EXISTING AEP
OVERHEAD LINE TO
REMAIN
RELOCATE 2250KW
480/277V DIESEL
GENERATOR
AEP SUBSTATION
GATE
GATE
SL1SL1
SL1 SL1
EMH NO. 1
CMH NO. 1
EMH NO. 23
CMH NO. 20
C
L
C
L
OP
EN
IN
G
VOLTAGE
REGULATOR
10MVA TRANSFORMER
3000KVA
TRANSFORMER
300KVA
TRANSFORMER
FXFX
DWG. No.
PROJ. No.
SCALE
DATE
DWG. TITLE
DWN.
CHK.
6-23-2020
479204
603 King Street
4th Floor Alexandria VA 22314
www.wendelcompanies.com
p:703.299.8718 f:716.625.6825
NO. REVISIONS DATE
01" 2"
GENERIC SCALE BAR
SCALE BAR SHOWN IS TWO INCHES ON THE ORIGINAL DRAWING.
IF NOT TWO INCHES ON THIS SHEET, ADJUST ACCORDINGLY
WENDEL ENGINEERING, P.C.
NOTE:
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN
INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF THE ARCHITECT
AND ENGINEER AND IS NOT TO BE USED IN WHOLE OR IN PART, FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE ARCHITECT AND
ENGINEER. UNAUTHORIZED ALTERATION OR ADDITION TO ANY SURVEY DRAWING,
DESIGN, SPECIFICATION, PLAN OR REPORT IS PROHIBITED IN ACCORDANCE WITH
STATE LAW, CODE AND RULES.
WESTERN VIRGINIA WATER
AUTHORITY
ELECTRICAL
INSTALLATION
BROWNLEE AVE
SE
PTV.
0ISSUED FOR BID
6/23/20
SCALE:
1
SUBSTATION PLAN
1/16"=1'-0"
CONSTRUCTION NOTES: X
1. RECEIVING STRUCTURE SWITCH CONTRACTOR TO FURNISH AND INSTALL ALL CONTROL WIRING
REQUIRED FROM STRUCTURE SWITCH TO PLC IN NEW SWITCHGEAR. PROVIDE CONNECTION TO
STRUCTURE MOTOR FROM 48VDC STATION BATTERY SYSTEM.
2. 138KV BUS STRUCTURE.
3. 138KV CIRCUIT SWITCHER CONTRACTOR TO FURNISH AND INSTALL ALL CONTROL WIRING
REQUIRED FROM CIRCUIT SWITCHER TO PLC IN NEW SWITCHGEAR. PROVIDE CONNECTION TO
STRUCTURE MOTOR FROM 48VDC STATION BATTERY SYSTEM.
4. 10MVA TRANSFORMER CONTRACTOR TO FURNISH AND INSTALL ALL CONTROL WIRING
REQUIRED FROM TRANSFORMER TO PLC IN NEW SWITCHGEAR.
5. 12.47KV DOWN CONDUCTOR POLE, CONTRACTOR TO INSTALL WIRING FURNISHED BY OWNER.
FURNISH AND INSTALL ALL WIRING CONNECTORS AND CONNECTIONS AS REQUIRED.
6. MULTI-PHASE PAD MOUNTED STEP VOLTAGE REGULATOR, CONTRACTOR TO INSTALL WIRING
FURNISHED BY OWNER. FURNISH AND INSTALL ALL WIRING CONNECTORS AND CONNECTIONS
AS REQUIRED.
7. 3000KVA PAD MOUNTED TRANSFORMER T-GEN. FURNISH AND INSTALL ALL WIRING
CONNECTORS AND CONNECTIONS AS REQUIRED.
8. 300KVA PAD MOUNTED TRANSFORMER T-SS, FURNISH AND INSTALL ALL WIRING CONNECTORS
AND CONNECTIONS AS REQUIRED.
9. 2250KW DIESEL GENERATOR, CONTRACTOR TO RELOCATE FROM BACK OF PLANT AND INSTALL
ON CONCRETE PAD. FURNISH AND INSTALL ALL WIRING CONNECTORS AND CONNECTIONS AS
REQUIRED.
10. SWITCHGEAR BUILDING, PROVIDED AND INSTALLED BY OWNER. CONTRACTOR TO INSTALL NEW
SWITCHGEAR FURNISHED BY OWNER. REFER TO DRAWING E201 FOR ADDITIONAL
REQUIREMENTS.
11. RUN NEW WIRING IN EXISTING CONDUIT FOR SITE LIGHTING CONNECT TO SWITCH IN
SWITCHGEAR BUILDING.
12. EXISTING CONDUIT STUB UPS TO REMAIN.
13. EXTEND ALL CONDUITS FINAL 5 ' FROM CURRENT LOCATION TO SWITCHGEAR CUBICLES . REFER
TO DRAWING E201 FOR ADDITIONAL REQUIREMENTS.
14. CONTRACTOR TO INSTALL 2" OF CLEAN VDOT #57 STONE IN TRANSFORMER BASIN.
1
2
23
3
4
4
5
5
6
6
7
8
9
10
2
64
65
66
53
55
54
56
57
61
62
59
63
52
1
69
58
11 11
11
11
68
67
60
2
70
72
71
12
66
65
68
13
14
14
14
14
J
LINK SEAL ON BOTH SIDES OF
THE PENETRATION WITH
STAINLESS STEEL BOLTS &
PRESSURE PLATES
TYPICAL RGS CONDUIT
CORE DRILLED PENETRATION
CONCRETE WALL OR
FOUNDATION
SCALE:
2
WALL
PENETRATION DETAIL
NONE
X
CONSTRUCTION NOTES:
1. NEW COMMUNICATIONS CONDUIT. PENETRATE WALL AND RUN UP ABOVE CEILING. REFER TO
WALL PENETRATION DETAIL.
2. RUN 12 STRAND MULTIMODE FIBER FROM SWITCHGEAR BUILDING PLC TO ADMINISTRATION
NETWORK ROOM. PROVIDE 12 STRAND FIBER TERMINATIONS ON BOTH ENDS. COORDINATE
CONNECTOR TYPE WITH OWNER.
3. TRANSITION TO CORRIGATED LOOM TUBE FOR RUN ABOVE CEILING AND OVER TO DATA
CLOSET. REMOVE AND REINSTALL EXISTING CEILING TILES AS REQUIRED TO FACILITATE
INSTALLATION OF CABLE.
SCALE:
1
ADMINISTRATION BUILDING PLAN
1/8"=1'-0"
REFER TO DRAWING E102
EXISTING DATA RACK
1 2
3
DWG. No.
PROJ. No.
SCALE
DATE
DWG. TITLE
DWN.
CHK.
6-23-2020
479204
603 King Street
4th Floor Alexandria VA 22314
www.wendelcompanies.com
p:703.299.8718 f:716.625.6825
NO. REVISIONS DATE
01" 2"
GENERIC SCALE BAR
SCALE BAR SHOWN IS TWO INCHES ON THE ORIGINAL DRAWING.
IF NOT TWO INCHES ON THIS SHEET, ADJUST ACCORDINGLY
WENDEL ENGINEERING, P.C.
NOTE:
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN
INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF THE ARCHITECT
AND ENGINEER AND IS NOT TO BE USED IN WHOLE OR IN PART, FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE ARCHITECT AND
ENGINEER. UNAUTHORIZED ALTERATION OR ADDITION TO ANY SURVEY DRAWING,
DESIGN, SPECIFICATION, PLAN OR REPORT IS PROHIBITED IN ACCORDANCE WITH
STATE LAW, CODE AND RULES.
WESTERN VIRGINIA WATER
AUTHORITY
ELECTRICAL
INSTALLATION
BROWNLEE AVE
SE
PTV.
0ISSUED FOR BID
6/23/20
Xref ..\Xref\XEE-WVWW-ER-LTG.dwg
3
3
SCALE:
1
SWITCHGEAR BUILDING LIGHITNG PLAN
1/4"=1'-0"
CONSTRUCTION NOTES: X
1. SWITCHGEAR MS-1 FURNISHED BY OWNER INSTALLED BY CONTRACTOR .
COORDINATE CONNECTIONS WITH SWITCHGEAR VENDOR.
2. PANELBOARDS AND TRANSFORMER FURNISHED AND INSTALLED BY CONTRACTOR.
3. STATION BATTERIES FURNISHED BY SWITCHGEAR MANUFACTURER INSTALLED BY
CONTRACTOR.
4. STATION BATTERY CHARGER FURNISHED BY SWITCHGEAR MANUFACTURER
INSTALLED BY CONTRACTOR .
5. RUN NEW CONDUIT FROM 5' OUTSIDE OF BUILDING TO EXISTING DUCT BANK.
INSTALL WIRING AS SHOWN ON WIRING DIAGRAMS DRAWING E602-E607. REFER TO
SITE PLAN E200 FOR CONDUIT CONTINUATION. CONCRETE ENCASEMENT NOT
REQUIRED.
6. INSTALL JUCTION BOX AND TRANSITION FROM UNDERGROUND PVC CONDUIT TO
EMT CONDUIT AND RUN AT CEILING OVER TO SWITCHGEAR. CONTROL WIRES
TERMINATE IN SWITCHGEAR PLC AND POWER SUPPLY. COORDINATE EXACT
LOCATION WITH SWITCHGEAR MANUFACTURER PRIOR TO CONSTRUCTION.
7. PROVIDE CONNECTION TO HEATING AND COOLING UNIT 6-#10 AWG. THHN CU. WIRES
AND #10 AWG GROUND.
8. CONTRACTOR TO PROVIDE AND INSTALL BATTERY PACK EMERGENCY LIGHT
FIXTURE AS MANUFACTURED BY DUAL LITE EZ-2 SERIES.
9. RUN (2) CONDUITS FROM THIS DUCTBANK TO CUBICLE A2 AND (2) TO CUBICLE B2.
10. RUN (2) CONDUITS FROM THIS DUCTBANK TO CUBICLE A1 AND (2) TO CUBICLE B1.
WP1,1
WP1,1
WP1,1
SM14,1
SM14,1
SM14,1
SM14,1
SM14,1
LIGHT SWITCH FOR SITE
LIGHTING
SCALE:
3
TYPICAL SWITCHGEAR SECTION
1/4"=1'-0"
MAIN
TIE
MAIN
G1
A2
S1, A1
G2
B2/B1
SCALE:
2
SWITCHGEAR BUILDING POWER PLAN
1/4"=1'-0"
PANEL HMP1
T-GB
4
3
1
MAIN SWITCHGEAR MS-1
LPP1,3 LPP1,3
LPP1,3
LPP1,3
LPP1,3
LPP1,11
LPP1,11
LPP1,11
WP
PANEL LPP1
LPP1,13
LPP1,5,7
7
7
4'-0"
3'-4"
28"
3'-0"
5
5
5
5
5
5
5
5
5
5
5
5
61
57
56
60
58
68
67
6665
64
55
3'-0"
FX
MAIN
TIE
MAIN
G1
A2
S1, A1
G2
B2/B1
FXFX
57
58
71
72
63
70
62
69
J
5
J
J
LPP1,11
WP
5
J
J
J
J
67 66
6865
2
2
2
7
HMP1
6
70
64
69
6
66
6
66
6
6
WP1,1
LPP1-13
LPP1-13
LPP1-13
LPP1-13
8
8
8
8
9
10
A1
B1
B2
A2
DWG. No.
PROJ. No.
SCALE
DATE
DWG. TITLE
DWN.
CHK.
6-23-2020
479204
603 King Street
4th Floor Alexandria VA 22314
www.wendelcompanies.com
p:703.299.8718 f:716.625.6825
NO. REVISIONS DATE
01" 2"
GENERIC SCALE BAR
SCALE BAR SHOWN IS TWO INCHES ON THE ORIGINAL DRAWING.
IF NOT TWO INCHES ON THIS SHEET, ADJUST ACCORDINGLY
WENDEL ENGINEERING, P.C.
NOTE:
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN
INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF THE ARCHITECT
AND ENGINEER AND IS NOT TO BE USED IN WHOLE OR IN PART, FOR ANY OTHER
PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF THE ARCHITECT AND
ENGINEER. UNAUTHORIZED ALTERATION OR ADDITION TO ANY SURVEY DRAWING,
DESIGN, SPECIFICATION, PLAN OR REPORT IS PROHIBITED IN ACCORDANCE WITH
STATE LAW, CODE AND RULES.
WESTERN VIRGINIA WATER
AUTHORITY
ELECTRICAL
INSTALLATION
BROWNLEE AVE
SE
PTV.
0ISSUED FOR BID
6/23/20