WESTERN RAILWAY
LAW BOOK 2014‐15
( September 2014 )
Page No.
From To
1 Summary of Alloted Funds I -
2 Distribution of outlays for the Works under Board, GM & DRM's Power II IV
3 PH 16 - Traffic Facilities - Yard Remodelling & Others 1 3
4 PH 17 - Computerisation 3 4
5 PH 29 - Road Safety Works- Level Crossings 5 16
6 PH 30 - Road Safety Works- Road Over/Under Bridges 17 21
7 PH 31 - Track Renewals 21 48
8 PH 32 - Bridge Works 48 51
9 PH 33 - Signalling & Telecommunication Works 52 61
10 PH 36 - Other Electrical Works 61 -
11 PH 37 - Traction Distribution Works 62 63
12 PH 42 - Workshop - Including Production Units 63 66
13 PH 51 - Staff Quarters 66 68
14 PH 52 - Amenities for Staff 69 71
15 PH 53 - Passenger and Other Railway Users' Ameniites 71 73
16 PH 64 - Other Specified Works 73 76
17 Summary 77 -
I N D E X
Sr. Particulars
Page No. : I
( Figures in thousands of Rs. )
Sr.No. Plan Heads Cap. DRF DF(1) DF(2) DF(3) DF(4) S.Fund OLWR Total
1 Doubling 3300 41325 44625
2 Traffic Facilities 9000 5500 78287 89 92876
3 Computerisation 54700 1800 1200 57700
4 Road Safety Works - Level Crossings 204800 204800
5 Road Safety Works - ROB/RUB 258000 258000
6 Track Renewals 367678 367678
7 Bridge Works 70000 453 715 71168
8 Signalling & Telecommunication Works 10000 158735 30000 100000 298735
9 Other Electrical Works 9500 5500 15000
10 Traction Distribution Works 45900 13500 59400
11 Workshop - Including Production Units 7856 4000 14542 26398
12 Staff Quarters 38000 28082 66082
13 Amenities for Staff 16500 23608 21162 422 61692
14 Passenger Amenity 98400 290004 23711 412115
15 Other Specified Works 3100 14332 1000 26000 56000 1200 101632
Total 87756 921760 292804 47162 223615 102004 462800 2137901
WESTERN RAILWAY
Assets ‐ Acquisition, Construction and Replacement for 2014‐15
PLAN HEAD WISE SUMMARY OF ALLOTTED FUNDS WITH ALLOCATIONS
( Works costing below Rs. 2.5 crores )
(Figures in thousands of Rs.)
Itemised Works Reserve
1 Doubling Cap.DRFTotal
2 Traffic Facilities Cap. 8000 6949 851 200 DRF 4500 2000 600 400 1500 DF(1)DF(3) 71287 21500 29284 12903 1500 1650 1500 1600 1350 DF(4) 89 89 OLWRTotal 83876 21500 36233 15843 2100 1650 1900 3100 1550
3 Computerisation Cap.DRF 35000 24090 10910 DF(1) 800 800 DF(3) 200 200 OLWRTotal 36000 800 24090 11110
4 RSW-LC Gates S.Fund 194800 10250 161776 3174 3000 3000 4600 3000 3000 3000
5 RSW-ROB/RUB S.Fund 219749 219749
6 Track Renewal DRF 357000 37000 294000 20000 1400 500 1400 2700
7 Bridge Works DRF 60000 15502 41418 3080 DF(3) 453 453 DF(4) 715 715 Total 61168 15502 41418 3080 715 453
8 Signal & Telecom Works Cap. 10000 10000 DRF 148835 6026 121884 5178 3346 500 145 1309 3376 7071 DF(3) 30000 13309 9560 1600 4039 1492 DF(4) 90000 60821 17151 1085 1200 2540 4115 2229 859 OLWRTotal 278835 6026 206014 31889 4431 3300 6724 5424 5605 9422
9 Other Electrical Works Cap.DRF 4500 2285 2115 100 DF(3) 3500 3200 100 200 OLWRTotal 8000 3200 2285 2115 100 300
10 Traction Distribution Works Cap.DRF 30000 13801 12579 2390 1000 230 DF(3) 10000 3597 5903 500 OLWRTotal 40000 13801 16176 8293 1500 230
11 Workshop Cap. 7356 3886 3403 67 DRF 3500 2477 126 494 403 DF(3) 14042 2 10922 2440 678 OLWRTotal 24898 2 17285 3403 2566 1172 470
12 Staff Quarters Cap. 37500 490 25794 11216 DRF 27582 12037 14375 1170 Total 65082 12527 40169 12386
13 Amenities for Staff Cap. 16300 4438 6080 5082 700 DRF 23508 6000 13069 3307 114 172 846 DF(2) 16062 1800 7989 2343 2000 1430 500 DF(3) 422 422 Total 56292 12238 27138 11154 2114 1430 172 2046
14 Passenger Amenity DRF 62400 32200 900 4000 9000 7800 2500 6000 DF(1) 220004 83000 52400 52904 8000 5000 9700 5000 4000 DF(3) 23711 23711 Total 306115 83000 108311 53804 12000 14000 17500 7500 10000
15 Other Specified Works Cap. 2100 1897 203 DRF 13332 3000 7005 1227 1000 500 300 300 DF(1) 1000 646 354 DF(2) 26000 11463 11594 1443 500 700 300 DF(3) 45000 20655 12244 9601 2000 500 DF(4) 1200 1200 OLWRTotal 88632 35118 30843 16014 3000 1000 1203 954 500
Grand Total 1820447 167964 1200176 246772 73915 23110 29871 29739 20479 28421
Under DRM RTM
Under DRM ADI
Under DRM RJT
Under DRM BVP
Under DG/RSC
CWM/PLW
Pa
ge
No
. IILB 2014-15 : WORKS IN PROGRESS
Distribution of outlays for the Works under Board's Power, GM's Power and DRM's Power
Sr No. Planhead Alocation Total ProvisionUnder Board's
Power
Under GM's PowerUnder
DRM BCTUnder
DRM BRC
(Figures in thousands of Rs.)
Itemised Works Reserve
1 Doubling Cap. 3300 3300 DRF 41325 41325 Total 44625 44625
2 Traffic Facilities Cap. 1000 200 150 200 200 150 100 DRF 1000 100 200 200 200 200 100 DF(1)DF(3) 7000 3000 600 500 700 1000 600 600 DF(4)OLWRTotal 9000 3000 900 850 1100 1400 950 800
3 Computerisation Cap.DRF 19700 1000 2505 16195 DF(1) 1000 1000 DF(3) 1000 1000 OLWRTotal 21700 1000 2505 18195
4 RSW-LC Gates S.Fund 10000 500 5500 500 3500
5 RSW-ROB/RUB S.Fund 38251 35751 2500
6 Track Renewal DRF 10678 2100 8578
7 Bridge Works DRF 10000 9980 20 DF(3)DF(4)Total 10000 9980 20
8 Signal & Telecom Works Cap.DRF 9900 9900 DF(3)DF(4) 10000 10000 OLWRTotal 19900 19900
9 Other Electrical Works Cap.DRF 5000 100 100 1600 1000 700 500 500 500 DF(3) 2000 600 300 300 400 200 200 OLWRTotal 7000 100 100 2200 1300 1000 900 700 700
10 Traction Distribution Works Cap.DRF 15900 100 3800 6000 2400 1800 1800 DF(3) 3500 1600 1900 OLWRTotal 19400 100 5400 7900 2400 1800 1800
11 Workshop Cap. 500 200 25 275 DRF 500 25 475 DF(3) 500 500 OLWRTotal 1500 500 200 50 750
12 Staff Quarters Cap. 500 450 50 DRF 500 450 50 Total 1000 900 100
13 Amenities for Staff Cap. 200 90 90 20 DRF 100 90 10 DF(2) 5100 1500 1590 150 150 400 400 400 510 DF(3)Total 5400 1500 1590 330 240 400 400 400 540
14 Passenger Amenity DRF 36000 20000 2500 2500 5000 4000 1000 1000 DF(1) 70000 35000 5000 2500 3500 10000 6000 4000 4000 DF(3)Total 106000 55000 5000 5000 6000 15000 10000 5000 5000
15 Other Specified Works Cap. 1000 700 100 100 100 DRF 1000 500 300 100 100 DF(1)DF(2)DF(3) 11000 6100 900 200 500 1000 700 500 1100 DF(4)OLWRTotal 13000 6600 1000 1000 200 500 1000 700 700 1300
Grand Total 317454 3300 104383 121941 17830 10990 19850 21500 7770 7200 2690
Under DRM BRC
Under DRM RTM
Under DRM ADI
Under DRM RJT
Under DRM BVP
Under DG/RSC
CWM/PLW
LB 2014-15 : NEW WORKSP
ag
e N
o. III
Distribution of outlays for the Works under Board's Power, GM's Power and DRM's Power
Sr No. Planhead Alocation Total ProvisionUnder Board's
Power
Under GM's PowerUnder
DRM BCT
Itemised Works
Reserve
1 15 44625 44625
2 16 92876 21500 39233 15843 3000 2500 3000 4500 2500 800
3 17 57700 1800 26595 29305
4 29 204800 10250 162276 8674 3500 3000 4600 6500 3000 3000
5 30 258000 219749 35751 2500
6 31 367678 39100 302578 20000 1400 500 1400 2700
7 32 71168 15502 41418 13060 715 20 453
8 33 298735 6026 225914 31889 4431 3300 6724 5424 5605 9422
9 36 15000 3300 2285 2215 2200 1300 1100 900 700 1000
10 37 59400 13901 21576 8293 9400 2630 1800 1800
11 42 26398 2 17785 3603 2566 1222 470 750
12 51 66082 12527 41069 12386 100
13 52 61692 12238 28638 12744 2444 1670 572 400 400 2046 540
14 53 412115 138000 113311 58804 18000 29000 27500 12500 15000
15 64 101632 35118 37443 17014 4000 1200 1703 1000 1654 1200 1300
Grand Total 2137901 171264 1304559 368713 91745 34100 49721 51239 28249 35621 2690
LB 2014-15 : GRAND SUMMARY
Page N
o. IV
Distribution of outlays for the Works under Board's Power, GM's Power and DRM's Power (Works in Progress and New Works)
Sr No. Planhead Total ProvisionUnder Board's
Power
Under GM's PowerUnder
DRM BCTUnder
DRM BRCUnder
DRM RTMUnder
DRM ADIUnder
DRM RJTUnder
DRM BVP
Under DG/RSC
CWM/PLW
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 1
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
A ‐ Works in Progress
Mumbai
1 Churchgate ‐ Construction of Guards & Motorman DF(3) 99,52 31,56 21,00 46,96
lobby. (BCT/S/09‐10)
2 Bhestan:‐ Providing new foot over bridge. DF(3) 83,91 .. 30,00 53,91
3 Provision of approach road to Goods Shed at Surat DF(3) 82,02 59,38 9,62 13,02
Vadodara
4 Godhara Phase‐II work: Making line No.2 as main Up DF(3) 95,45 .. 80,00 15,45
line and line No.4 as Dn main line for raising of
speed from 15 to 50 Kmph on main line throght yard
remodelling.
Ratlam
5 Nagda ‐ Piploda Bagla ‐ Providing intermediate DF(3) 2,21,24 1,13,74 45,00 62,50
block section.
6 Dalauda:‐ Provision of direct reception & Cap. 96,11 58,99 34,49 2,63
dispatch facility at DLD goods/ Ballast siding.
(RTM/S/10‐11)
7 Shambhupura :‐ Improvement to goods platform DF(3) 67,18 .. 1 67,17
surface. (RTM/U/11‐12)
Ahmedabad
8 Provision of Intermediate Block stop signal DF(3) 2,38,79 35,50 1,00,00 1,03,29
between Ambli road – Sanand – Ambli road section
(Both up and down lines).IBS to be planned in such
location on both the lines which will bifurcate
the block section almost halve.No such gradients
9 Maliya Miyana ‐ Extension of shunting neck to full DF(3) 1,85,26 61,00 70,00 54,26
length loading spur.
10 VTA‐ Providing direct connectiviy from Down yard DF(3) 95,89 48,00 27,21 20,68
to Common loop. Existing point no. 111/112 to be
reversed. A new point (1:12) to be provided to
give connectivity from UP main line to Diesel
shed. A Trap point to ensure isolation of Down
Rajkot
11 Digsar ‐ Providing simultaneous reception DF(3) 76,55 31,66 30,00 14,89
facility. (RJT/U/09‐10)
12 Daldi‐ Providing simultaneous reception DF(3) 73,91 17,92 35,00 20,99
facilities. (RJT/U/09‐10)
13 Okha :‐ Stabling line along side of pit line. Cap. 99,01 .. 35,00 64,01
(RJT/U/1‐12)
14 Rajkot : ‐ Improvement in existing Goods Yard to DF(3) 91,11 19,64 30,00 41,47
make fit for reception and dispatch of
Passenger trains.(Main Line of Goods Yard)
15.04.16.09.3.
53.001
15.04.16.11.3.
53.001
15.04.16.12.3.
53.001
15.05.16.10.3.
54.001
15.05.16.11.3.
54.001
15.01.16.12.2.
13.001
15.01.16.10.2.
50.001
15.01.16.12.6.
50.001
15.04.16.09.3.
53.002
TRAFFIC FACILITIES
15.03.16.09.3.
52.001
15.03.16.10.3.
52.002
15.03.16.12.3.
52.001
15.06.16.12.3.
55.002
15.05.16.10.2.
54.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 2
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
15 Relaxation of existing Permanent Speed Restriction DF(3) 58,63 4,70 30,00 23,93
of 30Kmph on Wankaner main line.
Mumbai
16 Works costing below DRM's Power DRF 6,00 .. 6,00 ..
DF(3) 15,00 .. 15,00 ..
Vadodara
17 Works costing below DRM's Power DF(3) 16,50 .. 16,50 ..
Ratlam
18 Works costing below DRM's Power DRF 4,00 .. 4,00 ..
DF(3) 15,00 .. 15,00 ..
Ahmedabad
19 Works costing below DRM's Power DRF 15,00 .. 15,00 ..
DF(3) 16,00 .. 16,00 ..
Rajkot
20 Works costing below DRM's Power Cap. 2,00 .. 2,00 ..
DF(3) 13,50 .. 13,50 ..
TOTAL‐WORKS IN PROGRESS Cap. .. .. 71,49 ..
DRF .. .. 25,00 ..
DF(3) .. .. 5,83,84 ..
B ‐ New Works
Mumbai
21 Bandra Terminus ‐ Provision of shunting neck at DF(3) 93,00 .. 10,00 83,00
south of coaching yard.
Ahmedabad
22 Kankariya Goods shed :‐ Provision of CC approach DF(3) 90,08 .. 10,00 80,08
road between out ward PF no.3 and cover goods shed
PF.
Rajkot
23 OKHA:‐ conversion of non running line 04 into DF(3) 83,86 .. 10,00 73,86
running line by provision of cross over from main
line to shunting neck
Mumbai
24 Works costing below DRM's Power Cap. 2,00 .. 2,00 ..
DRF 1,00 .. 1,00 ..
DF(3) 6,00 .. 6,00 ..
Vadodara
25 Works costing below DRM's Power Cap. 1,50 .. 1,50 ..
DRF 2,00 .. 2,00 ..
DF(3) 5,00 .. 5,00 ..
Ratlam
26 Works costing below DRM's Power Cap. 2,00 .. 2,00 ..
DRF 2,00 .. 2,00 ..
DF(3) 7,00 .. 7,00 ..
Ahmedabad
27 Works costing below DRM's Power Cap. 2,00 .. 2,00 ..
DRF 2,00 .. 2,00 ..
DF(3) 10,00 .. 10,00 ..
Rajkot
28 Works costing below DRM's Power Cap. 1,50 .. 1,50 ..
DRF 2,00 .. 2,00 ..
DF(3) 6,00 .. 6,00 ..
15.04.16.14.3.
53.001
15.03.16.14.3.
00.999
15.06.16.14.3.
00.999
15.05.16.14.3.
00.999
15.01.16.14.3.
00.999
15.04.16.14.3.
00.999
15.06.16.14.3.
00.999
15.05.16.14.3.
00.999
15.01.16.14.3.
00.999
15.04.16.14.3.
00.999
15.03.16.14.3.
52.001
15.01.16.14.3.
50.001
TRAFFIC FACILITIES
15.04.16.12.3.
53.002
15.03.16.14.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 3
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Bhavnagar
29 Works costing below DRM's Power Cap. 1,00 .. 1,00 ..
DRF 1,00 .. 1,00 ..
DF(3) 6,00 .. 6,00 ..
TOTAL‐NEW WORKS Cap. .. .. 10,00 ..
DRF .. .. 10,00 ..
DF(3) .. .. 70,00 ..
TOTAL‐Traffic Facilities Cap. .. .. 81,49 ..
DRF .. .. 35,00 ..
DF(3) .. .. 6,53,84 ..
A ‐ Works in Progress
Headquarter
30 Replacement of Heavyduty chart Printers at various DRF 52,51 52,50 .. 1
PRS locations, due for replacement in the year
2012‐13
31 Replacement of 14nos. High Speed Dot Matrix DRF 9,03 .. 9,03 ..
Printers at various PRS locations.
32 Replacement of 464 UTS ticket printers DRF 41,50 39,64 1 1,85
33 Replacement of 32 SMC at 28 suburban stations DRF 28,18 .. 28,18 ..
34 Replacement of heavy duty chart printers, desktop DRF 15,49 31 15,18 ..
computers, and laser printers
35 Provision of 31 nos of additional heavy duty chart DF(1) 48,11 .. 7,94 40,17
printers (line) at various charting PRS locations
36 Western Railway ‐ Replacement of 263 nos. Ticket DRF 18,23 .. 18,23 ..
Printers at various PRS locations
37 Replacement of CMS equipments of WR DRF 33,65 .. 33,65 ..
38 Replacement of Datacom Equipment of FOIS DRF 39,92 .. 39,92 ..
Mumbai
39 Replacement of 220 high speed ticket printers for DRF 34,62 .. 34,62 ..
Mumbai suburban on emergent basis
40 Provision of 86 terminal servers DF(1) 35,00 22,91 1 12,08
41 Provision of 93 switches. DF(1) 29,00 21,20 1 7,79
42 Provision of 65 LAN extenders. DF(1) 10,00 7,31 1 2,68
43 Provision of 5, 2 MBPS routers. DF(1) 6,00 4,40 1 1,59
44 Provision of PC based charting. DF(1) 10,93 .. 1 10,92
45 Replacement of 1 No. fast report printers. DRF 79 .. 1 78
46 Mumbai Division:‐ Replacement of existing out DRF 50,00 25,02 24,98 ..
dated computers & printers along with furniture of
Engineering department.
15.03.17.08.3.
12.002
15.03.17.10.3.
52.001
15.03.17.13.6.
12.001
15.03.17.07.2.
12.003
15.03.17.07.2.
12.004
15.03.17.07.2.
12.002
15.03.17.07.2.
12.001
15.03.17.08.2.
12.003
15.00.17.12.3.
12.005
15.00.17.12.6.
12.001
15.00.17.13.2.
12.001
15.00.17.13.6.
12.003
15.00.17.13.6.
12.001
15.00.17.13.6.
12.002
TRAFFIC FACILITIES
15.02.16.14.3.
00.999
COMPUTERISATION
15.00.17.12.2.
12.001
15.00.17.12.3.
12.003
15.00.17.12.3.
12.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 4
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
47 Replacement of equipments for FOIS Terminals – DRF 10,50 9,39 50 61
Procurement of Computers, printers and
peripherals.
Vadodara
48 Chhota Udaipur:‐ Providing UTS. DF(1) 9,26 5,75 1 3,50
49 Vadodara Division:‐Replacement of FOIS and TMS DRF 13,32 .. 13,32 ..
computer system on BRC Division.
Ahmedabad
50 Ahemdabad Division ‐ Replacement of equipments for DRF 14,91 11,84 1,00 2,07
FOIS Terminals – Procurement of Computers,
printers and peripherals.
Rajkot
51 Rajkot Division ‐ Procurement of 41 Nos. of PCs & DRF 19,20 .. 19,20 ..
38 Nos. Printers on replacement account for
Operating Department.
Bhavnagar
52 Bhavnagar Division ‐Proposal for personal computer DRF 3,07 .. 3,07 ..
sets and UPS for FOIS work on replacement account.
TOTAL‐WORKS IN PROGRESS DRF .. .. 2,40,90 ..
DF(1) .. .. 8,00 ..
B ‐ New Works
Headquarter
53 Abstract Estimate of Replacement of 335 nos LCD DRF 81,00 .. 10,00 71,00
Dumb Terminals with keyboards against existing
Terminal/keyboards at various PRS loacations
54 Replacement of Datacom equipment for FOIS at 10 DRF 21,05 .. 21,05 ..
locations
Ratlam
55 Ratlam Division‐Replacement of FOIS(TMS) equipment DRF 23,48 .. 1,00 22,48
at various TMS Locations in Ratlam Divsion.
Ahmedabad
56 Ahemdabad Division ‐ Replacement of equipments for DRF 27,51 .. 1,00 26,51
FOIS Terminals – Procurement of Computers,
printers and peripherals.
Rajkot
57 Rajkot Division ‐ Procurement of 04 computers with DRF 2,38 .. 1,00 1,38
UPS and printers on replacement account for
COIS/ICMS system.
58 Rajkot : Providing Compurasied system in wards of DRF 3,79 .. 1,00 2,79
Divisional Hospital at.
TOTAL‐NEW WORKS DRF .. .. 35,05 ..
TOTAL‐Computerisation DRF .. .. 2,75,95 ..
DF(1) .. .. 8,00 ..
15.01.17.14.3.
12.001
15.04.17.14.3.
12.001
15.04.17.14.3.
12.002
15.01.17.10.3.
12.001
15.04.17.13.6.
12.001
15.02.17.13.6.
12.001
15.00.17.14.2.
12.001
15.00.17.14.3.
12.001
15.05.17.14.3.
12.001
COMPUTERISATION
15.03.17.10.3.
12.003
15.06.17.05.2.
12.001
15.06.17.13.6.
12.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 5
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
A ‐ Works in Progress
Mumbai
59 Virar‐Surat Section:‐ Improvement of LC gates by S.Fund 34,00 .. 1 33,99
replacement of new PRC sleepers on various L.C.
and paver block etc. under ADEN/DRD section.
(BCT/S/09‐10)
60 Mumbai Non‐Suburban Section:‐ Replacement of 13 S.Fund 98,60 48,03 3,00 47,57
Nos. of (Swing / flap) gates into Electrically /
Mechanically operated lifting barrier.
(S&T/U/09‐10)
61 Dahanu Road‐Surat Section:‐ Providing LED signal S.Fund 96,75 66,35 4,00 26,40
units at multi‐aspect colour light signals
controlled by Gate huts. (S&T/U/10‐11)
62 Dahanu Road‐Bhilad Section:‐ Providing IPS at 13 S.Fund 1,47,51 91,75 1,00 54,76
LC gate huts. (S&T/U/10‐11)
63 Virar‐Surat Section:‐ Rebuilding of gate lodge, S.Fund 95,00 .. 3,00 92,00
providing gang tool room &providing toilet with
sock pit etc. under various L.C Under ADEN DRD.
(BCT/U/10‐11)
64 Virar‐Surat Section:‐ Rebuilding of gate lodge, S.Fund 97,55 .. 8,00 89,55
providing gang tool room & providing toilet with
sock pit etc. under various L.C Under ADEN ST .
(BCT/U/10‐11)
65 ADEN/W/Nandurbar jurisdiction:‐ Upgradation and S.Fund 1,11,51 61,67 1,00 48,84
declassification of LCs. (BCT/S/10‐11)
66 ADEN/E/Nandurbar jurisdiction:‐ Upgradation and S.Fund 1,05,02 80,82 5,00 19,20
declassification of LCs. (BCT/S/10‐11)
67 Virar‐Surat Section:‐ Providing MS fencing to S.Fund 1,00,00 54,75 6,00 39,25
protect cattle run over (2200 RM). (BCT/U/10‐11)
68 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 5. S.Fund 75,00 21,75 10,00 43,25
(BCT/U/11‐12)
69 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 28. S.Fund 75,00 31,78 10,00 33,22
(BCT/U/11‐12)
70 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 40. S.Fund 75,00 35,29 10,00 29,71
(BCT/U/11‐12)
71 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 54. S.Fund 75,00 31,76 20,00 23,24
(BCT/U/11‐12)
72 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 56. S.Fund 75,00 35,30 20,00 19,70
(BCT/U/11‐12)
15.03.29.10.3.
52.013
15.03.29.11.3.
52.004
15.03.29.11.3.
52.002
15.03.29.11.3.
52.003
15.03.29.11.3.
52.005
15.03.29.11.3.
52.006
15.03.29.10.3.
52.006
15.03.29.10.3.
52.005
15.03.29.10.3.
52.015
15.03.29.10.3.
52.014
15.03.29.10.3.
52.004
15.03.29.10.3.
52.002
ROAD SAFETY ‐ LEVEL CROSSINGS
15.03.29.09.3.
52.005
15.03.29.09.3.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 6
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
73 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 86. S.Fund 75,00 39,37 20,00 15,63
(BCT/U/11‐12)
74 Virar‐Dahanu Road Section:‐ Provision of battery S.Fund 90,49 73,65 1,00 15,84
back up for relays through IPS at 8 Relay
Huts.(S&T/U/11‐12)
75 Churchgate‐Virar Section:‐ Replacement of gate S.Fund 55,61 1,00 1,00 53,61
machines and rewiring of indoor signaling circuits
at LC‐ 19, LC‐24 & LC‐41.(S&T/U/11‐12)
76 UDN‐JL Sec. Upgradation & Reclassification of at S.Fund 1,01,41 82,20 19,21 ..
LC No.8, 16, 25, 27, 28, 36, 37, 40
77 Virar‐Surat section: Upgradation and S.Fund 99,00 .. 1,00 98,00
reclassification of 8 Nos LCs (52, 65, 70, 82, 88,
103, 105)
78 UDN‐JL Sec. Upgradation and reclassification of S.Fund 70,77 .. 4,00 66,77
LC's nos. 136,137,142,153.
79 BCT‐ Providing fibre reinforced precast RCC block S.Fund 1,02,46 3,50 4,00 94,96
at LC's CCG‐VR : 24, 25, 26, 41 VR‐ST : 90, 92,
94, 96, 97, 99, 100, 101, 102, 103, 104, 105
UDN‐JL : 27, 35, 36, 37.
80 Provision of Auto Changeover panels at 50 Auto S.Fund 62,70 1,00 2,00 59,70
Relay Huts at LC gates in VR‐ST section
81 Providing sliding boom at 30 LC gates on S.Fund 74,00 1,00 1,00 72,00
Virar‐Surat section.
Vadodara
82 Vadodara Division:‐Vadodara‐Godhra S.Fund 2,29,85 10,00 80,00 1,39,85
Section:‐Elimination of Level X‐ing No. 30 at Km.
444/0‐2, 43 at Km. 459/41‐42 & LC No. 45 at Km.
460/25‐27 by providing diversion road.
83 Vadodara‐Utran Section (NG):‐ Electrification of S.Fund 59,92 38,68 1 21,23
LC gates (52 Nos.) . (ELE/S/09‐10)
84 Vadodara Division:‐ Providing height gauge on S.Fund 2,47,60 2,09,29 .. 38,31
level crossing (52 Nos.) (ST‐BRC‐GDA & BRC‐ADI
section).((BRC/U/10‐11)
85 Surat ‐ Vadodara Section ‐ Replacement of S.Fund 1,32,00 36,17 5,00 90,83
mechanical lifting barriers / wing gates into
electrically operated lifting barrier gates.
86 Surat‐Vedcha Section:‐ Providing IPS at 12 LC gate S.Fund 84,69 13,48 1,00 70,21
huts. (S&T/U/10‐11)
87 Vadodara Division:‐ Interlocking of LC gates S.Fund 99,75 56,31 10,00 33,44
having ATVU more than 25000 at LC No.8, 32, 83,
86, 28 (5 LCs). (S&T/S/10‐11)
15.06.29.10.2.
55.002
15.06.29.10.2.
55.001
15.06.29.10.3.
52.002
15.06.29.10.3.
55.003
15.03.29.12.3.
52.004
15.03.29.12.3.
52.005
15.03.29.12.3.
52.001
15.03.29.12.3.
52.002
15.06.29.13.2.
55.001
15.06.29.09.3.
55.004
ROAD SAFETY ‐ LEVEL CROSSINGS
15.03.29.11.3.
52.007
15.03.29.11.3.
52.008
15.03.29.11.3.
52.001
15.03.29.12.3.
52.003
15.03.29.12.3.
52.006
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 7
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
88 Vadodara‐Anand Section:‐ Replacement of mechanical S.Fund 1,10,02 26,67 50 82,85
lifting barrier/ wing gates into electrically
operated lifting barrier (7 gates). (S&T/S/10‐11)
89 Nadiad‐Anand Section:‐ Replacement of mechanical S.Fund 1,10,02 1,20 10 1,08,72
lifting barrier/ wing gates into electrically
operated lifting barrier (7 gates). (S&T/S/10‐11)
90 Vadodara‐Godhra Section:‐ Replacement of S.Fund 1,10,02 .. 50 1,09,52
mechanical lifting barrier/ wing gates into
electrically operated lifting barrier (7 gates).
(S&T/S/10‐11)
91 Vadodara‐Surat Section:‐ Augmentation of power S.Fund 97,20 86,35 1,00 9,85
supply arrangment and provision of LED signals to
enhance safety. (8 gates). (S&T/S/10‐11)
92 ADEN‐Nadiad Jurisdiction:‐ Providing road sign S.Fund 95,40 85,51 1,00 8,89
boards speed breakers and rail fencing on various
LC.(BRC/U/11‐12)
93 Surat‐Godhara:‐ Up‐gradation and reclassification S.Fund 67,10 .. 2,00 65,10
of various LCs.(BRC/U/11‐12)
94 Vadodara‐Anand‐Godhra Section:‐ Provision of S.Fund 99,87 82,88 2,00 14,99
battery back up for relays through IPS at
interlocked LC gates.(S&T/U/11‐12)
95 Anand‐Utarsanda Section:‐ Provision of battery S.Fund 99,87 20,50 2,00 77,37
back up for relays through IPS at 9LC gate relay
huts.(S&T/U/11‐12)
96 Kanjari Boriyavi Jn.‐Mahemdabad Section:‐ S.Fund 99,87 85,83 1,00 13,04
Provision of battery back up for relays through
IPS at 9 LC gate relay huts.(S&T/U/11‐12)
97 Gothan‐Geratpur Section:‐ Provision of battery S.Fund 99,87 83,83 1,00 15,04
back up for relays through IPS at 9 LC gate relay
huts. (BRC/U/11‐12)
98 Vadodara Division:‐ Provision of RTUs/Dataloggers S.Fund 91,15 .. 3,00 88,15
at LC gates in PRTN‐CTD & ANND‐GDA Sections.
(BRC/U/11‐12)
99 Provision of Emergency key Chain Interlocking S.Fund 91,47 61,04 5,00 25,43
using Sliding boom in ANND‐GER Automatic
Signalling section of Vadodara Division.(40 LC
Gates)
100 Vadodara Division: Replacement of Mechanical S.Fund 88,31 .. 5,00 83,31
lifting barrier into Electrical lifting barrier(6
Nos)
101 Vadodara Division:‐Construction of approch road S.Fund 51,54 .. 1,00 50,54
between LC 34 & 35 in connection with closure of
LC 34 on Anand‐Khambhat Section.
15.06.29.12.3.
55.002
15.06.29.11.3.
55.003
15.06.29.11.3.
55.005
15.06.29.11.3.
55.004
15.06.29.11.3.
55.008
15.06.29.12.3.
55.007
15.06.29.12.3.
55.017
15.06.29.10.3.
55.001
15.06.29.10.3.
55.006
15.06.29.10.3.
55.007
15.06.29.11.3.
55.011
15.06.29.11.3.
55.007
15.06.29.11.3.
55.009
ROAD SAFETY ‐ LEVEL CROSSINGS
15.06.29.10.3.
55.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 8
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
102 Provision of approach warning at interlocked LC S.Fund 93,76 .. 20,00 73,76
gates on Vadodara‐Godhra and Anand‐Godhra Sections
of Vadodara Division.
103 Provision of selective calling facility at LC S.Fund 88,00 .. 10 87,90
gates in BRC ‐ GDA section
104 Provision of Remote monitoring of signalling gears S.Fund 93,99 .. 1,00 92,99
from stations at LC gates in ST‐BRC section
105 Vadodara Division:‐Upgradation and S.Fund 94,52 .. 20,00 74,52
reclassification of 8 Nos. of Level X‐ings on
ST‐BRC Section LC No. 182, 189, 232 & 233 and
BRC‐GER Section LC No. 239, 246, 255 & 260) (Total
8 Nos. of level X‐ings)
106 Vadodara Division:‐Providing fibre reinforced S.Fund 94,33 .. 5,00 89,33
precast RCC blocks at level X‐ings. L. C. No. 151,
158, 161, 165, 178, 185, 187, 191, 197, 198 & 228
on ST‐BRC Section, L. C. No. 32, 37, 38, 41, 7 & 5
on BRc‐GDA Section and LC No. 240, 244, 290 & 299
107 Vadodara Division:‐Upgradation and S.Fund 94,52 .. 15,00 79,52
reclassification of 8 Nos. of Level X‐ings. Level
X‐ing No. 264, 265, 269, 278, 285, 286, 295 & 300
on BRC‐GER Section.
108 Provision of Sliding boom at 33 LC gates in S.Fund 78,28 13,35 8,00 56,93
Vadodara‐Godhra‐Anand section of Vadodara
Division.
Ratlam
109 Ratlam Division ‐ UJN‐BPL Section‐‐ Interlocking S.Fund 49,09 .. 5,00 44,09
of LC 110 Km. 217/ 22‐24 in PUD‐BQE section
110 Ratlam division: Provision of LED signal units for S.Fund 1,78,51 84,26 3,00 91,25
better visibility at interlocked LC gates
111 RTM‐CNA & IDU section‐Provision of solar panel for S.Fund 1,78,77 91,26 3,00 84,51
reliable power supply for signalling installaion
at interlocked LC gates. (Total 10 Nos)
112 Ratlam Division ‐ Providing of diversion road for S.Fund 1,49,60 1,44,27 5,00 33
closing of LCs No. 218, 215, 5UB, 84, 122, 136,
181 & 186. (RTM/U/08‐09)
113 Ratlam‐ Khandwa Section ‐ Removal of deficiences S.Fund 2,32,70 84,12 5,00 1,43,58
on mannual LC's (51 Nos.). (RTM/S/08‐09)
114 Ratlam Division‐Providing lever locking device at S.Fund 58,87 32,31 5,00 21,56
LCs. (RTM/S/08‐09)
115 Ujjain ‐ Bhopal Section:‐ Providing standard S.Fund 51,97 47,98 2,00 1,99
height gauge and speed breakers at LCs.
(RTM/S/08‐09)
15.05.29.08.2.
54.001
15.05.29.08.2.
54.002
15.05.29.08.3.
54.004
15.05.29.08.3.
54.007
15.06.29.12.3.
55.014
15.06.29.12.3.
55.015
15.06.29.12.3.
55.016
15.05.29.12.6.
54.001
15.05.29.11.2.
54.001
15.05.29.12.2.
54.001
ROAD SAFETY ‐ LEVEL CROSSINGS
15.06.29.12.3.
55.012
15.06.29.12.3.
55.003
15.06.29.12.3.
55.004
15.06.29.12.3.
55.013
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 9
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
116 Ratlam ‐ Khandawa Section:‐ Providing Duty bunk at S.Fund 41,67 18,65 1,00 22,02
various gate lodges (14 Nos.). (RTM/S/08‐09)
117 Godhra‐Nagda Section.:‐ Providing Standard Height S.Fund 1,08,45 59,27 5,00 44,18
Gauge at various LC's. (RTM/S/09‐10)
118 Godhra‐Nagda Section‐Improvement to various LCs S.Fund 1,18,47 67,71 5,00 45,76
by providing pavers block, approach road & rumble
strips. (RTM/S/09‐10)
119 Nagda‐Ujjain‐Maksi & IDU Section:‐ Improvement to S.Fund 99,82 43,71 5,00 51,11
various LCs by providing pavers block, approach
road & rumble strips. (RTM/S/09‐10)
120 Ujjain‐Bhopal Section:‐ Manning of Un manned Lc S.Fund 96,95 21,38 5,00 70,57
No. 52 ?C? Km. 69/04‐05.55?C? Km. 101/6‐08.
(RTM/S/09‐10)
121 Ujjain‐Bhopal Section:‐ Up gradation of LCs. from S.Fund 1,19,21 93,87 5,00 20,34
?A? to Aspl. LC.NO. 104,107& 108 . (RTM/S/09‐10)
122 Ratlam Division:‐ Interlocking of LC No. 34 Km S.Fund 98,18 90,48 7,70 ..
508/16‐18 in GDA‐RTM section & LC No. 3 Km 4/1‐2
in IND‐UJN section. (S&T/U/10‐11)
123 Nagda‐Ujjain‐Bhopal Section:‐ Modification and S.Fund 63,71 46,86 2,00 14,85
upgradation in existing boom locking system
suitable for power operated lifting barrier at
interlocked LC gates. (S&T/U/10‐11)
124 Godhra‐Nagda‐Ujjain‐IDU Section:‐ Providing remote S.Fund 1,26,87 1,26,58 29 ..
terminal units at LC gates (20 Nos.).
(S&T/U/10‐11)
125 Neemach‐Chanderiya Section:‐ Removing signalling S.Fund 99,12 91,26 1,00 6,86
defficiencies at 13 interlocked LC gates.
(S&T/U/10‐11)
126 Indore‐Dewas‐Ujjain Section:‐ Interlocking & up S.Fund 96,10 75,49 5,00 15,61
gradation of Lc no. 3 Km.4/01‐02. at.(C to Spl).
(S&T//U/10‐11)
127 Indore‐Dewas‐ Ujjain Section:‐ Up gradation of LC S.Fund 99,57 99,56 1 ..
No.30 Km: 42/08‐09 A to spl), & LC 37 Km
53/08‐09(C to spl). (RTM/U/10‐11)
128 Indore‐Dewas‐ Ujjain Section:‐ Up gradation of S.Fund 94,33 29,10 5,00 60,23
LC No. 27 Km 37/16‐18(C to spl) and LC 31 at Km
43/01‐02 (C to B2 ). (RTM/U/10‐11)
129 Ujjain‐Bhopal Section:‐ Up gradation of LC No. S.Fund 1,07,17 92,96 3,00 11,21
26 Km: 53/06‐08 (B to spl), LC no. 21 Km.
42/24.26 ( B to A). (RTM/U/10‐11)
130 Ujjain‐Bhopal Section:‐ Up gradation of, LC 29 S.Fund 99,21 89,52 2,86 6,83
Km 57/38‐40 ( A to spl), LC No. 45 Km: 85/30‐32(
‘A’ to spl.). (RTM/U/10‐11)
15.05.29.10.3.
54.019
15.05.29.10.3.
54.017
15.05.29.10.3.
54.008
15.05.29.10.3.
54.003
15.05.29.10.3.
54.009
15.05.29.10.3.
54.007
15.05.29.10.3.
54.006
15.05.29.10.3.
54.005
15.05.29.09.3.
54.003
15.05.29.09.3.
54.002
15.05.29.09.3.
54.007
15.05.29.09.3.
54.009
15.05.29.09.3.
54.011
15.05.29.10.3.
54.012
ROAD SAFETY ‐ LEVEL CROSSINGS
15.05.29.08.3.
54.006
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 10
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
131 Indore‐Dewas‐ Ujjain Section:‐ Up gradation of S.Fund 99,02 83,20 1,00 14,82
Level crossing No. 45 Km 63/9‐10 (C to Spl.), Lc
no. 52 X Km. 70/2‐3.(C to SPL). (RTM/U/10‐11)
132 Ujjain‐Bhopal Section‐ up gradation of LC No. 79 S.Fund 91,58 74,24 4,00 13,34
Km 157/21‐23 (A to Spl.), Lc no. 85 Km.
170/10‐12.(A to SPL). (RTM/U/10‐11)
133 Vadodara‐Nagda Section:‐ Providing gate lodges at S.Fund 75,60 11,83 10,00 53,77
interlocked gates having elevated ground frames.
(RTM/U/10‐11)
134 Ujjain‐Bhopal Section:‐ Up gradation of Level S.Fund 97,28 93,28 4,00 ..
crossing No. 113 Km 223/11‐13 (C to A.), Lc no.
114 Km. 226/17‐19.(C to A). (RTM/U/10‐11)
135 Ujjain‐Bhopal Section:‐ Up gradation of Level S.Fund 1,29,12 1,24,61 4,51 ..
crossing No. 113 Km 223/11‐13 (C to A.), Lc no.
114 Km. 226/17‐19.(C to A). (RTM/U/10‐11)
136 Ratlam Division:‐ Interlocking of LC No. BCW in S.Fund 75,59 53,65 5,00 16,94
CAN‐RTM section & LC No. 31 in IND‐UJN section.
137 Ratlam‐Neemach Section:‐ Removing Signaling S.Fund 1,00,92 41,02 5,00 54,90
deficiencies at 20 interlocked LC Gates.
(RTM/U/11‐12)
138 Ujjain‐Bhopal Section:‐ Removing Signaling S.Fund 1,05,85 70,87 5,00 29,98
deficiencies at 21 interlocked LC Gates.
(RTM/U/11‐12)
139 Ratlam‐Nagda‐Bhopal & IDU section:‐ Providing Road S.Fund 80,59 28,84 5,00 46,75
Signals at 25 interlocked LC gates. (RTM/U/11‐12)
140 Chanderiya‐Ratlam Section:‐ Provision of Remote S.Fund 68,84 20,12 5,00 43,72
Terminal Units at OSL interlocked LC gates in
Ratlam division.(RTM/U/11‐12)
141 INDORE‐DEWAS‐UJJAIN section‐Closure of unmanned S.Fund 1,19,96 1,19,95 1 ..
level crossing no. 33X between stations DEWAS and
BARLAI by merging with manned Lc no.33.
142 MKC‐BPL section‐Closure of unmanned level S.Fund 98,17 .. 5 98,12
crossing no. 64 between stations BCH&KSH by
merging with manned Lc no.65.
143 GDA‐MGN Sec:‐ Providing retro reflecting sign S.Fund 56,00 38,74 1,00 16,26
boards ( W/L, road sign boards, danger sign boards
etc) at various LC's.
144 Chanderiya ‐ Ratlam Sec :‐ Closure of unmanned LC S.Fund 1,01,50 11,07 50,00 40,43
no 149 between stations PIP & MDS by merging with
manned LC No 148 at
145 RTM Div.‐‐ Provision of solar street lights at LC S.Fund 39,74 5,75 10,00 23,99
Gates and Replacement of AT
Cable at some of Interlocked LC Gates
15.05.29.11.3.
54.001
15.05.29.12.3.
54.009
15.05.29.12.3.
54.012
15.05.29.12.3.
54.014
15.05.29.12.3.
54.013
15.05.29.12.3.
54.016
15.05.29.10.3.
54.016
15.05.29.10.3.
54.015
15.05.29.10.3.
54.013
15.05.29.11.3.
54.003
15.05.29.11.3.
54.004
15.05.29.11.3.
54.002
ROAD SAFETY ‐ LEVEL CROSSINGS
15.05.29.10.3.
54.004
15.05.29.10.3.
54.018
15.05.29.10.3.
54.020
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 11
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
146 MHOW‐ Khandwa Section:‐ Providing RCC retaining S.Fund 68,46 .. 1,00 67,46
wall (210 Rm) on approaches in accident prone LC
No. 266, 268 & 270.
147 IDU section‐ Providing diversion road for S.Fund 98,16 88,36 9,80 ..
closing of manned LC no. 40 Km. 57/12‐13 between
BLX‐MGG by 41X.
148 GDA‐NAD Sec:‐ Upgradation of Lc Nos.34, 63 and 87. S.Fund 1,00,03 .. 30,00 70,03
149 NAD ‐UJN ‐MKC Section‐ Up gradation of LC No. 9 S.Fund 77,51 18,80 25,00 33,71
('B1' to 'A' Class), 38 ('C' to 'A' Class and LC
No.52 ('A' to 'Spl' Class)
150 CNA‐NMH Section‐ Up gradation of LC No. BCW ('C' S.Fund 1,02,05 12,67 25,00 64,38
to 'A' Class), 100 ('B1' to 'A' Class and LC
No.120 ('A' to 'Spl' Class)
151 NMH‐RTM Section‐ Up gradation of LC No. 151 S.Fund 1,02,47 14,63 25,00 62,84
(B2C' to 'A' Class), 152 ('A' to 'Spl' Class and
LC No.157('C' to 'B2' Class)
152 NMH‐RTM Section‐ Up gradation of LC No. 162 ('C' S.Fund 1,00,70 10,76 50,00 39,94
to 'B1' Class), 177 ('A' to 'SPL' Class and LC
No.187('B1' to 'SPL' Class)
153 Chanderia‐Chittor‐Ratlam Section:‐Provision of RTU S.Fund 79,70 42,33 37,37 ..
and its networking at interlocking LC gates
154 Godhra‐Nagda‐Ujjain‐Indore &Ujjain‐Bhopal S.Fund 79,46 42,49 10,00 26,97
section:‐ Provision of RTU's and its networking in
WSL gates on Rtalm Division.
155 Godhra‐ Ratlam Sec.: Provision of approach warning S.Fund 71,37 28,48 8,21 34,68
system at mid section (OSL) interlocked LC Gate
No. 61(Spl class) between MGN‐THDR Station and
79 (Spl Class) between MRN‐RTM A Station.
156 Godhra‐Nagda‐Ujjainand Indore‐Ujjain S.Fund 66,93 20,33 20,00 26,60
section‐‐Provision of Stand By Transmission system
for the slot from LC to panel for WSL Gates and LC
Gate Closed indication to Cabin / ASM at OSL LC on
RTM Division
157 RTM division :‐ Providing fibre reinforced pre S.Fund 84,95 .. 15,00 69,95
cast RCC blocks at 20Lc GDA‐RTM,NAD‐UJN&
IDU,UJN‐FTD‐UJN,RTM‐KNW section.
158 Ratlam Division ‐ Interlocking of LC 162 Km. 313/ S.Fund 92,70 .. 50,00 42,70
01‐02 in DLD‐KCNR and LC 98 Km. 203/ 07‐08 SMP‐
GRF section.
Ahmedabad
159 Mahesana‐Kalol Section:‐ Providing colour light S.Fund 39,41 39,40 1 ..
signals at L.C. gates Nos. 202,227,228,229& 230.
(S&T/S/07‐08)
15.05.29.12.3.
54.023
15.05.29.12.6.
54.002
15.01.29.07.3.
50.006
15.05.29.12.3.
54.021
15.05.29.12.3.
54.022
15.05.29.12.3.
54.017
15.05.29.12.3.
54.018
15.05.29.12.3.
54.004
15.05.29.12.3.
54.026
ROAD SAFETY ‐ LEVEL CROSSINGS
15.05.29.12.3.
54.015
15.05.29.12.3.
54.002
15.05.29.12.3.
54.024
15.05.29.12.3.
54.019
15.05.29.12.3.
54.020
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 12
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
160 Ahmedabad Division:‐ Interlocking of (1) LC No. S.Fund 99,95 64,64 1,00 34,31
58, Km.641/10‐11 between CUL‐SUK, (2) LC No.73,
Km.667/11‐12 between HVD‐DHNL ,(3) LC No.110,Km
730/5‐6 between SRBR‐KATR in DHG‐SIOB section &
(4) LC No.183, Km 675/10‐11 between CHP‐DRW
161 Ahmedabad Division:‐ Interlocking of LC Gate No.3, S.Fund 99,98 84,71 1,00 14,27
Km.5/7‐8 between GIM‐AI of GIM‐NBVJ section & LC
Gate No. 51,Km.631/15‐632/1 between DHG‐CUL in
VG‐SIOB section. (S&T/S/09‐10)
162 Palanpur‐Samakhiali Section:‐ Interlocking of LC S.Fund 99,98 84,20 10,00 5,78
Gate No. 2 , Km.1/5‐6 & LC Gate No.3 , Km.2/5‐6
between PNU‐CDS. (S&T/S/09‐10)
163 Ahmedabad Division:‐ Manning of LC No.15 KM 17/ S.Fund 77,16 70,89 1,00 5,27
2‐3 on KLL‐KTRD‐RUJ Section, LC No 16 at Km 16/4‐5
on MSH‐VG Section & LC No 21at Km 21/10‐22/1
MSH‐PTN Section. (ADI/S/09‐10)
164 Sr.DEN(W) Jurisdiction:‐ Providing speed breakers S.Fund 56,18 46,92 2,00 7,26
at LCs (148 Nos). (ADI/S/09‐10)
165 Sr.DEN(NW) Jurisdiction:‐ Providing speed breakers S.Fund 47,45 2,00 1,00 44,45
at LCs (141 Nos). (ADIS/09‐10)
166 Palanpur‐Ahmedabad Section:‐ Interlocking of LC S.Fund 99,98 84,05 1,00 14,93
Gate No.199, Km.694/4‐5 between KMLI‐UJA & LC Gate
No.170, Km.655/3‐4 between PNU‐UM. (S&T/S/09‐10)
167 Ahmedabad Division:‐ Interlocking of 2 Nos. of S.Fund 98,44 69,68 28,76 ..
Engg. LC gates:‐ (1) LC No.169 at Km. 653/10‐11
between PNU‐UM (2) LC No.88 KHXB ‐ WDHR .
(S&T/S/10‐11)
168 Ahmedabad Division:‐ Interlocking of 2 Nos. of S.Fund 97,85 69,41 28,44 ..
Engg. LC gates:‐ (1) LC Gate No.316A bet. ABD ‐
SAU & (2) LC Gate No.205 bet.VONB‐BCOB.
(S&T/S/10‐11)
169 Ahmedabad Division:‐ Interlocking of 2 Nos. of S.Fund 97,64 68,08 28,84 72
Engg. LC gates:‐ (1) LC Gate No.215 bet. BCOB‐CHIB
& (2) LC No.229 bet.BMSB‐GIMB. (S&T/S/10‐11)
170 Ahmedabad Division:‐ Interlocking of 3 Nos. of S.Fund 89,65 51,98 20,00 17,67
Traffic LC gates:‐ (1) LC No.10C at JN, (2) LC
No.62 at SUK & (3) LC No.80 at DVY section.
(S&T/S/10‐11)
171 Ahmedabad Division:‐ Interlocking of 3 Nos. of S.Fund 89,64 51,14 10,00 28,50
Traffic LC gates:‐ (1) LC No.98C at MALB, (2) LC
No.213 at UMN & (3) LC No.111 at KATR.
(S&T/S/10‐11)
172 Ahmedabad Division:‐ Removal of infrastructure S.Fund 94,29 89,81 50 3,98
deficiencies on LC’s between Mahesana‐Tarangahill
& Ranuj‐Katosan RD (MG) section. (ADI/U/10‐11)
15.01.29.10.3.
50.002
15.01.29.10.3.
50.001
15.01.29.10.3.
50.004
15.01.29.10.3.
50.005
15.01.29.10.3.
50.008
15.01.29.09.3.
50.006
15.01.29.09.3.
50.004
15.01.29.09.3.
50.008
15.01.29.09.3.
50.007
15.01.29.09.3.
50.005
15.01.29.10.3.
50.003
ROAD SAFETY ‐ LEVEL CROSSINGS
15.01.29.09.3.
50.002
15.01.29.09.3.
50.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 13
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
173 AJM‐VJF‐UMN Section:‐ Removal of infrastructure S.Fund 90,15 75,13 50 14,52
deficiencies on LC’s. (ADI/S/10‐11)
174 Ahmedabad‐Palanpur Section:‐ Augmentation of Power S.Fund 86,45 86,33 1 11
Supply at 11 Mid section Interlocked gates.
(S&T/U/10‐11)
175 Ahmedabad‐Samakhiali‐Gandhidham‐Bhuj Section:‐ S.Fund 1,14,33 1,14,20 1 12
Augmentation of Power Supply at 16 Mid section
interlocked gates. (S&T/S/10‐11)
176 Ahmedabad Division:‐ Provision of battery back up S.Fund 86,73 .. 10,00 76,73
for relays through IPS at Mid section interlocked
gates. (ADI/U/11‐12)
177 Ahemdabad Division:‐ Replacement of old mechanical S.Fund 92,26 83,43 8,83 ..
lifting barriers at 10 LC Gates (7 Nos Traffic & 3
Nos Engg). (ADI/U/11‐12)
178 Ahemdabad Division:‐ Replacement of Mechanical S.Fund 58,24 54,63 3,61 ..
lifting barriers 4 LC Gates (2 Nos Traffic & 2 Nos
Engg). (ADI/U/11‐12)
179 Ahemdabad Division:‐ Provision of Road signals and S.Fund 96,00 8,65 10,00 77,35
Hooter on interlocked LC gates in ADI‐MSH‐PNU,
ADI‐VG‐SIOB & SIOB‐PNU (21 LC gates).
(ADI/U/11‐12)
180 Ahmedabad division‐ Replacement of old mechanical S.Fund 51,39 28,62 5,00 17,77
lifting barrier by electric operated lifting
barrier on age cum condition basis.
181 Ahmedabad Division: Provision of slide boom type S.Fund 99,38 36,32 5,00 58,06
gates.
182 Ahmedabad Div: Provision of stand by transmission S.Fund 66,32 .. 10,00 56,32
system for the slot from LC gate to panel for WSL
gates.
183 Ahmedabad Division : Provision of fuse alarm S.Fund 29,46 .. 5,00 24,46
system at 79 interlocked LC gates.
184 Ahmedabad division‐ Provision of emergency sliding S.Fund 76,91 10,48 66,43 ..
type boom barrier at 30 interlocked LC gates.
185 ADI:‐ Providing fibre reinforced pre cast RCC S.Fund 97,58 11,00 50,00 36,58
block at various 20 Nos. of LCs. (VG‐SIOB ‐ Lc No.
3,5,7,32,43,108,112,114,116 & 117) (KHD‐GNC‐12,
KLL‐GNC‐3 &5, KLL‐RUJ‐10 & 22 AJM‐UMN ‐ 14,66,67 &
70)
Rajkot
186 Rajkot Division: Up gradation of LC No.219 bet. S.Fund 40,92 31,46 1,00 8,46
Kanalus ‐Modpur, LC No. 289 bet. Gorinja ‐ Dwarka
& LC No.303 bet. Bhimrana ‐Okha. (RJT/S/08‐09)
15.01.29.12.3.
50.008
15.04.29.08.3.
53.005
15.01.29.11.3.
50.002
15.01.29.12.3.
50.002
15.01.29.12.3.
50.003
15.01.29.12.3.
50.006
15.01.29.12.3.
50.001
15.01.29.12.3.
50.007
15.01.29.10.3.
50.011
15.01.29.11.3.
50.009
15.01.29.11.3.
50.010
15.01.29.11.3.
50.006
15.01.29.11.3.
50.004
15.01.29.11.3.
50.003
ROAD SAFETY ‐ LEVEL CROSSINGS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 14
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
187 Rajkot Division:‐ Interlocking of Manned OSL S.Fund 71,84 16,55 33,13 22,16
LC.gate No.236 at Km 884/1 ‐2 between Khambhaliya
‐ Bhatel section.(S&T/U/11‐12)
188 Viramgham ‐ Okha Section:‐ Interlocking of LC S.Fund 71,64 47,74 2,00 21,90
No.120'C' class Engg. at Km 739/7‐8 between BLWR ‐
RJT on VG ‐ OKHA section.(S&T/U/11‐12)
189 Rajkot Division:‐ Upgradation of LC gate No.305 at S.Fund 73,67 23,29 40,66 9,72
Km 985/0‐1 between BMRN ‐ OKHA from 'B' class to
Spl' class.(S&T/U/11‐12)
190 Morbi‐Barwara Road Section:‐ Upgradation of LC S.Fund 67,40 53,67 2,00 11,73
gate No.036 at Km 30/8‐9 between MVI ‐ BRL from
B' class to 'Spl' class.(S&T/U/11‐12)
191 Rajkot Division:‐ Provision of battery back up for S.Fund 39,30 5,92 20,00 13,38
relays through IPS at LC gates in Wankaner (Ex) ‐
Navalakhi ‐ Dahisara ‐ Vavaniya section and in
VG‐SUNR section. (RJT/U/11‐12)
192 RJT DIV ‐ Closing of LCs by interconnectivity in S.Fund 95,77 9,39 86,38 ..
the jurisdiction of DEN(E)‐RJT.
193 RJT Division ‐ Closing of LCs by S.Fund 96,42 44,52 51,90 ..
inter‐connectivity in the jurisdiction of
DEN(W)RJT
194 Rajkot Division : Provision of CLS at 3 S.Fund 93,85 32,77 20,00 41,08
Interlocked OSL LC gates in RJT‐HAPA section in
connection of PI works already sanction. Ie LC
128,136 & 147.
195 Rajkot Division : Provision of Approach Warning S.Fund 75,26 34,17 70 40,39
System for Interlocked LC gate.ie Viramgam‐OKHA
section including branch
196 RJT Divn: Providing fibre reinforced pre‐cast RCC S.Fund 65,35 1,00 5,00 59,35
blocks at 20 LC gates under DEN(W)‐RJT.
197 RJT Divn: Providing fibre reinforced pre‐cast RCC S.Fund 60,49 .. 1,00 59,49
blocks at 20 LC gates under DEN(E)‐RJT.
198 Rajkot Division : Up gradtion and Interlocking of S.Fund 38,51 30,52 5,00 2,99
Manned OSL LC gate No. 113 at Km 727/4‐5 to 'A'
class between Khorana ‐ Kankot section .
199 Rajkot Division:Up gradation and interlocking of S.Fund 39,00 32,14 6,86 ..
LC No. 135'C' class Engg. at Km 755/0‐1 between
Khandheri‐ Padadhari section to 'A' class,
200 RJT DIVN ‐ Providing interconnecting road for S.Fund 91,33 .. 91,33 ..
closure of unmanned LC gates under DEN (W) RJT's
jurisdiction.
15.04.29.12.3.
53.007
15.04.29.12.3.
53.009
15.04.29.12.3.
53.002
15.04.29.12.3.
53.003
15.04.29.13.3.
53.001
15.04.29.11.3.
53.002
15.04.29.11.3.
53.004
15.04.29.12.3.
53.010
15.04.29.12.3.
53.008
15.04.29.12.3.
13.011
15.04.29.12.3.
53.001
ROAD SAFETY ‐ LEVEL CROSSINGS
15.04.29.11.3.
53.003
15.04.29.11.3.
53.001
15.04.29.11.3.
53.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 15
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Bhavnagar
201 Sabarmati ‐ Botad, Dhasa ‐ Jetalsar, Kanalus ‐ S.Fund 1,76,79 1,17,91 1,00 57,88
Porbandar Section ‐ Providing CC paver block on
150 LCs. (BVP/U/08‐09)
202 KJV‐VSW Section (MG):‐ Providing CC Block on level S.Fund 36,23 8,27 2,00 25,96
crossings gates (30 nos.). (BVP/S/08‐09)
203 Bhavnagar Division ‐ Removal of defeciencies and S.Fund 2,17,41 39,40 50 1,77,51
providing Paver Blocks with speed breakers /
Rumble Strips on 219 LCs.
204 ADEN‐Botad Sub‐division:‐ Manning of unmanned S.Fund 48,79 23,83 5,00 19,96
level crossings 24,Km 26/7‐8 between GG ‐ SEJ and
159/X at km 172/8‐9 between SAPR ‐ BTD.
(BVP/S/09‐10)
205 Sabarmati‐Botad (MG) Section:‐ Manning of LC No S.Fund 24,69 1,15 23,54 ..
81, km 84/2‐3 between KTGD and LHBK station.
(BVP/S/09‐10)
206 ADEN‐Junagadh Sub Division:‐ Manning of unmanned S.Fund 33,70 20,50 5,00 8,20
level crossings 105/C, km 146/7‐8 between KSD ‐
MLHA and 126/C, km 179/3‐4 between ADE VRL .
(BVP/S/09‐10)
207 PRCL Section:‐ Manning of unmanned level crossings S.Fund 19,11 5,35 13,76 ..
41/C, km 34/1‐2 between DAS ‐ RLA. (BVP/S/09‐10)
208 PRCL Section:‐ Manning of unmanned level crossings S.Fund 18,07 5,48 12,59 ..
LC 22 at km 16/1‐2 between DME and LMO stations.
(BVP/S/09‐10)
209 Ribda‐Bhaktinagar Section:‐ Upgradation & S.Fund 37,75 16,64 5,00 16,11
interlocking of LC no 13. (S&T/U/09‐10)
210 Bhavnagar sub division:‐ Providing approach road S.Fund 63,47 15,98 20,00 27,49
between two unmanned level crossings situated
within 01 Km for diversion of traffic and closing
one ( LC 192 & 193, LC 21 & 22 , LC 212 & 213, LC
29 & 30 ). (BVP/S/10‐11)
211 Bhavnagar Division:‐ Providing approach road S.Fund 37,38 2,28 35,10 ..
between two unmanned level crossings situated
within 01 Km for diversion of traffic and closing
one (LC 3 &4, 5 & 6, 7 & 8, 9 & 10, 12 & 13, 16 &
15, 36 & 37 ,43 & 44 Khijadiya ‐ Veraval and LC 26
212 DAS‐RLA Section:‐ Improvement of poor visibility S.Fund 17,38 74 1,00 15,64
by cutting of earthwork at LCs (LC No. 41, 68, 72
& 80). (BVP/U/10‐11)
213 Bhavnagar Division:‐ Interlocking of LC gates No S.Fund 53,42 19,79 33,63 ..
24 between Gandhigram‐ Sarkhej on Botad‐Sabarmati
(MG) Section.(S&T/U/11‐12)
15.02.29.11.3.
51.003
15.02.29.09.3.
51.007
15.02.29.09.3.
51.005
15.02.29.09.3.
51.008
15.02.29.10.3.
51.005
15.02.29.10.3.
51.001
15.02.29.10.3.
51.002
15.02.29.08.2.
51.002
15.02.29.08.3.
51.008
15.02.29.09.2.
51.001
15.02.29.09.3.
51.001
15.02.29.09.3.
51.010
15.02.29.09.3.
51.003
ROAD SAFETY ‐ LEVEL CROSSINGS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 16
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
214 Bhavnagar Division:‐ Interlocking of LC gate No 11 S.Fund 57,88 10,23 15,00 32,65
C' Class (Engg) between Dhasa‐Damnagar on
Dhasa‐Rajula Jn. Section.(S&T/U/11‐12)
215 Rajula Jn.‐Mahuva Sec:‐Interlocking and S.Fund 47,60 10,25 10,00 27,35
upgradation of LC gate No 129 'C' Class (Engg).
216 Prachiroad‐Delvada MG section:‐Interlocking and S.Fund 45,49 9,78 10,00 25,71
upgradation of LC gate No 49 (Engg)
217 BVP Divn.: Upgradation & Reclassification of 3 S.Fund 61,48 .. 10,00 51,48
Nos LC's ( KNLS ‐ PBR ‐ 63, 68, JLR ‐ WSJ ‐ 67)
218 BVP Division ‐ Providing fiber reinforced S.Fund 63,26 .. 1,00 62,26
pre‐cast RCC blocks at 20LC's
RWO‐WSJ,63,57,56,JLR‐VRL,
81,82X,77,82,JND‐VSW,11,SUNR‐WC 108/C,109,110,
RUR‐KDI 160,BTJ YD 213X BVP‐BVC 219BVC YD 220
Mumbai
219 Works costing below DRM's Power S.Fund 30,00 .. 30,00 ..
Vadodara
220 Works costing below DRM's Power S.Fund 30,00 .. 30,00 ..
Ratlam
221 Works costing below DRM's Power S.Fund 46,00 .. 46,00 ..
Ahmedabad
222 Works costing below DRM's Power S.Fund 30,00 .. 30,00 ..
Rajkot
223 Works costing below DRM's Power S.Fund 30,00 .. 30,00 ..
Bhavnagar
224 Works costing below DRM's Power S.Fund 30,00 .. 30,00 ..
TOTAL‐WORKS IN PROGRESS S.Fund .. .. 19,16,26 ..
B ‐ New Works
Mumbai
225 Virar‐Surat section: Provision of IPS at 4 Relay S.Fund 72,67 .. 5,00 67,67
Huts in Valsad‐Bilimora section of Mumbai
Division.
226 Works costing below DRM's Power S.Fund 5,00 .. 5,00 ..
Ahmedabad
227 Works costing below DRM's Power S.Fund 35,00 .. 35,00 ..
TOTAL‐NEW WORKS S.Fund .. .. 45,00 ..
TOTAL‐Road Safety ‐ Level S.Fund .. .. 19,61,26 ..
Crossings
15.02.29.14.3.
00.999
15.03.29.14.3.
52.001
15.03.29.14.3.
00.999
15.01.29.14.3.
00.999
15.02.29.12.3.
51.004
15.03.29.14.3.
00.999
15.06.29.14.3.
00.999
15.05.29.14.3.
00.999
15.01.29.14.3.
00.999
15.04.29.14.3.
00.999
ROAD SAFETY ‐ LEVEL CROSSINGS
15.02.29.11.3.
51.001
15.02.29.12.3.
51.001
15.02.29.12.3.
51.003
15.02.29.12.3.
51.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 17
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
A ‐ Works in Progress
Mumbai
228 Udvada‐Pardi:‐ Road over bridge in lieu of LC No. S.Fund 2,47,13 50,00 3,00 1,94,13
87. (BCT/U/09‐10) Deposit 2,47,13
229 Virar‐Surat:‐ Road over bridge in lieu of LC No. S.Fund 2,12,70 50,00 3,00 1,59,70
101 (near Doongri). (BCT/U/09‐10) Deposit 2,75,36
230 Udhna‐Jalgaon Section:‐ Providing limited height S.Fund 1,30,42 45,52 84,00 90
subway to in lieu of LC No. 62. (BCT/U/11‐12)
231 UDN‐JL Sec. Providing limied height sub‐way in liu S.Fund 1,30,60 .. 75,00 55,60
of LC no.85 at km143/6‐7
232 UDN‐JL(Sec):Providing normal limited height subway S.Fund 1,59,47 .. 75,00 84,47
in lieu of LC No 154
Vadodara
233 Bharuch Town (Hospital Road):‐ Construction of RUB S.Fund 1,27,00 50,00 3,00 74,00
in lieu of LC No. 3 near. (BRC/U/10‐11) Deposit ..
234 Bharuch Town (Shaktinath Road):‐ Construction of S.Fund 2,44,00 50,00 3,00 1,91,00
RUB in lieu of LC No. 4 near. (BRC/U/10‐11) Deposit ..
Ratlam
235 Godhra‐Nagda Section:‐ Providing limited use S.Fund 93,99 91,87 1 2,11
subway to eliminate LC No. 16 at Km. 487/4‐6
between CCL and SAT. (RTM/S/10‐11)
236 Godhra‐Nagda Section:‐ Providing limited use S.Fund 1,18,03 77,57 1 40,45
subway to eliminate LC No. 24 at Km. 496/14‐16
between SAT and PPD. (RTM/S/10‐11)
237 Godhra‐Nagda Section:‐ Providing limited use S.Fund 1,26,87 79,33 1 47,53
subway to eliminate LC No. 43 at Km. 534/0‐2
between JKT and RET. (RTM/S/10‐11)
238 Godhra‐Nagda Section:‐ Providing limited use S.Fund 1,27,36 .. 1 1,27,35
subway to eliminate LC No. 48 at Km. 549/24‐26
between DHMA and BIO. (RTM/S/10‐11)
239 Godhra‐Nagda Section:‐ Providing limited use S.Fund 1,35,61 64,30 10 71,21
subway to eliminate LC No. 54 at Km. 560/22‐24
between Anas and NRH. (RTM/S/10‐11)
240 Ujain‐Bhopal Section:‐ Providing limited height S.Fund 1,38,40 1,36,40 2,00 ..
subway to eliiminate LC No. 99 at km. 196/00‐02
between BKTL‐SHE at unmanned LC. (RTM/U/11‐12)
241 Nagda‐Ujjain Section:‐ Providing limited height S.Fund 1,60,70 1,37,78 5,00 17,92
subway to eliiminate LC No. 16 at km. 33/30‐42/2
between PSO‐ASL at unmanned LC. (RTM/U/11‐12)
15.05.30.11.3.
54.005
15.05.30.10.3.
54.001
15.05.30.10.3.
54.002
15.05.30.10.3.
54.003
15.05.30.10.3.
54.004
15.05.30.10.3.
54.005
15.05.30.11.3.
54.007
15.03.30.09.3.
30.002
15.03.30.11.3.
52.001
15.03.30.12.3.
52.002
15.03.30.12.3.
52.001
15.06.30.10.3.
55.001
15.06.30.10.3.
55.002
ROAD SAFETY ‐ ROB/RUB
15.03.30.09.3.
30.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 18
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
242 Nagda‐Ujjain Section:‐ Providing limited height S.Fund 1,57,40 1,37,60 5,00 14,80
subway to eliiminate LC No. 17X at km. 36/26‐28 at
unmanned LC. (RTM/U/11‐12)
243 Ujjain‐Bhopal Section:‐ Providing limited height S.Fund 1,38,90 1,36,59 2,00 31
subway to eliiminate LC No. 97 at km. 192/24‐26 at
unmanned LC. (RTM/U/11‐12)
244 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,43,00 79,60 36,00 27,40
subway to eliiminate LC No. 47 at km. 584/24‐26
between DHD and BIO stations. (RTM/U/11‐12)
245 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,45,00 79,60 45,00 20,40
subway to eliiminate LC No. 52 at km. 555/14‐16
between BIO and ANAS stations. (RTM/U/11‐12)
246 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,45,00 54,14 60,00 30,86
subway to eliiminate LC No. 56 at km. 563/10‐12
between ANAS and NRH stations. (RTM/U/11‐12)
247 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,43,00 80,42 36,00 26,58
subway to eliiminate LC No. 58 at km. 570/10‐12
between ANAS and MGN stations. (RTM/U/11‐12)
248 GDA‐NAD Section‐Provision of Limited use sub way S.Fund 1,17,38 10,35 75,00 32,03
to eliminate L. C. No. 50 at Km 552/16‐18 between
Bordi & ANAS stations.
249 GDA‐NAD Section‐Provision of Limited use sub way S.Fund 1,34,89 1,34,80 1 8
to eliminate L. C. No. 73 at Km 613/22‐24 between
AGR & BMI stations.
250 IDU section‐ povidinglimited height subway to S.Fund 1,92,75 96,75 96,00 ..
eliminateManned Lc no.48 at Km.65/16‐66/01
betweenMGG&LMNR stations.
251 INDORE‐ DEWAS‐UJJAIN section:‐ Providing Limited S.Fund 1,95,00 5,17 1,00 1,88,83
height Subway to eliminiate unmanned LC no. 15
at. Km. 19/9‐10 between KADCHA‐NARANGIPUR
stations.
252 INDORE‐DEWAS‐UJJAIN section :‐ Providing Limited S.Fund 1,10,06 1,04,33 5,09 64
height Subway to eliminiate LC no. 9 at. Km.
10/14‐15 between UJJAIN‐KADCHA stations.
253 INDORE‐DEWAs‐UJJAIN sectio n:‐ Providing Limited S.Fund 92,29 43,95 44,94 3,40
height Subway to eliminiate LC no. 18 between
KDHA‐NRGR at Km. 23/5‐6.
254 INDORE‐DEWAS‐UJJAIN section:‐ Providing Limited S.Fund 1,53,38 1,13,50 25,00 14,88
height Subway to eliminiate unmanned LC no. 12 at.
Km. 14/17‐15/1 between UJJAIN‐KADCHAstation.
255 CNA ‐ RTM ‐ KNW section :‐ Providing Limited S.Fund 1,99,40 1,56,52 24,00 18,88
height Subway in lieu of Unmanned LC no. 155 & 239
at Km. 299/8 ‐ 9 & 480/9 ‐ 10 at‐
15.05.30.12.3.
54.004
15.05.30.12.3.
54.005
15.05.30.12.3.
54.008
15.05.30.12.3.
54.006
15.05.30.11.3.
54.003
15.05.30.11.3.
54.004
15.05.30.12.3.
54.003
15.05.30.12.3.
54.007
15.05.30.12.3.
54.001
15.05.30.12.3.
54.002
ROAD SAFETY ‐ ROB/RUB
15.05.30.11.3.
54.006
15.05.30.11.3.
54.008
15.05.30.11.3.
54.001
15.05.30.11.3.
54.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 19
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
256 Ratlam Division‐Providing Limited Hieght Subway of S.Fund 1,47,67 .. 1,00,00 47,67
4.00 M (Width) x 3.00 M (Height) (Internal
dimension) precast R.C.C. M‐35 box in liue of
Unmanned LC No. 194 & 195 at Km 382/8‐9 & 384/6‐7
between RTM‐NGW section.
257 Ratlam Division‐ Providing Limited Hieght Subway S.Fund 2,27,10 .. 1,00,00 1,27,10
of 4.00 M (Width) x 3.00 M (Height) (Internal
dimension) precast R.C.C. M‐35 box in liue of
Unmanned LC No. 200 & 201 at (Km 399/8‐9) & (Km
401/9‐10) between NGW‐RNJ section.
258 Providing Limited Hieght Subway of 4.00 M (Width) S.Fund 2,16,76 .. 1,00,00 1,16,76
x 3.00 M (Height) (Internal dimension) precast
R.C.C. M‐35 box in liue of Unmanned LC No. 205 &
211 at Km 408/1‐2 & Km 424/11‐12 &between
RNJ‐BNG and BNG‐GPX section.
259 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12 .. 60,00 1,05,12
Sub‐ways(3.66 x 4.00 m) in lieu of Unmanned
Level crossing No.213/C , Km 428/9‐10 between
Barnagar ‐Gautampura Station.
260 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12 .. 60,00 1,05,12
Sub‐ways(3.66 x 4.00 m) in lieu of Unmanned
Level crossing No. 220/C , Km 442/3‐4 between
Gautampura‐ Fatehabad Station.
261 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12 .. 60,00 1,05,12
Sub‐ways(3.66 x 4.00 m) in lieu of Unmanned
Level crossing No. 221/C , Km 444/3‐4 between
Gautampura‐ Fatehabad Station.
262 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12 .. 60,00 1,05,12
Sub‐ways(3.66 x 4.00 m) in lieu of Unmanned
Level crossing No. 224/C , Km 450/2‐3 between
Gautampura‐ Fatehabad Station.
263 Indore ‐Dewas ‐Ujjain section ;Providing Sub‐way S.Fund 1,30,38 .. 1 1,30,37
(RUB) to eliminate LC No. 31 Km: 43/1‐2 in
Ratlam Division of Western railway at.
264 Chittaurgarh‐Kota section ;Providing Sub‐way S.Fund 1,18,54 .. 10,00 1,08,54
(RUB) to eliminate LC No. 121 Km: 155/11‐12
Bet: CNA‐BSSL in Ratlam Division of Western
railway at.
Ahmedabad
265 Construction of Limited Hieght Subway in lieu of S.Fund 2,41,24 1,00 30 2,39,94
LC No. 244C (manned) at Km 778/7‐8 between SBI‐CDK
station
266 Elimination of LC No. 16A at Km. 517/08‐09on S.Fund 2,22,86 1,00 1,00,00 1,21,86
ADI‐VG Section by providing RUB for Dedicated Deposit ..
freight corrdor.
15.05.30.13.3.
54.001
15.05.30.13.3.
54.002
15.01.30.13.3.
50.001
15.01.30.13.3.
50.005
15.05.30.12.3.
54.010
15.05.30.12.3.
54.012
15.05.30.12.3.
54.013
15.05.30.12.3.
54.014
15.05.30.12.3.
54.015
15.05.30.12.3.
54.009
ROAD SAFETY ‐ ROB/RUB
15.05.30.12.3.
54.011
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 20
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
267 Elimination of LC No. 16 at Km. 517/01‐02on ADI‐VG S.Fund 1,55,99 1,00 80,00 74,99
Section by providing RUB for Dedicated freight
corrdor.
268 Elimination of LC No. 18 at Km. 520/0‐1 on ADI‐VG S.Fund 1,55,99 1,00 80,00 74,99
Section by providing RUB for Dedicated freight Deposit ..
corrdor.
269 Elimination of LC No. 19 at Km. 521/0‐1 on ADI‐VG S.Fund 1,55,99 1,00 80,00 74,99
Section by providing RUB for Dedicated freight Deposit ..
corrdor.
270 Elimination of LC No. 20 at Km. 521/5‐6 on ADI‐VG S.Fund 1,55,99 1,00 80,00 74,99
Section by providing RUB for Dedicated freight Deposit ..
corrdor.
271 Elimination of LC No. 21 at Km. 523/01‐02 on S.Fund 1,55,99 1,00 70,00 84,99
ADI‐VG Section by providing RUB for Dedicated Deposit ..
freight corrdor.
272 Elimination of LC No. 10 at Km. 8/8‐9 on PNU‐SIOB S.Fund 1,39,94 1,00 75,00 63,94
Section by providing RUB for Dedicated freight
corrdor.
273 Elimination of LC No. 11 at Km. 9/8‐9 on PNU‐SIOB S.Fund 1,39,94 1,00 70,00 68,94
Section by providing RUB for Dedicated freight
corrdor.
274 Elimination of LC No. 8 C at Km. 8/4‐5 on MSH‐PTN S.Fund 1,21,09 1,00 48,00 72,09
Section by providing RUB.
Rajkot
275 Than‐Lakhamachi:‐ Road over bridge in lieu of LC S.Fund 1,42,80 50,00 3,00 89,80
No. 73. (RJT/U/09‐10) Deposit 1,42,80
276 Rajkot Division:.‐ Road over bridge in lieu of LC S.Fund 89,43 50,00 3,00 36,43
No.274 at Km. 936/13‐14 between Kuranga‐Okhamadhi. Deposit 89,43
(S&C/U/09‐10)
Bhavnagar
277 Construction of Limited Height Sub Way to S.Fund 1,89,46 .. 1,00 1,88,46
elimination of Level crossing (LC No. 32 & 36 on
Kanalus ‐Porbandar section)
278 Construction of Limited Height Sub Way to S.Fund 2,34,86 .. 1,00 2,33,86
elimination of Level crossing (LC No. 17 & 22 on
Kanalus ‐Porbandar section)
279 Construction of Limited Height Sub Way to S.Fund 2,19,39 .. 1,20,00 99,39
elimination of Level crossing (LC No. 37 & 42 on
Kanalus ‐Porbandar section)
280 Construction of Limited Height Sub Way to S.Fund 2,29,65 .. 1,00 2,28,65
elimination of Level crossing (LC No. 43 & 45 on
Kanalus ‐Porbandar section)
15.02.30.13.3.
51.012
15.01.30.13.3.
50.002
15.04.30.09.3.
30.002
15.04.30.09.3.
30.001
15.02.30.13.3.
51.009
15.02.30.13.3.
51.010
15.02.30.13.3.
51.011
15.01.30.13.3.
50.008
15.01.30.13.3.
50.009
15.01.30.13.3.
50.010
15.01.30.13.3.
50.003
15.01.30.13.3.
50.004
15.01.30.13.3.
50.006
ROAD SAFETY ‐ ROB/RUB
15.01.30.13.3.
50.007
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 21
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
281 Construction of Limited Height Sub Way to S.Fund 2,37,08 .. 1,00 2,36,08
elimination of Level crossing (LC No. 59 & 71 on
Kanalus ‐Porbandar section)
282 Construction of Limited Height Sub Way to S.Fund 1,83,97 .. 1,00 1,82,97
elimination of Level crossing (LC No. 81 & 79 on
Jetalsar ‐ Wansjaliya section)
283 Construction of Sub Way to elimination of Level S.Fund 2,12,51 .. 1,20,00 92,51
crossing (LC No. 91 & 85 on Jetalsar ‐ Wansjaliya
section)
284 Construction of Limited Height Sub Way to S.Fund 2,25,49 .. 1,00 2,24,49
elimination of Level crossing (LC No. 97 & 109 on
Jetalsar ‐ Wansjaliya section)
285 Construction of Sub Way to elimination of Level S.Fund 2,34,50 .. 1,00 2,33,50
crossing (LC No. 112 & 114 on Jetalsar ‐
Wansjaliya section)
286 Construction of Limited Height Sub Way to S.Fund 1,83,91 .. 1,00 1,82,91
elimination of Level crossing (LC No. 51 on
Kanalus‐ Porbandar & 116 on Jetalsar ‐ Wansjaliya
section)
287 Construction of Limited Height Sub Way to S.Fund 2,36,66 .. 1,00 2,35,66
elimination of Level crossing (LC No. 94 & 96 on
Jetalsar ‐ Wansjaliya section)
288 Construction of Limited Height Sub Way to S.Fund 2,19,04 .. 1,00 2,18,04
elimination of Level crossing ( LC No. 18 & 105 on
RAJKOT ‐ SOMNATH section )
TOTAL‐WORKS IN PROGRESS S.Fund .. .. 21,97,49 ..
B ‐ New Works
Ahmedabad
289 Works costing below DRM's Power S.Fund 25,00 .. 25,00 ..
TOTAL‐NEW WORKS S.Fund .. .. 25,00 ..
TOTAL‐Road Safety ‐ ROB/RUB S.Fund .. .. 22,22,49 ..
A ‐ Works in Progress
Mumbai
290 Udhna‐Jalgaon section:‐ TWR = 10.00 kms.( DRF 83,54 11,01 10,77 61,76
Udhna‐Chalthan section) & ( Gangdhara‐Bardoli
section). (BCT/U/10‐11)
291 Udhna‐Jalgaon sectionn:‐ TWR =12.00 Kms. ( DRF 99,84 20,25 10,25 69,34
Timbarva ‐ Madhi section) & ( Loterva‐Lakkadkhot
section). (BCT/U/10‐11)
292 Udhna‐Jalgaon section:‐ TWR = 5.00 Kms. ( Uakai DRF 41,77 11,01 8,50 22,26
Songadh ‐Lakkadkhot section) & ( Lakkadkhot ‐
Navapur section). (BCT/U/10‐11)
15.03.31.10.3.
52.033
15.03.31.10.3.
52.036
15.03.31.10.3.
52.034
15.02.30.13.3.
51.006
15.02.30.13.3.
51.007
15.02.30.13.3.
51.008
15.02.30.13.3.
51.001
15.01.30.14.3.
00.999
TRACK RENEWALS
ROAD SAFETY ‐ ROB/RUB
15.02.30.13.3.
51.002
15.02.30.13.3.
51.003
15.02.30.13.3.
51.004
15.02.30.13.3.
51.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 22
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
293 Udhna‐Jalgaon section:‐ TWR =5.00 Kms.( Navapur ‐ DRF 43,89 11,01 7,68 25,20
Kolde section) & ( Khatgaon ‐ Kandbara section).
(BCT/U/10‐11)
294 Sindkheda‐Nardana section:‐ TWR=5.00 Kms. DRF 41,77 11,01 9,25 21,51
(BCT/U/10‐11)
295 Chawlkhede‐Jalgaon section:‐ TWR =5.00 Kms. DRF 43,97 11,01 14,67 18,29
(BCT/U/10‐11)
296 Lotarva‐Kaher section:‐ TRR = 1.00 kms. DRF 89,00 66,12 9,25 13,63
(BCT/U/10‐11)
297 Udhna‐Jalgaon section:‐ TRR =1.00 kms. DRF 79,70 66,12 8,95 4,63
(BCT/U/10‐11)
298 Udhna‐Jalgaon section:‐ TRR =1.00 kms. DRF 79,70 66,12 6,45 7,13
(BCT/U/10‐11)
299 Udhna‐Jalgaon section:‐ TRR=1.27 kms in DRF 99,50 83,70 15,00 80
SE/Khandbara jurisdiction. (BCT/U/10‐11)
300 Udhna‐Jalgaon section:‐ TRR=1.00 kms. in DRF 79,70 66,12 6,00 7,58
SE/Navapur jurisdiction. (BCT/U/10‐11)
301 Udhna‐Jalgaon section:‐ TRR=1.00 kms. ( Dharangaon DRF 79,70 66,12 8,95 4,63
Yard). (BCT/U/10‐11)
302 Udhna‐Jalgaon section:‐ RR = 0.6 kms. on major DRF 47,82 26,00 12,75 9,07
curve no‐ 6 , in SE/p‐way /Bhayander jurisdiction
. (BCT/U/10‐11)
303 Udhna‐Jalgaon section:‐ TRR = 0.5 kms. on major DRF 39,85 27,40 12,45 ..
curve no‐ 12 , in SE/p‐way /Vyara jurisdiction.
(BCT/U/10‐11)
304 Udhna‐Jalgaon section:‐ TRR = 0.68 kms. on major DRF 54,20 43,33 6,95 3,92
curve no‐ 40 , in SE/p‐way /Khandbara
jurisdiction. (BCT/U/10‐11)
305 Udhna‐Jalgaon section:‐ TRR on major Bridge no‐ DRF 51,81 16,00 8,40 27,41
226 , 228 , 257 = Total‐ 650 TRM. (BCT/U/10‐11)
306 Udhna‐Jalgaon section:‐ TSR = 0.703 kms.on major DRF 37,17 15,00 8,65 13,52
Bridge no‐ 374. (BCT/U/10‐11)
307 Udhna‐Jalgaon section:‐ Providing complete set of DRF 90,00 16,50 5,40 68,10
SEJs. (BCT/U/10‐11)
308 Udhna‐Jalgaon Section:‐ Replacment of curved DRF 99,00 32,00 11,25 55,75
switches = 126 Nos.under ADEN/E/Nandurbar.
(BCT/U/10‐11)
309 Udhna‐Jalgaon Section. Replacment of curved DRF 99,00 24,00 9,03 65,97
switches = 126 Nos.under ADEN/W/Nandurbar.
(BCT/U/10‐11)
15.03.31.10.3.
52.019
15.03.31.10.3.
52.023
15.03.31.10.3.
52.014
15.03.31.10.3.
52.031
15.03.31.10.3.
52.015
15.03.31.10.3.
52.025
15.03.31.10.3.
52.027
15.03.31.10.3.
52.030
15.03.31.10.3.
52.032
15.03.31.10.3.
52.001
15.03.31.10.3.
52.012
15.03.31.10.3.
52.028
15.03.31.10.3.
52.029
15.03.31.10.3.
52.017
15.03.31.10.3.
52.016
TRACK RENEWALS
15.03.31.10.3.
52.035
15.03.31.10.3.
52.013
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 23
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
310 Udhna‐Jalgaon Section:‐ Renewal of SEJ = 88 Nos. DRF 99,00 15,00 6,25 77,75
under ADEN/E/Nandurbar. (BCT/U/10‐11)
311 Udhna‐Jalgaon Section:‐ Renewal of SEJ = 88 Nos. DRF 99,00 37,00 6,25 55,75
under ADEN/W/Nandurbar. (BCT/U/10‐11)
312 Virar‐Surat section:Replacement of CMSC = 30 Nos DRF 52,77 34,90 10,17 7,70
in the jurisdiction of ADEN/Dahanu Road and
ADEN/Surat section. (BCT/U/10‐11)
313 Virar‐Surat Section:‐ Replacement of CS = 40Nos. DRF 71,85 26,00 6,45 39,40
in the jurisdiction of ADEN/Dahanu Road and
ADEN/Suarat section. (BCT/U/10‐11)
314 Virar‐Surat Section:‐ Replacement of GRSP in the DRF 50,00 16,00 6,25 27,75
jurisdiction of ADEN/Dahanu Road and ADEN/Suarat
section. (BCT/U/10‐11)
315 Virar‐Surat section :‐ TRR = 1.10 kms. DRF 87,67 30,90 8,02 48,75
(BCT/U/10‐11)
316 Virar‐Surat section:‐ TRR = 1.15 kms. DRF 91,65 25,01 9,10 57,54
(BCT/U/10‐11)
317 Virar‐Surat section:‐ TRR 1.056 km. (BCT/U/10‐11) DRF 84,16 22,00 6,44 55,72
318 Virar‐Surat section:‐ TRR = 1.15 km. (BCT/U/10‐11) DRF 91,65 27,00 7,59 57,06
319 Virar‐Surat section:‐ TRR = 1.170 kms. DRF 93,24 27,00 8,85 57,39
(BCT/U/10‐11)
320 Virar‐Surat section:‐ TRR = 1.16 kms. DRF 92,45 27,00 6,13 59,32
(BCT/U/10‐11)
321 Virar‐Surat section:‐ TRR = 1.16 kms. DRF 92,45 27,00 7,45 58,00
(BCT/U/10‐11)
322 Virar‐Surat section:‐ TRR = 1.00 kms. DRF 79,70 43,00 9,25 27,45
(BCT/U/10‐11)
323 Virar‐Surat section:‐ TWR = 2135 Jts. (60 kg/52 kg DRF 90,00 11,01 9,55 69,44
) by mobile FBW plant in situ or on cess under
ADEN/Surat section. (BCT/U/10‐11)
324 Virar‐Surat section :CTR(S ) Sorting line Balsad DRF 78,00 33,50 7,90 36,60
DN yard. (BCT/U/10‐11)
325 Virar‐Surat section :Renewal of switch,crossing & DRF 95,00 30,50 7,50 57,00
GRSP for turnout in the section of ADEN/Surat &
ADEN/Dahanu Road. (BCT/U/10‐11)
326 Churchgate‐Virar Section :‐ CMSCR =8 Nos.under DRF 99,00 38,35 12,85 47,80
SSE(Pway)Bhayandar. (BCT/U/10‐11)
327 Churchgate‐Virar Section :‐ Replacement switches = DRF 85,00 84,00 1,00 ..
80 Nos. under SSE(Pway)BVI & SSE(Pway)Bhayandar.
(BCT/U/10‐11)
15.03.31.10.3.
52.039
15.03.31.10.3.
52.040
15.03.31.10.3.
52.006
15.03.31.10.3.
52.008
15.03.31.10.3.
52.047
15.03.31.10.3.
52.051
15.03.31.10.3.
52.049
15.03.31.10.3.
52.050
15.03.31.10.3.
52.046
15.03.31.10.3.
52.052
15.03.31.10.3.
52.053
15.03.31.10.3.
52.044
15.03.31.10.3.
52.043
15.03.31.10.3.
52.038
15.03.31.10.3.
52.048
15.03.31.10.3.
52.045
TRACK RENEWALS
15.03.31.10.3.
52.020
15.03.31.10.3.
52.021
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 24
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
328 Churchgate‐Virar Section :‐ Replacement of DRF 66,13 20,00 13,08 33,05
existing SEJ = 40 under ADEN(T/S)Lower Parel &
ADEN(T/N)Borivali. (BCT/U/10‐11)
329 Churchgate‐Virar Section : ‐ Replacement fish DRF 66,66 17,00 14,65 35,01
bolts with nuts = 136000 Nos.& Black Bolts = 10000
Nos. in the section of ADEN (T/S) Lowr Parel &
ADEN (T/N) Borivali. (BCT/U/10‐11)
330 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57 25,75 10,35 60,47
SE/BIY.
331 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57 25,75 9,09 61,73
SE/NWU.
332 Udhana‐JalgaonTRR in connection with TWR under DRF 96,57 25,75 7,05 63,77
SE/KBH.
333 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57 25,75 3,99 66,83
SE/NDB.
334 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57 25,75 13,02 57,80
SE/DDE.
335 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57 25,75 13,02 57,80
SE/DXG.
336 Virar‐Surat Section :‐ TRR on urgent condition DRF 98,57 25,25 14,75 58,57
basis due to severe liner bite UP Km.82.594 to
83.650 =1.056 & DN km 254.15 to 254.313 = 0.16
Total 1.2 Kms .
337 Virar‐Surat Section :‐ TRR on urgent condition DRF 96,15 25,00 2,54 68,61
basis due to severe liner bite UP Km.114.810 to
115.925 = 1.150 Kms .
338 Virar‐Surat Section :‐ TRR on urgent condition DRF 96,15 25,00 6,35 64,80
basis due to severe liner bite UP Km.116.940 to
117.955 = 1.150 km.
339 Virar‐Surat Section :‐ UP line‐ TRR on urgent DRF 88,33 25,00 14,55 48,78
condition basis due to severe liner bite Km.
118.970 to Km.119.031 =0.061 Kms, Km.264.719 to
Km.265.031=0.313 Kms, Km. 267.344 to Km.267.906
=0.563 Kms, Km 268.031 to Km. 268.156= 0.125 Kms.
340 Virar‐Surat Section DN line :‐ TRR on urgent DRF 98,61 25,50 10,10 63,01
condition basis due to severe liner bite Km.
268.063 to 269.00= 0.938 kms, Km 263.458 to
Km.263.706 = 0.248 Kms Total 1.186 Km.
341 Virar‐Surat Section DN line :‐ TRR on urgent DRF 79,09 21,50 9,46 48,13
condition basis due to severe liner bite Km.
255.00 to 255.563 = 0.563, km 264.750 to
265.125=0.375 Total ‐ 0.938 km.
15.03.31.11.3.
52.029
15.03.31.11.3.
52.016
15.03.31.11.3.
52.026
15.03.31.11.3.
52.024
15.03.31.11.3.
52.025
15.03.31.11.3.
52.027
15.03.31.11.3.
52.028
15.03.31.10.3.
52.002
15.03.31.11.3.
52.014
15.03.31.11.3.
52.018
15.03.31.11.3.
52.022
15.03.31.11.3.
52.017
15.03.31.11.3.
52.015
TRACK RENEWALS
15.03.31.10.3.
52.007
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 25
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
342 Virar‐Surat Section:‐ Casual renewal of channel DRF 94,98 23,75 4,57 66,66
sleeper fittings.
343 Churchgate‐Virar Section :‐ Replacement of DRF 87,52 31,50 15,77 40,25
existing SEJ's under ADEN(T/S)PL Qty:60sets.
344 Churchgate‐Virar Section :‐ Replacement of DRF 87,52 31,50 9,95 46,07
existing SEJ's under ADEN(T/N)BVI Qty:60sets.
345 Churchgate‐Virar section: ‐ Replacement of DRF 84,27 30,50 10,05 43,72
existing sleepers on curves by slack gauge
sleepers between CYR‐GTR under SSE(Pway)DDR
Qty:4000 Nos.
346 Churchgate‐Virar & UDN‐JL sections ;‐ Casual DRF 89,99 27,50 20,22 42,27
Renewal of Channel Sleepers fittings.
347 VR‐ST & UDN‐JL sections :‐ Casual renewal of PSC DRF 89,59 32,50 8,90 48,19
sleepers on points & crossings.
348 Mumbai division :‐ Casual renewal of fittings of DRF 93,93 33,00 9,74 51,19
P&Cs.
349 Mumbai division :‐ Casual renewal of glued joints. DRF 86,59 31,50 9,09 46,00
350 Mumbai division:‐ Casual renewal of rails of DRF 95,65 53,50 13,66 28,49
points & crossings.
351 Virar‐Surat & Udhna‐Jalgaon sections:‐ Casual DRF 99,82 24,00 8,64 67,18
renewal of SEJs.
352 Mumbai division ‐ Renewal of special layouts on DRF 98,96 74,75 9,84 14,37
wooden sleepers by PRC sleepers.
353 CCG‐VR Section:‐Replacement of scabbed /damaged DRF 98,59 40,00 9,60 48,99
rails under ADEN(T/S)PL Section.
354 VR ‐ ST section :‐ TRR on urgent condition basis DRF 99,19 74,48 8,75 15,96
due to sever liner bite Km.77.00 to 78.15 UP line
Total km 1.15 km .
355 VR ‐ ST section :‐ TRR on urgent condition basis DRF 86,70 74,29 6,25 6,16
due to sever liner bite Km.78.15 to 79.15 UP line
Total 1.0 km
356 VR‐ST‐ section:Replacement of GRSP ordinary, GRSP DRF 98,81 20,00 11,77 67,04
for turn out , turn out fittings & SEJ etc. in the
jurisdiction of ADEN/DRD, ADEN/BL, ADEN/ST
section.
Complete Track Renewal
357 Churchgate‐ Virar Section. (A) CTR(S&P)=2.20 DRF 2,29,51 1,15,49 20,00 94,02
kms.(B)TRR(P)=0.70 kms. (A) of existing 60kg(SH)
on PRC with 60kg (SH) on new PRC @ M+7 in BCT main
PF 1 to 5 =2.20( B) P) of exitg 60kg 90UTS on PRC
by 60kg 90UTS LWR on new PRC/6 fr. km 5.00 ‐ 5.4
15.03.31.11.3.
52.010
15.03.31.12.3.
52.017
15.03.31.12.3.
52.009
15.03.31.12.3.
52.011
15.03.31.12.3.
52.018
15.03.31.09.2.
52.002
15.03.31.11.3.
52.001
15.03.31.11.3.
52.032
15.03.31.11.3.
52.011
15.03.31.11.3.
52.012
15.03.31.11.3.
52.013
15.03.31.11.3.
52.023
TRACK RENEWALS
15.03.31.11.3.
52.030
15.03.31.11.3.
52.002
15.03.31.11.3.
52.003
15.03.31.11.3.
52.008
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 26
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Complete Track Renewal
358 VR‐ST section : Complete track Renewal(S ) km for DRF 98,24 8,15 7,10 82,99
providing ballast siding at UVD quarry.
Complete Track Renewal
359 VR ST section: CTR(P) by 60 kg 90 UTS rail and PRC DRF 41,98 .. 5,00 36,98
sleepers @ 1660 Nos/Km in yards(manual) between km R. 1,42
67.935 to 68.221 = 0.286 km DN Line.
Complete Track Renewal
360 VR ST section: CTR(P) by 60 kg 90 UTS rail and PRC DRF 61,64 .. 5,00 56,64
sleepers @ 1660 Nos/Km in yards between km 76.480 R. 2,08
to 76.90=0.420 km DN Line.
Through Rail Renewal
361 Churchgate‐Virar: ‐ Replacement of defective/ DRF 88,23 .. 5,00 83,23
scabbed rails under section of ADEN(T/S)PL
section.
Through Rail Renewal
362 Churchgate‐Virar:‐Replacement of scabbed /damaged DRF 88,23 .. 14,05 74,18
rails under section of ADEN(Track/North)Borivali
Through Rail Renewal
363 Virar‐Surat section‐ Casual renewal of rails due DRF 95,23 .. 5,00 90,23
to eutectic welds under the jurisdiction of SSE(p.
way) Vapi section.
Through Rail Renewal
364 Virar‐Surat section:‐ section :‐ Casual Renewal DRF 80,02 .. 5,00 75,02
of rails on due to sever liner bite between Km
188/01 to 192//01 Km UP line Total 0.986 kms.
Through Rail Renewal
365 Virar‐Surat UP line:‐ Casual renewal of rails DRF 43,01 .. 14,20 28,81
from 143.00 to 143.530 = 0.53 Km
Through Rail Renewal
366 Virar‐Surat UP line :‐ Casual renewal of rails DRF 68,09 .. 6,00 62,09
from Km.202/01 to Km.202/29 =0.839 kms.
Through Rail Renewal
367 Udhna‐Jalgaon:‐. Casual renewal of rail under DRF 88,90 .. 5,00 83,90
SSE(P.way), Vyara
Through Rail Renewal
368 Udhna‐Jalgaon:‐. Casual renewal of rails under DRF 88,90 .. 5,00 83,90
SS(P.WAY),Navapur
Through Rail Renewal
369 Udhna‐Jalgaon Section:‐. Casual renewal of rails DRF 88,90 .. 5,00 83,90
at various location with 52kg rail under
SSE(P.WAY),Nandurbar
Through Rail Renewal
370 Udhana‐Jalgaon section:‐ . Casual renewal of rails DRF 88,90 .. 5,00 83,90
at various loctions with 52kg rails under
SSE(P.WAY)Amalner
15.03.31.13.3.
52.021
15.03.31.13.3.
52.010
15.03.31.13.3.
52.013
15.03.31.13.3.
52.012
15.03.31.13.3.
52.009
15.03.31.13.3.
52.017
15.03.31.13.3.
52.019
15.03.31.13.3.
52.020
TRACK RENEWALS
15.03.31.12.3.
52.019
15.03.31.13.6.
52.001
15.03.31.13.6.
52.002
15.03.31.13.3.
52.018
15.03.31.13.3.
52.008
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 27
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Through Rail Renewal
371 CCG‐VR Section:‐Replacement of Existing SEJ under DRF 89,69 20,00 10,15 59,54
ADEN(T/S)PL section.
Through Rail Renewal
372 VR ‐ ST section :‐TRR on urgent condition basis DRF 86,79 74,30 5,20 7,29
due to sever liner bite bet.various location from
196/11 to 197/21 Km UP line Total 1.001 kms
Through Rail Renewal
373 CCG‐VR Section:‐Replacement of scabbed /damaged DRF 98,59 40,00 8,75 49,84
rails under ADEN(T/N)BVI Section.
Through Rail Renewal
374 VR ‐ ST section :‐ TRR (p)on urgent condition DRF 78,67 74,17 4,50 ..
basis due to sever liner bite bet.various location
from 184/25 to 187/21 Km UP line Total 0.905 kms
Through Rail Renewal
375 VR ‐ ST section :‐ TRR (p)on urgent condition DRF 78,98 74,17 4,81 ..
basis due to sever liner bite bet.various location
from 192/07 to 195/15 Km UP line Total 0.907 kms
Through Rail Renewal
376 VR ‐ ST section :‐ TRR (p)on urgent condition DRF 89,30 40,00 8,10 41,20
basis due to sever liner bite bet.various location
from 197/29 to 199/05 Km UP line Total 1.032 kms
Through Rail Renewal
377 VR ‐ ST section :‐ TRR(P) on urgent condition DRF 97,76 74,46 8,15 15,15
basis due to sever liner bite bet.various location
from 199/15 to 201/13 Km UP line Total 1.132 kms.
Through Rail Renewal
378 VR ‐ ST section :‐ TRR (P)bet.various location DRF 97,76 74,09 6,25 17,42
from 201/13 to 201/29 =.452 Km & 136/19 to137
=.387 kms. UP line Total0.839 kms.
Through Rail Renewal
379 UDN‐JL Sec. Casual renewal of rail by 52kg in DRF 71,10 1,00 8,75 61,35
connection of replaced of SEJ
Through Sleeper Renewal
380 Bilimora ‐ Waghai ( NG section ) ‐ Through DRF 1,36,91 37,47 20,00 79,44
Sleeper Renewal(s) of the existing on wooden R. 24,57
sleepers with ST / CST‐9 sleepers ( SH ) at 1310
Nos/ Kms. Dencity including deep screening &
recoupment of ballast to 150 mm ‐ a) From km
Through Sleeper Renewal
381 VR‐ST section: TSR(P) of existing 52kg PRC DRF 74,88 .. 5,00 69,88
sleepers at 1540 Nos/km with 60kg PRC sleepers at R. 7,07
1660 Nos/km including deep screening and
recoupment of ballast to 300mm (i) Km 70.87‐ Km
71.705=0.835 km DN line.(ii) Km 74.89‐ Km
15.03.31.11.2.
52.001
15.03.31.13.6.
52.003
15.03.31.12.3.
52.005
15.03.31.12.3.
52.006
15.03.31.12.3.
52.007
15.03.31.12.3.
52.008
15.03.31.12.3.
52.012
15.03.31.12.3.
52.002
TRACK RENEWALS
15.03.31.12.3.
52.021
15.03.31.12.3.
52.010
15.03.31.12.3.
52.020
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 28
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Through Sleeper Renewal
382 VR‐ST section: TSR(P) of existing 52kg PRC DRF 52,55 .. 5,00 47,55
sleepers at 1540 Nos/km with 60kg PRC sleepers at R. 4,96
1660 Nos/km including deep screening and
recoupment of ballast to 300mm (i) Km 75.480‐ Km
76.48: Total 1.00 km DN line
Ballast
383 VR‐ST section : construction of Ballast wall in DRF 99,00 18,00 15,45 65,55
various location in the jurisdiction of
SSE/P‐way/ST section TV main line from TV/1‐0 to
TV 2/12 and UDN by pass line from km UB 1/1 to UB
4/1 and km 264/7 to 264/15 between ST‐UDN UP &
Points & Crossings
384 Virar‐Surat:‐TTR of one Diamonds crossing at NVS DRF 64,91 .. 6,00 58,91
R. ..
Points & Crossings
385 Virar‐Surat:‐ TTR of one diamonds at Vapi (Point DRF 65,27 .. 5,00 60,27
no 108) R. ..
Points & Crossings
386 Udhna‐Jalgaon:‐. TTR of 6 P&Cs on wooden sleeper DRF 87,60 .. 5,00 82,60
layout by PRC sleeper layout in NDB yard R. 6,81
Points & Crossings
387 Virar‐Surat. :‐Replacement of Trap points laid on DRF 63,23 .. 5,00 58,23
wooden sleepers layouts with new trap points on R. ..
PRC sleepers layout at Valsad & Dungri stations
under ADEN‐BL . Total 10 Sets
Points & Crossings
388 Virar‐Surat. :‐Replacement of Trap points laid on DRF 93,99 .. 2,00 91,99
wooden sleepers layouts with trap points on PRC R. ..
sleepers layout under ADEN‐DRD . (Total 15 Sets)
Points & Crossings
389 Virar‐Surat. :‐Replacement of Trap points laid on DRF 93,99 .. 5,00 88,99
wooden sleepers layouts with new trap points on R. ..
PRC sleepers layout under ADEN‐ST . (Total 15
Sets)
Points & Crossings
390 Mumbai Division Virar ‐Surat section :‐TTR=22 Nos DRF 73,13 73,00 13 ..
1 in 8.5 = 22 Nos.existing 90R/52kg railso n R. 3,62
wooden/ST 52/60 KG derailing switches on PRC
ayout ballast cushion from 25 to 30 cms.
Points & Crossings
391 CCG – VR section: ‐ Replacement of existing Obtus DRF 53,10 5,00 11,25 36,85
CMS Crossings by new 52 Kg 1 in 8.5 Obtus CMS
Crossings under CCG‐VR section.
Others
392 Virar ‐ Surat section :Through Fittings Renewal of DRF 1,05,62 18,98 10,00 76,64
fittings of turnouts: 1 in 12 =120 Nos.
15.03.31.12.3.
52.003
15.03.31.11.2.
52.003
15.03.31.13.3.
52.027
15.03.31.13.3.
52.026
15.03.31.13.3.
52.022
15.03.31.13.3.
52.023
15.03.31.13.3.
52.024
15.03.31.08.3.
52.015
TRACK RENEWALS
15.03.31.13.6.
52.005
15.03.31.09.3.
52.031
15.03.31.13.3.
52.025
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 29
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Others
393 Churchgate‐Virar section: ‐ Replacement of DRF 93,85 .. 5,00 88,85
existing 52/60 Kg Built up acute and Obtuse Built
up crossings
Others
394 Virar‐Surat Section:‐ Scattered renewal of SEJ DRF 48,00 42,10 5,90 ..
and special sleepers. (BCT/U/08‐09)
Others
395 Scattered renewal of fish bolts & black bolts. DRF 49,68 22,03 4,97 22,68
(BCT/U/08‐09)
Others
396 Virar ‐ Surat section:‐TFR = 25.154 kms.DN/UP DRF 1,14,47 72,54 20,00 21,93
Through fitting renewal of existing fittting by
new ERC clips,Rubber pad and liners etc.fr.
km.112.10‐124.00 = 11.90, 133.75‐1135.56 =1.81 &
137.00‐143.60 = 6.60 on UP & fr.km 124.36‐129.20
Others
397 VR‐ST section :TFR at km 212/0 to 229/24 DN line= DRF 90,00 19,00 18,57 52,43
17.35 km. (BCT/U/09‐10)
Others
398 VR‐ST section : Removal of Broken PRC sleepers DRF 49,00 43,00 6,00 ..
Qty. 3300 Nos. (BCT/U/09‐10)
Others
399 UDN‐JL Sec.Casual renewal of damaged/broken DRF 54,21 19,00 16,86 18,35
sleepers of 2000Nos. 52kg and 1000Nos. 60kg.
(BCT/U/09‐10)
Others
400 UDN‐JL Sec.Casual renewal of damaged/broken DRF 98,02 29,00 17,25 51,77
sleepers of 5000 of 60 kgs. (BCT/U/09‐10)
Others
401 Udhana ‐ Jalgoan section TFR = 26.72 kms. bet. DRF 1,68,59 40,36 10,00 1,18,23
225.08 ‐ 251.80.
Others
402 Churchgate ‐ Virar Section :‐ Replacement of DRF 1,07,30 60,00 9,35 37,95
Existing Bridge timbers with Galvanised steel
channel sleepers on Bridge no 20,61, 62 & 66 on
BCT suburban section
Others
403 ccg‐virar Section Replacement of Existing Bridge DRF 96,86 60,00 13,66 23,20
timbers with Galvanised steel channel sleepers on
Bridge no 5,7,27,31,43,46,56&78.Total =555 Nos.
Others
404 CCG‐VR Section:‐Replacement of glued joint under DRF 86,48 20,00 8,75 57,73
ADEN(T/S)PL & (T/N)BVI section.
15.03.31.11.3.
52.034
15.03.31.11.3.
52.035
15.03.31.12.3.
52.014
15.03.31.09.2.
52.003
15.03.31.09.3.
52.034
15.03.31.09.3.
52.033
15.03.31.09.3.
52.023
15.03.31.09.3.
52.024
15.03.31.10.2.
52.001
TRACK RENEWALS
15.03.31.13.3.
52.011
15.03.31.08.3.
52.027
15.03.31.08.3.
52.020
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 30
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Others
405 CCG‐VR Section:‐Replacement of Existing SEJ under DRF 89,68 10,00 11,70 67,98
ADEN(T/N)BVI section.
Others
406 UDN‐JL Sec. TRR by 52kg in P&C near vicinity of DRF 1,03,94 9,10 11,85 82,99
CMS crossing under SSE(P.WAY), NWU
Others
407 UDN‐JL Sec. TRR by 60kg at KM 50.54 to 50.93 = DRF 87,71 13,08 8,75 65,88
0.39, 83/1 to 83/5 = 0.325 km (LKKD‐BBAI) , 87/16
to 88/5 = 0.325km (BBAI‐NWU) Total = 1.04kms.
Others
408 UDN‐JL Sec. TRR at KM 262.67 to 263.57 = 0.9km DRF 75,86 1,00 11,25 63,61
(TKHE Yard) Total = 0.9km
Others
409 UDN‐JL Sec. Casual renewal of 52kg rail due to DRF 1,03,94 19,00 8,90 76,04
lateral wear at km239/11‐14, 239/14 to 240/0,
240/0‐13, 241/0‐2, 241/7‐12 (Total = 1430m).
Others
410 Mumbai Central :‐ Modification of Line No. 1 & 2 DRF 95,17 .. 5,00 90,17
at EMU car shed BCT North end at MX. R. 4,58
Vadodara
411 Vadodara Division:‐Miyagam‐Malsar (NG) DRF 2,08,80 1,32,77 25,00 51,03
Section:‐Through Sleeper Renewal of existing R. 32,57
wooden sleepers laid at density 1310 Nos/Km. with
60R/75R CST‐9/ST (S/H) sleepers at 1310 Nos.Km
including providing clean ballast cushion of 150mm
412 Godhra Yard: TBR & casual renewal of sleepers of DRF 89,49 38,07 25,00 26,42
line No. 1, and up & Dn line total 6.50 Kms.
(BRC/U/10‐11)
413 Vadodara division ‐ Casual Renewal of Channel DRF 90,33 38 8,00 81,95
Sleepers fittings.
414 Vadodara Division:‐Casual Renewal of warnout and DRF 92,45 33,47 5,00 53,98
defective glud joints, curved switches, CMS
crossings, SEJs, fittings of Points & X‐ings, Trap
points, Fittings of SEJ and other misc. heavy P.
Way materials under jurisdfiction of SSE(P.
415 Vadodara Division:‐Casual Renewal of existing DRF 86,28 60,00 5,00 21,28
defective 60Kg rails with nw 60 Kg (90 UTS) rails
for removal of defective welds at isolated
location on Dn main line between stations Vadodara
& Anand under SSE(P. Way)‐I‐Anand Total length
416 Vadodara Division:‐Casual Renewal of existing DRF 87,14 61,86 5,00 20,28
defective 60Kg rails with nw 60 Kg (90 UTS) rails
for removal of defective welds at isolated
location on Up main line between stations
Nadiad‐Geratpur under SSE(P. Way)‐Mahemdavad Total
15.06.31.11.3.
55.011
15.06.31.12.3.
55.002
15.06.31.12.3.
55.021
15.06.31.12.3.
55.033
15.03.31.12.3.
52.013
15.03.31.12.3.
52.004
15.03.31.12.3.
52.016
15.03.31.13.6.
52.004
15.06.31.13.2.
55.002
15.06.31.10.3.
55.003
TRACK RENEWALS
15.03.31.12.3.
52.015
15.03.31.12.3.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 31
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
417 Vadodara Division:‐Casual Renewal of existing DRF 89,36 65,30 2,50 21,56
defective 60Kg rails with new 60 Kg (90 UTS) rails
on Up line of Bridge No. 616, 624 & Bridge No. 699
and its approaches between BRC‐GER Total length
1.00 Kms.
418 Vadodara Division:‐Casual Renewal of existing DRF 89,29 65,78 1,00 22,51
defective 60Kg rails with nw 60 Kg (90 UTS) rails
for removal of defective welds at isolated
location between stations Anand‐Sevaliya under
SSE(P. Way)‐I‐Anand Total length 1.00 Kms.
Complete Track Renewal
419 PRTN BG Yard:‐Through Turn out renewal of DRF 1,70,60 61,40 15,00 94,20
existing 90R 1 in 8.5 turnouts with new 52 kg 1 in R. 7,11
8.5 turnouts on PRC sleepers including deep
screening and recoupment of ballast to 250mm
Total11 Nos including complete Track Renewal of
Complete Track Renewal
420 Godhra‐Nagda:‐CTR of 52Kg rails laid on wooden DRF 87,36 33 30,00 57,03
sleepers/blocks on CC apron by new 60Kg (90 UTS) R. 6,70
rails on PRC sleepers 1660 Nos./Km.with 300mm
clean ballast cushion on Line No. 4 at Godhra
Yard. Total length 0.65 Kms.
Through Rail Renewal
421 Surat‐Godhra section DN line:‐TRR of exisitng 60 DRF 88,62 .. 5,00 83,62
Kg (90 UTS) rails laid on PRC sleepers with new
60Kg (90 UTS) rails on existing PRC sleepers from
Km. 397.59 to Km. 398.40 & Km. 398.64 to 398.83.
Total 1 Km
Through Rail Renewal
422 Surat‐Godhra section UP line:‐ TRR(P) of exisitng DRF 88,62 .. 5,00 83,62
60 Kg (90 UTS) rails laid on PRC sleepers with new
60Kg (90 UTS) rails from Km. 397.55 to Km. 398.35
& Km. 399.52 to 399.720. Total TRR 1.00 Kms
Through Rail Renewal
423 Surat‐Vadodara‐Godhra DN line:‐TRR(P) of 60Kg DRF 56,67 .. 6,00 50,67
rails laid on steel channel sleepers with 60 Kg
rails from Km. 380.750 to Km. 381.350=0.600 Kms.
on Major Bridge No. 566, 567 & 100m of its
approaches.
Through Rail Renewal
424 Surat‐Godhra Section UP line:‐TRR(P) of 60Kg DRF 56,67 .. 2,00 54,67
rails on steel channel sleepers with 60 Kg rails
from Km. 380.750 to Km. 381.350=0.600 Kms. on
Major Bridge No. 566, 567 & its approaches
Through Rail Renewal
425 Surat‐Godhra Section DN line :‐TRR of 60Kg rails DRF 70,48 .. 5,00 65,48
laid on PRC sleepers with 60 Kg rails from Km.
393.26 to Km. 396.050=0.814 Kms. on DN line
15.06.31.13.3.
55.008
15.06.31.13.3.
55.020
15.06.31.12.3.
55.017
15.06.31.13.2.
55.001
15.06.31.13.3.
55.028
15.06.31.13.3.
55.012
15.06.31.13.3.
55.013
15.06.31.13.3.
55.024
TRACK RENEWALS
15.06.31.12.3.
55.013
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 32
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Through Rail Renewal
426 Surat‐Godhra Section UP & DN :‐TRR(P) of 60Kg DRF 80,20 .. 5,00 75,20
rails laid on PRC sleepers with 60 Kg rails from
Km. 371.690 to Km. 372.120=0.430 Kms. on Major
Bridge No. 550, 551 & its approaches
Through Rail Renewal
427 Surat‐Godhra UP line:‐TRR(P) of 60Kg rails laid on DRF 60,27 .. 5,00 55,27
PRC sleepers with 60 Kg ) rails from Km. 395.305
to Km. 395.997=0.692 Kms.
Through Rail Renewal
428 Vadodara‐Godhra UP line:‐TRR(P) of 60 Kg rails DRF 68,72 .. 5,00 63,72
laid on PRC sleepers with 60 Kg 90 UTS rails from
Km. 400.21 to Km. 401.00=0.79 Kms.
Through Rail Renewal
429 Vadodara‐Gerathpur Dn Line:‐TRR(P)Km. 477.50 to DRF 61,38 .. 3,00 58,38
Km. 478.20 = 0.70Kms. .
Through Rail Renewal
430 Vadodara‐Gerathpur Dn Line:‐ TRR(P) Km. 474.60 to DRF 85,36 13,77 3,00 68,59
Km. 475.00 & Km. 475.40 to 476.00 Total 1.00 Kms.
Through Rail Renewal
431 Vadodara ‐ Gerathpur (Dn Line):‐TRR(P) from Km. DRF 92,01 .. 3,00 89,01
429.25 to Km. 429.40 & Km. 429.40 to 490.30 Total
1.05 Kms.
Through Rail Renewal
432 Vadodara‐ Gerathpur Up Line:‐TRR(P) from Km. DRF 93,15 .. 3,00 90,15
449.80 to Km. 450.30 & Km. 450.50 to Km. 451.10
Total 1.10 Kms.
Through Rail Renewal
433 Vadodara Division:‐TRR(P) of 52 Kg (90 UTS) rails DRF 79,52 60,00 5,00 14,52
laid on PRC sleepers with 52Kg (90 UTS) rails
from Km. 0.00 to 1.080 of Bajuwa Bypass line.
Through Rail Renewal
434 Vadodara Division:‐Casual Rail Renewal of existing DRF 89,10 79,15 2,00 7,95
60 Kg rails laid on PRC sleepers with new 60 Kg
(90 UTS) rails on approach of turnouts on Up main
line under SSE(P. Way)‐URN.
Through Rail Renewal
435 Vadodara Division:‐Through Rail Renewal of DRF 87,40 1,46 5,00 80,94
existing 60Kg rails with new 60Kg 90(UTS) rails
due to liner bite from Km. 421.89 to Km.
422.87=0.98 Km. on Dnline in Samlaya station yard.
Through Rail Renewal
436 Vadodara Division:‐Through Rail Renewal of DRF 79,54 .. 5,00 74,54
existing 60Kg rails with new 60Kg (90 UTS) rails
due to liner bite from Km. 458.25 to Km.
459.14=0.89 Km. on Dn line in Kharsaliya station
yard.
15.06.31.12.3.
55.011
15.06.31.12.3.
55.012
15.06.31.13.3.
55.019
15.06.31.13.3.
55.015
15.06.31.13.3.
55.014
15.06.31.13.3.
55.023
15.06.31.13.3.
55.016
15.06.31.12.3.
55.035
TRACK RENEWALS
15.06.31.13.3.
55.022
15.06.31.13.3.
55.021
15.06.31.13.3.
55.017
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 33
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Ballast
437 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 72,80 .. 10,00 62,80
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 273.15 to
Km. 274.80, Km. 279.73 to Km. 281.08 & Km. 288.61
to Km. 291.60. Total TBR 5.99 Kms.
Ballast
438 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 71,13 .. 10,00 61,13
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 291.60 to
Km. 296.75 & Km. 297.34 to Km. 298.19 Total TBR
6.00 Kms.
Ballast
439 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 46,98 .. 6,00 40,98
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 298.19 to
Km. 300.00, Km. 315.28 to Km. 316.32, Km. 344.00
to Km. 344.26 & Km. 394.94 to Km. 395.04 Total TBR
Ballast
440 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 61,85 .. 10,00 51,85
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 333.55 to
Km. 339.00 Total TBR 5.45 Kms.
Ballast
441 Vadodara Division:‐Surat‐Godhra Section (Up DRF 77,62 14,79 10,50 52,33
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 268.89 to
Km. 270.98, Km. 273.26 to Km. 274.11, Km. 276.32
to Km. 278.00 & Km. 297.89 to Km. 299.29 Total TBR
Ballast
442 Vadodara Division:‐Surat‐Godhra Section (Up DRF 61,40 .. 5,00 56,40
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 27930 to
Km. 281.08, Km. 289.30 to 290.76, Km. 293.82 to
Km. 293.93, Km. 315.25 to Km. 315.74 & Km. 395.00
Ballast
443 Vadodara Division:‐Surat‐Godhra Section (Up DRF 49,25 .. 7,50 41,75
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 327.15 to
Km. 331.49 otal TBR 4.34 Kms.
Ballast
444 Vadodara Division:‐Surat‐Godhra Section (Up DRF 68,09 .. 5,00 63,09
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 384.00 to
Km. 390.00 Total TBR 6.00 Kms.
Ballast
445 Vadodara Division:‐Surat‐Godhra Section (Up DRF 56,74 .. 5,00 51,74
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 390.00 to
Km. 395.00 Total TBR 5.00 Kms.
15.06.31.12.3.
55.020
15.06.31.12.3.
55.023
15.06.31.12.3.
55.034
15.06.31.12.3.
55.025
15.06.31.12.3.
55.026
15.06.31.12.3.
55.027
TRACK RENEWALS
15.06.31.12.3.
55.015
15.06.31.12.3.
55.016
15.06.31.12.3.
55.019
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 34
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Points & Crossings
446 Vadodara Division:‐Replacement of double slip DRF 92,16 .. 12,00 80,16
scissor X‐ing in Anand yard by new double slip R. 3,80
scissor X‐ing on PRC sleeper layout.
Points & Crossings
447 Vadodara Division:‐Replacement of 15 Nos. of Trap DRF 84,69 .. 24,71 59,98
points laid on wooden sleepers layouts with new R. 6,76
trap points on PRC sleepers layout in various
station yards under jurisdiction of Sr. DEN(N)‐BRC
Points & Crossings
448 Vadodara Division:‐Replacement of 12 Nos. of Trap DRF 67,08 3 15,00 52,05
points laid on wooden sleepers layouts with new R. 5,41
trap points on PRC sleepers layout in various
station yards under AEN‐ANND section.
Others
449 Vadodara Division:‐Casual Renewal of warnout and DRF 85,34 47,55 5,00 32,79
defective glued joints, curved switches, CMS
crossings, SEJs, fittings of Point & X‐ings, Trap
point, Fittings of SEJ and other misc. heavy P.
Way materials under SSE(P. Way))‐BRCP under Sr.
Others
450 Vadodara Division:‐Casual Renewal of warnout and DRF 91,49 59,27 10,00 22,22
defective glued joints, curved switches, CMS
crossings, SEJs, fittings of Point & X‐ings, Trap
point, Fittings of SEJ and other misc. heavy P.
Way materials under SSE(P. Way))‐BRGY under Sr.
Others
451 Vadodara Division:‐Casual Renewal of warnout and DRF 90,85 44,42 5,00 41,43
defective glued joints, curved switches, CMS
crossings, SEJs, fittings of Point & X‐ings, Trap
point, Fittings of SEJ and other misc. heavy P.
Way materials under SSE(P. Way)‐(I)‐Anand & SSE(P.
Others
452 Vadodara Division:‐Casual Renewal of warnout and DRF 97,42 68,91 15,00 13,51
defective glued joints, curved switches, CMS
crossings, SEJs, fittings of Point & X‐ings, Trap
point, Fittings of SEJ and other misc. heavy P.
Way materials under SSE(P. Way)‐Sevaliya &
Others
453 Vadodara Division:‐Casual Renewal of Switches, DRF 97,14 70,74 5,00 21,40
Crossings Glued joints etc under jursuduction of
ADEN‐Anand under Sr. DEN(N)‐BRC
Others
454 Vadodara Division:‐Casual Renewal of Switches, DRF 95,98 65,38 5,00 25,60
Crossings Glued joints etc under jursuduction of
ADEN‐Nadiad under Sr. DEN(N)‐BRC
15.06.31.12.3.
55.008
15.06.31.12.3.
55.028
15.06.31.12.3.
55.007
15.06.31.12.3.
55.032
TRACK RENEWALS
15.06.31.13.3.
55.025
15.06.31.13.3.
55.027
15.06.31.13.3.
55.030
15.06.31.12.3.
55.024
15.06.31.12.3.
55.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 35
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Others
455 Surat‐Godhra UP line:‐Replacement of existing DRF 91,15 .. 29,00 62,15
broken/cracked steel channel sleeers on Bridge No.
452 (Tapti River) Total 475 Nos.
Others
456 Surat‐Godhra section:‐TBTR of existing DRF 91,31 .. 50,50 40,81
broken/cracked steel channel sleepers on DN line
of Bridge No. 452 i.e. Tapti River Total 476
Nos.
Others
457 Vadodara Division:‐Casual Renewal of existing DRF 87,09 11,00 1,00 75,09
defective 60Kg rails with nw 60 Kg (90 UTS) rails
for removal of defective welds at isolated
location on Up main line between stations Vadodara
& Anand under SSE(P. Way)‐I‐Anand Total length
Others
458 Vadodara Division:‐Deep Screening of 25 Nos. 1 in DRF 68,71 4,42 10,00 54,29
12 Turnouts on main line, its approaches and
renewal of grooved rubber sole plate for 60 Kg 1
in 12 turnouts under jurisdiction of ADEN‐Anand
under jurisdiction of Sr. DEN(N)‐BRC
Others
459 Vadodara Division:‐Deep Screening of 25 Nos. 1 in DRF 68,71 .. 10,00 58,71
12 Turnouts on main line, its approaches and
renewal of grooved rubber sole plate for 60 Kg 1
in 12 turnouts under jurisdiction of ADEN‐Nadiad
under jurisdiction of Sr. DEN(N)‐BRC
Others
460 Surat‐Vadodara‐Godhra Section:‐Replacement of DRF 69,86 20,78 1,00 48,08
Rubber Pads and GFN lines on Up & Dn Main lines at
isolated location under jurisdiction of Sr.
DEN(S)‐BRC
Others
461 Vadodara Division:‐Removal of special layouts of DRF 95,97 .. 28,00 67,97
turnouts at Anand Yard.
Others
462 Vadodara Division:‐Casual Renewal of Switches, DRF 97,16 27,04 11,31 58,81
X‐ings & Glued Joints under jurisdiction of
ADEN(S)‐BRC under Sr. DEN(S)‐BRC
Others
463 Vadodara Division:‐Casual Renewal of Switches, DRF 94,55 28,27 5,00 61,28
X‐ings & Glued Joints under jurisdiction of
ADEN(S)‐BH under Sr. DEN(S)‐BRC
Others
464 Vadodara Division:‐ Rectification of badlayout in DRF 99,52 22,72 35,00 41,80
Godhra yard to prevent accidents
15.06.31.12.3.
55.031
15.06.31.12.3.
55.005
15.06.31.12.6.
55.001
15.06.31.13.3.
55.026
15.06.31.12.3.
55.022
15.06.31.12.3.
55.029
15.06.31.12.3.
55.030
15.06.31.12.3.
55.018
15.06.31.12.3.
55.014
TRACK RENEWALS
15.06.31.13.3.
55.029
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 36
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Ratlam
465 Ngda‐Ujjain‐Indore Section‐Spot renewal of 1:12 DRF 63,00 52,78 28 9,94
(60/52 Kg.) switches.TTR=118 Nos. (RTM/U/10‐11)
466 Chanderia‐Ratlam Section : ‐ TWR=1381 Nos. DRF 92,35 38,18 5,00 49,17
(RTM/U/10‐11)
467 Chanderia‐Neemach Section : ‐ Casual renewal of DRF 1,14,00 37,58 20,00 56,42
rails (52 Kg rail) .
468 Neemach‐Ralam Section : ‐ Through weld renewal of DRF 78,00 32,67 10,00 35,33
defective SKV joints .
469 Ujjain‐Maksi & IDU Section:‐ Deep screening of DRF 70,00 10,31 10,00 49,69
turn outs in different location of various yards‐(
1 in 12 ‐ 43, 1 in 8 1/2 ‐22 & derailing
switches‐2).
470 Ujjain‐Maksi Section:‐TBR of DN line at km DRF 1,02,65 23,13 10,00 69,52
87/0‐95/0= 8.0 Km bet TAN –MKC section and line
no.5 MKC yard=700 TRM.
471 NAD‐BPL section‐ Casual Rail Renewal with 60 DRF 1,24,93 48,44 5,00 71,49
kg/90 UTS new rails in AEN (E) UJN
472 CNA – RTM Section :‐ Casual renewal of worn out & DRF 1,27,71 33,62 5,00 89,09
defective curved switches 52kg 1 In 12, 52kg 1 in
8.5
473 GDA‐NAD SEC:‐ Through weld renewal by renewal of DRF 1,20,81 49,17 20,00 51,64
SKV welds with FB welds
474 DWx‐MKc section‐rail renewal by 60kg( 90UTs)from DRF 1,24,93 79,69 10,00 35,24
23.50‐24.65Km
Complete Track Renewal
475 IDU section ‐CTR of loops and siding UJN yard DRF 1,14,06 95,51 1,00 17,55
L/9=339.50,yard L/10=617.20 & IOW Sdg.=200 & CTR
of loops and siding UJN IOW Sdg.=100, UJN loco
line no.1=268.00, loco line no. 2 =444.93.
(RTM/U/09‐10)
Through Rail Renewal
476 GDA‐NAD Section ‐ Removal of speed restriction of DRF 1,04,20 28,06 5,00 71,14
75 KMPH to normal speed at MAM & USRA stations.
Through Rail Renewal
477 Ujjain‐Maksi DN line:‐ TRR(P)with 60(kg) 90 UTS DRF 99,65 2,94 20,00 76,71
rails between Km 58.00 to Km 59.65
Through Rail Renewal
478 Ujjain‐Maksi DN line:‐ TRR(P)with 60(kg) 90 UTS DRF 75,49 30,00 20,00 25,49
rails between Km 59.75 to Km 61.00
Through Rail Renewal
479 Godhra‐Nagda Sec:‐ Casual renewal of 60kg rails DRF 91,03 .. 10,00 81,03
between Meganagar & Ratlam stations.
15.05.31.13.3.
54.006
15.05.31.12.3.
54.020
15.05.31.12.3.
54.004
15.05.31.09.3.
54.008
15.05.31.12.3.
54.024
15.05.31.13.3.
54.015
15.05.31.13.3.
54.016
15.05.31.11.3.
54.001
15.05.31.11.3.
54.009
15.05.31.11.3.
54.017
15.05.31.11.3.
54.018
15.05.31.12.3.
54.012
15.05.31.12.3.
54.005
TRACK RENEWALS
15.05.31.10.3.
54.004
15.05.31.10.3.
54.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 37
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Through Rail Renewal
480 Godhra‐Nagda:‐ Casual rail renewal of rails DRF 96,77 .. 2,00 94,77
between Dahod & Meganagar stations.
Through Rail Renewal
481 Godhra‐Nagda:‐ Casual renewal of 60 Kg rails DRF 96,93 39,09 2,00 55,84
between Ratlam & Nagda stations.
Through Rail Renewal
482 Nagda‐Bhopal:‐ Casual Renewal of rails on DRF 96,93 48,65 10,00 38,28
Makshi‐Sujalpur section under ADEN(E) Ujjain
Through Rail Renewal
483 Nagda‐Bhopal:‐ Casual Rail Renewal of rails on DRF 96,93 48,29 20,00 28,64
Sujalpur‐Bhopal section under ADEN(E) Ujjain
Through Rail Renewal
484 Nimach‐ Dhosawas Section :‐ Casual rail renewal DRF 96,31 .. 10,00 86,31
with 52 Kg 90UTS rails
Through Rail Renewal
485 Chanderiya ‐ Nimach section :‐ Casual rail DRF 99,12 .. 10,00 89,12
renewal with new 52 Kg ( 90UTS) rails .
Through Rail Renewal
486 GDA‐NAD Sec:‐ Through Rail renewal with 60(kg) 90 DRF 94,93 90,00 4,93 ..
UTS rails between Km 475.50 to Km 477.00 Km ( UP
Line).
Through Rail Renewal
487 Through Rail renewal with 60(kg) 90 UTS rails DRF 95,21 94,21 1,00 ..
between Km 595.30‐ 595.630 & 607.45 to 608.40( DN
Line).
Through Rail Renewal
488 GDA‐NAD Sec:‐ Through Rail renewal with 60(kg) 90 DRF 1,22,79 1,03,11 10,00 9,68
UTS rails between Km 587.00‐ 588.00( UP Line).
Through Rail Renewal
489 GDA‐NAD Sec:‐ Through Rail renewal with 60(kg) 90 DRF 1,24,93 1,21,29 1,00 2,64
UTS rails between Km 530.60‐531.30 &
643.40‐644.35( DN Line).
Through Rail Renewal
490 NAD‐BPL Section:‐ Casual renewal of 1:12 ( 60kg) DRF 1,04,03 9,02 5,00 90,01
& 1:8.5( 60kg) switches.
Through Rail Renewal
491 NAD‐BPL Section:‐ Casual renewal of 1:12( 60kg)& DRF 1,06,45 .. 5,00 1,01,45
1:8.5( 60kg) CMS x‐ing.
Through Rail Renewal
492 NAD‐BPL section‐Casual renewal of SEJ's. DRF 1,22,24 .. 15,00 1,07,24
Through Rail Renewal
493 NAD‐BPL section‐Casual renewal of Glued joints. DRF 1,27,14 13,25 10,00 1,03,89
15.05.31.12.3.
54.025
15.05.31.12.3.
54.026
15.05.31.12.3.
54.014
15.05.31.12.3.
54.015
15.05.31.13.3.
54.007
15.05.31.13.3.
54.011
15.05.31.12.3.
54.013
15.05.31.12.3.
54.016
15.05.31.12.3.
54.017
15.05.31.12.3.
54.018
TRACK RENEWALS
15.05.31.13.3.
54.017
15.05.31.13.3.
54.018
15.05.31.13.3.
54.012
15.05.31.13.3.
54.013
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 38
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Through Rail Renewal
494 NAD‐BPL section‐Through rail renewal by 60Kg( DRF 1,27,88 62,50 10,00 55,38
90UTS) From 5.00‐6.25Km( NAD‐PPG Dn line)
Through Rail Renewal
495 GDA‐NAD Sec:‐ Through Rail renewal with 60(kg) 90 DRF 1,24,93 92,00 10,00 22,93
UTS rails between Km 597.82 to 599.20 ( DN Line)
Through Rail Renewal
496 IDU Section ‐ ‐ Through rail renewal by 52Kg( DRF 1,27,78 87,95 9,00 30,83
90UTS) of line no. 1 & 5 of INDORE station.
Through Sleeper Renewal
497 Chanderia ‐ Ratlam : ‐ TSR (S) with Deep Screening DRF 2,02,67 97,02 9,00 96,65
of Main/loop line (8.02 Km.) at‐.����� R. 8,18
Through Sleeper Renewal
498 GDA‐NAD Sec.:‐ Through sleeper renewal at sharp DRF 1,28,06 90,73 26,79 10,54
curves 3 to 5 degree with slack gauge PRC R. 4,22
sleepers.
Ballast
499 GDA‐NAD (BG) Section :‐Through ballast recoupment DRF 1,85,16 51,50 30,00 1,03,66
of existing ballast laid under 60Kg rails and PRC
sleepers by deep screening and recoupment of
ballast to the existing standard of 30 Cms. on
GDA‐NAD (UP & DN Line) Sec..= 23.83 Km
Points & Crossings
500 GDA‐NAD Section:‐ Casual renewal of 1:12 & 1:8.5 DRF 1,06,04 29,91 10,00 66,13
(60 KG) switches.
Points & Crossings
501 Chanderiya – Ratlam Section :‐ Casual Renewal of DRF 1,26,45 31,97 10,07 84,41
52 kg CMS X‐ings 1 in 12/1 in 8.5 (Total 58 Nos.)
Others
502 Nagda‐Bhopal :‐ Casual Renewal of rails on DRF 95,42 41,74 20,00 33,68
Nagda‐Makshi section under ADEN(W) Ujjain.
Others
503 NAD‐UJN‐BPL, IDU , DWX‐MKC (BG) Section DRF 2,48,60 1,47,43 19,00 82,17
:‐Replacemnt of damaged/ Decayed slpeers with new
galvanised steel channel sleepers with all
fixtureson NAD‐UJN‐BPL & IDU, DWX‐MKC
section.Bridge Nos. Nad‐UJN‐8Up/Dn, 12Up/dn, 32A,
Others
504 Indore‐Dewas‐Ujjain :‐ TWR Km.0 to 43.65 Km DRF 1,73,90 .. 20,00 1,53,90
Others
505 Nagda‐Bhopal Section. :‐ Supplying and fixing of DRF 99,63 65 10,00 88,98
new Insulated fittings for steel Channel sleepers
on different bridges
15.05.31.12.3.
54.007
15.05.31.13.3.
54.019
15.05.31.12.2.
54.003
15.05.31.13.2.
54.001
15.05.31.13.3.
54.020
15.05.31.12.3.
54.008
15.05.31.12.3.
54.006
15.05.31.12.2.
54.001
15.05.31.12.3.
54.019
15.05.31.12.2.
54.002
15.05.31.12.3.
54.027
TRACK RENEWALS
15.05.31.12.3.
54.009
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 39
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Others
506 Ratlam Division Godhra‐Nagda Section (UP /Dn Line) DRF 1,63,95 1,48,30 12,00 3,65
:‐TWR = 56.85
Others
507 Indore‐Dewas ‐Ujjain Section : ‐ WFT=14.00kms. DRF 2,46,61 94,64 10,00 1,41,97
Formation Treatment using blaxial Geo ‐ Grid from
km 27/0 ‐ 32/0, 35/0‐36/0,44/0 ‐ 48/1 and59/0 ‐
63/0 =14.00 kms.
Others
508 MGN ‐RTM Sec:‐Easing of slopes and Widening of DRF 98,27 10,88 6,00 81,39
Deep Cutting in section of SE (P. WAY) BOG under
AEN (E) RTM. (RTM/U/09‐10)
Others
509 TAN‐Providing stabling siding for track DRF 84,33 41,20 10,00 33,13
machine.(173 RM). (RTM/U/09‐10)
Others
510 Godhra‐Nagda.:‐ Development of ballast siding for DRF 44,50 74 12,50 31,26
full length to accommodate 30 hoppers including
top wiring at Morwani station.
Others
511 Nagda‐Bhopal:‐ .‐Development of ballast siding at DRF 58,43 22,48 23,43 12,52
Ujjain including top wiring.
Others
512 GDA‐NAD Sec.:‐ Casual renewal of SEJs. DRF 1,04,29 41,50 10,00 52,79
Others
513 GDA‐NAD Sec.:‐ Casual renewal of Glued Joints. DRF 1,25,19 39,15 5,00 81,04
Others
514 GDA‐NAD Sec.:‐ Casual renewal of Channel Sleeper & DRF 1,20,74 55,15 35,00 30,59
Fittings in ADEN(S)‐DHD Section.
Others
515 GDA‐NAD Sec.:‐ Casual renewal of Channel sleepers DRF 1,22,49 65,19 5,00 52,30
and fittings in ADEN(E)‐RTM Section.
Others
516 Chanderiya ‐ Neemuch Section :‐ Deep screening of DRF 87,47 53,71 10,00 23,76
CNA, COR, SMP (C ), NBH & JWO Yard main line track
Others
517 RATLAM ‐ CHANDERIYA section‐ Through Weld Renewal DRF 1,25,59 33,25 5,00 87,34
of defective joints
Others
518 Name of work :‐ DWX‐MKC section‐ Through Rail DRF 1,24,93 49,88 15,00 60,05
Renewal with 60 kg/90 UTS new rails from22.20kmto
23.35Km..
15.05.31.12.3.
54.011
15.05.31.12.3.
54.028
15.05.31.12.3.
54.001
15.05.31.12.3.
54.002
15.05.31.12.3.
54.003
15.05.31.12.3.
54.023
15.05.31.12.3.
54.010
15.05.31.08.2.
54.004
15.05.31.09.2.
54.002
15.05.31.09.3.
54.011
15.05.31.09.3.
54.018
15.05.31.11.3.
54.020
15.05.31.11.3.
54.021
TRACK RENEWALS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 40
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Ahmedabad
519 Ahmedabad‐Viramgam:‐ TRR(P) of 52Kg. rails laid on DRF 98,81 .. 25,00 73,81
M+7 density with new 52Kg rails on Major bridge No
733 from Km 499.00 to 500.30. Total 1.3Km
520 Gerathpur‐Ahmedabad section:‐ Through turn out DRF 92,28 40,00 8,00 44,28
renewal(P) 4 Nos 1 in 8.5 on PRC layout after R. 59
removal of 2 Nos double slip in KKFY yard
521 Ahmedabad‐Viramgam‐Samakhiali section:‐ TTR of 5 DRF 91,50 60,00 9,00 22,50
sets of 1 in 8.5 and 1 set 1 in 12 P&Cs on R. 1,71
wooden/ST layout by PRC lay out.
522 Ahmedabad division:‐ TTR(P) of 6 Nos 1 in 8.5 P&Cs DRF 80,02 55,00 10,00 15,02
on 90R/52 Kg rails laid on wooden/ST layout by R. 7,00
52/60 Kg rail on PRC lay out in the jurisdiction
of CPWI DHG and CPWI VG.
523 Ahmedabad division:‐ TTR (P) of 11 Nos trap point DRF 60,96 45,00 8,00 7,96
in the jurisdiction of ADEN(N/W)ADI R. 11,53
524 Viramgam‐Samikhiali:‐ Casual renewal of channel DRF 80,06 40,00 10,00 30,06
sleeper fittings between HVD‐SIOB section under
jurisdiction of CPWI MALB
525 Viramgam‐Okha:‐ Casual renewal of channel sleeper DRF 30,06 20,00 10,00 6
fittings between JN‐HVD section under jurisdiction
of CPWI DHG
526 Ahmedabad‐TRR(S) of 52Kg. rails laid on PRC DRF 58,18 30,00 10,00 18,18
sleepers at M+7 density with 52Kg rails (SH) in
ADI yard PF line No 2 & 7. Total TRR=1.1 Km
527 Viramgaon ‐ Samakhyali Section:‐ SEJR=82 Nos. DRF 39,34 5,68 1 33,65
(ADI/U/10‐11)
528 Ahmedabad‐Viramgaon Section:‐ TSEJR = 32 Nos. DRF 39,34 5,68 1 33,65
(ADI/U/10‐11)
529 Ahmedabad ‐ Viramgaon (DN )Section:‐ TWR =1550 DRF 90,41 69 2,00 87,72
Nos. (ADI/U/10‐11)
530 Mehesana Station Yard Line 1 & 4:‐ TRR (S) = 1.75 DRF 97,96 56,80 1 41,15
Kms. (ADI/U/10‐11)
531 Ahmedabad yard:‐TRR (S) =1.54 Kms. on goods line DRF 37,00 5,68 8,00 23,32
No. 7 & 9. (ADI/U/10‐11)
532 Ahmedabad Yard:‐ TRR (S)=1.66 Kms. on goods line DRF 40,00 5,68 9,00 25,32
No.6 & 8. (ADI/U/10‐11)
533 Patdi & Kharaghoda station Yard:‐ TSR (P)=2.15 DRF 94,55 11,87 5,00 77,68
Kms. (ADI/U/10‐11)
534 Replacement of corroded fittings of turnout under DRF 78,00 26,34 2,00 49,66
SSE (Pway) ADI.
15.01.31.10.3.
50.007
15.01.31.10.3.
50.019
15.01.31.10.3.
50.013
15.01.31.10.3.
50.012
15.01.31.10.3.
50.020
15.01.31.11.3.
50.017
15.01.31.13.3.
50.020
15.01.31.13.3.
50.022
15.01.31.13.3.
53.023
15.01.31.13.3.
50.024
15.01.31.10.3.
50.025
15.01.31.10.3.
50.014
TRACK RENEWALS
15.01.31.13.3.
50.014
15.01.31.13.3.
50.018
15.01.31.13.3.
50.019
15.01.31.13.3.
50.021
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 41
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
535 Renewals of wornout rails of various turnouts in DRF 89,88 34,60 2,00 53,28
the jurisdiction of SSE (P.Way) ADI.
536 Through Switch Renewal (P) of chipped/wornout 1:12 DRF 84,53 33,13 2,00 49,40
switches with new 52 kg/60kg sawitches on
ADI‐VG‐SIOB section.
537 Through Weld Renewal in Chandlodiya‐Khodiyar DRF 90,23 24,70 5,00 60,53
Section.
538 Through Weld Renewal in Ahmedabad‐Geratpur DRF 77,33 21,17 5,00 51,16
Section.
539 Renewals of wornout rails of various turnouts in DRF 81,50 32,31 2,00 47,19
the jurisdiction of SSE (P.Way) SBI .
540 Ahmedabad division ‐ Casual Renewal of Channel DRF 90,00 29,66 2,00 58,34
Sleepers fittings.
541 Ahmedabad division‐ Casual renewal of sleepers on DRF 92,00 45,18 10,00 36,82
P&C.
542 Ahmedabad division‐ Casual renewal of fittings of DRF 86,00 35,53 1 50,46
P&C.
543 Ahmedabad division‐ Casual renewal of glued DRF 88,00 34,08 4,00 49,92
joints.
544 Ahmedabad division ‐ Casual renewal of rails on DRF 94,00 35,72 2,00 56,28
points & crossings.
545 Ahmedabad division‐Casual renewal of SEJs. DRF 96,00 36,27 10,00 49,73
546 Khodiyar yard : Through Rail Renewal (S) of DRF 84,86 28,23 15,00 41,63
existing 90 R rails with 52 Kg (SH) rails on line
No. 1 & 2 of Khodiyar yard =TRR 1.49 (S) Kms.
547 Khodiyar yard : Through Rail Renewal (S) of DRF 83,22 27,78 14,00 41,44
existing 90 R rails with 52 Kg (SH) rails on line
No. 4 & 5 of Khodiyar yard =TRR 1.48 (S) Kms.
548 Ahmedabad‐SHB section‐TTR(P) with 60 kg 1:12 PRC DRF 86,33 33,62 14,00 38,71
fan shaped layout including deep screening (5
sets).
549 TTR of 03 Nos 1 in 8 ½ Turn outs in Asarava Yard DRF 52,22 .. 3,00 49,22
R. 4,48
550 CTR of line No. 1 & TSR of line No. 2 along with DRF 96,56 5,00 2,00 89,56
deep screening at Asarava yard. R. 2,03
551 Through fitting renewal between KHD‐PNU section. DRF 89,65 5,00 12,00 72,65
552 Through Bridge Timber Renewal‐ Replacement of DRF 70,17 23,95 25,85 20,37
existing wooden sleeper with new galvanized steel
channel sleepers with all fittings and fixtures on
HMT‐KDBM(MG section) of DEN(N)’s jurisdiction
(total Nos 372).
15.01.31.12.3.
50.018
15.01.31.11.3.
50.012
15.01.31.11.3.
50.013
15.01.31.11.3.
50.007
15.01.31.12.3.
50.004
15.01.31.12.3.
50.011
15.01.31.12.3.
50.012
15.01.31.11.3.
50.001
15.01.31.11.3.
50.005
15.01.31.11.3.
50.003
15.01.31.11.3.
50.004
15.01.31.11.3.
50.002
15.01.31.11.3.
50.006
TRACK RENEWALS
15.01.31.11.3.
50.015
15.01.31.11.3.
50.024
15.01.31.11.3.
50.026
15.01.31.11.3.
50.025
15.01.31.11.3.
50.016
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 42
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
553 Replacement of Curved switches & CMS Xing for PSC DRF 90,82 10,00 30,00 50,82
fan shaped layout on age cum condition basis in R. ..
the section of Sr. DEN (NW)‐ADI
554 Replacement of Curved switches & CMS Xing for PSC DRF 90,82 10,00 2,00 78,82
fan shaped layout on age cum condition basis in R. ..
the section of Sr. DEN (W)‐ADI
555 Replacement of Curved switches & CMS Xing for PSC DRF 90,82 10,00 12,00 68,82
fan shaped layout on age cum condition basis in R. ..
the section of DEN (N)‐ADI
556 Replacement of Glued joint & SEJs with web DRF 89,96 10,00 5,00 74,96
stiffener on age cum condition basis in the
section of Sr. DEN (W)‐ADI
557 TBTR with steel channel sleepers on Br. No 731‐A DRF 93,61 .. 40,00 53,61
and casual renewal of steel channel sleepers on
Br. No.733 ADI‐VG section
558 Scattered renewal of switches & crossings on 1:12 DRF 97,80 10,00 2,00 85,80
(52 Kg) points under ADEN(NW)ADI R. ..
559 Through deep screening between section GER‐ADI DRF 84,28 5,00 25,00 54,28
R. 12,84
560 Replacement of Glued joint & SEJs with web DRF 76,18 10,00 2,00 64,18
stiffener on age cum condition basis in the
section of Sr. DEN (NW)‐ADI
561 Replacement of Glued joint & SEJs with web DRF 76,18 10,00 5,00 61,18
stiffener on age cum condition basis in the
section of DEN (N)‐ADI
562 Renewal of three single slip Diamond crossing in DRF 98,32 .. 14,63 83,69
GER‐ADI Section R. 20
563 Renewal of Scissors Crossover in ADI Yard DRF 88,10 40,00 12,03 36,07
564 Renewal of 2 Nos diamond crossing (BG/MG) in DRF 65,13 .. 18,00 47,13
Jurisduction of SSE(PWay)ADI
Complete Track Renewal
565 Palanpur & Bhildi Yards CTR(S)=1.466 & DRF 2,25,00 1,41,24 3,32 80,44
TRR(S)=1.750 kms. of existing 52 kg 72 UTS rails R. 17,64
laid on PRC‐52 kg sleepers M+4 density with 52Kg
90 UTS SH. rails & PSC sleepers(P) M+7 density in
PNU yard of line No. 1 & 5 & TRR of existing 90R
Through Rail Renewal
566 Samakhiali‐Gandhidham Section:‐TRR(P) of 52kg rail DRF 96,31 .. 30,00 66,31
laid on PRC sleepers with new 52kg (90UTS) rails
from km 781.20 to 782.50=1.30 kms
Through Rail Renewal
567 Samakhiali‐Gandhidham‐TRR(P) of 52kg rail laid on DRF 74,08 .. 25,00 49,08
PRC sleepers with new 52kg (90UTS) rails from km
777.30 to 778.30=1.00 kms
15.01.31.12.3.
50.017
15.01.31.12.6.
50.001
15.01.31.11.2.
50.001
15.01.31.13.3.
50.016
15.01.31.13.3.
50.006
15.01.31.12.3.
50.005
15.01.31.12.3.
50.006
15.01.31.12.3.
50.007
15.01.31.12.3.
50.009
15.01.31.12.3.
50.010
15.01.31.12.3.
50.003
TRACK RENEWALS
15.01.31.12.3.
50.013
15.01.31.12.3.
50.014
15.01.31.12.3.
50.015
15.01.31.12.3.
50.016
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 43
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Through Rail Renewal
568 Samakhiali‐Gandhidham Section:‐TRR(P) of 52kg rail DRF 88,90 .. 30,00 58,90
laid on PRC sleepers with new 52kg (90UTS) rails
from km 764.30 to 765.50=1.20 kms
Through Rail Renewal
569 Samakhiali‐Gndhidham :‐TRR (P) of 52kg rail laid DRF 74,08 .. 24,00 50,08
on PRC sleepers with new 52kg (90UTS) rails from
km 757.00 to 758.00=1.00 kms
Through Rail Renewal
570 Samakhiali‐Gandhidham:‐TRR(P) of 52kg rail laid on DRF 74,08 .. 24,00 50,08
PRC sleepers with new 52kg (90UTS) rails from km
779.30 to 780.30=1.00 kms
Through Sleeper Renewal
571 Gandhidham yard:‐ TSR(P)5.157 Km of existing CST‐9 DRF 1,99,16 1,09,16 10,00 80,00
sleepers with PSC sleepers @1660 nos/Km
Points & Crossings
572 Ahmedabad yard:‐Renewal of two Nos scissors DRF 2,25,79 7,55 61,00 1,57,24
crossing and one diamond withhout slip. R. 16,35
Points & Crossings
573 Ahmedabad‐Palanpur Section:‐ TTR(P) of existing DRF 1,32,21 .. 35,89 96,32
points and X‐ings 50R/60R/75R/90R rails on wooden R. 11,34
sleeper layout with new 52Kg (90 UTS) points and
X‐ings on PRC sleeper layout including deep
screening and recoupment of ballast on BG station
Points & Crossings
574 Ahmedabad Division:‐TTR(P) of existing points and DRF 1,48,25 5,00 38,78 1,04,47
X‐ings 50R/60R/75R/90R rails on wooden sleeper R. 11,85
layout with new 52Kg (90 UTS) points and X‐ings on
PRC sleeper layout including deep screening and
recoupment of ballast on MG station yards 1 in
Points & Crossings
575 Sabarmati ‐ Renewal of 3 Nos Gauntelated Diamond DRF 95,61 60,00 15,00 20,61
crossing (BG/MG)
Points & Crossings
576 ADI‐PNU & GER‐VG Section: ‐ Through Switch Renewal DRF 47,69 10,36 1 37,32
(P) of chipped/ worn out 1: 12 switches with new
52kg/60kg switches. (ADI/U/08‐09)
Points & Crossings
577 GER ‐ SIOB section : Through switch Renewal (P) of DRF 86,54 18,00 1 68,53
existing worn out crossings with new 52 kg/60kg.
crossing. (ADI/U/09‐10)
Points & Crossings
578 Renewal of one double slip and one single slip DRF 96,50 40,00 40,00 16,50
diamond crossing in ADI yard.
15.01.31.13.2.
50.002
15.01.31.13.3.
50.017
15.01.31.08.3.
50.001
15.01.31.09.3.
50.019
15.01.31.12.3.
50.001
15.01.31.13.3.
50.011
15.01.31.13.3.
50.015
15.01.31.13.3.
50.013
15.01.31.10.2.
50.005
15.01.31.13.1.
50.003
15.01.31.13.2.
50.001
TRACK RENEWALS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 44
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Points & Crossings
579 Renewal of scrissors crossover in GER‐ADI section. DRF 88,10 20,00 4,35 63,75
Points & Crossings
580 Renewal of 2 Nos 1 in 16 points and crossing in DRF 45,85 .. 13,00 32,85
ADI‐VG section under jurisduction of SSE(Pway) ADI
Others
581 Through Fitting Renewal on Jhund ‐Samakhiali DRF 2,24,18 5,00 1 2,19,17
section Total = TFR 31.40 Kms.
Others
582 Through Fitting Renewal from km 769.900 to 795.910 DRF 1,64,99 15,00 1,00 1,48,99
on Samakhiali ‐ Gandhidham section Total = TFR
26.01 Kms.
Others
583 Through Weld Renewal and related track works on DRF 85,60 25,60 1 59,99
JN ‐ VG ‐ ADI (UP) section Total TWR = 1450 Nos.
(ADI/U/09‐10)
Others
584 Through Fitting Renewal from km 721.24 ‐ 732.0 DRF 58,36 22,47 1 35,88
on JN ‐ SIOB section Total = TFR 10.76 Km.
(ADI/U/09‐10)
Others
585 ADI‐VG section :‐ Conversion of free rails into DRF 84,44 27,79 1 56,64
LWR on loop lines of Total=14 loop lines.
(ADI/U/09‐10)
Others
586 Through Fitting Renewal from km 508.93 to 522.60 DRF 74,19 13,38 1 60,80
(UP) on ADI ‐ VG section Total = TFR 13.67 Km.
(ADI/U/09‐10)
Others
587 ADI ‐ VG ‐ JN Section : Providing gapless joints DRF 88,29 27,18 4,00 57,11
at CMS crossings in the yards. (ADI/U/09‐10)
Others
588 Replacement of U/S sleepers in track circuited DRF 99,72 21,38 25,00 53,34
portion with PRC sleepers(MG) and 60R rails with
90‐R SH rails in ADI yard. (ADI/U/09‐10)
Others
589 GER ‐ SIOB section : Through crossing Renewal (P) DRF 90,50 21,38 1 69,11
of existing worn out crossings with new 52
kg/60kg. crossing. (ADI/U/09‐10)
Others
590 Through Weld Renewal and related track works on DRF 88,69 18,48 1 70,20
SIOB‐GIM‐BVJ section Total = TWR 1550 Nos.
(ADI/U/09‐10)
15.01.31.09.3.
50.016
15.01.31.09.3.
50.030
15.01.31.09.3.
50.011
15.01.31.09.3.
50.026
15.01.31.09.3.
50.018
15.01.31.09.3.
50.033
15.01.31.12.3.
50.002
15.01.31.12.6.
50.002
15.01.31.12.2.
50.001
15.01.31.12.2.
50.002
15.01.31.09.3.
50.032
15.01.31.09.3.
50.031
TRACK RENEWALS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 45
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Others
591 Viramgam‐Samakhiali Through SEJ renewal of DRF 65,02 20,00 2,00 43,02
existing SEJs to be replaced with new 52Kg SEJ on
PRC sleepers (50 Nos)
Rajkot
592 Rajkot Yard ‐ CTR =1.30 Kms. on R&D and IOC DRF 99,99 17,10 12,00 70,89
siding. (RJT/U/10‐11)
593 Jaliyadewani Yard ‐ TRR(S) = 1.60 Kms.in line DRF 72,13 17,10 10,00 45,03
No.1&3. (RJT/U/10‐11)
594 Sikka Yard ‐ TRR = 2.40 Kms. in line No.1,2&3. DRF 99,93 38,25 13,00 48,68
(RJT/U/10‐11)
595 Rajkot Division. ‐ Renewal of switch and crossings DRF 66,87 20,00 10,00 36,87
in VG‐OKHA Section 28 Sets.
596 Rajkot division ‐ Casual Renewal of Channel BOND 59,91 3 .. 59,88
Sleepers fittings.
597 Rajkot division‐ Casual renewal of sleepers on DRF 40,25 5,00 5,00 30,25
P&C.
598 Rajkot division‐ Casual renewal of fittings of DRF 48,95 23,85 11,00 14,10
P&C.
599 Rajkot division‐ Casual renewal of glued joints. DRF 51,70 5,62 10,00 36,08
600 Rajkotdivision ‐ Casual renewal of rails on points DRF 59,64 20,00 5,00 34,64
& crossings.
601 Rajkot division‐Casual renewal of SEJs. DRF 53,76 5,00 10,00 38,76
Complete Track Renewal
602 Vavaniya Yard ‐ Complete Track Renewal of DRF 95,63 10,00 22,50 63,13
existing 52Kg rails on PRC with 52 Kg.SH rails R. 2,75
(SWR) on new PRC sleepers at M+4 density (1340
Nos./Km.) including deep screening on salt loading
line .Total 1.10 Kms.
Complete Track Renewal
603 Lavanpur Yard ‐ Complete Track Renewal of DRF 67,55 10,00 20,00 37,55
existing 52Kg rails on PRC with 52 Kg.SH rails R. 2,00
(SWR) on new PRC sleepers at M+4 density (1340
Nos./Km.) including deep screening on salt loading
line .Total 0.80 Kms.
Through Rail Renewal
604 Viramgam ‐ Surendranagar ; TRR (P) on major DRF 89,31 .. 12,00 77,31
bridges & its approaches .
Through Sleeper Renewal
605 Viramgam‐Okha:‐ Replacement of existing scabbed DRF 97,03 .. 13,00 84,03
rails between Wankaner and Amarsar station, Total
1.30Kms.
15.04.31.12.3.
53.003
15.04.31.12.3.
53.005
15.04.31.13.3.
53.004
15.04.31.13.3.
53.003
15.04.31.11.3.
53.004
15.04.31.11.3.
53.007
15.04.31.11.3.
53.005
15.04.31.11.3.
53.006
15.04.31.11.3.
53.010
15.04.31.11.3.
53.008
TRACK RENEWALS
15.01.31.11.3.
50.030
15.04.31.10.3.
53.006
15.04.31.10.3.
53.002
15.04.31.10.3.
53.007
15.04.31.11.3.
53.009
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 46
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Points & Crossings
606 Wankaner‐Navlaki:‐ Renewal of existing DRF 99,98 .. 5,00 94,98
wornout/corroded Switches and TRR (S) on line No.
3&4 in Navlakhi yard.
Others
607 Creating of necessary facilities for Machine DRF 98,79 50,67 5,00 43,12
Maintenance of track in Rajkot Division costing
Rs. 98.79 Lakhs. (RJT/U/09‐10)
Others
608 Rajkot Division ; Renewal of Glued Joints 180 Nos. DRF 69,94 20,19 10,00 39,75
Others
609 Rajkot Division ; Through Weld Renewal of DRF 95,59 84,34 5,00 6,25
defective flash butt welds and AT welds (fracture
prone location) from kms. 571.60 to 577.40 and 586
to 591 between Vani Road and Lilapur Road
stations.Total 10.80 Kms.
Others
610 Rajkot Division ; Through Weld Renewal of DRF 95,59 74,02 9,00 12,57
defective flash butt welds and AT welds (fracture
prone location) on various locations between
Chamaraj and Lakhamanchi stations.Total 13.50 Kms.
Others
611 Renewal of switch and crossings under ADEN‐SUNR's DRF 93,16 10,00 8,50 74,66
jurisdiction.
Bhavnagar
612 Kanalus‐Porbandar Section : Through bridge timber DRF 98,36 73,17 16,00 9,19
replacement = 880 Nos. of girder bridges with span
above 6.1m. (BVP/S/10‐11/OT)
Complete Track Renewal
613 CTR 0.91Km Yard Line (MG) in JUNAGADH. DRF 52,57 .. 30,00 22,57
R. 9,92
Through Rail Renewal
614 Rajkot‐Veeraval section:‐ TRR(S) 0.70 Km on pit DRF 44,62 .. 25,00 19,62
line
Others
615 BVP Division ‐ Casual renewal of P. Way fittings DRF 96,53 .. 22,00 74,53
Mumbai
616 Works costing below DRM's Power DRF 14,00 .. 14,00 ..
Vadodara
617 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
Rajkot
618 Works costing below DRM's Power DRF 14,00 .. 14,00 ..
Bhavnagar
619 Works costing below DRM's Power DRF 27,00 .. 27,00 ..
TOTAL‐WORKS IN PROGRESS DRF .. .. 33,70,00 ..
15.02.31.14.3.
00.999
15.02.31.12.3.
51.002
15.02.31.13.3.
51.001
15.02.31.12.3.
51.001
15.03.31.14.3.
00.999
15.06.31.14.3.
00.999
15.04.31.14.3.
00.999
15.04.31.09.3.
53.001
15.04.31.12.3.
53.004
15.04.31.12.3.
53.006
15.04.31.12.3.
53.007
15.04.31.12.3.
53.008
15.02.31.10.3.
51.004
TRACK RENEWALS
15.04.31.13.3.
53.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 47
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
B ‐ New Works
Through Rail Renewal
Headquarter
620 Gerathpur–Ahmedabad‐Viramgam & DRF 2,26,81 .. 11,00 2,15,81
Chandlodiya‐Khodiyar:‐ TRR(P)2.762Km
Through Rail Renewal
Mumbai
621 Udhna‐Jalgaon section.:‐ Casual renewal of rails DRF 80,04 .. 5,20 74,84
under SSE(Pway) Vyara
Through Rail Renewal
622 Udhna‐Jalgaon . Casual renewal of rails under DRF 89,68 .. 5,20 84,48
SSE(P.Way)Nandurbar. Total 1.20 kms.
Through Rail Renewal
623 Udhna‐Jalgaon. Casual renewal of rails under DRF 89,68 .. 5,18 84,50
SSE/P.way/Amalner. Total 1.20 kms.
Through Rail Renewal
624 Udhna Jalgaon .:‐Casual renewal of rails under DRF 95,65 .. 5,20 90,45
ADEN‐Vyara. Total 1.280 kms.
Through Rail Renewal
625 Churchgate ‐ Virar Section: TRR (P) DNLL38.85 to DRF 84,93 .. 5,00 79,93
39.85 = 1.00 Km Br.No.72
Through Sleeper Renewal
626 Virar‐Surat Sec. TSR(P) 220.563 to 221.250 = 0.69 DRF 86,22 .. 5,00 81,22
km & 221.313 to 222.180 = 0.87 Total TSR(P) = R. 7,78
1.56km on UP Line.
Through Rail Renewal
Vadodara
627 Surat‐Miyagam Section:‐TRR(P) Up Km. 302.150 to DRF 84,93 .. 5,00 79,93
Km. 303.150=1.00 Kms with 60kg rails
Points & Crossings
628 Surat‐Godhra section:‐ TTR of 4 P&Cs (2 at Bharuch DRF 88,56 .. 5,00 83,56
& 2 at Palej) on wooden/ST sleepers by PRC and R. 4,54
casual renewal of sleepers for one Km
Others
629 Surat Godhra section:‐ Development of Track DRF 88,34 .. 5,00 83,34
Machine siding at Bharuch and Palej Stations
Through Rail Renewal
Ratlam
630 Chanderiya ‐ Nimach section :‐ TRR (P) on Major DRF 1,29,13 .. 10,00 1,19,13
bridge No. 491, 229, 232, 256, 271 & 272 Total
1.728 Km
Others
631 Godhra‐Nagda section‐Casual Renewal of Switches, DRF 90,52 .. 5,00 85,52
crossings and SEJs
15.05.31.14.3.
54.002
15.03.31.14.3.
52.006
15.03.31.14.3.
52.001
15.06.31.14.3.
55.002
15.06.31.14.3.
55.001
15.06.31.14.3.
55.003
15.05.31.14.2.
54.001
15.00.31.14.2.
50.001
15.03.31.14.3.
52.004
15.03.31.14.3.
52.005
15.03.31.14.3.
52.003
15.03.31.14.3.
52.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 48
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Others
632 Godhra‐Nagda section:‐ Renewal of fittings of DRF 91,06 .. 5,00 86,06
channel sleepers, Riubber pads of points and
crossings and other fittings.
Ahmedabad
633 Jhund‐Kharagoda: TTR ‐5 sets DRF 90,56 .. 5,00 85,56
R. 6,78
Through Rail Renewal
634 Viramgam‐Samakhiali:‐ TRR (P) on curve No52 from DRF 82,20 .. 5,00 77,20
Km 700.80 to 701.90 = 1.10 Km
Through Rail Renewal
635 Viramgam‐Samakhiali:‐TRR(P) on curve No53 from Km DRF 82,20 .. 5,00 77,20
702.10 to 703.20 = 1.10 Km
Points & Crossings
636 Ahmedabad division:‐ TTR of one P&C at Kharaghoda DRF 43,04 .. 5,00 38,04
and five trap points at Jhund, Kkodiyar & R. 7,03
Ahmedabad yards on wooden/ST sleeper by PRC layout
Others
637 Palanpur‐Gandhidham section:‐ Providing facilities DRF 64,45 .. 5,00 59,45
for track machine siding at Gandhidham & Bhildi
Others
638 Mehasana‐ Viramgam‐Samakhiali:‐ Providing DRF 96,67 .. 5,00 91,67
facilties for track machine sidings at Mehasana,
Dharangadhara & Halvad
TOTAL‐NEW WORKS DRF .. .. 1,06,78 ..
TOTAL‐Track Renewals DRF .. .. 34,76,78 ..
A ‐ Works in Progress
Mumbai
639 Replacement of Elastomeric Bearing on PSC‐Box DRF 35,89 1 20,00 15,88
Girder Bridge NO. 75UP/DN(11X48.50MTS0 Local Line
between BYR‐NIG Stations on CCG‐VR Section in
Mumbai Division W.Rly
640 Virar‐Surat Section:‐ Replacement & strengthening DRF 2,47,39 1,87,34 40,00 20,05
of cracked stringer angles in Br.No. 275 and 313
and replacement of corroded bracing gussets and
metallising of flooring system of Br. No.313.
(BCT/S/06‐07)
641 Nallasopara ‐ Vasai Road ‐ Construction / DRF 2,33,14 .. 1 2,33,13
strengthening of cast iron screw piles (bridge No
78) at Km. 53/6‐7. (BCT/S/06‐07) XEN/BR/DDR
642 Churchgate‐Virar Section:‐ Replacement of small DRF 86,33 53,86 32,47 ..
span girders by PSC slabs upto 6.10m span bridges
(Br.No. 15,24,25,32, 38,40,53, 54 & 58 = 9
bridges.). (BCT/U/06‐07)
15.03.32.06.2.
52.002
15.03.32.06.2.
52.001
15.01.31.14.3.
50.005
15.01.31.14.3.
50.003
15.01.31.14.3.
50.001
BRIDGE WORKS
15.03.32.13.3.
11.002
15.03.32.06.2.
11.003
TRACK RENEWALS
15.05.31.14.3.
54.001
15.01.31.14.3.
50.006
15.01.31.14.3.
50.002
15.01.31.14.3.
50.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 49
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
643 Virar‐Surat Section ‐ Replacement of existing DRF 31,53 19,57 1 11,95
corroded girder on bridge No.150, 153, 192A & 420
(Total 9 span) pre cast R.C.C. Slab and also
improvement protection and provision of toe wall
for bridge No. 401. (BCT/S/09‐10)
644 Virar ‐ Surat Section ‐ Replacement of cracked top DRF 1,16,37 1 25,00 91,36
flange, bracing and gussets etc. of Br.No. 417 UP
& DN (13 x 18.30m) at km 249/11‐29.
645 Replacement of Elastomeric Bearings on PSC BOX DRF 94,63 1 20,00 74,62
Girder of bridge No.73 UP/DN Local Line between
BYR‐NIG stns on CCG‐VR section on Mumbai Division.
Vadodara
646 Vadodara Division ‐ Replacement of existing aged DRF 1,05,58 52,70 20,00 32,88
steel girders by providing 9.15 m spans PSC slabs
on Br. No.537, 539, 568, 549 on Surat‐Godhra
Sectoin and Br. No.51A on Anand‐Godhra Section
(Total 9 spans). (BRC/S/08‐09)
647 Godhra (Yard):‐ Repalcement of steel girder by DRF 40,03 9,79 1 30,23
Precast PSC slabs of Bridge No. 102/A at Km.
468/44‐46 (1x6.10m span (5 Nos. of span)
(BRC/S/08‐09)
648 Ankleshwar ‐ Bharuch Section:‐ Replacement of DRF 49,75 44,26 5,49 ..
chequered plate & top hand railing of foot path &
trolley refuge on Bridge No. 502.(BRC/S/08‐09)
(Dy.CE(BR)‐BL)
649 Vadodara Division:‐ Replacement of bearing and DRF 86,12 1 19,13 66,98
rehabilitation of PSC/RCC girders. (BRC/S/09‐10)
650 Vadodara Division:‐ Replacement of loose rivets DRF 26,34 9 7,50 18,75
and corroded components of bridge No.65 in
Anand‐Godhra section and bridge No.49‐A and 74 ‐ B
in Vadodara‐Godhra section. (BRC/U/09‐10)
651 Vadodara Division:‐Providing RCC box at various DRF 49,79 34,18 15,00 61
breaches locations in Anand‐Khambhat,
Vasad‐Kathana & Nadiad‐Modasa Sections.
(BRC/U/09‐10)
652 Sr.DEN(N)BRC's Jurisdiction:‐ Replacement of aged DRF 84,81 12,00 15,00 57,81
steel girders by providing PSC/RCC slabS up to
6.10 m span (25 bridges). (BRC/U/11‐12)
653 Regirdering of Br.No.102 including channel DRF 96,95 29,31 50,00 17,64
sleepers. (BRC/U/11‐12)
654 Vadodara Division:‐Rebuilding of Bridge No. 531 at DRF 67,46 .. 5,00 62,46
Km on Surat‐Vadodara Section with 5.10m RCC Box.
Ratlam
655 Ratlam ‐ Godhara Section:‐ Replacement of PSC DRF 32,04 27,73 4,31 ..
girders of Bridge No. 264 Up (1x10.55m) at km
636/3‐5.(RTM/S/08‐09) (DY.CE(BR)BL)
15.06.32.11.3.
55.002
15.06.32.11.3.
55.001
15.06.32.12.3.
55.001
15.05.32.08.3.
54.002
15.06.32.08.2.
55.001
15.06.32.08.3.
55.003
15.06.32.08.3.
11.002
15.06.32.09.3.
11.002
15.06.32.09.3.
55.003
15.06.32.09.3.
55.004
BRIDGE WORKS
15.03.32.09.3.
52.001
15.03.32.10.2.
11.001
15.03.32.13.3.
11.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 50
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
656 Godhra‐Meghnagar Section:‐ Re‐building of Bridge DRF 89,50 34,96 10,00 44,54
No. R‐01 (UP & DN) at Km. 514/15‐17 & R‐21 (DN) at
Km. 521/14‐16 and R‐22 (DN) at Km. 622/22‐24 .
657 UJN ‐BPL Sec.:‐ Replacement of Earley steel DRF 99,48 .. 50,00 49,48
girders by providing PSC/PRC slabs of 9.15m span
on NAD‐UJN‐ BPL,IDU, DWX‐MKC section at ORN‐2
Bridge Nos. 134 Dn( 1X9.15m),135 ( 1X9.15m) ,137
Dn( 2X9.15m), 175 Dn( 3X9.15m),176 Dn (
658 Indore ‐ Dewas ‐Ujjain section‐Rebuilding of S.Fund 61,52 35,13 .. 26,39
bridge no.32. ( 2x091 M hume pipe),46(2X0.91),49(
2X0.91) by RCC box.
659 MKC‐BPL section‐Rebuilding of bridge no.105 Dn DRF 93,18 .. 30,00 63,18
(1x1.22 M),166Dn(2X.91m),167Dn(2X0.91m) ( ORN‐2)
by RCC box.
Ahmedabad
660 Planpur ‐ Ahmedabad Section ‐ Rebuilding of Br.No. DRF 1,47,02 1,04 1 1,45,97
1016 at Km. 744/9‐10 between DNW‐JUL.
661 Mehasana ‐ Palanpur Section ‐ Regirdering Br. DRF 1,92,71 1 1 1,92,69
No.945 (3x24). (ADI/S/08‐09)
662 Mahesana‐Jagudan Section:‐ Rebuilding of Br. No. DRF 48,23 25,22 15 22,86
973 A by RCC Box. (ADI/S/09‐10)
663 Ahmedabad‐Viramgam Section:‐ Rebuilding of Br. No. DRF 74,15 1 1 74,13
5,7 in Viramgam‐ Jhund Section & Br. No. 24,29,
29Dn, 33Dn of Ahmedabad‐Viramgam & Br. No. 38 of
Jhund‐Kharaghoda Section. (ADI/U/09‐10)
664 Samakhiali‐Gandhidham‐Kandla Port Section:‐ DRF 75,43 11 1 75,31
Replacement of small span girder by providing PSC
slab at Br. No. 313 (6 x 3.05m) & Br. No. 277 (5 x
8.23m) & 279 ( 3 x 8.23m). (ADI/U/10‐11)
665 Ahmedabad ‐Viramgam ‐Jhund Section‐:‐ Replacement DRF 33,50 1 1 33,48
of small span girders by providing PSC slab.(
Br.No.26DN,89 Up,89L1,715). (ADI/U/11‐12)
666 Chandlodiya‐Khodiyar‐Gandhinagar section:‐ DRF 62,50 1 50,00 12,49
Replacement of small span girders by providing PSC
slab.( Br.No.28,20,70,2up,4up). (ADI/U/11‐12)
667 Jhund‐Kharaghoda section:‐ Replacement of small DRF 62,50 1 1 62,48
span girders by providing PSC slab.
(Br.No.13,14,17,19A). (ADI/U/11‐12
668 Ambli Road‐Sanand:‐ Rebuilding of Br.No.12 at km DRF 87,00 1 50,00 36,99
515/5‐6(Up&Dn line). (ADI/U/11‐12)
669 Samakhiali‐Gandhidham Section:‐ Replacement of DRF 63,33 1 1 63,31
steel girders by PSC slab of BrNo. 314(1x3.05
m)and Br.No.316(6x12.19m)(Total span 9 nos.).
(ADI/U/11‐12)
15.01.32.11.3.
50.008
15.01.32.09.3.
50.001
15.01.32.10.3.
50.001
15.01.32.11.3.
50.001
15.01.32.11.3.
50.003
15.01.32.11.3.
50.004
15.01.32.11.3.
50.002
15.05.32.12.3.
54.003
15.05.32.12.3.
54.001
15.05.32.12.3.
54.002
15.01.32.10.1.
30.001
15.01.32.08.3.
11.001
15.01.32.09.3.
50.002
BRIDGE WORKS
15.05.32.09.3.
54.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 51
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
670 Sabarmati (Engg.W/S):‐ Replacement of broken AC C.Fund 93,95 1 .. 93,94
sheets with aluminium sheets and polycorbonate
sheets and down take pipes in STR shop.
(ADI/U/11‐12)
671 Sabarmati:‐ Improvement to flooring in STR shop DRF 93,07 2,98 1 90,08
and other allied Engineering works. (ADI/U/11‐12)
Rajkot
672 Pipli ‐ Kanalus Section:‐ Replacement of Top DRF 35,48 24,22 1 11,25
flange plate of Bridge No.427(6x18.30m+1x12.20m)
at km 883/3‐5 between KMBL‐VOD & Br. No. 395
(5x12.20m) at km 852/5‐6. (RJT/S/08‐09)
673 Viramgam‐Surendranagar Section:‐ New Bridge No. DRF 48,11 1 1 48,09
20X (RCC Box 2x 3.05m) at Km. 587.15.
(RJT/S/10‐11)
674 Rajkot Division:‐ New Bridge No.380/A‐ Proposed DRF 59,71 1 1 59,69
R.C.C. Box ( 2x6.10m RCC Box) at Km 838/0‐1.
(RJT/S/10‐11)
675 Viramgam‐Okha Section:‐ Replacement of old girder DRF 32,50 1 1 32,48
Bridge No.39(1x6.10m) by RCC Box (1x4.72 m+1x3.90
m) at km 616/9‐617/1 between BLRD‐SUNR section.
(RJT/U/11‐12)
Bhavnagar
676 Kanalus Porbandar Section ‐ Replacement of steel DRF 2,49,00 55,17 70,00 1,23,83
girders up to 6.10 m span by RCC/PSC (41 spans)
677 Replacement of damaged RCC slab of Br. No. 46 (3 X DRF 68,53 24,80 30,00 13,73
2.42) & Br. No. 59 (3 X 3.02) on SBI‐BTD Section.
Ahmedabad
678 Works costing below DRM's Power DF(4) 7,15 .. 7,15 ..
Bhavnagar
679 Works costing below DRM's Power DF(3) 4,53 .. 4,53 ..
TOTAL‐WORKS IN PROGRESS DRF .. .. 5,69,20 ..
DF(3) .. .. 4,53 ..
DF(4) .. .. 7,15 ..
B ‐ New Works
Rajkot
680 Works costing below DRM's Power DRF 20 .. 20 ..
TOTAL‐NEW WORKS DRF .. .. 20 ..
TOTAL‐Bridge Works DRF .. .. 5,69,40 ..
DF(3) .. .. 4,53 ..
DF(4) .. .. 7,15 ..
15.04.32.14.3.
00.999
15.04.32.10.3.
53.001
15.04.32.11.3.
53.002
15.02.32.09.2.
51.001
15.02.32.12.3.
51.001
15.01.32.14.3.
00.999
15.02.32.14.3.
00.999
BRIDGE WORKS
15.01.32.11.3.
50.006
15.01.32.11.3.
50.007
15.04.32.08.3.
11.001
15.04.32.10.3.
53.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 52
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
A ‐ Works in Progress
Headquarter
681 Vadodara & Ahmedabad Division ‐ Upgradation of DF(3) 2,01,08 25,93 .. 1,75,15
OFC equipments of PDH to SDH.
682 CSTE office Churchgate‐Provision of V‐LAN facility DF(3) 22,14 10,00 7,89 4,25
for CAD Centre in Drawing section.
Mumbai
683 Marine Lines ‐ Replacement of signalling PI DRF 1,39,33 67,37 60,26 11,70
equipments with centralised operation of points &
signals in Churchgate‐Virar section on 'C' route.
(BCT/S/08‐09)
684 Churchgate‐Virar Section:‐ Replacement of signal DRF 47,25 26,03 12,31 8,91
Foundation alongwith Signal Posts & Signal unit at
5 stations. (BCT/S/08‐09)
685 Mumbai Suburban Section:‐ Replacement of Opto DRF 94,55 51,62 29,67 13,26
Coupler Boxes with FRP boxes & Opto coupler cards,
AWS clamps, Protection pipe from Track Magnet to
Optocoupler box with wiring. (BCT/S/09‐10)
686 Mumbai Division:‐ Providing Fuse Alarm System with DF(4) 97,46 52,83 38,57 6,06
Automatic change over system in Relay Huts of
VR‐ST section and point health monitoring system
in Mumbai Division. (BCT/S/09‐10)
687 Charni Road:‐: Provision of MSDAC on flood prone DF(4) 95,30 80,12 8,86 6,32
tracks. (BCT/S/10‐11)
688 Charni Road:‐ Rewiring of Signalling Circuits at DRF 24,94 .. 24,93 1
Relay Room. (BCT/S/10‐11)
689 Borivali‐Virar Section:‐ Modification to AFTC DF(4) 95,00 72,95 5,03 17,02
layouts to overcome harmonic interference.
(BCT/U/10‐11)
690 Borivali (RRI Yard):‐ Modification to AFTC layouts DF(4) 90,00 70,56 5,03 14,41
to overcome harmonic interference. (BCT/U/10‐11)
691 Borivali‐Santacruz Section:‐ Modification to AFTC DF(4) 95,00 73,56 5,03 16,41
layouts to overcome harmonic interference.
(BCT/U/10‐11)
692 Bandra (RRI):‐ Replacement of defective/over aged DRF 1,12,95 15,04 70,00 27,91
cables at various locations. (BCT/S/10‐11)
693 Mahim (RRI):‐ Replacement of defective/over aged DRF 1,12,52 15,04 70,00 27,48
cables at various locations. (BCT/S/10‐11)
15.03.33.10.3.
52.004
15.03.33.10.3.
52.002
15.03.33.10.3.
52.011
15.03.33.09.3.
52.004
15.03.33.09.3.
52.003
15.03.33.10.3.
52.008
15.03.33.10.3.
52.006
15.03.33.10.3.
52.005
15.03.33.10.3.
52.003
S & T WORKS
15.00.33.08.2.
55.002
15.00.33.12.3.
52.001
15.03.33.08.2.
52.001
15.03.33.08.3.
52.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 53
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
694 Andheri‐Virar Section:‐ Replacement of DRF 1,48,75 1,28,75 20,00 ..
defective/over aged cables at various locations.
(BCT/U/10‐11)
695 Valsad:‐ Replacement of over aged outdoor DRF 98,12 26,36 20,00 51,76
Signalling gears. (BCT/U/10‐11)
696 Churchgate‐Virar Section:‐ Replacement of DRF 96,26 37,05 20,00 39,21
corroded, rusty and worn‐out location boxes.
(BCT/U/10‐11)
697 Churchgate‐Virar Section: Replacement of worn out DRF 96,26 47,33 25,00 23,93
and corroded AWS Track‐Device Accessories /
Equipments. (BCT/S/10‐11)
698 Virar‐Surat Section:‐ Provision of LED Signals in DF(4) 97,84 39,99 12,92 44,93
auto signalling section. (BCT/U/10‐11)
699 Virar ‐Kelve Road Section:‐ Provision of battery DF(4) 1,19,26 .. 5,00 1,14,26
back up for relays through IPS at 9 Relay
Huts.(BCT/U/11‐12)
700 Kelve Road‐Boribali Section:‐ Provision of battery DF(4) 1,01,30 86,23 7,29 7,78
back up for relays through IPS at 9 Relay
Huts.(BCT/U/11‐12)
701 Virar:‐Provision of MSDAC for valunerable track Cap. 95,00 72,59 15,10 7,31
circuits.(BCT/U/11‐12)
702 Nalasopara:‐ Provision of MSDAC for valunerable Cap. 95,00 66,43 9,80 18,77
track circuits.(BCT/U/11‐12)
703 Dahisar:‐ Provision of MSDAC for valunerable track Cap. 95,00 66,43 9,79 18,78
circuits.(BCT/U/11‐12)
704 Churchgate:‐ Provision of MSDAC for valunerable Cap. 95,00 66,08 9,79 19,13
track circuits.(BCT/U/11‐12)
705 CCG‐VR :‐ Replacement of Rusty Rail Track Circuits DRF 85,25 1 5,00 80,24
with Digital Axle Counterson CCG‐VR suburban
section
706 CCG‐VR :‐ Provision of additional locations and DF(3) 95,25 .. 30,00 65,25
laying of standby cables acrossthe bridges for
enhancing the availability of spare cables
duringemergency in CCG‐VR suburban section
707 CCG‐VR Section:‐ Casual renewal of defective and DRF 95,92 1 5,00 90,91
overaged signalling cables in MEL‐MRU & KHAR‐VLP
section of Mumbai suburban section
708 CCG‐VR Section ‐ Strengthening of Datalogger DF(4) 73,67 1 30,00 43,66
network extending connectivity to HQ& field
offices, generation of various reports, alarms,
SMS andproviding centrallised monitoring in Mumbai
Suburban Section.
15.03.33.12.3.
52.010
15.03.33.11.3.
52.005
15.03.33.11.3.
52.003
15.03.33.11.3.
52.002
15.03.33.12.3.
52.008
15.03.33.12.3.
52.009
15.03.33.12.3.
52.016
15.03.33.10.3.
52.010
15.03.33.10.3.
52.009
15.03.33.10.3.
52.018
15.03.33.11.3.
52.006
15.03.33.11.3.
52.004
15.03.33.11.3.
52.007
S & T WORKS
15.03.33.10.3.
52.001
15.03.33.10.3.
52.017
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 54
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
709 CCG‐VR :‐ Provision of fuse alarm system for DF(4) 1,10,21 81,01 18,48 10,72
balance fuses in CCG‐VR section
710 CCG‐BVI :‐ Provision of additional AWS track DF(4) 89,96 66,63 19,96 3,37
devices at stop marks ahead ofstarter signals of
vulnerable stations in Churchgate‐Borivali section
711 BVI‐VR :‐ Provision of additional AWS track DF(4) 91,89 68,03 21,89 1,97
devices at stop marks ahead ofstarter signals of
vulnerable stations in Borivali – Virar section.
712 Provision of Power Management System at DF(4) 59,16 1 30,00 29,15
signalling installations in CCG‐VR suburban
section
713 Provision of UPS at 10 stations in CCG‐VR section DF(4) 85,11 65,53 9,90 9,68
714 Palghar : Provision of High reliability digital DRF 1,09,76 1 5,00 1,04,75
axle counters (HRDAC ) for frequently failing
track circuits in flood prone area along with
replacement of associated signalling equipment.
715 Dhanu Road : Provision of High reliability digital DRF 1,04,28 .. 5,00 99,28
axle counters (HRDAC ) for frequently failing
track circuits in flood prone area along with
replacement of associated signalling equipment
716 Replacement of track circuits by DAC in rusty rail DRF 1,07,12 1 5,00 1,02,11
sections in VR ‐ DRD section
717 Strengthening of Datalogger network extending DF(4) 93,92 .. 5,00 88,92
connectivity to HQ & field offices, generation of
various reports, alarms, SMS and providing
centrallised monitoring in non suburban section of
Mumbai Div
718 Replacement of automatic change over panel at DRF 88,84 .. 20,00 68,84
stations between VR‐ST section
Vadodara
719 Vasad ‐ Kathana Section ‐ Providing composite DF(3) 2,32,00 2,28,06 .. 3,94
cable (43 Kms)
720 Replacement of Auto Telephone Exchange and DRF 30,00 26,76 3,20 4
defective U/G cable at BRCP. (BRC/S/08‐09)
721 Replacement of Auto Telephone Exchange and DRF 30,00 2,05 19,00 8,95
defective U/G cable at GDA (BRC/S/08‐09)
722 Vadodara Division:‐ Replacement of over aged DRF 49,40 2,98 20,00 26,42
battery at 32 stations. (BRC/U/09‐10)
723 Vadodara and Anand (RRIs):‐ Provision in battery DF(4) 83,96 .. 15,00 68,96
backup. (BRC/S/10‐11)
15.06.33.08.2.
55.001
15.06.33.08.3.
55.004
15.06.33.08.3.
55.005
15.06.33.09.3.
55.003
15.06.33.10.3.
55.006
15.03.33.12.3.
52.003
15.03.33.12.3.
52.004
15.03.33.12.3.
52.001
15.03.33.12.3.
52.005
15.03.33.12.3.
52.002
15.03.33.13.3.
52.001
S & T WORKS
15.03.33.12.3.
52.011
15.03.33.12.3.
52.012
15.03.33.12.3.
52.013
15.03.33.12.3.
52.014
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 55
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
724 Surat‐Vadodara Section:‐ Provision of LED Signals DF(4) 99,81 39,40 55,27 5,14
in auto signalling. (BRC/S/10‐11)
725 Vadodara‐Anand‐Vatva Section:‐ Provision of DF(4) 97,98 74,48 10,00 13,50
Integrated power supply at relay huts for auto
signalling in Auto Section. (BRC/S/10‐11)
726 Vadodara Division:‐ Replacement of Overaged DRF 29,16 7,98 12,00 9,18
Universal Emergency Communication eqpts by VHF
Sets for communication of Guard and Driver with
Station Masters(BRC/U/11‐12)
727 Vadodara Division:‐ Replacement of defective DRF 99,89 58,83 20,00 21,06
Signaling cable.(BRC/U/11‐12)
728 Surat‐Vadodara‐Godhra Section:‐ Provision of DF(3) 94,03 .. 35,00 59,03
Automatic fuse alarm system with automatic change
over at stations & Auto Huts.(BRC/U/11‐12)
729 Vadodara Division:‐ Replacement of overaged DRF 59,20 .. 25,00 34,20
Section Control, Emergency Control and Traction
Power Control HQ Control equipments & Control
Telephone system in ST ‐ BRC ‐ GER, BRC ‐ GDA ‐
ANND sections.(BRC/U/11‐12)
730 Casual renewal of defective signalling cables & DRF 95,47 .. 10,00 85,47
signalling gears over Vadodara division
731 Vadodara Division: Provision of duplicate fuse DF(4) 86,29 69,84 10,00 6,45
panel in Auto Sections, stations
732 Vadodara Division:Replacement of CLS Shunt Signal DRF 98,70 .. 40,00 58,70
lamp and 'A'/'AG', SPI lamp by LED type
733 Vadodara Division ‐ Shifting of Starter Signal to DF(4) 61,65 .. 20,00 41,65
the boundary of Track circuit ahead in Itola
‐Ranoli & Vadodara ‐ Godhra Section
734 Vadodara Division ‐ Shifting of Starter Signal to DF(4) 61,40 5,29 25,00 31,11
the boundary of Track circuit ahead in Vasad ‐
Geratpur & Anand ‐ Godhra Section
735 Vadodara Division: Shifting of Starter Signal to DF(4) 71,82 78 10,00 61,04
the boundary of Track circuit ahead in Surat ‐
Kashipura & Pratapnagar ‐ Chhota Udepur Section
Ratlam
736 Nagda‐Ujjain‐Bhopal Section ‐Provision of High DRF 93,29 .. 45,00 48,29
reliability digital axle counters (HRDAC ) for
frequently failing track circuits in flood prone
area along with replacement of associated
signalling equipment at stations
737 Godhra‐Dahod Section and IBH:‐ Replacement of age DRF 94,89 5,46 45,00 44,43
old Data logger (9 Nos) for improving efficiency &
usefulness of Signaling System on RTM Division
15.05.33.12.3.
54.015
15.05.33.12.3.
54.013
15.06.33.12.3.
55.002
15.06.33.12.3.
55.003
15.06.33.12.3.
55.004
15.06.33.13.3.
55.001
15.06.33.13.3.
55.002
15.06.33.13.3.
55.003
15.06.33.10.3.
55.004
15.06.33.10.3.
55.008
15.06.33.11.3.
55.004
15.06.33.11.3.
55.002
15.06.33.11.3.
55.001
15.06.33.11.3.
55.003
S & T WORKS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 56
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
738 Ujjain‐Bhopal Section:‐ Replacement of Analog Axle DRF 95,73 79,45 5,60 10,68
Counters by conventional DC Track Circuits.
(RTM/U/09‐10)
739 Indore‐Dewas‐Ujjain Section:‐ Expansion of DF(4) 1,09,09 1,03,09 6,00 ..
Existing Dataloggers to suit expanded yards.
(RTM/U/10‐11)
740 Ratlam‐Nagda Section:‐ Replacement of age old DRF 1,03,92 68,75 27,31 7,86
Analog Axle counters and MUX of BPAC by DAC &
UFSBI in 2 block sections i.e
RNH‐KUH‐BRNA.(RTM/U/111‐12)
741 Ratlam‐Chitorgarh Section‐ Provision of Fuse DF(3) 73,13 71,95 1,18 ..
monitoring cum Automatic Change over system at all
stations in RTM‐COR section in RTM
division.(RTM/U/11‐12)
742 Neemuch‐Chanderia Section:‐ Provision of Solar Cap. 98,54 90,45 5,87 2,22
Panel for reliable power supply for signalin
installation at 4 stations i.e. NMH, BIWK, JWO &
NBH.(RTM/U/11‐12)
743 Jekot‐Usra, Rentiya‐Jekot and DRF 88,26 1,06 61,44 25,76
Bajranggarh‐Panchpipliya sections: Replacement of
analog axle counters for BPAC/IBS by High
reliability digital axle counters (HRDAC )
744 Nagda‐Berwaniya, Asloada‐ Pulsoramakrawan and DRF 88,27 .. 45,00 43,27
Ujjain C‐Pingleshwar sections: Replacement of
analog axle counters for BPAC by HRDAC.
745 Ratlam‐Runkheda section: Replacement of analog DRF 90,72 3,66 45,00 42,06
axle counters for BPAC by High Reliability Digital
Axle cCounters (HRDAC) of Ratlam division.
746 Nagda‐Piploda Bagla and Nishadpura‐ Bairaghar: DF(4) 62,35 .. 46,91 15,44
Provision of High reliability digital axle
counters (HRDAC ) for BPAC of Ratlam Division
747 Ratlam Division: Strengthening of Datalogger DF(4) 91,66 27,89 46,49 17,28
Network extending connectivity to HQ & Field
offices, generation of various reports, alarms,
sms and providing centrallised monitoring
748 Indore, Ujjain and Ratlam stations: Provision of DRF 79,95 45,12 20,00 14,83
High reliability digital axle counters (HRDAC )
for frequently failing track circuits in flood
prone area along withreplacement of associated
signalling equipment.
749 Chitoor‐Chanderia Section: Replacement of DC LED DRF 1,01,77 12,14 5,00 84,63
Signals & Nagda‐Ujjain old version LED Signals on
with revised RDSO Spec LED Signals on RATLAM
Division.
15.05.33.12.3.
54.005
15.05.33.12.3.
54.006
15.05.33.12.3.
54.001
15.05.33.11.3.
54.004
15.05.33.11.3.
54.003
15.05.33.12.3.
54.007
15.05.33.12.3.
54.008
15.05.33.12.3.
54.009
15.05.33.12.3.
54.010
S & T WORKS
15.05.33.09.3.
54.003
15.05.33.10.3.
54.003
15.05.33.11.3.
54.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 57
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
750 Godhra‐Nagda section: Replacement of Power Plant DRF 1,02,47 54,14 10,00 38,33
with 200 AH VRLA Battery of OFC locations &
different Exchanges (NAD,COR,&UJN) of RTM
Division.
751 Ratlam Division: Provision of Maintanance free DF(3) 82,53 75,69 6,82 2
Earth and Lightning Surge Protection cum safety
Device for different Signal & Telecom locations.
752 Ratlam Division: Provision of Parallel VDU with DF(3) 42,71 22,34 12,66 7,71
version 3 at four electronic interlocking
installation.
753 Godhra‐Nagda Section: Casual renewal of signaling DRF 1,12,50 83,57 2,38 26,55
gears & improving reliability on RATLAM Division.
754 Nagda‐ Bhopal, Indore ‐Dewas Ujjain & Chanderia DRF 1,30,17 19,23 50,00 60,94
‐Chittaur: Casual renewal of signaling gears &
improving reliability on RATLAM Division.
755 Godhra‐Nagda section ‐Provision of High DRF 88,29 .. 50,00 38,29
reliability digital axle counters (HRDAC) for
frequently failing track circuits in flood prone
area along with replacement of associated
signaling equipment at stations
Ahmedabad
756 Khodiyar‐Dangarva Section:‐ Replacement of Low DRF 98,64 86,15 5,00 7,49
insulation / defective cables. (ADI/S/10‐11)
757 Ahmedabad Division:‐ Replacement of worn out DRF 89,23 55,89 20,00 13,34
location boxes of Vatva‐Geratpur automatic
section.(ADI/U/11‐12)
758 Ahmedabad Yard:‐ Replacement of shelf type relay DRF 92,24 46,07 25,00 21,17
Track Circuit by MSDAC.(ADI/U/11‐12)
759 i)Supply and installation of HRDAC in MSH‐PNU and Cap. 1,35,51 74,53 19,55 41,43
shifting of SSDAC from MSH‐PNU to ADI‐MSH section
for dual detection. & ii)Supply and installation
of HRDAC in CLDY‐ABD and shifting of SSDAC from
CLDY‐ABD to SBI‐CLDY section for dual detection.
760 Ahmedabad‐ Viramgam section‐ Provision of high DRF 98,63 22,63 40,00 36,00
reliability digital axle counter(HRDAC) for
frequently failing track circuit in flood prone
area along with replacement of associated
signalling equipment.
761 Ahmedabad yard‐ Provision of high reliability DRF 88,97 4,50 35,00 49,47
digital axle counter (HRDAC) for frequently
failing track circuit in flood prone area along
with replacement of associated signalling
equipment.
15.01.33.11.3.
50.003
15.01.33.12.3.
50.002
15.01.33.12.3.
50.003
15.01.33.12.3.
50.004
15.05.33.12.3.
54.004
15.05.33.12.3.
54.011
15.05.33.12.3.
54.012
15.05.33.12.3.
54.014
15.01.33.10.3.
50.003
15.01.33.11.3.
50.002
S & T WORKS
15.05.33.12.3.
54.002
15.05.33.12.3.
54.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 58
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
762 Ahmedabad division‐Casual renewal of defective DRF 95,00 19,64 15,00 60,36
signalling cable .
763 Viramgam‐Mahesana‐Patan, Gandhinagar ‐ Kalol DRF 42,00 .. 10,00 32,00
section. ‐Replacement of old current regulators of
LED signals.
764 Ahmedabad division Strengthning of datalogger DF(4) 85,94 48,89 25,94 11,11
network extending connectivity to HQ & field
official, generation of various report, alarm, SMS
and providing centralised monitoring..
765 Ahmedabad division‐Casual renewal of signalling DRF 72,34 22,14 5,00 45,20
gears at 25 station
766 Ahmedabad division‐ Replacement of defective DRF 63,25 14,77 35,00 13,48
telecom cables and Remote Location Unit (RLU).
767 To provide Electronic Interlocking System at S&T DF(4) 97,24 .. 5,00 92,24
Traning centre Sabarmat for setting up a training
facility on EI.
768 Ahmedabad Division‐ Shifting of Starter Signal to DF(4) 35,28 .. 5,00 30,28
the boundary of the Track Circuit ahead to
mitigate the risk in GER(Ex) –CLDY section.
769 Ahmedabad Division‐ Shifting of Starter Signal to DF(4) 36,80 .. 5,00 31,80
the boundary of the Track Circuit ahead to
mitigate the risk in SBI‐KLL‐GNC section.
770 Replacement of over aged Ahmedabad exchange of DRF 64,48 .. 60,00 4,48
Ahmedabad Division
Rajkot
771 Rajkot Division:‐Provision of D Type Surge DF(4) 64,14 46,87 7,70 9,57
Protection Device and Maintainance free earthing
at 34 stations and ring earth for relay rooms at
29 stations.(RJT/U/11‐12)
772 Wankaner(Ex) ‐Navalakhi, Dahisara‐ Vavaniya DF(4) 59,92 9,00 50,92 ..
section Provision of IPS in Rajkot Division .
773 Rajkot Div.: Replacement of defective signaling DRF 71,72 11,61 20,00 40,11
cables, provision of cable at various locations.
774 Rajkot Division : Provision of High reliability Cap. 62,70 27,20 15,05 20,45
digital axle counters ( HRDAC) for BPAC in VG‐VNRD
(2), SR‐BMM,BMM‐LPR ie 4 Block Section .
775 Surendranagar , Rajkot,Bhaktinagar and Modpur DRF 29,43 1 10,00 19,42
stations :Replacement of old current regulatorof
LED Signals.
776 Rajkot Division : Provision of High reliability Cap. 62,70 27,20 15,05 20,45
digital axle counters (HRDAC) for BPAC in Lilapur
Rd.‐Kessariya Rd., Kesariya Rd.‐Lakhtar,
Lakhtar‐Bajrangpura & Bajrangpura‐Bala Road ie 4
Block Sections.
15.04.33.12.3.
53.006
15.04.33.12.3.
53.007
15.01.33.13.3.
50.001
15.01.33.13.3.
50.003
15.04.33.11.3.
53.001
15.04.33.12.3.
53.003
15.04.33.12.3.
53.004
15.04.33.12.3.
53.005
15.01.33.12.3.
50.006
15.01.33.12.3.
50.007
15.01.33.12.3.
50.008
15.01.33.12.3.
50.001
15.01.33.12.6.
50.001
15.01.33.13.3.
50.002
S & T WORKS
15.01.33.12.3.
50.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 59
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
777 Rajkot Division : Replacement of CLS lamps with DRF 73,95 1 40,00 33,94
LED signal aspects in Wankaner –Navlakhi,
Dahisara‐ Maliya section.
778 Rajkot Division : Strengthening of Datalogger DF(4) 62,12 42,19 6,02 13,91
network extending connectivity to HQ & field
offices,generation of various reports, alarms,
SMS and providing centrallised monitoring.
779 Rajkot Division : Shifting of Starter Signal to DF(4) 53,81 .. 10,00 43,81
the boundary of the Track Circuit ahead to
mitigate the risk in WKR‐WWA sec,SUNR, RJT BKNG &
MDPR .
Bhavnagar
780 Bhavnagar Division:‐ Upgradation of data logger DF(3) 43,45 14,88 19,54 9,03
and its connectivity at Signal Fault Control and
at SSE/Signal ‐ Dhola, Botad and Junagadh.
(BVP/S/09‐10)
781 Surendranagar‐Pipavav, Rajkot‐Somnath & DF(4) 98,59 .. 5,00 93,59
Jetalsar‐Wansjaliya sections:‐ Provision of fuse
indication and monitoring system at 35 Panel
interlocked stations .
782 Bhavnagar Division:‐Strengthening of Data Logger DF(4) 48,96 8,00 20,00 20,96
Network extending connectivity to HQ and field
offices,generation of various reports,alarms,SMS
and providing centralised monitoring.
783 Dhasa‐Pipavav and Rajula‐Mahuva section ‐Provision DF(3) 98,51 4,50 20,00 74,01
of short haul OFC equipments.
784 Porbandar‐Kanalus section:‐Casual renewal of DRF 94,10 2,30 1,00 90,80
signalling gears at Porbandar and Ranavav
stations.
Mumbai
785 Works costing below DRM's Power DRF 33,46 .. 33,46 ..
DF(4) 10,85 .. 10,85 ..
Vadodara
786 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 16,00 .. 16,00 ..
DF(4) 12,00 .. 12,00 ..
Ratlam
787 Works costing below DRM's Power DRF 1,45 .. 1,45 ..
DF(3) 40,39 .. 40,39 ..
DF(4) 25,40 .. 25,40 ..
Ahmedabad
788 Works costing below DRM's Power DRF 13,09 .. 13,09 ..
DF(4) 41,15 .. 41,15 ..
Rajkot
789 Works costing below DRM's Power DRF 33,76 .. 33,76 ..
DF(4) 22,29 .. 22,29 ..
Bhavnagar
790 Works costing below DRM's Power DRF 70,71 .. 70,71 ..
DF(3) 14,92 .. 14,92 ..
DF(4) 8,59 .. 8,59 ..
15.06.33.14.3.
00.999
15.05.33.14.3.
00.999
15.01.33.14.3.
00.999
15.04.33.14.3.
00.999
15.02.33.14.3.
00.999
15.02.33.09.3.
51.001
15.02.33.12.3.
51.005
15.02.33.12.3.
51.003
15.02.33.12.3.
51.004
15.02.33.12.3.
51.002
15.03.33.14.3.
00.999
S & T WORKS
15.04.33.12.3.
53.001
15.04.33.12.3.
53.002
15.04.33.13.3.
53.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 60
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
TOTAL‐WORKS IN PROGRESS Cap. .. .. 1,00,00 ..
DRF .. .. 14,36,57 ..
DF(3) .. .. 2,04,40 ..
DF(4) .. .. 7,28,49 ..
B ‐ New Works
Vadodara
791 Kosamba: Provision of Multisection Digital Axle DF(4) 94,63 .. 33,00 61,63
Counters on vulnerable track circuits for
improving reliability of signalling systems at
792 Provision of Multisection Digital Axle Counters DF(4) 92,31 .. 33,00 59,31
for improving reliability of signaling system at
Ankleshwar‐Bharuch section in ST‐BRC section.
(Phase I)
793 Provision of Multisection Digital Axle Counters DF(4) 99,61 .. 34,00 65,61
for improving reliability of signaling system at
Nabipur‐ Varediya section in ST‐BRC section (Phase
I)
Ratlam
794 Ratlam Division.‐‐Shifting of S&T equipments from DRF 86,14 .. 5,00 81,14
existing dilapidated S&T Rooms to new location
with PI System 1.Shifting of S&T equipments new
S&T rooms:‐Provision of new PI System for thr
entire Indoor replacement work Shifting of
795 Godhra‐Kansudhi, Kansudhi‐Chanchelav and DRF 95,00 .. 19,00 76,00
Chanchelav‐Sant Road. Section‐Replacement of
analog axle counters for BPAC/IBS by High
reliability digital axle counters (HRDAC ) of
Ratlam division.
796 Piplod‐Limkheda, Limkheda‐ Mangal Mahudhi, Mangal DRF 95,00 .. 19,00 76,00
Mahudhi‐USRA, Section‐Replacement of analog axle
counters for BPAC/IBS by High reliability digital
axle counters (HRDAC ) of Ratlam division.
797 Punchpiplia‐Amargarh, Bhairongarh‐Raoti, DRF 96,27 .. 28,00 68,27
Bildi‐Morwani IBS, Replacement of analog axle
counters for BPAC by High reliability digital axle
counters (HRDAC) of Ratlam division.
798 Dhameda‐Bordi, Bordi‐Anas, Anas‐Megnagar DRF 95,00 .. 28,00 67,00
Section‐Replacement of analog axle counters for
BPAC/IBS by High reliability digital axle counters
(HRDAC ) of Ratlam division.
15.05.33.14.3.
54.003
15.06.33.14.3.
55.003
15.06.33.14.3.
55.001
15.05.33.14.3.
54.002
15.05.33.14.3.
54.005
15.05.33.14.3.
54.004
15.05.33.14.3.
54.001
15.06.33.14.3.
55.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 61
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
TOTAL‐NEW WORKS DRF .. .. 99,00 ..
DF(4) .. .. 1,00,00 ..
TOTAL‐S & T Works Cap. .. .. 1,00,00 ..
DRF .. .. 15,35,57 ..
DF(3) .. .. 2,04,40 ..
DF(4) .. .. 8,28,49 ..
A ‐ Works in Progress
Ratlam
799 Western Railway:‐ Use of renewable energy sources DF(3) 2,26,09 20,99 32,00 1,73,10
for inproving energy efficiency and energy
conservation (Part of PB 2010‐11 item No.264 of
CR). (WRLY/U/10‐11)
800 RTM (P) Division:‐ Replacement of over aged LT DRF 55,13 32,28 22,85 ..
distribution panels & Replacement of existing
worn out earthing at Rly. Power house, PRS &
Electrical sub station & replacement of worn out
earths in staff quarters. (RTM/U/11‐12)
801 Works costing below DRM's Power DF(3) 1,00 .. 1,00 ..
Bhavnagar
802 Works costing below DRM's Power DRF 1,00 .. 1,00 ..
DF(3) 2,00 .. 2,00 ..
TOTAL‐WORKS IN PROGRESS DRF .. .. 23,85 ..
DF(3) .. .. 35,00 ..
B ‐ New Works
Vadodara
803 Vadodara Division ‐ Replacement of averaged, DRF 1,10,64 .. 1,00 1,09,64
undersized AT cables at various places.
Mumbai
804 Works costing below DRM's Power DRF 16,00 .. 16,00 ..
DF(3) 6,00 .. 6,00 ..
Vadodara
805 Works costing below DRM's Power DRF 10,00 .. 10,00 ..
DF(3) 3,00 .. 3,00 ..
Ratlam
806 Works costing below DRM's Power DRF 7,00 .. 7,00 ..
DF(3) 3,00 .. 3,00 ..
Ahmedabad
807 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 4,00 .. 4,00 ..
Rajkot
808 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 2,00 .. 2,00 ..
Bhavnagar
809 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 2,00 .. 2,00 ..
TOTAL‐NEW WORKS DRF .. .. 49,00 ..
DF(3) .. .. 20,00 ..
TOTAL‐Other Electrical Works DRF .. .. 72,85 ..
DF(3) .. .. 55,00 ..
15.02.36.14.3.
00.999
15.06.36.14.2.
55.001
15.03.36.14.3.
00.999
15.06.36.14.3.
00.999
15.05.36.14.3.
00.999
15.01.36.14.3.
00.999
15.04.36.14.3.
00.999
OTHER ELECTRICAL WORKS
15.05.36.10.2.
54.001
15.05.36.11.3.
54.001
15.05.36.14.3.
00.999
15.02.36.14.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 62
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
A ‐ Works in Progress
Mumbai
810 Mumbai Suburban Section ‐ Modification of OHE at DRF 1,71,53 1,22,18 28,00 21,35
vulnerable locations viz. points, crossing and
overlaps between Bandra ‐ Borivali.
811 Mumbai Local Section:‐ Replacement of 44 Nos. DRF 1,75,92 1,40,28 1 35,63
corroded OHE structure by GI Structures (78.2 MT).
(BCT/S/03‐04).
812 Churchgate ‐ Virar Section ‐ Replacement of 10 Km. DRF 1,33,79 1,21,57 10,00 2,22
242 Sq. mm. catenary wire
813 Mahalaxi and Elphinstone Road:‐ Replacement of DRF 84,86 49,76 35,10 ..
anchoring arrangement on two bridges by
independent structures. (BCT/U/11‐12)
Vadodara
814 BRC Division‐Replacement of overaged 25 kV SP DRF 50,02 1 30,00 20,01
Isolator
815 BRC Division ‐ Re‐location of critical DRF 97,59 .. 40,00 57,59
implantation locations‐
816 BRC Division‐ Augmentation of capacitor bank at DF(3) 35,97 .. 35,97 ..
Godhra TSS.
Ratlam
817 Godhra‐Nadga Section ‐ Replacement of Oil type DRF 1,82,73 1 1,00,00 82,72
interrupter by Vacuum type Interrupter.
818 Replacement of Lightening Arrestor between GDA‐BPL DRF 44,58 28,00 8,69 7,89
section
819 Replacement of existing isolator of OHE with DRF 50,01 32,00 12,00 6,01
higher rating isolator and replacement of cross
feeder at FP/SP/SSP of RTM division
Mumbai
820 Works costing below DRM's Power DRF 10,00 .. 10,00 ..
DF(3) 5,00 .. 5,00 ..
Vadodara
821 Works costing below DRM's Power DRF 2,30 .. 2,30 ..
TOTAL‐WORKS IN PROGRESS DRF .. .. 2,76,10 ..
DF(3) .. .. 40,97 ..
15.03.37.14.3.
00.999
15.06.37.14.3.
00.999
15.06.36.12.3.
55.002
15.06.36.12.3.
55.003
15.06.36.12.3.
55.001
15.05.36.12.2.
54.001
15.05.36.12.3.
54.001
15.05.36.12.3.
54.002
TRACTION DISTRIBUTION WORKS
15.03.36.08.2.
52.001
15.03.36.03.2.
52.002
15.03.36.09.2.
52.001
15.03.36.11.3.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 63
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
B ‐ New Works
Mumbai
822 Churchgate‐Marine Lines Seciton ‐ Replacement of DRF 1,99,60 .. 1,00 1,98,60
non standard OHE structures.
823 Churchgate‐Virar Section ‐ Provision of insulation DRF 69,82 .. 7,00 62,82
scheme for catenary wire under FOB/ROB.
824 Providing DC voltage (Battery) monitoring relay at DF(3) 66,52 .. 8,00 58,52
traction sub stations in VR‐JL section of Mumbai
division
825 Churchgate‐ Virar section ‐ Replacement of non DRF 91,51 .. 9,00 82,51
standard suspension adaptor fittings of OHE.
Vadodara
826 Vadodara Division :‐ Strenghtening of OHE by DRF 49,79 .. 8,00 41,79
providing proper cross feeder, G jumper, C jumper
etc.
Ratlam
827 RTM Division:Replacement of relay and control DRF 60,00 .. 14,00 46,00
panel at DHD, BMI & NAD traction substation of RTM
division.
828 RTM Division:Augmentation of capacitor bank at RTM DF(3) 40,64 .. 8,00 32,64
& NAD/TSS of Ratlam division, Western Railway.
Mumbai
829 Works costing below DRM's Power DRF 60,00 .. 60,00 ..
DF(3) 19,00 .. 19,00 ..
Vadodara
830 Works costing below DRM's Power DRF 24,00 .. 24,00 ..
Ratlam
831 Works costing below DRM's Power DRF 18,00 .. 18,00 ..
Ahmedabad
832 Works costing below DRM's Power DRF 18,00 .. 18,00 ..
TOTAL‐NEW WORKS DRF .. .. 1,59,00 ..
DF(3) .. .. 35,00 ..
TOTAL‐Traction Distribution DRF .. .. 4,35,10 ..
Works DF(3) .. .. 75,97 ..
A ‐ Works in Progress
Headquarter
833 PBR ‐ Replacing 4 main water pipe line for washing DRF 16,58 11,76 3,70 1,12
pit line total 540Mtrs. and providing path way on
both side of extended portion of pit line.
Mumbai
834 PAREL WORKSHOP Improvement to storm water drainag DF(3) 2,42,41 .. 1 2,42,40
system and water pipe line to prevent water
logging and contamination of drinking water.
15.01.37.14.3.
00.999
WORKSHOPS INCLUDING PUS
15.00.42.12.3.
51.001
15.03.42.11.1.
52.001
15.06.37.14.3.
55.001
15.05.37.14.3.
54.001
15.05.37.14.3.
54.002
15.03.37.14.3.
00.999
15.06.37.14.3.
00.999
15.05.37.14.3.
00.999
15.03.37.14.2.
52.001
15.03.37.14.3.
52.001
15.03.37.14.3.
52.003
15.03.37.14.3.
52.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 64
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
835 Valsad:‐ Providing one pit line & associated sick DF(3) 1,29,06 40,08 1 88,97
line facilities. (BCT/S/06‐07)
836 Mumbai Central (CFO Yard):‐ Extension of covered DF(3) 92,99 52,68 25,71 14,60
shed on extended pit lines. (BCT/U/10‐11)
837 Parel (CR Shop):‐ Structural rehabilitation of DRF 75,83 43,66 3,16 29,01
Component Testing and Repair (CTR) shop (Smith
shop). (BCT/S/10‐11)
838 Parel (CR Shop):‐ Improvement to flooring by DF(3) 43,20 .. 1 43,19
hardonite of Wheel shop , North side of ACC shop.
(BCT/U/10‐11)
839 Parel (CR Shop):‐ Paver block in Jumbo yard , BUF, DF(3) 39,92 31,94 3,42 4,56
Roller bearing, Wheel shop from Corrosion shop
entrance. (BCT/S/10‐11)
840 Parel (CR Shop):‐ Providing CC apron at New Trail Cap. 84,15 45,29 38,86 ..
Line (NTL) and Old Trial Line (OTL). (BCT/U/10‐11)
841 Surat Area:‐ Design, Development, Supply, DF(3) 89,85 59,62 6,62 23,61
Intallation, Testing & Commissioning of Machines/
Equipments for setting up a Mechanized Laundry on
Turn Key Basis. (BCT/U/11‐12)
842 Surat:‐ Provision of essential maintenance DF(3) 83,81 52,37 11,45 19,99
facilities at coaching Depot. (BCT/U/11‐12)
843 Bandra Terminus:‐ Provision of heavy duty DF(3) 98,92 25,73 9,50 63,69
industrial paver block pathway at STR Miatenance
Lines. (BCT/U/11‐12)
844 Lower Parel:‐ Replacement and laying of LT cables DRF 47,90 .. 1 47,89
of different sizes as per schedule of rate and
scope of work. (BCT/U/11‐12)
845 BCT (CFO Yard)‐Provision of CC Apron on washing DF(3) 80,15 .. 1 80,14
lines
Vadodara
846 Pratapnagar (Workshop):‐ Providing Hardonite DF(3) 83,11 41,11 1 41,99
Flooring in various shops & IOH facilities for ICF
Bogies. (BRC/S/10‐11)
847 BRCY ‐ Improvement to storm water drainage system DF(3) 87,95 33,57 1 54,37
and roof of electric loco shed.
Ratlam
848 Ratlam (D/Shed):‐ Rebuilding of heavily cracked DRF 99,40 47,50 5,65 46,25
and leaky administrative building. (RTM/S/09‐10)
849 Dahod (workshop):‐ Replacement of Old corroded DRF 98,51 37,83 1 60,67
steel member of structure and painting of all
steel structure to prevent rusting. (RTM/U/10‐11)
15.05.42.09.3.
54.003
15.05.42.10.3.
54.004
15.03.42.11.3.
52.004
15.03.42.11.3.
52.001
15.03.42.11.3.
52.002
15.03.42.12.3.
52.003
15.06.42.10.3.
55.001
15.06.42.12.3.
55.001
15.03.42.10.3.
52.002
15.03.42.10.3.
52.008
15.03.42.10.3.
52.003
15.03.42.10.3.
52.004
15.03.42.10.3.
52.005
15.03.42.11.3.
52.003
WORKSHOPS INCLUDING PUS
15.03.42.06.2.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 65
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
850 Dahod (workshop):‐ Renovation work of Battery DF(3) 34,66 25,69 5,00 3,97
Section. (RTM/U/10‐11)
851 Dahod (workshop):‐ Improvement to lighting in DF(3) 94,74 78,74 16,00 ..
wheel shop by replacing AC Sheet. (RTM/U/10‐11)
Ahmedabad
852 Sabarmati (BG):‐ Extension of new shed by 35 mtrs. DF(3) 99,45 94,45 4,03 97
along with flooring and electrical and mechanical
work for carrying out ROH of BLC rakes.
(ADI/U/11‐12)
853 ADI (BG):‐ Repair to cat walks of washing cum DRF 97,36 .. 1 97,35
inspection pit lines with portal lightings.
854 Ahmedabad ‐ Augmentation to BG pit line at ADI DF(3) 96,76 1 1 96,74
area
Rajkot
855 Okha:‐ Increasing width of cat walk of existing DF(3) 54,07 30,65 14,50 8,92
pit line. (RJT/S/09‐10)
856 Hapa:‐ ‐ Rehabilitation of catwalk of existing DRF 98,97 23,23 12,23 63,51
pit line. (RJT/U/11‐12)
Bhavnagar
857 JUNAGARH ‐ Setting up of Mechanized Laundry with a DF(3) 96,38 50,52 12,94 32,92
capacity of 01 ton per shift (Phase II) at JND
Mumbai
858 Works costing below DRM's Power DRF 1,26 .. 1,26 ..
DF(3) 24,40 .. 24,40 ..
Ratlam
859 Works costing below DRM's Power DRF 4,94 .. 4,94 ..
DF(3) 6,78 .. 6,78 ..
Rajkot
860 Works costing below DRM's Power Cap. 67 .. 67 ..
DRF 4,03 .. 4,03 ..
TOTAL‐WORKS IN PROGRESS Cap. .. .. 39,53 ..
DRF .. .. 35,00 ..
DF(3) .. .. 1,40,42 ..
B ‐ New Works
Lower Parel Workshop
861 Lower Parel Workshop ‐ MPCB compliance : Provision DF(3) 16,32 .. 5,00 11,32
of ETP
Ratlam
862 Works costing below DRM's Power Cap. 25 .. 25 ..
DRF 25 .. 25 ..
Lower Parel Workshop
863 Works costing below DRM's Power Cap. 2,75 .. 2,75 ..
DRF 4,75 .. 4,75 ..
15.05.42.14.3.
00.999
15.04.42.14.3.
00.999
15.10.42.14.3.
74.001
15.05.42.14.3.
00.999
15.10.42.14.3.
00.999
15.01.42.12.3.
50.002
15.01.42.12.3.
50.001
15.04.42.09.3.
53.001
15.04.42.11.3.
53.001
15.02.42.12.3.
51.001
15.03.42.14.3.
00.999
WORKSHOPS INCLUDING PUS
15.05.42.10.3.
54.003
15.05.42.10.3.
54.001
15.01.42.11.3.
50.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 66
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
TOTAL‐NEW WORKS Cap. .. .. 3,00 ..
DRF .. .. 5,00 ..
DF(3) .. .. 5,00 ..
TOTAL‐Workshops including PUs Cap. .. .. 42,53 ..
DRF .. .. 40,00 ..
DF(3) .. .. 1,45,42 ..
A ‐ Works in Progress
Mumbai
864 Udhna ‐ Jalgaon Section (Corporate Welfare Plan) ‐ DRF 1,26,49 27,15 40,00 59,34
Rebuilding of 17 units type‐II quarters.
865 Virar‐Surat section:‐ Providing 12 units type II DRF 95,86 .. 20,00 75,86
quarters in lieu of earlier demolished unsafe
quarter No 25/L at Udhna.
Vadodara
866 Ankleshwar :‐ Providing 15 units type‐II for DRF 84,85 10 30,00 54,75
gangmen in lieu of Gang chawl No. E/34.
(BRC/U/09‐10)
867 Vadodara Division:‐ Providing 7 units type‐III and Cap. 83,87 16,08 67,79 ..
3 units type‐IV quarters for supervisors.
(BRC/U/09‐10)
868 Vadodara Division : Providing Type‐V bungalows for DRF 2,34,66 1,13,35 80,37 40,94
officers (Total 10 units) on replacement account.
869 Vadodara Division: Providing 12 Units Type ‐ II DRF 1,13,76 92,10 1,00 20,66
quarters for gangman at Gothaj in lieu of
Gangchwal under the SSE (P.Way) MHD Jurisdiction.
(BRC/U/11‐12)
870 Vadodara Division:‐Providing 9 units Type II DRF 1,21,03 75,99 10,00 35,04
quarters for gang in lieu of abandoned staff
quarter & 1 No. new Type III quarter for PWS at
Makarpura
871 Vadodara Division ‐ Providing 7 units type II Cap. 95,50 75,75 19,75 ..
quarters and 2 units type III quarters for
Operating staff at Bodeli.
Ratlam
872 Nagda‐Bhopal Section:‐ Providing 5 units type II Cap. 35,34 22,93 4,00 8,41
quarters at LC No.44(2),LC No.30(1),LC
No.32(1)&LC35(1). (RTM/S/08‐09)
873 Mhow and Jaora:‐ Providing 5 units type‐IV Cap. 70,84 19,76 20,00 31,08
quarters for station superitendent & SE(P.Way) at
Mhow & JAO and Providing 2 units type‐III quarters
for Dy.SS & JE(P.Way) at Jaora. (RTM/U/09‐10)
874 CNA‐NMH Section:‐ Shifting of abandoned mid Cap. 94,00 45,32 40,00 8,68
section gang chawl No. 28 at Chanderia Station.
(RTM/U/11‐12)
15.06.51.12.3.
55.001
15.06.51.12.3.
55.002
15.05.51.08.3.
54.001
15.05.51.09.3.
54.001
15.05.51.11.3.
54.001
15.03.51.10.2.
52.001
15.03.51.12.3.
52.001
15.06.51.09.3.
55.001
15.06.51.09.3.
55.002
15.06.51.09.2.
55.001
15.06.51.11.3.
55.001
STAFF QUARTERS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 67
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
875 GDA‐NAD Sec:‐ Providing 8 unit type III quarters Cap. 72,75 .. 50,00 22,75
for PWS at THDR, BJG, CCL, SAT, LMK, MAM, JKT &
KUH stations.
Ahmedabad
876 Ahmedabad ‐ Construction of 4 type V and 4 type IV Cap. 2,00,62 1,43,47 4,90 52,25
quarters for officers.
877 GIM‐Providing 10 units type II Qrts on replacement DRF 74,23 10,00 10,00 54,23
account in lieu of SARVA colony.
Rajkot
878 RJT Divn:Replacement of 10 units type‐I DRF 81,58 43,83 37,75 ..
substandard qtrs of Gang No 49 at KNLS by standard
type‐II quarters.
879 DWK: Providing 4 unit type‐II qtrs for RPF staff. Cap. 33,21 8,75 24,46 ..
Bhavnagar
880 ADEN Botad Sub Division:‐ Providing 3 units Cap. 43,00 27,38 14,90 72
Type‐III Qtrs. for Dy. SS & ASM SEJ & Dy. SS
operating Deptt.at Dhandhuka. (BVP/U/08‐09)
881 Veraval:‐ Providing 3‐units type IV qtrs. For Cap. 39,95 22,91 17,04 ..
CPWI,PWI,and IOW. (BVP/U/08‐09)
882 Jamjodhpur: Providing 6 units type II quarters and DRF 63,84 .. 35,00 28,84
one Units type III quarter on replacement
accounts.
TOTAL‐WORKS IN PROGRESS Cap. .. .. 2,62,84 ..
DRF .. .. 2,64,12 ..
B ‐ New Works
Vadodara
883 Vadodara Division:‐Providing new 8 Units Type II DRF 70,32 .. 1,50 68,82
quarters in lieu of abandoned staff quarters block
No. E/90 at Bharuch Railway station.
Ratlam
884 Indore ‐ Providing 10 units Type ‐II quarters DRF 99,37 .. 1,50 97,87
(multistoried) in lieu of abandoned quarters.
Rajkot
885 Than ‐ Replacement of non‐standard type I quarters DRF 87,90 .. 1,50 86,40
by type II standard quarters.(10 units)
886 RJT : Providing 2 units transit accomodation for Cap. 33,96 .. 4,50 29,46
Officers.
Railway Staff College
887 Works costing below DRM's Power Cap. 50 .. 50 ..
DRF 50 .. 50 ..
15.14.51.14.3.
00.999
15.02.51.08.3.
51.002
15.02.51.12.3.
51.001
15.06.51.14.3.
55.001
15.05.51.14.3.
54.001
15.04.51.14.3.
53.001
15.04.51.14.3.
53.002
15.05.51.13.3.
54.001
15.01.51.10.2.
30.001
15.01.51.12.3.
50.001
15.04.51.12.3.
53.001
15.04.51.12.3.
53.002
15.02.51.08.3.
51.001
STAFF QUARTERS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 68
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
TOTAL‐NEW WORKS Cap. .. .. 5,00 ..
DRF .. .. 5,00 ..
TOTAL‐Staff Quarters Cap. .. .. 2,67,84 ..
DRF .. .. 2,69,12 ..
A ‐ Works in Progress
Headquarter
888 Vadodara and Ratlam Division ‐ Rewiring of staff DF(2) 1,50,00 43,94 18,00 88,06
quarters
Mumbai
889 Virar‐Surat Section ‐ Corporate Welfare plan ‐ DRF 1,32,15 1,04,92 20,00 7,23
Improvements to quarters, latrines, bathrooms,
kitchen, court‐yard, verandas, re‐roofing, decade
wood work raising of floors, Augmentation of water
supply.
890 Dahanu road:‐ Improvement to sub‐standard quarter DF(2) 54,40 27,35 3,05 24,00
type I. (BCT/S/08‐09)
891 Valsad: Improvement to Rly. School class room 1 to DF(2) 37,44 34,97 2,47 ..
4. (BCT/S/08‐09)
892 Mumbai Central:‐ Improvement to Railway Institute. DF(2) 30,53 28,94 10 1,49
(BCT/U/08‐09)
893 Malad:‐ Segregation of domestic water suply to DF(2) 28,73 .. 6,00 22,73
colony and distribution system improvement.
(BCT/S/08‐09)
894 Udhna‐Jalgaon Section:‐ Providing bathroom DF(2) 44,72 .. 12,00 32,72
facilities in 60 type I qtrs at AEN/E/NDB.
(BCT/U/09‐10)
895 Mumbai Central:‐ Construction of Patient Officer's Cap. 76,68 63,43 10 13,15
attendent Room at GhasBazar. (BCT/U/10‐11)
896 Santacruz (East) – Improvement to water supply by DRF 71,72 6,78 30,00 34,94
construction of 80,000 lit. Capacity underground
tank with pump room in lieu of underground tank.
(BCT/U/11‐12)
897 Bandra (West):‐ Improvement to water supply by DF(2) 1,02,15 .. 20,00 82,15
providing overhead tanks to enhancement of BMC
water supply
Vadodara
898 Vadodara Division ‐ Improvement to drainage DRF 1,39,96 1,04,59 20,00 15,37
arrangements in Railway colony of various
stations.
899 Pratapnagar ‐ Construction of a new operation DF(2) 1,05,70 74,05 .. 31,65
theatre complex in divisional railway hospital.
(BRC/S/07‐08)
900 Pratapnagar (Railway Hospital) ‐ Proposed new ICU DF(2) 1,54,49 1,25,14 .. 29,35
building and lift facility for indoor patient on
first floor.
15.06.52.11.2.
55.001
15.06.52.07.2.
55.001
15.06.52.09.2.
55.001
15.03.52.08.3.
52.012
15.03.52.08.3.
52.008
15.03.52.09.3.
52.003
15.03.52.10.3.
52.009
15.03.52.11.3.
52.001
15.03.52.12.3.
52.001
AMENITIES FOR STAFF
15.00.52.11.2.
55.001
15.03.52.08.2.
52.001
15.03.52.08.3.
52.006
15.03.52.08.3.
52.015
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 69
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
901 Derol,Timba Road,Godhara:‐Improvement to watering Cap. 95,27 50,89 44,38 ..
arrangement by providing 100000 liters capacity
RCC OH tank with 20mm dia. Bore and paipe line
arrangement
Ratlam
902 Dahod ‐ Standardization of Sub standard qtrs 200 DRF 1,23,32 .. 10,00 1,13,32
Nos. in type‐II at Dhobighat, fiulter site area,
Sudaimata, Godhra road , char rasta & Bakri road
in connection with CWP
903 Dahod (Main Hospital) ‐ Construction of I.C.U. DF(2) 79,29 18,64 18,00 42,65
ward, addition/alteration and modification in
operation theater and replacement of Mangalore
tiled roof by R.C.C. roof. (RTM/S/08‐09)
904 Ratlam ‐Khandawa Section:‐ Providing Individual Cap. 42,92 18,61 20,00 4,31
latrines in staff quarters. (RTM/S/08‐09)
905 Ratlam:‐ Providing 250/200 mm dia 3 Nos borewell DF(2) 27,50 10,23 27 17,00
at Kurel dam. (RTM/U/08‐09)
906 Ratlam ‐ Rebuilding of old Dilapidated DRF 2,38,77 48,88 10,00 1,79,89
senior/junior institute
907 Ratlam‐Chanderia Section:‐ Improvement to sub Cap. 91,27 80,57 10,70 ..
standard quarters by providing basic facility like
lat, bath, kitchen & court yard & Raising of
plinth of staff quarters of Mandsaur(Gang chawl
No.47)& Jaora. (RTM/U/09‐10)
908 Ujjain:‐ Providing water storage facility with DRF 99,00 34,85 11,73 52,42
flushing system, water tap, water pipeline and
replacement of latrines AC sheet roof with RCC
roof in staff quarters – 40 Nos. (RTM/U/11‐12)
909 RTM‐Replacement of over aged filter plant at. DRF 99,99 .. 50,00 49,99
Ahmedabad
910 Virmagam :‐ Construction of 225 KL RCC O/H tank in DRF 24,95 23,85 10 1,00
lieu of abandoned 100kl UG sump & dilapidated
110kl masonary O/H tank in new colony. (on
replacement basis). (ADI/S/08‐09)
911 Sabarmati:‐ Replacement of 2 Nos. existing DRF 95,25 30,10 21,83 43,32
dilapidated tanks at township and near pump No. 4
with one bore and inter connectivity of various
bores. (ADI/U/09‐10)
912 MALB: Providing 1 lakh litres over head tank DF(2) 27,23 5,00 18,00 4,23
15.05.52.13.6.
54.001
15.01.52.08.3.
50.022
15.01.52.09.3.
50.003
15.01.52.12.3.
50.002
15.05.52.08.3.
54.001
15.05.52.08.3.
54.004
15.05.52.08.3.
54.005
15.05.52.09.2.
54.001
15.05.52.09.3.
54.005
15.05.52.11.3.
54.001
AMENITIES FOR STAFF
15.06.52.10.2.
55.001
15.05.52.11.2.
54.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 70
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
913 Kalol :‐Providing 1 lakh litres RCC OH tank on DRF 26,15 .. 10 26,05
replacement basis
Rajkot
914 New Jamnagar:‐ Providing RCC O/H tank 100 kl Cap. 34,34 1 30,00 4,33
Capacity & RCC sump 100kl capacity, one No.
borewell of 250mm dia. (RJT/U/10‐11)
Bhavnagar
915 Bhavanagar Division:‐ Replacement of C.I. pipeline DRF 51,23 34,30 16,93 ..
from GWIL‐Vartej to Loco tanki & Bhavnagar Ter.
(BVP/S/09‐10)
Mumbai
916 Works costing below DRM's Power DRF 1,14 .. 1,14 ..
DF(2) 20,00 .. 20,00 ..
Vadodara
917 Works costing below DRM's Power DF(2) 14,30 .. 14,30 ..
Ratlam
918 Works costing below DRM's Power DRF 1,72 .. 1,72 ..
Bhavnagar
919 Works costing below DRM's Power Cap. 7,00 .. 7,00 ..
DRF 8,46 .. 8,46 ..
DF(2) 5,00 .. 5,00 ..
TOTAL‐WORKS IN PROGRESS Cap. .. .. 1,12,18 ..
DRF .. .. 2,02,01 ..
DF(2) .. .. 1,37,19 ..
B ‐ New Works
Ahmedabad
920 Gandhidham (Colony) ‐ Providing 1 lac. Ltr DF(2) 41,32 .. 15,00 26,32
capacity RCC OH Tank at double storey quarters.
Mumbai
921 Works costing below DRM's Power Cap. 90 .. 90 ..
DRF 90 .. 90 ..
DF(2) 1,50 .. 1,50 ..
Vadodara
922 Works costing below DRM's Power Cap. 90 .. 90 ..
DF(2) 1,50 .. 1,50 ..
Ratlam
923 Works costing below DRM's Power DF(2) 4,00 .. 4,00 ..
Ahmedabad
924 Works costing below DRM's Power DF(2) 4,00 .. 4,00 ..
Rajkot
925 Works costing below DRM's Power DF(2) 4,00 .. 4,00 ..
Railway Staff College
926 Works costing below DRM's Power Cap. 20 .. 20 ..
DRF 10 .. 10 ..
DF(2) 5,10 .. 5,10 ..
15.14.52.14.3.
00.999
15.01.52.14.3.
50.001
15.03.52.14.3.
00.999
15.06.52.14.3.
00.999
15.05.52.14.3.
00.999
15.01.52.14.3.
00.999
15.04.52.14.3.
00.999
15.02.52.09.3.
51.001
15.03.52.14.3.
00.999
15.06.52.14.3.
00.999
15.05.52.14.3.
00.999
15.02.52.14.3.
00.999
15.01.52.13.3.
50.001
15.04.52.10.3.
53.002
AMENITIES FOR STAFF
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 71
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
TOTAL‐NEW WORKS Cap. .. .. 2,00 ..
DRF .. .. 1,00 ..
DF(2) .. .. 35,10 ..
TOTAL‐Amenities For Staff Cap. .. .. 1,14,18 ..
DRF .. .. 2,03,01 ..
DF(2) .. .. 1,72,29 ..
A ‐ Works in Progress
Headquarter
927 Ujjain ‐ Developing sitting space with covering DF(1) 1,90,32 29,75 1,30,00 30,57
shed on PF No 1 ( Nagda end) at old goods PF area
and Extension of PF shelter of galvenium at PF No
2/3 in connection to Sinhastha 2016 at.
Mumbai
928 Mumbai Central ‐ Design, Development, Supply, DF(1) 1,99,71 .. 1,00,00 99,71
Installation, Testing & Commissioning of Machines
/ Equipments for setting up a Mechanized Laundry
of 3 Ton capacity on Turn Key Basis.
929 Churchgate‐Virar Section:‐ Extension of covered DF(1) 2,54,36 2,00,71 30,00 23,65
shed on extended portion and covering the gaps in
cover over platforms on various platforms of
suburban section. (BCT/U/09‐10)
930 Surat ‐ Providing RCC overhead tank & water pipe DF(1) 1,45,14 82,36 30,00 32,78
lines for segregation of coach watering
931 Mumbai Division ‐ Extension of covershed at DF(1) 1,99,30 1,08,96 50,00 40,34
Jogeshwari (PF No. 1), Grant Road (PF No. 1),
Vasai Road (PF No. 6 & 7)
932 Surat:‐ Providing CC apron. (BCT/U/11‐12) DF(1) 2,46,97 1,20,00 60,00 66,97
933 BCT: Modernisation of Base Kitchen DF(1) 1,99,51 1,29,87 60,00 9,64
Vadodara
934 Nadiad ‐ Providing cover shed on platform 1, 2 & DF(1) 1,47,92 1,38,46 1,00 8,46
3
935 Anand‐Khambhat Section:‐ Improvement of latform DF(1) 1,90,00 1,51,95 18,00 20,05
surface and raising of platform 3 stations.
(BRC/U/11‐12)
Ratlam
936 Chittorgarh : Providing CC apron on PF no. 02 DF(1) 1,59,97 .. 1,00 1,58,97
937 UJN ‐ Providing additional FOB with connectivity DF(1) 1,98,65 .. 1,50,00 48,65
to all passenger platforms at IND end
938 UJN ‐Extension to existing FOB at NAD ends towards DF(1) 1,94,85 .. 1,50,00 44,85
Passenger platform no 8
Ahmedabad
939 Ahmedabad :‐ Providing two passenger lift at DF(1) 1,40,71 69,89 50,00 20,82
platform No.1 and one passenger lift on platform
No.2‐3, 4‐5, and 6‐7.
PASSENGER AMENITIES
15.00.53.11.3.
54.001
15.03.53.13.3.
52.002
15.03.53.09.3.
52.001
15.03.53.09.3.
52.002
15.03.53.10.3.
52.001
15.03.53.11.3.
52.001
15.03.53.12.3.
52.001
15.06.53.11.3.
55.001
15.05.53.13.3.
54.001
15.01.53.08.3.
50.001
15.06.53.10.3.
55.001
15.05.53.13.3.
54.003
15.05.53.13.3.
54.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 72
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Mumbai
940 Works costing below DRM's Power DRF 9,00 .. 9,00 ..
DF(1) 5,29,04 .. 5,29,04 ..
Vadodara
941 Works costing below DRM's Power DRF 40,00 .. 40,00 ..
DF(1) 80,00 .. 80,00 ..
Ratlam
942 Works costing below DRM's Power DRF 90,00 .. 90,00 ..
DF(1) 50,00 .. 50,00 ..
Ahmedabad
943 Works costing below DRM's Power DRF 78,00 .. 78,00 ..
DF(1) 97,00 .. 97,00 ..
Rajkot
944 Works costing below DRM's Power DRF 25,00 .. 25,00 ..
DF(1) 50,00 .. 50,00 ..
Bhavnagar
945 Works costing below DRM's Power DRF 60,00 .. 60,00 ..
DF(1) 40,00 .. 40,00 ..
TOTAL‐WORKS IN PROGRESS DRF .. .. 3,02,00 ..
DF(1) .. .. 16,76,04 ..
B ‐ New Works
Headquarter
946 Augmentation of Laundry at IND & ETPat Junagad. DF(1) 1,23,36 .. 25,00 98,36
Mumbai
947 Mumbai Central(L) to Bandra:Raising of suburban DF(1) 1,36,58 .. 65,00 71,58
section platforms at BCT (L) plat no.1&2, MX
plat no 2&3, EPR plat no.1&2, BA plat no. 2&3
from 840mm to 920 mm (08 platforms)
948 Churchgate & Grant Road ‐Raising of suburban DF(1) 1,47,89 .. 65,00 82,89
section platforms at CCG plat .no 1&2,2&3,3&4 and
GTR plat no 2&3 from 840mm to 920 mm( 08
platforms)
949 Dadar ‐ Renewal of deterioted COP covering and DRF 1,63,51 .. 1,00,00 63,51
structure.
Vadodara
950 Vadodara Division :‐ Dismantaling of corroded DRF 1,92,60 .. 1,00,00 92,60
existing covershed and providing new covershed at
Bharuch Railway station on platfom No. 1, 2, 3, 4
& 5.
951 Vadodara Division:‐Provision of of minimum DF(1) 1,71,34 .. 50,00 1,21,34
essantial amenities on various Railway station on
Vadodara Division to eliminate shortfall.
Ratlam
952 RTM Div‐ Provision of Multiline train display DF(1) 1,99,92 .. 1,00,00 99,92
boards at important stations in connection with
Simhastha Mela 2016.
Ahmedabad
953 ADI Division:‐ Removal of deficiencies in Minimum DF(1) 1,96,40 .. 45,00 1,51,40
Essential Amenities at stations over Ahmedabad
Division.
15.02.53.14.3.
00.999
15.00.53.14.3.
54.001
15.03.53.14.3.
52.002
15.03.53.14.3.
52.003
15.06.53.14.3.
55.002
15.05.53.14.3.
54.001
15.03.53.14.3.
52.001
15.06.53.14.3.
55.001
PASSENGER AMENITIES
15.03.53.14.3.
00.999
15.06.53.14.3.
00.999
15.05.53.14.3.
00.999
15.01.53.14.3.
00.999
15.04.53.14.3.
00.999
15.01.53.14.3.
50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 73
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Mumbai
954 Works costing below DRM's Power DRF 25,00 .. 25,00 ..
DF(1) 25,00 .. 25,00 ..
Vadodara
955 Works costing below DRM's Power DRF 25,00 .. 25,00 ..
DF(1) 35,00 .. 35,00 ..
Ratlam
956 Works costing below DRM's Power DRF 50,00 .. 50,00 ..
DF(1) 1,00,00 .. 1,00,00 ..
Ahmedabad
957 Works costing below DRM's Power DRF 40,00 .. 40,00 ..
DF(1) 60,00 .. 60,00 ..
Rajkot
958 Works costing below DRM's Power DRF 10,00 .. 10,00 ..
DF(1) 40,00 .. 40,00 ..
Bhavnagar
959 Works costing below DRM's Power DRF 10,00 .. 10,00 ..
DF(1) 40,00 .. 40,00 ..
TOTAL‐NEW WORKS DRF .. .. 3,60,00 ..
DF(1) .. .. 6,50,00 ..
TOTAL‐Passenger Amenities DRF .. .. 6,62,00 ..
DF(1) .. .. 23,26,04 ..
A ‐ Works in Progress
Mumbai
960 Mumbai Division ‐ Providing RPF barracks at BL ( DF(2) 1,11,48 71,85 39,63 ..
20 beds) and Vapi (10beds) dog kennels and
Malkhanas at BCT , BDTS and USD lock ups at BDTS,
UDN & BDTS , rest rooms at BSR, VR, and NDB for
RPF staff & cementing of parade ground at BL.
961 Mumbai Central (JRH) ‐Installation of Medical Gas DF(2) 22,02 11,10 10,92 ..
pipeline in JRH. (BCT/S/08‐09)
962 Mahalaxmi (General Stores):‐ Replacement of DF(3) 63,61 .. 43,61 20,00
dilapidated Non ‐ Ferrous Godown. (BCT/U/10‐11)
963 Churchgate ‐ Providing Disaster Management Control DF(3) 38,14 .. 38,14 ..
room in ground floor of GLO building.
Vadodara
964 Karachiya (Yard):‐ Providing pathway and drain for DF(3) 1,56,70 5,42 1,00 1,50,28
disposal of RFO's and storm water drain between
line No. 1 to 15. (Vadodara division)
(S&C/S/05‐06)
965 Pratapnagar (Railway Staff College) ‐ Upgradation DF(2) 1,95,13 .. 75,00 1,20,13
of sports facilities. (Vadodara division)
(S&C/U/07‐08)
966 Bharuch (Yard) ‐ Provision of storm water drain DF(3) 1,85,55 .. 1,85,55 ..
in yard for disposal of water and flooding of
track.
15.03.64.10.3.
52.001
15.06.64.07.2.
30.002
15.03.64.07.2.
52.001
15.03.64.08.3.
52.004
15.06.53.14.3.
00.999
15.05.53.14.3.
00.999
15.01.53.14.3.
00.999
15.04.53.14.3.
00.999
15.03.64.13.6.
52.001
15.06.64.05.2.
30.001
15.06.64.10.2.
55.001
PASSENGER AMENITIES
15.03.53.14.3.
00.999
15.02.53.14.3.
00.999
OTHER SPECIFIED WORKS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 74
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Ratlam
967 Ratlam ‐Improvement to Sports facilities DRF 45,00 44,00 1,00 ..
i.e.Basket ball, Volleyball, Badminton & Cricket
ground etc. (RTM/S/08‐09)
968 Ratlam ‐ Replacement of 200 mm dia CI pipe line DRF 1,59,71 1,10,66 30,00 19,05
from Well No 572 to Well No 470 and 150 mm dia new
CI pipe line at from well No 470 to loco well at
969 Ratlam:‐ Replacement of old leaky water supply DRF 1,00,00 22,51 49,05 28,44
line from Kurel Dam to LC Gate No. 88.
(RTM/U/11‐12)
970 RTM ‐ Improvement to sports facilities at. DF(2) 51,54 .. 51,54 ..
Ahmedabad
971 Sabarmati:‐ Upgradation and modifcation of S&T DF(3) 20,97 15,28 5,69 ..
training centre. (S&T/S/05‐06)
972 Ahmedabad:‐ Providing dinning hall, kitchen, DF(2) 24,57 6,23 18,34 ..
toilets, rooms and other facilities in the various
structures for faciliting shifting of the running
room. (ADI/S/08‐09)
973 Ahmedabad ‐ Improvement to existing building of DF(2) 29,90 9,07 20,83 ..
Engg. Deptt, S&T and Elect. Deptt. for housing the
Running room. (ADI/S/08‐09)
974 Ahmedabad area ‐ Construction of transit DF(3) 1,26,52 .. 20,00 1,06,52
accomodation and Divisional officer's rest house.
975 Mahesana:‐ Replacement of existing two nos Bore DRF 52,33 .. 20,00 32,33
Well 250mm dia. and 300m deep at Kalyaneshwar Bore
and Bala Hanuman ji Bore.
Rajkot
976 Dwarka:‐ Providing two additional rooms in DF(2) 19,97 6,16 13,81 ..
Officer's Rest House. (RJT/U/11‐12)
977 RJT: Improvement to Divisional Hospital, OT, ICU, DF(2) 20,74 14,56 50 5,68
Kitchen & Toilet etc.
Bhavnagar
978 Providing catch water drain, side drain at DF(3) 56,67 20,29 35,00 1,38
breaches locatons between Km: 18/11 ‐ 19/3 and Km:
23/5 to 23/11 on TAV ‐ DVA Section.
Mumbai
979 Works costing below DRM's Power DRF 10,00 .. 10,00 ..
DF(3) 20,00 .. 20,00 ..
Vadodara
980 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(2) 5,00 .. 5,00 ..
Ratlam
981 Works costing below DRM's Power Cap. 2,03 .. 2,03 ..
DRF 3,00 .. 3,00 ..
DF(2) 7,00 .. 7,00 ..
15.01.64.08.3.
50.001
15.05.64.11.3.
54.001
15.05.64.12.3.
54.001
15.01.64.05.3.
50.001
15.01.64.08.3.
50.003
15.05.64.09.2.
54.001
15.05.64.08.3.
54.005
OTHER SPECIFIED WORKS
15.01.64.09.2.
50.001
15.01.64.13.3.
50.001
15.04.64.12.3.
53.002
15.02.64.12.3.
51.001
15.06.64.14.3.
00.999
15.05.64.14.3.
00.999
15.04.64.11.3.
53.001
15.03.64.14.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 75
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Rajkot
982 Works costing below DRM's Power DRF 3,00 .. 3,00 ..
DF(1) 3,54 .. 3,54 ..
DF(2) 3,00 .. 3,00 ..
Bhavnagar
983 Works costing below DRM's Power DF(3) 5,00 .. 5,00 ..
TOTAL‐WORKS IN PROGRESS Cap. .. .. 2,03 ..
DRF .. .. 1,21,05 ..
DF(1) .. .. 3,54 ..
DF(2) .. .. 2,45,57 ..
DF(3) .. .. 3,53,99 ..
B ‐ New Works
Mumbai
984 Mumbai Central ‐ Installation of Effluent DF(3) 57,30 .. 10,00 47,30
treatment facility for JRH.
985 JR Hospital, Mumbai Central ‐ Provision of smoke DF(3) 62,97 .. 10,00 52,97
detection & fire alarm system at JR hospital at
Mumbai Central
Vadodara
986 Vadodara Division:‐Consultancy for restoration of DF(3) 71,58 .. 10,00 61,58
Pratap Vilas Palace building in National Academey
(Railway Staff College) at Pratapnagar, Vadodara.
Ratlam
987 Indore‐Provision of open drain for LMNR Colony at. DRF 39,65 .. 5,00 34,65
988 RTM‐Providing Effulent treatment plant in DF(3) 81,12 .. 11,00 70,12
Divisional Railway Hospital.
Ahmedabad
989 Maninagar:‐ Providing RPF building including DF(3) 35,35 .. 10,00 25,35
IPF,SIPF,Clerical, Armed & CCTV room at PF No.1.
Rajkot
990 HAPA ‐ Supply, Installation, Testing and DF(3) 35,77 .. 10,00 25,77
Commissioning of Effluent Treatment Plant at C&W
Depot of Capacity 10cubic metre per day.
Mumbai
991 Works costing below DRM's Power Cap. 1,00 .. 1,00 ..
DF(3) 9,00 .. 9,00 ..
Vadodara
992 Works costing below DRM's Power DF(3) 2,00 .. 2,00 ..
Ratlam
993 Works costing below DRM's Power DF(3) 5,00 .. 5,00 ..
Ahmedabad
994 Works costing below DRM's Power DF(3) 10,00 .. 10,00 ..
Rajkot
995 Works costing below DRM's Power DF(3) 7,00 .. 7,00 ..15.04.64.14.3.
00.999
15.04.64.14.3.
00.999
OTHER SPECIFIED WORKS
15.02.64.14.3.
00.999
15.03.64.14.3.
52.001
15.06.64.14.3.
55.001
15.05.64.14.3.
54.002
15.03.64.14.3.
52.002
15.05.64.14.3.
54.001
15.01.64.14.3.
50.001
15.04.64.14.3.
53.001
15.06.64.14.3.
00.999
15.05.64.14.3.
00.999
15.03.64.14.3.
00.999
15.01.64.14.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 76
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
Bhavnagar
996 Works costing below DRM's Power Cap. 1,00 .. 1,00 ..
DRF 1,00 .. 1,00 ..
DF(3) 5,00 .. 5,00 ..
Railway Staff College
997 Works costing below DRM's Power Cap. 1,00 .. 1,00 ..
DRF 1,00 .. 1,00 ..
DF(3) 11,00 .. 11,00 ..
TOTAL‐NEW WORKS Cap. .. .. 3,00 ..
DRF .. .. 7,00 ..
DF(3) .. .. 1,10,00 ..
TOTAL‐Other Specified Works Cap. .. .. 5,03 ..
DRF .. .. 1,28,05 ..
DF(1) .. .. 3,54 ..
DF(2) .. .. 2,45,57 ..
DF(3) .. .. 4,63,99 ..
15.02.64.14.3.
00.999
OTHER SPECIFIED WORKS
15.14.64.14.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2014‐15
PAGE NO : 77
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2013‐14
Outlay
2014‐15
Balance to
complete
work
TOTAL‐WORKS IN PROGRESS Cap. .. .. 5,88,07 ..
DRF .. .. 68,65,80 ..
DF(1) .. .. 16,87,58 ..
DF(2) .. .. 3,82,76 ..
DF(3) .. .. 13,63,15 ..
DF(4) .. .. 7,35,64 ..
S.Fund .. .. 41,13,75 ..
TOTAL ‐ NEW WORKS Cap. .. .. 23,00 ..
DRF .. .. 8,37,03 ..
DF(1) .. .. 6,50,00 ..
DF(2) .. .. 35,10 ..
DF(3) .. .. 2,40,00 ..
DF(4) .. .. 1,00,00 ..
S.Fund .. .. 70,00 ..
GRAND TOTAL Cap. .. .. 6,11,07 ..
DRF .. .. 77,02,83 ..
DF(1) .. .. 23,37,58 ..
DF(2) .. .. 4,17,86 ..
DF(3) .. .. 16,03,15 ..
DF(4) .. .. 8,35,64 ..