LEESER ARCHITECTURE PLLC20 Jay Street, Suite M03, Brooklyn, New York 11201
718 643 6656 email: [email protected]
LEESER ARCHITECTURE 3
EM QUARTIER RETAIL + CULTURAL CENTER
BANGKOK 04VOS HOTEL
NEW YORK 14MACY’S TOWER NEW YORK 16
DUMBO HEIGHTS NEW YORK 22
60 WATER STREET NEW YORK 30
MERCEDES HOUSE LOBBY + FITNESS
NEW YORK 36PIER 1 HOTEL +
RESIDENCES NEW YORK 42
SILVERCUP WEST NEW YORK 48
MUSEUM OF THE MOVING IMAGE NEW YORK 54
ROYAL TRI-CLIMATIC BIOSPHERE 68 ABU DHABIWORLD MAMMOTH + PERMAFROST MUSEUM 78 RUSSIAMOSCOW POLYTECHNIC MUSEUM & UNIVERSITY 82 RUSSIA3LD ART & TECHNOLOGY CENTER 86 NEW YORKHELIX HOTEL 92 ABU DHABIBRIC ARTS | MEDIA HOUSE / URBANGLASS 98 NEW YORKLONDON OLYMPIC PARK FLOATING LAKE 104 ENGLANDGENIUS/COWORK.RS 108 NEW YORK
PROJECTEXPERIENCE
LEESER ARCHITECTURE 54 EM QUARTIER
CLIENTThe Mall Group Co., Ltd.
ROLE
Leeser Architecture is the lead designer for this
extensive project coordinating with a large team
of international and local consultants, landscape
architects, lighting designers and several local
architects and engineers for each of the four
separate buildings. Leeser Architecture is
providing Concept Design, Schematic Design and
Design Development phase design services.
SIZE 2,700,000 ft2 / 250,838 m2
COST ~$800 million
PROGRAMRetail complex including three new buildings and
one building renovation. Connected by a plaza, all
buildings total in 2,500,000 sf of mixed use retail
space. Key features include a 30’ open air garden
on the fifth floor, six stories of dining terraces
sitting atop a helical floor slab, an eight theater
cinema complex including one imax theater as well
as a pedestrian street and five story waterfall, as
well as two stories of underground parking.
DESIGN COMMENTS Working with the developer responsible for
the largest shopping center in southeast Asia,
Leeser Architecture has designed architecture
that evokes the synthesis of beauty and
unpredictability found in both nature and
urbanism. The buildings alter the pure shape of
the traditional spiral, floor plates are shifted so
they do not align with the floors above. These
subtle imperfections provide outdoor terraces for
the visitors, blurring the boundary between inside
and out.
BANGKOK, THAILAND | 2015RETAIL / CULTURAL
EM QUARTIER RETAIL + CULTURAL CENTER
LEESER ARCHITECTURE 76 EM QUARTIER RETAIL + CULTURAL CENTER
Exterior views of Building A “the Helix”
featuring a 5th Floor open air garden
and sweeping views of Bangkok.
LEESER ARCHITECTURE 98 EM QUARTIER RETAIL + CULTURAL CENTER
LEESER ARCHITECTURE 11LEESER ARCHITECTURE 1110 EM QUARTIER RETAIL + CULTURAL CENTER
(left top) Garden.5th Floor open air garden in Building A and
sweeping views of Bangkok from the garden.
(top) Retail shops and atriumand Dining Helix in Building A
LEESER ARCHITECTURE 1312 EM QUARTIER
LEESER ARCHITECTURE 15
BROOKLYN, NEW YORK | 2015HOSPITALITY
CLIENT Second Development Services (SDS)
ROLELeeser Architecture performed design services for
the building enclosure.
SIZE 110,000 ft2 / 10,219 m2
COST N/A
PROGRAMThe hotel will rise approximately 300 feet and will
include a rooftop bar and pool, a banquet hall,
a ballroom, a performance space on the basement
level, and a ground floor restaurant and mezzanine
that looks onto an outdoor arts plaza.
DESIGN COMMENTS The 200-room Vos Hotel is designed to
accommodate the growing number of visitors
flocking to Brooklyn’s emerging cultural district.
The 30-story building, made of white fritted glass
and metal, will feature dramatic asymmetrical
fractures in the façade that reinforce a notion of
Brooklyn as multi-faceted and modern.
The outdoor arts plaza will rotate local art
organizations exhibitions anchoring the hotel as
a central public space within the new cultural
district.
The tower is scheduled to open in 2017.
VOS HOTEL
14 VOS HOTEL
(top and bottom) Day view and facade details. The facade is designed as a landmark in both day and evening
conditions. During daytime conditions, the façade is filtered
by a silk screened fritted on the glass panels and scaled with
recessed cavities of black glass.
(opposite page) Night view.At nighttime this condition is reversed by integrated luminaries
in the recessed cavities that complement an otherwise glass
façade illuminated from the interior. The shape of the building
gradually responds to the given zoning envelope with stepped
terraces from the lower volume to the upper volume.
LEESER ARCHITECTURE 17
BROOKLYN, NEW YORK | 2015RETAIL / RESIDENTIAL
CLIENTRFR & Kushner Properties
ROLELeeser Architecture developed concept designs,
schematic designs.
SIZE 1,225,000 ft2 / 113,805.277 m2
COST N/A
PROGRAMLeeser Architecture developed concepts for three
residential towers on the existing Macy’s parcels in
Downtown Brooklyn.
The design features a 910 feet tall tower, and two
390 feet tall towers, incorporating residential, a
commercial base of retail, and public plaza. .
DESIGN COMMENTS LEESER Architecture was engaged to develop
a vision for the 1.2 million-square-foot addition
on the Macy’s Downtown Brooklyn Parcels. The
iconic 910 feet tall tower will house 230 condos
and 468 rental units. The tower is added on top
of an existing building, preserving the existing Art
Deco style facades. This design also allow retail
stores such as Macy’s remain open during the
construction.
A two-tower mix used complex is designed on the
opposite side of Macy’s, provides 200,000 square
feet retail spaces, a public plaza, 248 condos units
and 308 rental units.
MACY’S DOWNTOWN
16 MACY’S DOWNTOWN
LEESER ARCHITECTURE 19
(left) Night view from the east side. Street view of
Downtown Brooklyn with Manhattan skyline in the back..
(bottom) Southern facade.
(opposite page) Night view from the west side.
18 MACY’S DOWNTOWN
LEESER ARCHITECTURE 2120 MACY’S DOWNTOWN
(top) Program division and vertical circulation.
(right) Day view.Street view of Downtown Brooklyn.
(opposite page) Views from the southern side.
LEESER ARCHITECTURE 2322 DUMBO HEIGHTS
BROOKLYN, NEW YORK | 2013RETAIL / RESIDENTIAL / HOSPITALITY
CLIENTRFR, Kushner Properties and LIVWRK
ROLELeeser Architecture developed extensive F.A.R.
studies, concept designs, schematic designs
SIZE 1,200,000 ft2 / 111,483 m2
COST N/A
PROGRAMThe project developed concepts for 5 prime
existing buildings in Dumbo, Brooklyn.
The design features a tower incorporating
residential penthouses, a commercial base of
retail, restaurants, bars and theatres, technology
hub and the original sky bridges being activated
through the introduction of an outdoor running
track, pool and fitness center.
A comprehensive F.A.R. study was also
undertaken for all properties on the site.
DESIGN COMMENTS & RELEVANCEThe consortium of RFR, Kushner Properties
and LIVWRK engaged LEESER Architecture to
develop a vision for the 1.2 million-square-foot
former Jehovah’s Witness publishing facilities.
The design utilized existing site features such as
the interconnecting sky bridges by converting
them to public amenities space including an open
air running track, gym and pool. Heavy walls
were removed to create public arcades doubling
sidewalks and allowing for restaurants, theaters
and a beer garden, all of which contribute to
creating a unique public destination and attractive
option for commercial and residential tenants.
Increased FAR from a proposed zoning change
would be distributed between commercial rooftop
penthouses and a residential tower atop one of
the existing buildings. Its form rotated to take
advantage of multiple river and city views.
The concept developed for Dumbo Heights lead to
the successful purchase of the development site
by the consortium.
DUMBO HEIGHTS
LEESER ARCHITECTURE 2524 DUMBO HEIGHTS
LEESER ARCHITECTURE 2726 DUMBO HEIGHTS
Buildings and patios of residential tower.
LEESER ARCHITECTURE 2928 DUMBO HEIGHTS
Amenity to floors.Watchtower site that utilized existing site features such as the interconnecting sky bridges,
converting them to public amenities space including an open air running track and the
removal of heavy street level walls to create public arcades that double existing sidewalks.
LEESER ARCHITECTURE 31
60 WATER STREETBROOKLYN, NEW YORK | 2015RETAIL / RESIDENTIAL / EDUCATIONAL
CLIENTTwo Trees Management Company
ROLELEESER Architecture performed full design
services including Programming, Concept
Design, Schematic Design, Design Development,
Bidding and Negotiating, Construction
Documentation and Construction Administration.
SIZE 350,000 ft2 / 32,516 m2
COST $150 million
PROGRAMThe program is comprised of a three-level
underground public parking garage; 10,000
square feet of ground floor retail space along
Water Street; a full-floor, 45,000-square-foot
public middle school to serve 300 students;
and 220,000 square feet of rental apartments,
20% of which will be designated for affordable
housing.
DESIGN COMMENTS LEESER’s design uses pattern at two scales to
enliven the surface of the residential tower project.
At the large scale, a branching two story line
cuts an iconic void pattern into the field of glass
fins that wrap the building. At the small scale, a
pattern of opposing triangles on each fin creates
the illusion that the façade is undulating. The
combination of the two gives a sense of depth and
movement to the simple taught glass form.
30 60 WATER STREET
LEESER ARCHITECTURE 33LEESER ARCHITECTURE 3332 60 WATER STREET
Façade.Softening the envelope and knowing that
the building is mostly seen at shallow angle,
fins blur the edges and make it appear cloudlike.
LEESER ARCHITECTURE 35LEESER ARCHITECTURE 3534 60 WATER STREET
(top) Street view.(right top) Exterior.
(right) Interior.
LEESER ARCHITECTURE 3736 MERCEDES HOUSE SOUTH LOBBY & FITNESS CENTER
MERCEDES HOUSE SOUTH LOBBY & FITNESS CENTER
NEW YORK, NEW YORK | 2012RESIDENTIAL
CLIENTTwo Trees Management Company
ROLELeeser Architecture performed full design
services including Programming, Concept Design,
Schematic Design, Design Development, Bidding
and Negotiating, Construction Documentation and
Construction Administration.
SIZE Interior 27,000 ft2 / 2,508 m2
Exterior 40,000 ft2 / 3,716 m2
COST N/A
PROGRAMLeeser Architecture’s design for the lobby includes
a reception area, mail room and an elevator lobby.
Leeser was also commissioned to design a 30,000
sq ft fitness center, lounge, spa, and roof deck.
DESIGN COMMENTS Located on the ground floor of a 29 story luxury
residential project on Manhattan’s west side, the
South Lobby of the Mercedes House uses vibrant
orange accents to emphasize the drama of the
sloped ceiling. A ribbon of diffuse, reflective
glass defines the ceiling’s edge with a dark gap,
articulating the separation between the vertical
surfaces and ceiling. Along the lobby’s edge, two
lines of glowing, color shifting LEDs highlight the
uniquely patterned terrazzo floor below.
For the fitness center, active interior spaces are
wrapped in planes of primary color glass and
zones of relaxation are enveloped in charcoal gray
wood.
LEESER ARCHITECTURE 3938 MERCEDES HOUSE SOUTH LOBBY & FITNESS CENTER
LEESER ARCHITECTURE 4140 MERCEDES HOUSE SOUTH LOBBY & FITNESS CENTER
LEESER ARCHITECTURE 4342 PIER 1 HOTEL + RESIDENCES
PIER 1 HOTEL + RESIDENCESBROOKLYN, NEW YORK | 2011RETAIL / RESIDENTIAL / HOSPITALITY
CLIENTSecond Development Services (SDS)
ROLELeeser Architecture designed a Concept Design
submission in the invited competition.
SIZE 500,000 ft2 / 46,451 m2
COST $295 million
PROGRAMLeeser Architecture’s design for the Pier 1
development includes 183 residential apartments,
170 hotel rooms, 300 underground parking spaces.
The building amenities include a 60-wide atrium,
an olympic-length, glass bottomed swimming pool,
spa, restaurants, a full service conference center, a
rooftop garden with running track and pool.
ENVIRONMENTAL DESIGNProjected to be LEED Gold
DESIGN COMMENTS Leeser Architecture’s design synthesizes dynamic
architecture with the playful and sustainable
qualities of New York City Parks, as exemplified
in Brooklyn Bridge Park. The building functions as
an extension of Brooklyn Bridge Park, seamlessly
integrating the site to create a unified experience
of nature and built environment. A ribbon of park
space extends from the ground floor to an exterior
garden terrace at the third floor of the larger
building, continuing across the courtyard at the
second building to form roof terraces and gardens.
A sixty foot wide atrium space that extends up the
entire height and length of the building. Above,
the 170 hotel rooms and suites float in air, lightly
framing the view of the sky.
LEESER ARCHITECTURE 45
(top) Restaurant/Lounge. Dramatic lifts in the
facade open up interior public spaces to allow for
unobstructed views of the East River and Manhattan
from the interior of the building. Spaces are lit with
bright orange lights to contrast the large glass facade.
(left) Hotel/Interior Park Entrance. The building’s
exterior glazing subtly lifts to shape unique spaces
within, creating a dynamic facade and providing the
public spaces. This glazing system serves both to
maximize natural day lighting and to express the
stepping pattern of the residential units on the exterior.
Outdoor terraces, an amphitheater, and roof gardens
allow for hotel guests and residents to experience the
dramatic views.
44 PIER 1 HOTEL + RESIDENCES
LEESER ARCHITECTURE 4746 PIER 1 HOTEL + RESIDENCES
(top) Interior park. The ground floor of the
development has been designed as an interior
park for residents and hotel guests. Laying at
the bottom of a sixty foot wide and hundred
foot tall atrium extending the length of the
entire building, the interior park fills the void
the building with the lightness of the natural
environment. Puncturing through the atrium, a
seventy foot tall escalator brings hotel guests up
through the atrium to the hotel levels, located
on floors seven through ten.
(right) Section through atrium.
LEESER ARCHITECTURE 4948 SILVERCUP
LONG ISLAND CITY, NEW YORK | 2013RETAIL / RESIDENTIAL / HOSPITALITY
CLIENTKushner Properties
ROLELEESER Architecture is providing FAR Analysis,
Concept Design phase services.
SIZE 2,772,886 ft2 / 257,609 m2
COST N/A
PROGRAMThe project included multiple program distribution
studies for a 2 million square foot ULURP
approved building proposal. Design features
commercial, residential and community facilities
and a large central atrium with spiraling circulation
from base to rooftop garden amenities space.
DESIGN COMMENTSCommissioned by Kushner Properties to reimagine
a previous submission by Richard Rogers for the
Silvercup Studios site in Long Island City, LEESER
Architecture created a bold concept for the 600
foot towers - developing 4 alternative distributions
and massing studies while maintaining the total
FAR of the existing ULURP approved proposal.
The design included street level and waterfront
retail to stimulate activity paired with an atrium
featuring an upward spiraling circulation to draw
public to the rooftop garden amenities space.
The commercial and community program at the
base provided 24 hour excitement while residential
units above maximizes the views of the East River
and Manhattan.
SILVERCUP
LEESER ARCHITECTURE 5150 SILVERCUP
(left) View from the river. (top) Urban context.
(below) Program distribution.
LEESER ARCHITECTURE 5352 SILVERCUP
Atrium featuring an upward spiraling circulation
to draw public to the rooftop garden amenities space.
LEESER ARCHITECTURE 5554 MUSEUM OF THE MOVING IMAGE LEESER ARCHITECTURE 55
NEW YORK, NEW YORK | 2011CULTURAL
MUSEUM OF THE
MOVING IMAGE
CLIENTMuseum of the Moving Image
NYC Economic Development Corporation
NYC Department of Cultural Affairs
ROLE
Leeser Architecture performed full design
services including Programming, Concept Design,
Schematic Design, Design Development, Bidding
and Negotiating, Construction Documentation and
Construction Administration.
SIZE Addition: 40,000 ft2 / 3,716 m2
Renovation: 60,000 ft2 / 5,574 m2
COST $70 million
PROGRAMThe Museum houses a 267-seat film theater,
education center, a 68-seat screening room,
changing exhibition gallery, permanent exhibition
galleries, administrative offices, collection storage
facility and special events spaces.
ENVIRONMENTAL DESIGNUSGBC LEED Silver certified
LEESER ARCHITECTURE 5756 MUSEUM OF THE MOVING IMAGE
DESIGN COMMENTS & RELEVANCENamed the “finest recent American example of
radical design” by the WALL STREET JOURNAL,
Leeser Architecture’s Museum of the Moving
Image gives visitors an inspiring space to explore
and engage with the moving image. Throughout
the Museum, Amphitheaters and flexible spaces
allow student groups to visit and hold sessions.
Among them, Media Classrooms in the Education
Center are comprised of retractable acoustically
isolating curtains, providing flexibility to form
intimate classrooms or one large gathering space.
For direct interaction with the moving image,
Video Editing Booths and hands on, various
explorative stations are integrated throughout the
Museum’s galleries and education spaces.
(top) Exterior. Front facade and main entrance.
(left) Interior. Museum shop.
LEESER ARCHITECTURE 59LEESER ARCHITECTURE 5958 MUSEUM OF THE MOVING IMAGE
(top) Lobby. The white walls of the entrance
provide a seamless backdrop for a 50 foot long
panoramic projection exhibit, The space of the
lobby is shaped by the underside of the main
theater, efficiently using the space while creating
a dynamic ceiling below.
(right) Lobby grand stair. Throughout the
Museum, color is used in stark contrast to
the white finishes to provide a heightened
experience of space. Each punch of color
is seen as a portal into a new programmatic
element such as a theater or exhibition space.
LEESER ARCHITECTURE 61LEESER ARCHITECTURE 6160 MUSEUM OF THE MOVING IMAGE
Film theater. The main theater uses a similar system of open
joints to make surfaces appear as if they are
suspended in space. Here, the softness required
to accomplish acoustic dampening of sound is
expressed through the softness of the individual
woven felt, vacuum formed panels.
LEESER ARCHITECTURE 63LEESER ARCHITECTURE 63
(right and bottom left) Video screening amphitheater. Upon reaching the first level, the
grand stair widens into a 1,700 square-foot video
screening amphitheater. The integration of ramp
and stair allows for the amphitheater to be an
interactive educational stage for visitors.
(bottom center) William Fox Amphitheater. Throughout the Museum, Leeser designed spaces
for student groups to visit and hold class sessions.
The amphitheater above gives students a space to
perform and display their own interpretation of the
moving image.
(bottom right) Ann and Andrew Tisch Education Center. The Education Center is a flexible
laboratory for community students to learn about
and interact with the Museum. The walls of the
classrooms are composed of retractable curtains,
providing the flexibility to form intimate classrooms
or one large gathering space.
62 MUSEUM OF THE MOVING IMAGE
LEESER ARCHITECTURE 65
LEESER ARCHITECTURE 67
LEESER ARCHITECTURE 69
TRI-CLIMATIC BIOSPHEREABU DHABI, UAE | 2015GREENHOUSE / EDUCATIONAL
CLIENTAl Nahyan Royal Family
ROLELeeser Architecture performed full design
services including Programming, Concept Design,
Schematic Design, Design Development, Bidding
and Negotiating, Construction Documentation and
Construction Administration.
SIZE 108,000 ft2 / 10,033 m2
COST $25 million
PROGRAMThree separate biomes (Mediterranean, Tropical,
and Vernalized) are housed under one undulating
roof. A continuous ramp circling each biome and
a central atrium leading to the roof terrace allows
for students and visitors to experience all climates
in a single path.
DESIGN COMMENTSThe Iconic Greenhouse project resulted from
Leeser’s winning proposal in an invited competition
for production based greenhouse in the Middle
East. The greenhouse is sited in the extreme
desert climate and challenges the difficult task of
housing three separate biomes under one roof.
The internal climates, drastically different than the
local conditions, are contained within an ETFE
membrane.
The use of the polymer Ethylene
tetraflouroethylene (ETFE) across the enclosure
and interior of the building has allowed us to
achieve maximum efficiency and minimum cost,
while gaining flexibility in form and transparency.
68 TRI-CLIMATIC BIOSPHERE LEESER ARCHITECTURE 69
LEESER ARCHITECTURE 71
(top) Creating three ecospheres with climates
dramatically different than the harsh environment of the
desert presents a unique opportunity for the residents of
Abu Dhabi. In addition to growing foreign plant species,
the building will serve as a laboratory and exhibition
center for students.
(below) Atrium. The atrium in the center of the building
is a gathering area that where educational and visitor
programs are held. From the atrium, visitors are visually
connected to all three biomes through the glass-like
ETFE. From the atrium, students are welcome to follow
the ramp up the building and through the biomes to
experience the different climates foreign to Abu Dhabi.
LEESER ARCHITECTURE 7372 TRI-CLIMATIC BIOSPHERE
LEESER ARCHITECTURE 7574 TRI-CLIMATIC BIOSPHERE
LEESER ARCHITECTURE 7776 TRI-CLIMATIC BIOSPHERE
LEESER ARCHITECTURE 7978 WORLD MAMMOTH + PERMAFROST MUSEUM
WORLD MAMMOTH + PERMAFROST MUSEUMYAKUTSK, RUSSIA | 2007CULTURAL
COMPETITION
ROLELeeser Architecture was awarded first prize
for their Concept Design submission in the
international, invited competition. Leeser’s design
was also featured in the Russian Pavilion at the
Venice Biennial in 2008.
SIZE 70,000 ft2 / 6503 m2
COST $18 million
PROGRAMThe WMPM houses a museum exhibition
and laboratories for the viewing, study, and
preservation of a frozen Siberian mammoth found
on the site. The program includes climatically
controlled exhibition spaces for the mammoth and
greenhouse , laboratories, and support spaces.
DESIGN COMMENTS The extreme climatic conditions of Yakustk, Russia
and the unique programmatic combination of a
science laboratory and museum drove the design
of the project. The building is sited at the foot
of the Tchoutchour Mouran, a hill puncturing the
flat landscape of Yakutsk. The building’s volume
responds to the terrain in its shape as well as
in mimicking the natural pattern of the shifting
permafrost cycles. The museum is elevated
20 feet off the ground to prevent heat transfer
between the structure and ground, keeping the
building climate stable during the dramatic climatic
swings of Siberia. To keep a constant climate
on the interior, Leeser Architecture designed
an envelope is constructed of a super-insulated
double wall glazed facade with an Aerogel lattice
network situated between the glazing layers.
Exterior.Elevating “legs” lift the building 20 feet off the ground, reducing
the building’s footprint and its effect on the environment. The
gap between ground and building separates the building from the
thermally sensitive ground of the site, also reducing thermal loss
and gain from the changing climate.
LEESER ARCHITECTURE 8180 WORLD MAMMOTH + PERMAFROST MUSEUM
(opposite page top) Exterior. The facade and structure of the
building is designed as a 3-D space frame in the pattern of a
voronoi, inspired by the rigid landscape patterns of the Siberian
terrain. To accommodate the dramatic temperature swings
between the harsh winters and hot summers, we designed as
facade system using AEROGEL as insulation. The translucent
AEROGEL provides a hyper insulated space allowing for the
interior temperature to remain comfortable despite the extreme
climate.
(opposite page bottom) Indoor gardens and mammoth exhibition space. The controlled climate on the interior of the building allows
for plant life unable to endure the harsh temperature changes of
Siberia to thrive, allowing for the museum to become a unique
education tool and house innovative laboratories. The controlled
climate also allows for the display and study of a Woolly Mammoth
which was previously preserved in a Siberian cave on the site.
(left) Model photo of the model exhibited at the Venice Biennale
in 2008.
(below) Laboratories. The building is designed so the worlds
of the museum and scientific research can coexist without
contamination. The nature of the Woolly Mammoth exhibition
requires the research spaces of the museum to be kept at cold
temperatures. Visitors are afforded views of the laboratories at
restricted levels by escalators that take them through a climate
controlled tube.
LEESER ARCHITECTURE 83
POLYTECHNIC MUSEUM + UNIVERSITYMOSCOW, RUSSIA | 2013CULTURAL / EDUCATIONAL
COMPETITION
ROLELEESER Architecture is providing Concept Design,
Schematic Design and Design Development phase
design services.
SIZE 3,767,000 ft2 / 349,965 m2
COST $180 million
PROGRAMThe Moscow Polytechnic Museum and Education
Center includes two auditoriums, a full lecture
theater, two lecture halls, research centers, labs, a
new library, permanent and temporary exhibition
spaces, offices, and a public terrace for additional
event space.
DESIGN COMMENTSLEESER Architecture’s design links the architecture of
constructivism with the premise of new technologies of
today and the future development of the Polytechnic
Museum and the Moscow Lomonosov University.
The sharp triangulated geometry creates powerful
architectural language and highlight the two institutions’
top place in science research field.
The design inspired by a separate circulation path
organized like a double helix to ensure two primary
groups-the Users and Visitors communicate and
interplay with each other to fosters an intense proximity
in certain areas while also having their own function
areas. The buildings interior orientation is achieved
through augmented reality technology pointing the way
to the Visitors or Users desired destination. People can
also connect the building’s network and database via
their own personal electronic devices to get the needed
information.
The design focus on sustainability through the use of
sun exposure, winds, as well as high efficient artificial
lighting. Further, the “spiked” south façade allows for
a multiple levels to absorb sunlight and heat from the
winter’s low hanging sun, providing maximum comfort in
cold seasons.
82 POLYTECHNIC MUSEUM + UNIVERSITY
LEESER ARCHITECTURE 8584 POLYTECHNIC MUSEUM + UNIVERSITY
(top) Lobby and auditorium.(left) Street view in winter.
(right) Street entrance.
LEESER ARCHITECTURE 8786 3LD ART + TECHNOLOGY CENTER
NEW YORK, NEW YORK | 2006CULTURAL
CLIENT3-Legged Dog Media + Theater Group
ROLELeeser Architecture performed full design
services including Programming, Concept Design,
Schematic Design, Design Development, Bidding
and Negotiating, Construction Documentation and
Construction Administration.
SIZE 12,000 ft2 / 1,114 m2
COST $4.1 million
PROGRAMThe facility includes a 200-seat main stage
theater, a 2200 square foot gallery space, three
stages/performance spaces and a video and audio
editing suite.
DESIGN COMMENTS In 2006, Leeser Architecture completed the 3
Legged Dog Art and Technology Center, located in
New York, NY. Due to the events of September 11,
2001, the 3 Legged Dog performance group was in
need of a new home base to replace their former
Lower Manhattan location. It was the first cultural
institution to rebuild at Ground Zero. Leeser
Architecture was commissioned to design a 12,000
square foot facility to house the production and
viewing of cutting edge, large scale, multimedia
performance and art. The space functions as
a laboratory for the exploration of multimedia
performances and art. The design focuses on
opening the conventionally hidden activities of
theater production to the public, be it the casual
passer-by or the theater visitor.
3LD ART + TECHNOLOGY CENTER
LEESER ARCHITECTURE 89
(left) Facade. The diaphanous glass façade stretching 90-
feet along the length of Greenwich Street is pulled gradually
inside the building from the existing structure’s front edge
and then back again.
(bottom left) Lobby. The smooth, white lobby connects the
intentionally raw spaces of the original parking structure,
which contain the major program elements.
(bottom right) Entrance. The clean lines of the lobby
are accented with a smooth band of reflective glass. The
reflection the city movement provides a stark contrast to
the simplicity and transparency of the facade and interior
spaces.
88 3LD ART + TECHNOLOGY CENTER
LEESER ARCHITECTURE 9190 3LD ART + TECHNOLOGY CENTER
(right) Main theater. The experimental art forms of the 3LD
Art + Technology Center take on variety of different forms.
The theater is designed to accommodate all performance types,
whether it be analog, digital, large, or small.
(bottom left) Main theater. Adjustable screens provide greater
flexibility. Through lowering or raising the screens, the size of
the performance space can be adjusted and a gallery can be
created. The theater’s adjacency to the street allows for the
gallery space to visible to those walking by.
(bottom right) Main theater. All of the screens in the space are
designed to accept digital projections, encouraging art forms of
the future.
LEESER ARCHITECTURE 9392 HELIX HOTEL
ABU DHABI, UAE | 2008HOSPITALITY
CLIENTAl Qudra Real Estate & QP Internationall
ROLELeeser Architecture was awarded first prize
for their Concept Design submission in the
international, invited competition.
SIZE 250,000 ft2 / 23,225 m2
COST N/A
PROGRAMThe five star hotel includes 208 guest rooms;
lounges, restaurants, conference rooms, and a
cafes dispersed throughout the building, a indoor-
outdoor health spa, and a roof deck pool.
ENVIRONMENTAL DESIGNWorking with Atelier Ten, Leeser Architecture
designed the building to maximize the building’s
heat and energy conservation.
DESIGN COMMENTS The central focus of the luxury hotel is a helical
floor surface that surrounds an undulating void,
with public functions of the hotel occurring at
each level. The hotel challenges the idea that
visitors must engage in the stale paradigms of
rigid hallways and atria that characterize a typical
hotel stay. Guest rooms are folded into the hotel
amenities along the helical path through the
building, creating an urban world of unregulated
paths within the hotel. Though the void seems
to offer unmitigated visibility, there are enclaves
for private meetings and guest privacy. Designed
to be both an icon and platform for world class
service, the hotel will serve as an anchor facility in
the Zayed Bay District and greater Abu Dhabi.
HELIX HOTEL
LEESER ARCHITECTURE 9594 HELIX HOTEL
(right) Interior void from above. The 208 guest rooms
and suites of the Helix Hotel are arranged around a
helical floor of, dispensing hotel visitors into public space.
As the helix winds upward, programmatic elements
change from lounges and restaurants on the bay, to
meeting rooms and conference facilities, to the luxury
indoor-outdoor health spa on the fifth floor, ending with
the upper pool deck on the roof.
(below) Lobby. Helical floor peels up from the ground
floor of the hotel. From the lobby visitors are able to
experience the expansive atrium above.
LEESER ARCHITECTURE 9796 HELIX HOTEL
(top) Exterior running track. The running track on the fifth floor is
the only moment when the ramping ceases and a flat surface prevails.
(bottom left and right) Interior. Guest rooms and lobby.
LEESER ARCHITECTURE 9998 BRIC ARTS | MEDIA HOUSE / URBANGLASS
BRIC ARTS | MEDIA HOUSE / URBANGLASSBROOKLYN, NEW YORK | 2013CULTURAL
CLIENTNYC Economic Development Corporation (EDC)
ROLE
Leeser Architecture is performing full design
services including Programming, Concept Design,
Schematic Design, Design Development, Bidding
and Negotiating, Construction Documentation and
Construction Administration.
SIZE 60,000 ft2 / 5,574 m2
COST $40 million
PROGRAMLeeser Architecture’s renovation and expansion
of this existing, under-utilized building involves
two user groups, BRIC Arts | Media | Brooklyn and
UrbanGlass. The project includes a full renovation
of the interior space to create new theaters,
television broadcasting studios, art galleries, glass
workshops, media labs, classrooms, administrative
and operation offices, and support spaces.
ENVIRONMENTAL DESIGNUSGBC LEED Silver certified
DESIGN COMMENTS & RELEVANCEThe project is a community arts center for two
arts organizations. While pursuing wildly different
types of work, the mission of each organization
is centered around community outreach and
participation. The primary project objective is the
expansion of BRIC and UrbanGlass to the vacant
ground floor and to visually open the building to
the street. Leeser Architecture juggled complex
programmatic demands and highly specific uses to
create an open and accessible arts facility that can
connect the community as well as invite them
inside to engage with the myriad of activities
occurring within.
LEESER ARCHITECTURE 101100 BRIC ARTS | MEDIA HOUSE / URBANGLASS
(right) Galleries from sidewalk. The facade of the
ground floor is designed to increase the visibility
and accessibility of the cultural organizations
housed within the building. The distinctive
V-shaped columns at the entrance facade opening
were designed for structural efficiency. The building
interior wall is of load-bearing masonry, and in order
to create the large scale facade opening, steel
beams and columns were necessary to carry the
weight of the wall above.
(below) BRIC Arts | Media House double height gallery. The clean lines and simple configurations of
the gallery spaces provide a platform for all types of
media to be displayed. Throughout the gallery there
are interactive installations for students and visitors
to engage with the artwork.
LEESER ARCHITECTURE 103102 BRIC ARTS | MEDIA HOUSE / URBANGLASS
(top) Signage. The BRIC Arts | Media House signage is fabricated in
raised metal lettering applied to the white painted surface. The word
BRIC is mapped onto the building by the technique of projection. The
outline edge of each letter follows every contour of the facade. The
techniques and optics of projection are integral to the production
of art within - be it Performing, Media or Visual Arts. The result is a
spatially rich graphic that composes its message as one moves around
the building.
(bottom) Entrace view. In using two V-columns, the design achieves
the same structural efficiency as using four vertical steel columns.
LEESER ARCHITECTURE 105104 LONDON OLYMPIC PARK FLOATING LAKE
LONDON, ENGLAND | 2009CULTURAL
COMPETITION
ROLELeeser Architecture was invited by the Mayor of
London to design a Concept Design submission for
the 2012 London Olympic Park.
SIZE 2,700 ft2 / 251 m2
COST N/A
PROGRAMLeeser Architecture designed an iconic structure
to act as the central pavilion for the 2012 Olympics
in London. The program includes amphitheaters,
public gathering spaces, as well as a digitally
controlled waterfall.
DESIGN COMMENTS This structure will provide a place for families
to visit, both tourists and locals, providing
breathtaking views over the Olympic Park as
well as over London in the distance. There are
no visible borders or edges which gives visitors
the sensation of being elevated upon a cloud,
one feels suspended above the vast expanses of
the Olympic Park. Utilizing the large amounts of
rain London receives each year, the edge of the
Floating Lake contains computer controlled water
nozzles that allow for a continuous patterned
waterfall spanning the complete perimeter, giving
the appearance of the lake overflowing its edge.
The space below is well suited for casual concerts,
performances or street theater.
LONDON OLYMPIC PARK FLOATING LAKE
LEESER ARCHITECTURE 107
(top) Aerial. The pavilion designed for the London 2012
Olympics as a permanent structure to remain after the
Olympics pass through
(left) Park and performance space. The space below
the pavilion is designed to accommodate performances,
lectures, and other cultural events. When events are not
being held that the space, it is used as public park.
(right) Water feature. The entire top surface of the pavilion
is a water feature. During the Olympic games the water
from the pavilion is to be used as a cooling tower for
surrounding buildings, increasing the energy efficiency of
the entire Olympic Park.
106 LONDON OLYMPIC PARK FLOATING LAKE
LEESER ARCHITECTURE 109108 GENIUS / COWORK.RS
GENIUS / COWORK.RSBROOKLYN, NEW YORK | 2015COMMERCIAL / OFFICE
CLIENTSGENIUS MEDIA
COWORK.RS
ROLE
Leeser Architecture performed full design
services including Programming, Concept Design,
Schematic Design, Design Development, Bidding
and Negotiating, Construction Documentation and
Construction Administration.
SIZE 80,000 ft2 / 7,432 m2
COST $TBD
PROGRAMLeeser Architecture’s renovation of this existing,
under-utilized building involves two tenants,
Genius Media and COWORK.RS. The project
includes a full renovation of the interior space
to create new office, collaborative work space,
meeting rooms, and event space.
DESIGN COMMENTSLeeser Architecture used a dichroic film at the
glass walls and polished metal laminate millwork to
energize the former industrial space for this hip,
young startup. Designed with an understanding
of how today’s office environments function,
the space is simple and and organized yet highly
dynamic.
LEESER ARCHITECTURE 111110 GENIUS / COWORK.RS
LEESER ARCHITECTURE 113112 GENIUS / COWORK.RS
LEESER ARCHITECTURE 115114 GENIUS / COWORK.RS
LEESER ARCHITECTURE 117116 GENIUS / COWORK.RS
LEESER ARCHITECTURE 119
iconic, influential design
Every building has its very own story to tell, a
unique experience that we discover and create
in close collaboration with our clients. We are
driven by a passion and commitment toward
architecture as a vehicle for educational,
social, cultural and technological engagement.
We challenge the conventional notions
of architecture with the use of new
technologies and radical design. Integrated
with the contemporary cultural, social, and
technological context this approach creates:
Based in Brooklyn, we are a mid-sized firm
comprised of architects and designers with
a broad range of knowledge and experience
as well as passion for innovation. Our highly
collaborative approach resonates throughout
our network of consultants and in our client
relationships.
We approach each client + project individually,
capitalizing on the unique opportunities of each
to create iconic architecture that is relevant to
its users + the surrounding community.
Additionally, we hold our client relationships
in the highest regard, + find that the most
successful projects result from strong
collaboration between client, design team
+ consultant team.
r i c h l y va r i e d s p at i a l ex p e r i e n c e s , n ew p ro g ra m m at i c
re l a t i o n s h i p s + b e a u t i f u l l y s i m p l e o rg a n i z a t i o n s .
ABOUT US
LEESER ARCHITECTURE 121
SIMON ARNOLD, RAPROJECT DIRECTOR / PROJECT ARCHITECT
Mr. Arnold was born and educated in England. He worked at Fox Linton Associates in London
before moving to the United States, where he has worked at Skidmore, Owings and Merrill and
Diller+Scofidio and Renfro. During his three years at SOM, Mr. Arnold worked on 7 World Trade
Center, NATO Headquarters in Brussels, Solow 9 West 57th Street, and Davis and Partners
Residential at 60 East 55th Street. Mr. Arnold is currently project manager for the Staten Island
Zoo Aquarium, a 110,000 sf Brooklyn Hotel Development, and a 280,000 sf Brooklyn Residential
Development. Mr. Arnold specializes in residential, hotel and cultural facilities.
SOFIA CASTRICONEPROJECT MANAGER
Ms. Castricone joined Leeser Architecture from Keenen/Riley Architecture in New York, where
she was involved with retail, residential, and museum projects. With Leeser Architecture, Ms.
Castricone has focused most of her time on cultural projects, notably the Museum of the Moving
Image and BRIC Arts | Media House. She is currently playing a key role in the Construction
Administration phase of the BRIC Arts | Media House and UrbanGlass construction and
renovation. Ms. Castricone specializes in cultural and educational facilities.
CHRISTIAN LEHMKUHL, LEED APARCHITECTURAL DESIGNER
Mr. Lehmkuhl was born and raised in Germany but received his architectural training at renown
institutions on four different continents. He holds a professional degree in Architectural Design
from the Technical University Berlin, where he concentrated on Digital Media and Mass
Customization as well as a Master of Science from the Massachusetts Institute of Technology.
Before joining Leeser Architecture, Mr. Lehmkuhl has concentrated on temporary structures
and the integration of digital media in architecture. He is currently involved in a broad variety of
projects at Leeser, where he specializes in the intersection between technology and design.
ANJA MISIC PAVLINARCHITECTURAL DESIGNER
Mrs. Misic Pavlin graduated in Architectural Design from the University of Ljubljana, Slovenia with
Cum Laude Distinction, where she dedicated her time in exploring the intersection of virtual and
material elements of space. During her studies in Slovenia she also received National Student Plecnik
Award 2011 and The International Trimo Research Award 2012. She also holds a Master of Science
degree from Pratt Institute, Brooklyn, NY where she was awarded The Pratt Institute Circle Award
2013 for outstanding Academic Achievement. Before joining Leeser architecture she worked for
Slovenian company that focuses on hotel, cultural and residential facilities. With Leeser architecture,
Mrs. Misic Pavlin has been involved in numerous projects, in particular Museum and educational
center in Moscow and Facade and lobby design for 17-story mixed use tower in Brooklyn.
KEY STAFF
TEACHING EXPERIENCE
Thomas Leeser is internationally known for his iconic architectural designs at all scales. As principal
of his own firm for the past twenty five years, his passion for the fusion of emerging technologies
and architecture has driven many of the firm’s award winning designs. Thomas’s commitment to
architecture extends beyond practicing in the field. He has been an architecture professor at nine
different universities. He is currently teaching at Columbia University, Cornell University, Harvard
University, and Pratt Institute. In his teaching and professional work, Thomas explores his commitment
to innovation and the advancement of the field of architecture. Thomas specializes in museums,
theaters, broadcast and educational facilities.
Registered Architect State of New York, License #022510
EDUCATION
1989 -
1980-89
1985
1980-81
1979
1974-75
2010 - Present
2011 - 2012
2012
2005 - 2009
2004 - 2012
1998 - 2000
1998 - 2002
1996
1989-1996
Principal Architect, Leeser Architecture, New York, New York
Partner-in-Charge of Design, Eisenman ArchitectsKey Projects include
The Wexner Center for Visual Arts, Ohio State University, Columbus, Ohio
The Progressive Corporation Headquarters, (with Frank Gehry and Claes Oldenburg, Carl André,
Richard Serra), Cleveland, Ohio
The University Art Museum, Long Beach, California
The Biocenter of the J.W. Goethe University, Frankfurt am Main, Germany
Choral Works/Parc de la VillePtte, (with Jaques Derrida), Paris, France
The Columbus Convention Center, Columbus, Ohio
The Tokyo Opera House Competition, Tokyo, Japan
Master of ArchitectureTechnische Hochschule Darmstadt, Darmstadt, Germany
Thesis Year Foreign Exchange ProgramThe Irwin S. Chanin School of Architecture at the Cooper Union, New York, New York
Bachelor of Architecture Technische Hochschule Darmstadt, Darmstadt, Germany
Undergraduate Program in Industrial Design and Visual Communication Hochschule für Industriedesign und visuelle Kommunikation, Germany
Pratt Institute, School of Architecture, Professor, Brooklyn, NY
Cornell University, School of Architecture, Adjunct Assistant Professor, New York City Campus
Harvard University, Graduate School of Design, Adjunct Assistant Professor
The Cooper Union, Irwin S. Chanin School of Architecture, Adjunct Assistant Professor
Columbia University, Graduate School of Architecture, Planning and Preservation , Adjunct Assistant Professor
Parsons School of Design, Department of Architecture, The New School, Adjunct Assistant Professor
Rensselaer Polytechnic Institute, School of Architecture, Adjunct Assistant Professor
Illinois Institute of Technology, College of Architecture, Visiting Associate Professor
Princeton University, School of Architecture, Assistant Professor
PROFESSIONAL EXPERIENCE
THOMAS LEESER, RAPRINCIPAL IN CHARGE
120 STAFF
PRINCIPAL
LEESER ARCHITECTURE 123
AWARDS
2015 Building Brooklyn Award : Community Development : BRIC Arts | Media
House / UrbanGlass, Brooklyn, New York // Asia Property Awards 2014 :
Best Commercial Architectural Design : EM Quartier Bangkok, Thailand //
Municipal Arts Society of New York MASterworks Award 2014 : Neighborhood
Catalyst : BRIC Arts | Media House, UrbanGlass, Brooklyn, New York
// Red Dot Design Award 2013 : Architecture and Urban Design
Category : Museum of the Moving Image, Astoria, New York //
International Competition 2012 : Shortlisted : Moscow Polytechnic Museum and
Education Center, Moscow, Russia // Public Design Commission of the City of New York
2011 : Award for Excellence in Design : Museum of the Moving Image, Astoria, New York //
Invited International Competition 2011 : Second Prize : Polytechnic Museum, Moscow, Russia
// Starnet Design Grand Prize Award 2011 : Museum of the Moving Image, Astoria, New York
// Invited International Competition 2010 : First Prize : Iconic Greenhouse, Abu Dhabi, UAE // Public
Design Commission of the City of New York 2010 : Award for Excellence in Design : Strand Theatre
Renovation, Brooklyn, New York // International Competition 2010 : Shortlisted : Frankfurt Jewish
Memorial, Frankfurt, Germany // Invited International Competition 2009 : First Prize : The Helix Hotel, Abu
Dhabi, UAE // AIA Design Award 2008 : World Mammoth and Permafrost Museum, Yakustk, Russia 2007 //
Invited Competition 2007 : First Prize : World Mammoth and Permafrost Museum, Yakustk, Russia // AIA Small
Projects Award 2005 : Vaccaro Loft, SoHo, New York // Invited Competition 2004 : First Prize and Commission
: Museum of the Moving Image, Astoria, NY // Invited Competition 2004 : Selected Project with MVRDV and StoSS :
NYC 2012 Olympic Village, New York, New York // Three Architectural Record Interiors Awards 2003 : Excellence in Design
: “Glass,” “Bot” and “Pod” // New York Foundation for the Arts Architecture and Design Discretionary Grant 2003 : Three
Legged Dog Performing Arts Group New Media Arts Center design // Invited International Competition 2003 : First Prize :
Design School Zollverein, Essen, Germany // International Competition 2003 : Finalist Award : Pontecagnano Faiano European
Center for Creativity, Salerno, Italy // Invited International Competition 2002 : Finalist Award : Eyebeam Atelier Museum
for Art and Technology, Chelsea, New York // James Beard Foundation “Best Design Award” 2002 : nomination : Glass //
Invited Limited Competition 2001 : Finalist : EMPAC-Electronic Media and Performing Arts Center, Rensselaer Polytechnic
Institute, Troy, New York // Two Stage International Competition 2000 : Award wining design : ETH World (virtual university)
AWARDS
LEESER ARCHITECTURE 125
CLIENT REFERENCES +TESTIMONIALS
REFERENCES
CARL GOODMAN Executive Director
Museum of the Moving ImageProject: Museum of the Moving Image
36-01 35th Avenue Astoria, NY 11101
718.777.6800
GREG CLANCYSVP Capital Program Development NYCEDC
[former]VP Project Development RXR Realty
[current]Project: BRIC Arts | Media House
1330 Avenue of the Americas #500New York, NY 10019
ASHER ABEHSERAPrincipal, LIVWRK Holdings
55 Prospect StreetDumbo, NY 11201
TESTIMONIALS
DAVID WALENTASFounding PartnerTwo Trees Management Co LLC
KEVIN CUNNINGHAMExecutive Artistic Director3 Legged Dog Art + Technology Center
CARL GOODMAN Executive DirectorMuseum of the Moving Image
CHRISTIANE PAULAdjunct Curator of New Media ArtsWhitney Museum of American Art
124
LEESER ARCHITECTURE 127
Left: 60 Water Street FacadeRight: Mercedes House South Lobby
126 CLIENT TESTIMONIALS
LEESER ARCHITECTURE 129
To Whom It May Concern,
I am writing to highly recommend the work of Leeser Architecture to you. Thomas Leeser and his team designed and oversaw the building of our 21st Century multi-purpose arts facility, 3LD Art & Technology Center (construction complete 2005) and the facility quickly became a major international center for multi-media and interdisciplinary art of all kinds.
Leeser Architecture’s unique understanding of the 21st Century, exhibition, display, media, interactive and telecommunications technology is unmatched among architects working today. Leeser’s foresight and intimate understanding of our mixed needs which must accommodate traditional exhibition, event space, full scale theatrical, large scale immersive multi-media and interactive installations has been a godsend as we built the facility programs.
opportunity in the design, value engineering and build phases of project. They were very hands on throughout the process of a project that proved to be an unusual logistical and bureaucratic challenge.
I cannot encourage you strongly enough to work with this extremely creative,
Sincerely,
Kevin CunninghamCEO, Artistic Director
3LD Art + Technology CenterLeft: Exterior Facade, Right: Lobby
128 CLIENT TESTIMONIALS
LEESER ARCHITECTURE 131
Museum of the Moving Image.Left: Exterior Facade, Right: Lobby
130 CLIENT TESTIMONIALS
LEESER ARCHITECTURE 133
Feedback Exhibition
132 CLIENT TESTIMONIALS
LEESER ARCHITECTURE 135
SELECTED WORKS
134
LEESER ARCHITECTURE 137
Staten Island Zoo AquariumStaten Island, NY2011
Augmented SiberiaGhent, NY2011
50 W23rd StreetNew York, NY 2010
Danet ResidencesAbu Dhabi , UAE2010
Taipei Pop Music Center Taipei, Taiwan2011
Shamaris Apart-mentNew York, NY 2009
Highlands HouseHighlands, NY2008
136 SELECTED PROJECTS
Hungarian House of MusicLiget, Budapest2014
Hong Kong Art PavilionHong Kong, China2014
455 JeffersonBrooklyn, NY2015
Paley Center for MediaNew York , NY2011
Moscow Polytechnic MuseumMoscow, Russia2011
BienenkorbhausFrankfurt, Germany2013
Olympic VillageQueens, NY2011
LEESER ARCHITECTURE 139
Vaccaro LoftNew York, NY 2004
Glass BarNew York, NY 2002
Nam June PaikSeoul, Korea 2003
Design School ZollVereinEssen, Germany 2003
Bottino Restaurant Chelsea, NY 1998
Eyebeam AtelierNew York, NY2001
138 SELECTED PROJECTS
Hong Kong Design InstituteHong Kong, China2006
Laboral Art Center GameworldGijon, Spain2007
Laboral Art Center FeedbackGijon, Spain2007
Estonian National MuseumTartu, Estonia2005
Theatre HeidelbergHeidelberg, Germany2008
Oasis Residences Dubai, UAE2008
Zürcher StudioNew York, NY2008
Moscow Economic SchoolMoscow, Russia2008