MMAYOR’S CABINET PRESENTATIONJJuly 9, 2018
LOS ANGELES STREET CIVIC BUILDING
p3 CONSORTIUM PRESENTATIONOCTOBER 03, 2018
01
https://civiccenterprojects.lacity.org
180928_v2.1
OOUR FUTURE WORKPLACE
CIVIC CENTER MASTER PLAN VisionDistrict Design GuidelinesLos Angeles Street Civic Building
PROCESS AND NEXT STEPSP3 - DBFOM Delivery MethodLASCB Space Programming Questionnaire
1. INTRODUCTIONS
2. CIVIC CENTER MASTER PLAN
3. PARKER CENTER DEMOLITION
4. REVIEW OF THE LOS ANGELESSTREET CIVIC CENTER PROJECT
5. QUESTIONS
02
https://civiccenterprojects.lacity.org
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PPARKER CENTER DEMOLITION
03
PROJECT SITECIVIC CENTER
VICINITY MAP
CCIVIC CENTER MMASTER PLAN
04
CIVIC CENTER DISTRICT BOUNDARIESCIVIC CENTER DISTRICT DESIGN GUIDELINES
UnionStation
Temple St.
2nd St.
Spring St.
Main St.
Los
Ange
les
St.
Judg
e Jo
hn A
iso
St.
Grande A
ve.
Ala
med
a St
.
1st St.
180927_v2.0
LAPD
CalTrans
CITY HALL
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PPARKER CENTER DEMOLITION
CIVIC CENTER MASTER PLANDRAFT CONCEPTUAL DESIGN
PH.APH.D PH.B
PH.FPH.E
PH.C
LOS ANGELES STREET CIVIC BUILDING
05
180927_v2.0
https://civiccenterprojects.lacity.org/projects/civic-center-master-plan-environmental-impact-report-eir
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PPARKER CENTER DEMOLITION
PARKER CENTER DEMOLITION
DEMOLITION DESIGN
RELOCATION OFINFORMATION TECHNOLOGYCABLING INCOLLABORATION WITH ITA
ARTWORK PRESERVATIONAND RELOCATION INCOLLABORATION WITH DCA
REMOVAL OF HAZARDOUSMATERIALS
BUILDINGDECONSTRUCTION
SITE GRADING TO 19 FT.BELOW STREET LEVEL
DEMOLITION COMPLETIONDECEMBER 2019
06
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PPARKER CENTER DEMOLITION
BUREAU OFENGINEERING
BOARD OFPUBLIC WORKS MUNICIPAL FACILITIES
COMMITTEE
COUNCIL
PERKINS + WILLPREPARE PRE-DESIGN
DOCUMENTS
P3 DEVELOPERTEAM
MAYOR
P3 COUNSEL
CITYATTORNEY
RFQ/ RFPCITY P3 ADVISOR
07
PROJECT ORGANIZATIONAL STRUCTURE
CITY ADMINISTRATIVE OFFICEMAYOR'S OFFICE
CITY LEGISLATIVE ANALYST
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PPARKER CENTER DEMOLITION
ogy
emova l
tion
ow
NTER N
LOS ANGELES STREET CIVIC BUILDINGDRAFT CONCEPTUAL DESIGN
08
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PARKER CENTER DEMOLITION
27 - 29 STORY, 753,740 S.F., APPROX.
1,173 SUBTERRANEAN PARKING
COMMERCIAL SPACE AREA 65,000 S.F.
RANGE OF OCCUPANTS 2,600 -3,200
INNOVATIVE CONSIDERATIONS:
CONFERENCE CENTER
COLLABORATIVE WORK SPACES
WITH STAFF HOTELING
LEED PLATINUM
SECURITY MEASURES
AUTOMATED PARKING
NEW CIVIC BUILDING
09
27 - 29 STORY (753,740 SF., APPROX.)1,173 SUBTERRANEAN PARKING SPACES65,000 SF. OF COMMERCIAL SPACE2,600 - 3,200 RANGE OF OCCUPANTS
INNOVATIVE CONSIDERATIONSCONFERENCE CENTERCOLLABORATIVE WORK SPACESLEED PLATINUM / NET-ZEROSOPHISTICATED SECURITYAUTOMATED PARKING
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PARKER CENTER DEMOLITION
CIVIC CENTER MASTER PLANDISTRICT DESIGN GUIDELINESIN COLLABORATION WITH THE CHIEF DESIGNOFFICER, THE PLANNING DEPARTMENT AND THEDEPARTMENT OF TRANSPORTATION
1. DEVELOP PEDESTRIAN REALM DESIGN STANDARDS2. PUBLIC RIGHT-OF-WAY STANDARDS (i.e. SIDEWALKS)3. MOBILITY CIRCULATION PLAN4. PUBLIC OPEN SPACE5. BUILDING FRONTAGE STREET LEVEL DESIGN6. PARKING ANALYSIS7. BUILDING MATERIALS AND COLOR
10http://clkrep.lacity.org/onlinedocs/2015/15-0554_rpt_CAO_01-09-2017.pdf
AAND NEXT STEPS
11
PP3PROJECT DELIVERY
METHOD
DESIGN - BUILD - FINANCE - OPERATE - MAINTAIN
Design Competition - RFP Process
Construction Completed by 2023
Estimated Capital Costs approximately $700M+
12
http://clkrep.lacity.org/onlinedocs/2014/14-1604_rpt_CAO_05-25-2018.pdf
PPerformance Specifications (Present - December 2018)
Space Planning(Present - December 2018)
Parker Center Demolition(Scheduled completion December 2019)
ProcurementJuly 2018 - April 2019
Construction(Target August 2023)
PROJECTMILESTONES
1. PRE-DESIGN TASK A: PROGRAMMING
TASK B: PERFORMANCE SPECIFICATION TASK C: DESIGN GUIDELINES FOR CIVIC CENTER TASK D: OPERATIONS & MAINTENANCE
2. PROCUREMENT CONSULTANT TO WRITE RFQ/RFP AND PROVIDE ADVICE ON FINANCIAL & ASSET DISPOSITION.
3. P3 LEGAL COUNSEL TO ASSIST AS NECESSARY DURING RFQ/RFP & IN WRITING PROJECT AGREEMENT
13
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PPARKER CENTER DEMOLITION
14
TASK A: FACILITYPROGRAMMING
· STREETS AND OPEN SPACES· BUILDINGS AND ARCHITECTURE· IDENTITY AND WAYFINDING· MOBILITY AND TECHNOLOGY· ETC...
· FACILITY MANAGEMENT· UTILITY MANAGEMENT· HELPDESK· HOUSEKEEPING· LANDSCAPE· SECURITY· PARKING· REPAIRS· LIFE CYCLE MAINTENANCE· ETC...
· SPACE PROGRAMMING· SPACE DATA· BLOCKING/STACKING DIAGRAMS· PARKING STRATEGIES· ETC...
TASK B: ARCHITECTURAL ANDENGINEERING PERFORMANCE
SPECIFICATIONSUNIFORMAT II SPECIFICATIONS (TO LEVEL 4)FOR:· A - SUBSTRUCTURE· B - SHELL· C - INTERIORS· D - SERVICES· E - EQUIPMENT & FURNISHINGS· F - SPECIAL CONSTRUCTION & DEMOLITION· G - BUILDING SITEWORK· ETC...
TASK C: CIVIC CENTER MASTERPLAN DISTRICT DESIGN GUIDELINES
TASK D: OPERATING ANDMAINTENANCE SPECIFICATIONS
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PPARKER CENTER DEMOLITION
1. RFQ TO BE ISSUED DECEMBER 2018(45 DAYS)
2. RFQ SUBMITTAL DUE DATE JANUARY 2019
3. RFP TO SHORT LISTED TEAMS MAY 2019
4. RFP SUBMITTAL DUE DATE SEPTEMBER 2019
5. SELECTION OF DBFOM TEAM NOVEMBER 2019
6. COUNCIL APPROVAL OF PROJECT AGREEMENT JANUARY 2020
7. START OF DESIGN & CONSTRUCTION FEBRUARY 2020
8. FACILITY GRAND OPENING APRIL 2023
SCHEDULE
15
QUESTIONS?
16
FEEDBACK
• NEXT OUTREACH MEETING
• STIPEND FOR DESIGN COMPETITION
• SCORING CRITERIA FOR SELECTION OF P3 DEVELOPER
• OTHER...
https://civiccenterprojects.lacity.org
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PPARKER CENTER DEMOLITION
LONG BEACH - SELECTION CRITERIA
17
ADMINISTRATIVE PASS - FAIL • CITY'S REQUIRED DOCUMENTS TO BE SUBMITTED (SUBMITTAL PACKAGE)TECHNICAL SCORING CIVIC CENTER 141 (57%) • CITY AMENITY (SIMILAR TO LOS ANGELES CITY'S BIP PROGRAM REQUIREMENTS) 32 (13%) • PROGRAM (DIVIDED FOR MAJOR COMPONENTS, SUCH AS: NUMBER OF STAFF, PARKING, LEED, SECURITY, ETC.) 26 (11%) • QUALITY (MATERIAL & SYSTEMS) 23 (9%) • ACCESS (PROXIMITY TO TRANSPORTATION, ETC.) 5 (2%) • URBAN FORM (URBAN PLANNING, INCLUDING: BUILDING MASSING, STREET SCAPE, ETC.) 55 (22%)TECHNICAL SCORING CIVIC CENTER FACILITY MANAGEMENT 18 (7%) • APPROACH TO OPERATION & MAINTENANCE, ETC.FINANCIAL SCORING CIVIC CENTER 88 (36%) • FINIANCIAL PLAN, MODEL, FLOW OF FUNDS, DOCUMENTS, TIMING AND PHASING, ETC.
TOTAL POINTS 247
Demolition Design
Informa tion T echnology Deca bling
H a za rdous W a ste R emova l
B uilding Deconstruction
S ite Gra ding 19’ B elow S treet Level
PPARKER CENTER DEMOLITION
LAWA - APM SCORING & EVALUATION CRITERIA
18
TECHNICAL MERIT 4,000APM SYSTEM 700APPROACH TO OPERATIONS AND MAINTENANCE 700INCLUSIVE - SIMILAR TO LOS ANGELES CITY'S BIP PROGRAM 600APPROACH TO EXECUTION OF PROJECT CONSTRUCTION 500APPROACH TO MAINTENANCE OF TRAFFIC/ MITIGATION OFCONSTRUCTION IMPACTS 500PROJECT SAFETY & SECURITY 500SUSTAINABILITY 300PUBLIC OUTREACH/ STAKEHOLDER COMMUNICATION 200
ARCHITECTURAL APPEAL 1,000ARCHITECTURAL APPEAL OF THE APM FIXED FACILITIES 750VEHICLE AESTHETICS 250
USER EXPERIENCE 1,000TECHNICAL POINTS 6,000
PRICE POINTS (100% TO TEAM WITH LOWEST PRICE) 4,000TOTAL AVAILABLE POINTS 10,000