Page 1: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

LHC Magnet Tests:LHC Magnet Tests:

A challenge A challenge

for anfor an

Operation Operation

TeamTeamV. ChohanV. Chohan

G.H. HemelsoetG.H. Hemelsoet

CernCern

GenevaGeneva

Always set the trail, never follow the path

Page 2: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

OutlineOutline

Introduction to SM18 & Magnets Tests Introduction to SM18 & Magnets Tests FacilityFacility

Operational TechniquesOperational Techniques The ChallengeThe Challenge The ActorsThe Actors Some tools set up by operationSome tools set up by operation

– Web serversWeb servers– Magnet Training CriteriaMagnet Training Criteria– Priority HandlingPriority Handling– Online and Real Time reportsOnline and Real Time reports

ConclusionsConclusions

Page 3: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

SM18 TestsSM18 Tests

Limited InfrastructureLimited Infrastructure Heterogeneous TeamHeterogeneous Team

– Staff and outside contractorsStaff and outside contractors– Core of test manpower was a Core of test manpower was a

collaboration from Indiacollaboration from India Tight schedule to test 1706 Tight schedule to test 1706

magnetsmagnets– In fact more than 1900 tests (with In fact more than 1900 tests (with

spares and repeats)spares and repeats)

Page 4: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Magnets testedMagnets tested

Current / Current / FieldField

Required for Required for LHCLHC

Total TestedTotal Tested

DipolesDipoles 11850 A/11850 A/

8.33T8.33T12321232 13751375

SSSSSS 11850 A11850 A

233 T/M233 T/M392392 450450

IR SSSIR SSS 8282 9494

1919 Magnets tested on time

Page 5: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Cumulative tested Cumulative tested magnets magnets

Early Performance

With Operational Techniques

Page 6: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Staffing: Various Team Staffing: Various Team of SM18of SM18

Magnet Tests Team OP

Cryogenic Team

Magnet Connect/Disconnect

Team

Magnet Transport

Team

Mainly associates from DAE

India

Industrial Consortia

Equipment

support

Page 7: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Magnet Tests.. Magnet Tests.. What do we do ?What do we do ?

New magnet arrives..

Insulation test, connection to CFB

Preparatory tests (functioning of protection systems & instrumentation, insulation…)

Preparatory tests (tuning DAQ..)

Insulation tests

Functioning of protection systems

Power tests (&Training)

Magnetic measurements

Final insulation tests @cold

Cool down to 1.9K

Final warm tests

Electrical integrity

Resistance measurements..

Final insulation tests

Disconnection from CFB

Warm –up

Page 8: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Test Facility in Test Facility in SM18SM18

12 test benches in SM1812 test benches in SM18 Roughly speaking:Roughly speaking:

– 3 magnets @1.9 ‘k3 magnets @1.9 ‘k– 3 in warm-up or cool-down phase3 in warm-up or cool-down phase– 3 in connection or disconnection phase 3 in connection or disconnection phase – 3 spare &/or dedicated to special use3 spare &/or dedicated to special use– 6 power supplies ( 1 per 2 benches)6 power supplies ( 1 per 2 benches)

Dipoles as well as SSS’s TestingDipoles as well as SSS’s Testing

C2C1

B2B1

A2A1

F2F1

E2E1

D2D1

Page 9: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Web Server (SMTMS)Web Server (SMTMS)

Maintains electronic repository of tests resultsMaintains electronic repository of tests results Links tests results with management toolsLinks tests results with management tools Tracks test progress & test statisticsTracks test progress & test statistics Automatic generation of test reportsAutomatic generation of test reports Automatic filling of the tests doneAutomatic filling of the tests done

Page 10: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

E-Traveller E-Traveller

Web based tool with mobile phone interface and video Web based tool with mobile phone interface and video display – alert teamsdisplay – alert teams

Keeps track of electronic, signature based information Keeps track of electronic, signature based information exchangeexchange

Automatic time stamped log of tests activitiesAutomatic time stamped log of tests activities Minimizes verbal communication.. Minimizes verbal communication..

Page 11: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Real Time InformationReal Time Information

Real time Real time status of the status of the facility was facility was displayed on displayed on the web and the web and on TV screens on TV screens around the around the CERNCERN

LHC Dashboard

Page 12: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Training RulesTraining Rules

Earlier, all magnets were trained to Earlier, all magnets were trained to ultimate field (12850A ~9T)ultimate field (12850A ~9T)

3-4 hours recovery time between 3-4 hours recovery time between quenches, Time consuming…quenches, Time consuming…

But… Most of the ‘good magnets’ But… Most of the ‘good magnets’ cross nominal field (11850A ~ cross nominal field (11850A ~ 8.33T) in the second training 8.33T) in the second training ramp.. ramp..

[ year 2003 Observation by OP [ year 2003 Observation by OP Team]Team]

Two-Quench Rule: Accept the Two-Quench Rule: Accept the magnet if it crosses nominal field in magnet if it crosses nominal field in Second training with small margin!Second training with small margin!

Three-Quench Rule: Accept the Three-Quench Rule: Accept the magnet if it crosses 12250 A (~8.66 magnet if it crosses 12250 A (~8.66 T) in third training, even if it had T) in third training, even if it had not passed the preceding rule..not passed the preceding rule..

80% magnets cross nominal in 2nd ramp!

ALL ramp2

10350

10850

11350

11850

12350

12850

13350

1001

-1st

run

3002

- 2n

d ru

n30

02-

3rd

run

3001

-3rd

run

1002

-3rd

run

1006

-1st

run

1008

-ist r

un10

1210

1310

1710

1810

3110

3210

3510

3810

4510

3910

4220

03-1

st r

un30

01-4

th r

un30

02-4

th r

un30

0430

0630

0730

0830

1430

2730

2830

46-2

nd r

un30

5430

7030

01-2

nd r

un10

04-1

st r

un20

0810

10-1

st r

un10

1610

50-2

nd r

un10

07-1

st r

un10

1510

0310

08-2

nd r

un10

09-1

st r

un20

0710

5210

2810

3420

08-2

nd r

un30

4520

0630

3430

4110

2330

4710

29-2

nd r

un20

0420

22-2

nd r

un20

26-2

nd r

un20

0930

4420

2030

1210

11-1

st r

un10

2410

0210

5030

1330

4210

4920

23-2

nd r

un30

1110

2130

3810

1410

2520

01-2

nd r

un20

01-3

rd r

un30

01-1

st r

un30

3930

6530

4310

26-

2nd

run

3002

- 1s

t run

2054

2002

1048

1029

-1st

run

3005

2017

2024

2025

-2nd

run

1027

2012

2029

1022

3046

2018

3055

2026

2001

-1st

run

1026

2010

1019

1020

2025

2021

2023

2024

2022

2027

1005

Page 13: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Magnet Appraisal & Magnet Appraisal & Performance Sheet Performance Sheet (MAPS)(MAPS)

Single page report Single page report on rule based on rule based magnet goodness magnet goodness evaluationevaluation

OP Team OP Team empowerment for empowerment for rapid, round the rapid, round the clock decision taking clock decision taking on first level of on first level of goodness evaluationgoodness evaluation

Mitigates issues of Mitigates issues of magnet storage magnet storage logisticslogistics

Page 14: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Overall & Cryo Priority SettingOverall & Cryo Priority Setting

Ensure that magnets follow the desired Ensure that magnets follow the desired cryogenic phase distribution, within the limits cryogenic phase distribution, within the limits of possibilities due to the varying training of possibilities due to the varying training performance ( a priori not known)performance ( a priori not known)

Page 15: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Rapid On Bench Thermal Rapid On Bench Thermal CycleCycle(ROBTC)(ROBTC)

Earlier, ‘poor magnets’ Earlier, ‘poor magnets’ were disconnected from were disconnected from bench, fitted with bench, fitted with anticryostats, tested anticryostats, tested again at a later date…again at a later date…

Additional Additional disconnection, disconnection, connection, preparatory connection, preparatory tests… time consuming..tests… time consuming..

But.. Quench But.. Quench performance improves performance improves after thermal cycleafter thermal cycle

Rapid On-Bench Rapid On-Bench Thermal Cycle (ROBTC): Thermal Cycle (ROBTC): Rapid thermal cycle of a Rapid thermal cycle of a poor magnet without poor magnet without disconnection from test disconnection from test benchbench

Page 16: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Prototype vs Prototype vs Operation Operation Prototype facilityPrototype facility

– Try to push every Try to push every magnet at the limitmagnet at the limit

– Repair or improve as Repair or improve as they have timethey have time

Operation not Operation not actively involved in actively involved in Software and design Software and design of facilityof facility– Each group has its Each group has its

own idea and own idea and implements its wayimplements its way

– Culture of keeping Culture of keeping control and hiding control and hiding thingsthings

Running acceleratorRunning accelerator– Try to push the whole Try to push the whole

complex at the limitcomplex at the limit– Fast and coordinated Fast and coordinated

repair and repair and improvementimprovement

Operation is central Operation is central about design and about design and software development software development – Advice of operation Advice of operation

before implementationbefore implementation– Open environment with Open environment with

trust of operationtrust of operation

Page 17: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Operation know-how Operation know-how

Before 2002Before 2002– All problems treated All problems treated

the same waythe same way No clear distinction No clear distinction

between magnet between magnet problem and problem and equipment problemequipment problem

– Poor global viewPoor global view Each magnet has its Each magnet has its

own Excel files with own Excel files with redundant redundant informationinformation

After 2003After 2003– Separation for magnet Separation for magnet

and bench problemsand bench problems E-log book for E-log book for

EquipmentEquipment Database for Database for

magnets magnets – Global web generated Global web generated

viewview One data base for all One data base for all

magnet information magnet information and an automatically and an automatically generated Magnet generated Magnet and Test Result and Test Result paper logbook.paper logbook.

Page 18: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

ConclusionsConclusions

The tools developed by Operation helped The tools developed by Operation helped a lot to finish the magnet tests on timea lot to finish the magnet tests on time– Identify bottlenecks Identify bottlenecks

To do list To do list StatisticsStatistics

– Real push from the team to gain time Real push from the team to gain time Change of the rules Change of the rules Tracking of down timeTracking of down time

– Real time Management of the facilityReal time Management of the facility PrioritiesPriorities Web DisplayWeb Display

Whether we play a large or small role, by working together we achieve our objectives.

Page 19: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Foreseen TimesForeseen Times

Standard timeStandard time– 12 hrs connection12 hrs connection– 12 hours vacuum 12 hours vacuum

pumpingpumping– 26 hours cooldown26 hours cooldown– 36 hours cold test36 hours cold test– 12 hours warm up12 hours warm up– 12 hours disconnection12 hours disconnection

Total 108 hours per Total 108 hours per magnet magnet – (4.5 days of 24 hours)(4.5 days of 24 hours)

Standard Model

0

12

24

36

48

60

72

84

96

108

Per Any Magnet

disconnect

warm up

cold tests

cooldown

pump down

connection

Page 20: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Ideal situationIdeal situation

To ensure a maximal usage of the To ensure a maximal usage of the facility, a cog-wheeling strategy has to facility, a cog-wheeling strategy has to be set up. be set up.

TB Period n n+1 n+2 n+3 n+4 n+5 n+6 n+7 n+81 Install Setup To 90 K To 1.9 K Test 1.9 K Test 1.9 K Test 1.9 K Warmup Remove2 Test 1.9 K Test 1.9 K Test 1.9 K Warmup Remove Install Setup To 90 K To 1.9 K3 Remove Install Setup To 90 K To 1.9 K Test 1.9 K Test 1.9 K Test 1.9 K Warmup4 To 1.9 K Test 1.9 K Test 1.9 K Test 1.9 K Warmup Remove Install Setup To 90 K5 Warmup Remove Install Setup To 90 K To 1.9 K Test 1.9 K Test 1.9 K Test 1.9 K6 To 90 K To 1.9 K Test 1.9 K Test 1.9 K Test 1.9 K Warmup Remove Install Setup7 Test 1.9 K Warmup Remove Install Setup To 90 K To 1.9 K Test 1.9 K Test 1.9 K8 Setup To 90 K To 1.9K Test 1.9K Test 1.9 K Test 1.9 K Warmup Remove Install9 Test 1.9 K Test 1.9 K Warmup Remove Install Setup To 90 K To 1.9 K Test 1.9 K10 Test 1.9 K Test 1.9 K Test 1.9 K Warmup Remove Install Setup To 90 K To 1.9 K11 Remove Install Setup To 90 K To 1.9 K Test 1.9 K Test 1.9 K Test 1.9 K Warmup12 To 1.9 K Test 1.9 K Test 1.9 K Test 1.9 K Warmup Remove Install Setup To 90 K

Page 21: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

In Reality …In Reality …

Page 22: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Operational Operational TechniquesTechniques Web based databaseWeb based database

– SM18 Test Management System (SMTMS)SM18 Test Management System (SMTMS) Links electronic repository of tests results with other Links electronic repository of tests results with other

management toolsmanagement tools Provide real time view of the facility to identify Provide real time view of the facility to identify

bottlenecksbottlenecks– E-travellerE-traveller

Web based, electronic signature based information Web based, electronic signature based information exchange toolexchange tool

Web Server

SM 18 control Room SM 18 Hall

Offices Status

Page 23: LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.

Operational Operational TechniquesTechniques Improved Training rulesImproved Training rules

– Use the last quench of a magnet to help the warming upUse the last quench of a magnet to help the warming up– Modified Magnet Training CriteriaModified Magnet Training Criteria

Two-Quench Rule Two-Quench Rule Three Quench RuleThree Quench Rule

– Rapid On-Bench Thermal Cycle (ROBTC)Rapid On-Bench Thermal Cycle (ROBTC) Thermal cycle of a poor magnet without disconnection from Thermal cycle of a poor magnet without disconnection from

test benchtest bench Time & space optimizationTime & space optimization

– Overall & Cryo priority handlingOverall & Cryo priority handling 24 hour priority decision by OP team for effective & clash-24 hour priority decision by OP team for effective & clash-

free utilization of ALL resources ( Cryo, Power, bench etc)free utilization of ALL resources ( Cryo, Power, bench etc)– MAPSMAPS

Single page record of ‘rule based magnet goodness Single page record of ‘rule based magnet goodness evaluation’evaluation’