOE Review:
• 1st USLHC String transported to tunnel
• LARP Oversight and technology transfer for USLHC interconnects
• Transportation and Installation of 2nd IR quad/DFBX/D1 on going.
LARPAC 05/11/2006 - Shiltsev 21
LHC Beam Commissioning
Accelerator Systems commissioners will
Organized on task groups of 3-4 people
(e.g. instrument operations+ developer+controls+physicist)
• LARP is heading toward having (at least) a double presence in the LARP instruments groups
• Will require coordination between L2s of “Instrumentation” and “Commissioning”
LARPAC 05/11/2006 - Shiltsev 22
Beam Commissioning Progress
LARPAC 05/11/2006 - Shiltsev 23
EoI Circulated
LARPAC 05/11/2006 - Shiltsev 24
LHC@FNAL Start-Up Committee’s work
complete Endorsement
received from Fermilab
Directorate Affected Fermilab
Divisions/Sections (AD, PPD, CD, FESS)
LARP management CMS management
Construction plans in development
Funds set aside/awaiting DOE approval
Center planned to be open in September 2006
LARPAC 05/11/2006 - Shiltsev 25
PHASE-I: Irradiation and Analysis of 2D Carbon-Carbon at BNLGOALS: Determine resilience of 2D CC against irradiation damage and assess
how the critical property of thermal expansion changes with irradiation
assembly irradiation
Post-irradiation Analysis
RESULT: PHASE-I 2D Carbon-Carbon self anneals irradiation ramage through thermal cycling in both strong and weak directions. Therefore, it is expected to meet the 25 it is expected to meet the 25 micronmicron condition set as goal
Phase-II LHC Collimator Material Irradiation Planned for May 2006
• Primary Materials: Annealed Copper and Glidcop (85% Cu – 15% Al) – done! (May 4, 2006)done! (May 4, 2006)• Other Potential Candidates: Super Invar, Gum Metal, 3D Carbon-Carbon
Material Irradiation Studies
LARPAC 05/11/2006 - Shiltsev 26
Rotating Collimator: Rescheduled
• Slip schedule ~6 months– Single jaw tests,
support/stopper design & write-up by EOFY06
– RC1 performance report by mid FY07
– $400k returned to LARP management in FY06 adjustment
– Expect slippage of Jan 2008 beam-testable RC2 delivery consistent with CERN’s latest schedule
• RC task is one of “hard deliverable” and requires closer attention at SLAC and LARP to avoid any further slippages
LARPAC 05/11/2006 - Shiltsev 27
Satisfactory Benchmarking (POSINST)
experimentsimulation
• Benchmark code against HCX experiment (LBNL)
• expt. and sim. agree quantitatively on characteristics of e– oscillations observed in magnetic quadrupole flooded with electrons:
LARPAC 05/11/2006 - Shiltsev 28
Wire Compensator
In CY06 – construct and install a wire compensator in RHIC, downstream of Q3 in IR6
• RHIC beam-beam experiments in April 2006
Motivation: Test of wire compensation in 2007
Determine if a single parasitic at top energy causes beam losses that need to be compensated. Similar experiment done last year at injection energy - found strong effects at separations ≤ 6σ.
2 experiments done so far – April 5th, April 12th
• Beam-beam simulations of 2006 experiments
Motivation: Tests and improvements of codes, predictions of observations in 2006 and of wire compensation
Four groups FNAL, SLAC: LBL; University of
Kansas
LARPAC 05/11/2006 - Shiltsev 29
• Recently initiated (minor) activities: – Flux jumps effects
– dB/B measurements
• Potential new L3 tasks (need feasibility studies): – AC dipole
– Crystal collimation
– Longitudinal Density Monitor
– e-lenses for Head-on B-B Compensation
– Crab cavities
• Considerations on Large Scale Improvements:– 1.5TeV Injector in LHC tunnel LER-LHC
– Optical Stochastic Cooling
New Initiatives (Apr’06 Coll.Mtg.)
LARPAC 05/11/2006 - Shiltsev 30
Consideration Process• “Gang of 5+1” is formed to consider/propose that
(L2s+VS+SP)
• General requirements:
– Interesting subject, development should push up the state of the accelerator physics and technology in the US
– Of interest for LHC
– Collaboration of >1 Lab, Universities welcome
– Not at expense of current unfinished tasks
– Right time and budget scale
• Considerations finished and decision taken:
– Either before start of FY’07 (better @ LARP Exec.Comm. June 5)
– After presentation of feasibility study results at the Collab Mtg
Then, L3 task formed, one of L2s picks it up plan, RLS, $$, etc
LARPAC 05/11/2006 - Shiltsev 31
Common questions to answer
• Title/subject
• Leader and participants
• Objectives
• Deliverables
• Time scale/schedule
• Resources needed:– Add’l man-power (and type eng, phys, techs)
– $$ Travel
– $$ Labor
– $$ M&S and Equipment
LARPAC 05/11/2006 - Shiltsev 32
Flux JumpsAn accelerator magnet would need to demonstrate no or sufficiently small fluctuations
How small?
preliminary estimates show that 1 unit of d(b3) will result in ~2 units of Q’ jumps if residual dispersion controlled to better than 1 cm at I
tune jumps and nonlinear effects need to be studied (AccelPhys)
LARPAC 05/11/2006 - Shiltsev 33
dB/B FluctuationsLHC tolerance: dB/B~3e-10
LHC screen: light and feels 20 K He flow turbulence; B-flux is constant at 3kHzdB/B ~ dR/R need dR < 1A to blow horizontal emittance
First attempts at CERN (2006):
~1e-8 noise in quad/no screen~1e-7 with air flow
LARPAC 05/11/2006 - Shiltsev 34
dB/B: Plan of Action• Perform dB/B measurements at CERN inside
– Dipole (cold, high current)
– Quadrupole (same)
– Measure vibrations of the screen and LB quadrupoleMeasure vibrations of the screen and LB quadrupole
• Will take about 1 year
• Cost:– 2-3 more trips to CERN ~6k$
– Low-noise pre-amp ~5k$
• Goal: conclude on dEmm/dt and need of FB
• Consider: use of Tune FB BBQ and kicker - ?
LARPAC 05/11/2006 - Shiltsev 35
AC dipole
• Recent good results from the Tevatron
• Formal proposal for LHC at Collab meeting (Apr ’06)
• Collaboration formed including Fermilab (A.Jansson, M.Syphers), UT Austin (R.Miyamoto, S.Kopp), BNL (M. Bai, R. Calaga) and CERN (H.Schmickler, J.Serrano)
First AC dipole data in the Tevatron
LARPAC 05/11/2006 - Shiltsev 36
• Objective– Investigate the conceptual design of ac dipole for LHC
• System design (Magnet, power system, tuning range)• test system
– the principles either at Tevatron or RHIC • Physics motivations and relevant beam experiments at RHIC
and Tevatron
• Financing– LARP: R&D– CERN: Final systems, funding available earliest at 2008– NSF through university program
• Deliverables– conceptual design report– Test system(s)– Relevant beam studies at Tevatron and RHIC
• Detailed feasibility study plan by June 12 (DoE R)
AC dipole collaboration
LARPAC 05/11/2006 - Shiltsev 37
Longitudinal Density Monitor(DeSantis, Byrd, Zolotorev)
Fiberoptic coupler/lens
Electro-optic modulator
InGaAs PD
Fiberoptic
Fiberoptic
PC
Fast pulser50 ps @ 40 MHz
Data acquisition board (ADC)• Presented at the LARP Coll.Mtg.• CERN interest is limited as they already have abort gap
monitors (enough for start-up)• LDM can be a very useful tool for high luminosity operation• …Under consideration for LARP
• Fresh Idea: Couple SyncLite to optical fiber, deliver signal upstairs and process it there with electro-optical modulator
• 50 ps slices, 10 s integration, resolves 0.5M p (!)
• To see ~1e-5 tails of main bunches and ghost bunches
LARPAC 05/11/2006 - Shiltsev 38
Head-on beam-beam compensation
• If beam sizes and shapes are matched (e=p)
• for LHC N_p=1.1e11, N_ip=4, for 10kV electrons (beta=0.2) one needs N_e=4.4e11 or J_e=1.2 A in L=3 m long e-beam
• approx Gaussian e-current distribution with rms = 0.3-0.5 mm
… or donut shape?
LARPAC 05/11/2006 - Shiltsev 39
Challenges of Head-On Compensation
• Total current is not a challenge
• Optimum beam profile (vs
bunchlength/beta*, Qx,y)
• Compression to 0.3-0.5 mm is
doable, though not easy
• Keeping beam straight within 0.03-
0.05 mm
• Beam-beam centering within 0.03-
0.05 mm
• Will bending sections do harm?
LARPAC 05/11/2006 - Shiltsev 40
e-Lens configurations
LARPAC 05/11/2006 - Shiltsev 41
Head-On BBC Action Path
• Form an LHC eCompensation Task Force with a charge to perform feasibility study in ~1 year
– FNAL, BNL, SLAC, LBL, UKansas
• Goal is to explore parameter space and effectiveness of head-on BBC in LHC and RHIC
Cost: buried in Accel Physics “Beam-Beam” task
In case of positive outcome, next steps may include:
• Design of the TEL for RHIC 2007 ~200k$ SWF
• Construction of TEL for RHIC 2008-2009 ~1300k$ M&S
• Demonstrate head-on compensation 2009-2010 ~200k$ SWF
• Build TELs for LHC 2011-2012 ~1100k$ M&S
• Install TELs in LHC and commission 2012-2014 ~200k$ SWF
Total: 3,000k$
LARPAC 05/11/2006 - Shiltsev 42
Q’s to Answer:• Will Gaussian or truncated Gaussian e-current density distribution
work (improve lifetime and reduce diffusion rates)?– Straightforward tracking with a weak-strong code– Is partial compensation helpful?
• Is there a better distribution?– from first principles, theory, analytical consideration – Effects are beta_TEL/beta*/sigma_z; or dP/P– check in numerical tracking
• Importance of e-pbar(p) interaction in bending sections– Which of three configurations is better?– Is the choice tune dependent?
• Lifetime deterioration due to e-p misalignment: – e-beam straightness tolerances – relative e-p displacement, angle
• Effect of low-frequency variations dJ, dX on beam lifetime• Ion cleaning efficiency tolerances• Cross-interaction with wires in LHC – if there is any• e-beam effect on coherent stability or strong-strong beam-beam
effects
LARPAC 05/11/2006 - Shiltsev 43
1.5 TeV SuperFerric Injector in LHC tunnel1.5 TeV SuperFerric Injector in LHC tunnel
J.JohnstoneT.Sen, H.Piekarz
LARPAC 05/11/2006 - Shiltsev 44
Summary LER-LHC
• Title: LER – A 1.5 TeV Injector Accelerator for the LHC• Leader & Participants: Henryk Piekarz, Steve Hays, Yuenian Huang,
John Johnstone, Gijs de Rijk, Lucio Rossi, Tanaji Sen, Vladimir Shiltsev
• Objectives: Determine feasibility of the LER accelerator • Deliverables: A preliminary design of the LER accelerator• Time scale/schedule: One year• Resources needed: - Travel ($50 K) - Low Field VLHC magnet test at 1.6 T ($50K)
Plan of Action : Make preliminary studies, prepare several presentations and attend LER-LHC Workshop at CERN (July 5, 2006) see its outcome and CERN position before committing any further resources
LARPAC 05/11/2006 - Shiltsev 45
Amplifier average power (W)
Damping time, sec
Lead ionsUndulator: period-=7 mfield = 10 T, number of periods = 3
Damping time for protons ~ 5 hours at 1kW amplifier power
Optical Stochastic Cooling
A.ZholentsM.Zolotorev
Plan of Action : support letter for OSC demonstration experiment (NSF)
wait for results
•Bypass optics
•Optical amplifier
•Proof-of-principle with electrons
Needs for R&D:
LARPAC 05/11/2006 - Shiltsev 46
BackUp Slides
LARPAC 05/11/2006 - Shiltsev 47
B-field is frozen at high frequencies
LARPAC 05/11/2006 - Shiltsev 48
• FY2006:– Design and construct a wire compensator – Install wire compensator in RHIC in summer 2006, downstream of Q3 in IR6– Perform theoretical studies to test the compensation and
robustness• FY2007:
– Study the wire compensation in RHIC with 1 proton bunch in each beam and nominal conditions at flat top and 1 parasitic interaction.
– Beam studies to test tolerances on: beam-wire separation compared to beam-beam separation, wire current accuracy and
current ripple• FY2008:
– Decide on scope of work for the LHC wire compensation
Wire Beam-Beam Compensation Overall Plan
LARPAC 05/11/2006 - Shiltsev 49
Contiguous with helical tube inside jaw.
Formed after assembly-brazing of jaw and installation of bearing on stub-shaft
Exits through support shaft per CERN design
Material: CuNi10Fe1, 10mm O.D., 8mm I.D.
Stub-shaft (bearing not shown)
Support shaft
Detail of flex cooling supply tube
Relaxed (as shown)
# coils
4
O.D. 111mm (4.4in)
full 360° rotation # coils 5
O.D. 91mm (3.6in)
torque 9.1N-m (81in-lb)
LARPAC 05/11/2006 - Shiltsev 50
• L2 Leader: Tom Markiewicz (SLAC)• FY06 budget 850 k$ • Goals:
– The LHC cleaning system must have exceptional efficiency to meet its design parameters, significantly beyond the state-of-the-art that is achieved in existing colliders. It is crucial for the success of the LHC that different paths are explored in order to optimize the design, hardware and operational procedures for the LHC collimation system. In view of the exceptional difficulty for the LHC it is essential to pursue parallel R&D studies in- and outside of CERN. The phased approach for the LHC collimation system will allow to test various proposals and to implement the best solutions in an already defined upgrade path to nominal performance. The LHC Collimator R&D will complement the work at CERN and will be performed in close
• L3 tasks:– Cleaning Efficiency Studies– Rotating Collimators R&D– Tertiary Collimators Studies– Material Irradiation Studies
1.3 LHC Collimation R&D
LARPAC 05/11/2006 - Shiltsev 51
• L3 Leader: Angelika Drees (BNL)• FY06 budget 50 k$ • Goals:
– The ultimate goal of this sub program is to bench mark code(s), in particular SIXTRACKwColl, in a variety of aspects with RHIC beams.
– We plan to install and implement at BNL accelerator tracking code identical with the one used at CERN (K2, SIXTRACK with Collimators, i.e. SIXTRACKwColl) and perform simulations of collimation efficiencies and loss maps which will then be compared to simulation results from earlier studies done at RHIC with other codes (Teapot, K2, ACCSIM) and with data. Various data sets at two energies are available.
– During the RHIC proton run collimator setup procedures should be implemented into the RHIC control system and tested with beam under real operating conditions.
1.3.1 Cleaning Efficiency Studies
LARPAC 05/11/2006 - Shiltsev 52
• FY2006: – debug the code – compare with other simulation and data, test
setup procedures, – finish reports
Cleaning Efficiency Studies: Overall Plan
LARPAC 05/11/2006 - Shiltsev 53
• L3 Leader: Tom Markiewicz (SLAC)• FY06 budget 720 k$ • Goals:
– The ultimate goal is a successful design for low impedance, high efficiency LHC secondary collimators. The design will be validated with a sufficient but small (1-3) number of prototypes and beam tests. The design specifications and the prototypes are the primary deliverables. The time scale is set by the desirability of testing the prototypes with LHC beam in 2008/09. Then, CERN will decide whether or not to proceed with the rotating collimator design. If a decision is made to proceed, this sub-project will provide an engineering drawing package to CERN and will support the effort to commission the collimators once they are manufactured and installed by CERN.
1.3.2 Rotating Collimators
LARPAC 05/11/2006 - Shiltsev 54
June 15-17 CERN/SLAC Collaboration Meeting
• Attendees– CERN: Ralph Assmann (Project Leader, Tracking),
Allesandro Bertarelli (Mechanical Eng.), Markus Brugger (Radiation Issues), Mario Santana (FLUKA)
– SLAC: Tom Markiewicz, Eric Doyle (ME), Lew Keller (FLUKA), Yunhai Cai (Tracking), Tor Raubenheimer
• Radiation Physics Group: Alberto Fasso, Heinz Vincke
• Results– Agreement on basic design of RC1 (1st rotatable
prototype)– Transfer of many of CERN mechanical CAD files– Lists of
• Further studies required• Outstanding Engineering Issues requiring more design work• Project Milestone List & Action Items List
– Test Installation of “New FLUKA”
LARPAC 05/11/2006 - Shiltsev 55
Conceptual Design of RC1 (1 of 2)
• Mechanics must fit within CERN Phase I C-C envelope– 224mm center-to-center with 88mm OD beampipes– 1480mm longitudinal flange-to-flange– 25mm adjustment/jaw (22.5mm relative to beam w/±5mm
allowed beam center motion• and use Phase I alignment and adjustment scheme
– Two 75cm Cu cylindrical jaws with 10cm tapered ends, 95cm overall length with axes connected to vertical mover shafts
– 136mm OD with 9mm taper– Each jaw end independently moved in 10um steps– Vacuum vessel sized to provide 8mm clearance to adjacent
beam and allow gross/fine 0°, 45°, 90° positions• Relaxed mechanical deformation specifications
– <25 um INTO beam guaranteed by adjustable mechanical stop(s)
• Ride on groove deep enough to not be damaged in accident case• Adjustable between ±5 and ±15 sigma (2-6mm) & centered on
beam– <325 um (750um) AWAY FROM beam @ 0.8E1p/s loss (4E11p/s)
• Flexible support on adjustment
LARPAC 05/11/2006 - Shiltsev 56
Proposed layout
136mm diameter x 950mm long jaws, vacuum tank,jaw support mechanism and support base derived from CERN Phase I
LARPAC 05/11/2006 - Shiltsev 57
•Stop prevents gap closing as jaw bows inward due to heat
•Jaw ends spring-loaded to the table assemby … move outward in response to bowing
•May use two stops to control tilt
•Slot deep enough to avoid damage in accident
•Stop far enough from beam to never be damaged & is out of way at injection
Adjustable gap-defining stop
LARPAC 05/11/2006 - Shiltsev 58
Rigid round-square transition
Spring loaded fingers ground two jaws through range of motion
Jaw support & gap adjustment borrowed from CERN
RF Contact Overview
LARPAC 05/11/2006 - Shiltsev 59
LHC Phase I 2D carbon-carbon Irradiation Specimen at BNL BLIP Facility
117 MeV or 200 MeV BNL LiNAC Protons (depending on the isotope production requirements downstream)
Preliminary Assessment:2D CC specimens normal to the planes of reinforcing fibers and close to the center of the beam (receiving high dose) experienced degradation.Less degradation was seen in the specimens along the reinforcement.
NOTE: Total dose received MUCH HIGHER than what LHC collimator jaws will see.
Status:Phase I Carbon-Carbon irradiation completedSample activation measurements completedThermal Expansion of specimens startedPLANNING of FY06 Post-Irradiation and Follow-up Irradiation Studies
LARPAC 05/11/2006 - Shiltsev 60
Phase-II LHC Collimator Material Irradiation Planned for May 2006
Primary Materials: Annealed Copper and
Glidcop (85% Cu – 15% Al)
Other Potential Candidates: Super Invar, Gum Metal,
Also: 2D Carbon-Carbon and
3D Carbon-Carbon
Test for physical properties (thermal conductivity, thermal expansion)
And
Stress-Strain (mechanical properties)
LARPAC 05/11/2006 - Shiltsev 61
POST IRRADIATION ANALYSIS REVEALED THAT PHASE-I 2D Carbon-Carbon Self Anneals Irradiation Damage through thermal cycling in both strong and weak directions. Therefore, it is expected to meet the 25 micron condition set as goal
Annealing along strong (fiber plane) direction Annealing along weak direction
Shown is annealing under different levels of irradiation damage
LARPAC 05/11/2006 - Shiltsev 62
PHASE-I: Irradiation and Analysis of 2D Carbon-Carbon at BNLGOALS: Determine resilience of 2D CC against irradiation damage and assess
how the critical property of thermal expansion changes with irradiation
assembly
irradiation
Beam exposure and irradiation damage assessment
Post-irradiation Analysis
At irradiation levels several orders of magnitude than what the LHC collimator jaws will see the 2D CC suffers structurallyfrom irradiation exposure
LARPAC 05/11/2006 - Shiltsev 63
Physics: Long Range @ RHIC
SPS : ~ d5 [measured 11/09/04]
Tevatron: ~ d3 [measured in HEP stores, TEL] RHIC : ~ d4 or d2 [measured 04/28/05, scan 4]
LARPAC 05/11/2006 - Shiltsev 64
• L2 Leader: Michael Syphers (FNAL)• FY06 budget 1,140 k$ • Goals:
– There is an overall benefit to the U.S. high-energy physics program if the LHC turns on rapidly and successfully. Our experimental physics groups have invested heavily in the LHC project, and the science produced there thus represents a return on the U.S. investment. A healthy and strong HEP activity at LHC will surely be necessary to secure future accelerator-based HEP projects in the U.S. The information gained during the commissioning will be available in a timely manner and will have maximum positive effect on U.S. plans for LHC
• L3 tasks:– Beam Commissioning– Hardware Commissioning– Toohig Fellowship– New Initiatives
1.2 LHC Commissioning
LARPAC 05/11/2006 - Shiltsev 65
• FY2006:– S/N study of low intensity bunches in Tevatron– Design pick-up structure, study PLL DAB board for DAQ– complete an “integration document”, signed off by both
parties, and entered into CERN EDMS – Design and build front-end electronics Q1– Joint LARP and CERN review of the proposed design
• FY2007:– Adapt Fermilab analysis software– Hardware commissioning at CERN without beam
• FY2008:– Hardware commissioning at CERN with beam
• FY2009:– Beam studies of chromaticity measurements, ramp effects
Schottky Monitors Overall Plan