GSPublisherVersion 0.0.100.100
Unexpected Co.Ltd.Unexpected Co.Ltd. The Royal Vibhavadi 46/29
Soi Vibhavadi 48Lad Yao, ChatuchakBangkok, 10900 Thailand
un_expected
BUILDING TYPE AARCHITECTURAL DRAWING SET
LOW COST HOUSING SANTA ROSA
City of Santa RosaProvince of Laguna
Philippines
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A0-02
1:75, 1:1SCALE :
Specifications
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
Legend Material Specifications
Table of Content
Sheet Topic
Flooring Specifications
Ceiling Specifications
Wall Specifications
1 Hollow Core Bricks / Screed Patching / Paint Outdoor / Semigloss (White)
F1 TBC, Total Thickn. 50 mm
Drawing Set Architecture
TBC
Index DescriptionC0 Raw Ceiling / Screed Patching / Paint Outdoor - Semigloss (White)A
A-01
1A-01
2A-01
3A-01
4A-01
View Marker
1A-01
Detail Marker
Section Marker
+2.50
Floor Level
N
North Orientation
Height Level to Reference +0.00
Dimension Grid
Property Line
C1
1
1
F2
1
C2
Flooring Spec. Marker
Ceiling Spec. Marker
Detail NameSheet Reference
Sheet Reference
Section Name
View Name
Sheet Reference
Structural Concrete
Brickwork Visible
Partition Wall Double Sided
Brick Hollow Core, Various Thickness
Door Spec Marker
Window Spec Marker
Wall Spec. Marker
Ceiling Spec Marker
AA-01
AA-01
AA-01
AA-01
TBC
F2 Ceramic Tile, TBC, Total Thickn. 50 mm
TBC
2
3
4 Wall Tile / Size 1''x1'
5
Partition Wall Single Sided
Index Description
Hollow Core Bricks / Screed Patching / Paint Outdoor / Semigloss (Beige)
Hollow Core Bricks / Screed Patching / Paint Indoor / Semigloss (White)
TBC
TBC
TBC
Index Description
Dimension Element
TBC
TBC
C1
C2
C3
C4
Raw Ceiling / Screed Patching / Paint Indoor - Matt (White)
IDA0-01A0-02A1-01A2-02A2-02A2-03A2-04A2-05A2-06A3-01A3-02A3-03A3-04A3-05A3-06A4-01A4-02A5-01A5-02A6-01A7-01A8-01
Layout NameCoverSpecificationsMaster PlanFloor Plan 1st Floor (A)Floor Plan 1st Floor (B)Floor Plan 2nd to 4th Floor (A)Floor Plan 2nd to 4th Floor (B)Floor Plan Roof (A)Floor Plan Roof (B)Elevation NorthElevation SouthElevation EastElevations WestElevation Section NorthElevation Section SouthSection ASection BDetail Main StairDetail Escape StairApp. Unit DetailDetail BathroomDetail Door Window
Size0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...0.594 / ...
No.01020304050607080910111213141516171920182122
Remark
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A1-01
1:750, 1:75SCALE :
Master Plan
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
39.0013.00
39.00
38.4
5
37.81
40.0012.00
40.0012.00
40.00
1
16
1
13
1
16
1 Motorbike Parking
15
1
23
Garbage Collection
Garbage CollectionRoad (8 M) / - 0.20
Garbage Collection
Firetruck
Garbage Collection
Road (8 M) / - 0.20
Garbage Collection
Detention
Playground
Green
Playground
Green
V. Pump
Type B+12.95 Type B
+12.95Type B+12.95 Type B
+12.95
Type A+12.95
Type A+12.95
Type A+12.95
Type A+12.95
Type A+12.95
Type A+12.95
+0.00
+0.00
+0.00
+0.00
+0.00
Area Calculation / Stanta Rosa
Area [m2] PercentageArea Type
4830.11 21.8 %Streetscape
5822.82 26.3 %Building Footprint
22147.00 100 %Property
11494.07 51.9 %Landscape
22592.91 102.0 %TFA (4 Floor Levels)
A1-
SITE LAYOUT1:750
N
BUILDING TYPE A
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A2-02
1:100SCALE :
Floor Plan 1st Floor (A)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
3
2 2
1 2 12
3 45
341 1
3 3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
4
5
33 3 3 3 3 3
333
3
2
121 2
345
3 411
3
5 x
18
= 90
1
2
3
4
5
UP 7 x 145 = 1.00
1 2 3 4 5 6 7
A B C D E F G H
1212
1111
1010
77
88
99
UP
18
x 16
5 = 3
.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
UP 19 x 16 = 3.00
1 2 3 4 5 6 7 8 9
10
111213141516171819
I
1212
1111
1010
77
88
99
10 5.50 5.50 2.36 5.50 5.50 2.45 5.50 5.50 10
103.
802.
202.
002.
203.
8011
.90
5.50 2.36 5.50
40 38.01 40
11.0
040
14.2
040
12.0
04.
11
12.0
03.
802.
202.
002.
203.
8010
11.0
040
14.2
040
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Office
BathPantry
Bath
Bedroom
Living
Main Stair
Corridor
Escape Stair
BA4-02
BA4-02
S1A5-01
S1A5-01
AA4-01
E5A3-05
E5A3-05
UP
18
x 16
5 = 3
.00
UP
18
x 16
5 = 3
.00
5 x
18
= 90
5 x
18
= 90
1.-
1st Floor1:100
2A3-02
4A3-04
1A3-01
3A3-03 N
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A2-02
1:100SCALE :
Floor Plan 1st Floor (B)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
4
5
33 3 3 3 3 3
333
5 x
18
= 90
1
2
3
4
5
UP 7 x 145 = 1.00
1 2 3 4 5 6 7
A B C D E F G H
66
55
11
22
33
UP
18
x 16
5 = 3
.001
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
UP 19 x 16 = 3.00
1 2 3 4 5 6 7 8 9
10
111213141516171819
I
66
55
11
22
33
44
11.9
03.
902.
202.
002.
203.
8010
5.50 2.36 5.50
10 5.50 5.50 2.36 5.50 5.50 2.45 5.50 5.50 1040 38.01 40
4014
.20
4011
.00
12.0
04.
11
103.
802.
202.
002.
203.
8012
.00
4014
.20
4011
.00
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Corridor
Escape Stair
Main Stair
S1A5-01
S1A5-01
AA4-01
E6A3-06
E6A3-06
S2A5-02
S2A5-02
UP
18
x 16
5 = 3
.00
UP
18
x 16
5 = 3
.00
5 x
18
= 90
5 x
18
= 90
1B-
1st Floor Plan1:100
2A3-02
4A3-04
1A3-01
3A3-03 N
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A2-03
1:100SCALE :
Floor Plan 2nd to 4th Floor (A)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
5
33 3 3 3 3 3
333
A B C D E F G H
1212
1111
1010
77
88
99
I
1212
1111
1010
77
88
99
UP
18
x 16
5 = 3
.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
UP 19 x 16 = 3.00
1 2 3 4 5 6 7 8 9
10
111213141516171819
10 5.50 5.50 2.36 5.50 5.50 2.45 5.50 5.50 10
40 38.01 40
12.0
03.
802.
202.
002.
203.
80
11.0
040
14.2
040
11.8
03.
902.
202.
002.
203.
8010
11.0
040
14.2
040
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Main Stair
Corridor
Escape Stair
BA4-02
BA4-02
S1A5-01
S1A5-01
AA4-01
E5A3-05
E5A3-05
S2
UP
18
x 16
5 = 3
.00
UP
18
x 16
5 = 3
.00
5 x
18
= 90
5 x
18
= 90
2A-
2nd to 4th Floor1:100
2A3-02
4A3-04
1A3-01
3A3-03 N
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A2-04
1:100SCALE :
Floor Plan 2nd to 4th Floor (B)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
3
2 2
1 2 12
3 45
341 1
3
5
33 3 3 3 3 3
333
A B C D E F G H
66
55
11
22
33
I
66
55
11
22
33
UP
18
x 16
5 = 3
.001
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
44
UP 19 x 16 = 3.00
1 2 3 4 5 6 7 8 9
10
111213141516171819
3.80
2.20
2.00
2.20
3.80
12.0
0
4010
14.1
040
11.0
0
10 5.50 5.50 2.36 5.50 5.50 2.45 5.50 5.50 1040 38.01 40
103.
802.
202.
002.
203.
8010
11.8
0
4014
.20
4011
.00
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Bedroom
Living
BathKitchen / Dining
Bath
Bedroom
Living
Corridor
Escape Stair
Main Stair
S1A5-01
S1A5-01
AA4-01
E6A3-06
E6A3-06
S2A5-02
S2A5-02
UP
18
x 16
5 = 3
.00
UP
18
x 16
5 = 3
.00
5 x
18
= 90
5 x
18
= 90
2B-
2nd to 4th Floor1:100
2A3-02
4A3-04
1A3-01
3A3-03 N
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A2-05
1:100SCALE :
Floor Plan Roof (A)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
A B C D E F G H
1212
1111
1010
77
88
99
I
1212
1111
1010
77
88
99
BA4-02
BA4-02
S1A5-01
S1A5-01
AA4-01
E5A3-05
E5A3-05
60 37.61 60
11.0
060
13.8
060
12.0
03.
802.
202.
002.
203.
7010
10 5.40 5.50 2.36 5.50 5.50 2.45 5.50 5.40 10
12.0
03.
802.
202.
002.
203.
7010
11.0
060
13.8
060
Roof Access1.0 x 1.5 M
Roof Access1.0 x 1.5 M
Slope 1/200Slop
e 1/
200
Slop
e 1/
200Slope 1/200
Slope 1/200Slop
e 1/
200
Slop
e 1/
200Slope 1/200
Slope 1/200Slop
e 1/
200
Slop
e 1/
200Slope 1/200
Water Tanks Water Tanks
UP
18
x 16
5 = 3
.00
UP
18
x 16
5 = 3
.00
5 x
18
= 90
5 x
18
= 90
3A-
Roof Plan1:100
2A3-02
4A3-04
1A3-01
3A3-03 N
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A2-06
1:100SCALE :
Floor Plan Roof (B)
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
A B C D E F G H
66
55
11
22
33
I
66
55
11
22
33
44
S1A5-01
S1A5-01
AA4-01
E6A3-06
E6A3-06
S2A5-02
S2A5-02
4014
.20
4011
.00
103.
802.
202.
002.
203.
8012
.00
10 5.40 5.50 2.36 5.50 5.50 2.45 5.50 5.40 1060 37.61 60
103.
802.
202.
002.
203.
8012
.00
4014
.20
4011
.00
Roof Access1.0 x 1.5 M
Roof Access1.0 x 1.5 M
Slope 1/200Slop
e 1/
200
Slop
e 1/
200Slope 1/200
Slope 1/200Slop
e 1/
200
Slop
e 1/
200Slope 1/200
Slope 1/200Slop
e 1/
200
Slop
e 1/
200Slope 1/200
Water Tanks Water Tanks
UP
18
x 16
5 = 3
.00
UP
18
x 16
5 = 3
.00
5 x
18
= 90
5 x
18
= 90
3B-
Roof Plan1:100
2A3-02
4A3-04
1A3-01
3A3-03 N
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A3-01
1:100SCALE :
Elevation North
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
H G F E D C B AI
+0.90
+3.90
+6.90
+9.90
+12.90
+15.85
+13.25
5.50 5.50 2.45 5.50 5.50 2.36 5.50 5.50
40 38.01 40
10 10
2
2
2
2
1
1
1
1
1
1
1
1
1
E1-
Elevation North1:100
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A3-02
1:100SCALE :
Elevation South
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
A B C D E F G H I
5.50 5.50 2.36 5.50 5.50 2.45 5.50 5.5010
40 38.01 40
10
+0.90
+3.90
+6.90
+9.90
+12.90+13.25
+15.85+15.85
2
2
2
2
1
1
1
1
1
1
1
1
1
E2-
Elevation South1:100
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A3-03
1:100SCALE :
Elevation East
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
11 22 33 55 66 77 88 99 1010 1111 12124
3.80 2.20 2.00 2.20 3.80 12.00 3.80 2.20 2.00 2.20 3.80
40 14.20 40 11.00 40 14.20 40
1010
+0.90
+3.90
+6.90
+9.90
+12.90+13.25
+15.85+15.85
+13.25
±0.00 ±0.00
2
2
2
2
1
1
1
1
1
1
1
1
1
2
1
1
1
1
2
2
2
2
2
2
2
2
2
1
1
1
1
2
2
2
2
1
1
1
1
E3-
Elevation East1:100
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A3-04
1:100SCALE :
Elevations West
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
3.80 2.20 2.00 2.20 3.80 12.00 3.80 2.20 2.00 2.20 3.80
80 40 14.20 40 11.00 40 14.20 40 80
1010
+0.90
+3.90
+6.90
+9.90
+12.90+13.25
+15.85
+13.25
+15.85
+1.00
±0.00
E4-
Elevation West1:100
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A3-05
1:100SCALE :
Elevation Section North
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
A B C D E F G H I
5.50 5.50 2.36 5.50 5.50 2.45 5.50 5.5040 38.01 40
1010
±0.00
+1.00
+4.00
+7.00
+10.00
+13.00
+15.50
E5-
Elevation Section North1:100
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A3-06
1:100SCALE :
Elevation Section South
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
I H G F E D C B A
5.50 5.50 2.45 5.50 5.50 2.36 5.50 5.5040 38.01 40
10
±0.00
+1.00
+4.00
+7.00
+10.00
+12.95
1.00
3.00
3.00
3.00
3.00
+15.85+15.85
E6-
Elevation Section South1:100
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A4-01
1:100SCALE :
Section A
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
1212 1111 1010 99 88 77 66 55 33 22 114
+1.00
+4.00
+7.00
+10.00
+12.95+13.25
+0.95
+3.95
+6.95
+9.95
+12.95
+1.00
+4.00
+7.00
+10.00
+0.90
+3.90
+6.90
+9.90
+12.90
+1.00
+4.00
+7.00
+10.00
+0.90
+3.90
+6.90
+9.90
+12.90
+15.85
7525
2.75
252.
7525
2.75
252.
7520
2.55
2015
1.00
3.00
3.00
3.00
2.95
2.90
A-
Section1:100
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A4-02
1:100SCALE :
Section B
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
A B C D E F G H I
5.50 5.50 2.36 5.50 5.50 2.45 5.50 5.50
7525
2.75
252.
7525
2.75
252.
7520
1.00
3.00
3.00
3.00
2.95
+4.00
+1.00
+7.00
+10.00
+12.95
40 10 37.81 10 40
+15.85 +15.85
B-
Section1:100
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A5-01
1:50SCALE :
Detail Main Stair
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
+1.00
+4.00
+7.00
+2.58
+5.58
+8.58
±0.00
1.00
3.00
3.00
3.00
3.00
7525
2.75
252.
7525
5.75
20
7525
1.58
2.80
202.
8020
4.17
20
UP 7 x 14.5 = 100 CM
1 2 3 4 5 6 7
4.11
2.25 125
3.86
125
32 32 32 32 32 32 32
DN
19 x 16 = 300 CM
1 2 3 4 5 6 7 8 9
10
111213141516171819
315 315 315 37
125 5.11 125
3.21 1.90
125
3.61
125
1.70
211.
70
UP
19 x 16 = 300 CM
1 2 3 4 5 6 7 8 9
10
111213141516171819
125
3.61
125
1.70
211.
70
315 315 315
2.84 37 1.90125 5.11 125
37
UP
19 x 16 = 300 CM
1 2 3 4 5 6 7 8 9
10
111213141516171819
1.70
211.
70
125
3.61
125
5.36
125 3.21 1.90
2.84 37
315 315 315
C D E
S1-
Section1:50
D1-
Stair 1.01:50
D4-
Stair 1.31:50
D3-
Stair 1.21:50
D2-
Stair 1.11:50
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A5-02
1:50SCALE :
Detail Escape Stair
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
+1.00
+4.00
+7.00
+10.00
+0.10
+2.50
+5.50
+8.50
+12.95
7525
2.75
252.
7525
2.75
252.
7520
1.00
3.00
3.00
3.00
2.95
252.
2020
2.80
202.
8020
4.25
20
DN
18
x 16
.5 =
300
CM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1.00 25 1.00
2.38
621.
00
3.00
1.00
295
295
295
325
1.00
4.00
UP
18
x 16
.5 =
300
CM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
295
295
295
4.00
3.00
1.00
1.00 25 1.00
2.25
UP
18
x 16
.5 =
300
CM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1.00 25 1.00
2.25
3.00
1.00
4.00
295
295
295
5 x 18 = 90
1
2
3
4
5
1.25 1.00
1.45
2.55
2929
29
2.25
4.00
33 22 114
S2-
Section1:50
D8-
Stair 2.31:50
D7-
Stair 2.21:50
D6-
Stair 2.11:50
D5-
Stair 2.01:50
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A7-01
1:25SCALE :
Detail Bathroom
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
+0.95
+3.75
90
2.80
2.80
1.20
+0.95
+3.75
68
2.80
1.20
90
+0.95
+2.15
+3.75
+0.95
+3.75
2.80
1.20
90
5
0
40
4035
4540
2020
01
02
03
04 I-01
SLOPE 1:200
FD
BathA: 2.94 m2
I-01-
041:25
I-01-
031:25
I-01-
021:25
I-01-
011:25
D9-
Bathroom Unit1:25
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A8-01
1:1SCALE :
Detail Door Window
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
ID 1 2 3 3 4 5
Quantity 96 96 80 96 96 48
Position Unit Unit Unit Unit
Plan View
3D Front View
90
1.70
1.20
2.40
1.00
40
1.00
40
80
40
40
1.50
Nominal W x H ... 0.90x1.70 1.20x2.40 1.00x0.40 1.00x0.40 0.80x0.40 0.40x1.50
TypeSliding Frame with upperTransom
Sliding Frame with upper Transom Top Hung Fixed Air Vent
Transom Fixed Frame / Single Glas Fixed Frame / Single Glas None None
Sash Sliding Frame / Single Glas Sliding Frame / Single GlasTop Hung / SingleGlas
Metal Grill
Frame UPVC / Alt. Aluminum UPVC / Alt. Aluminum UPVC / Alt. Aluminum UPVC / Alt. Aluminum
Equipment TBC (Manufacturer) TBC (Manufacturer) TBC (Manufacturer) TBC (Manufacturer)
Note
Window List
ID 1 2 3 4 5
Quantity 96 95 96 2 8
Poistion Unit Unit Unit Common
Plan View
3D Front View
90
2.40
80
2.00
75
2.00
90
2.10
1.50
2.10
Nominal W x H ... 0.90x2.40 0.80x2.00 0.75x2.00 0.90x2.10 1.50x2.10
TypeSingle Door / Hinged/ with Upper Trasom
Single Door / HingedSingle Door / Hinged with AirVent
Single Door / Hinged Double Door / Hinged
Door LeafSolid / UPVC (Alt.Wood)
Solid / UPVC (Alt. Wood)Solid with Vent Grill / UPVC(Alt. Wood)
Solid / Metal /Painted
Solid / Metal / Painted
Door Frame UPVC (Alt. Wood) UPVC (Alt. Wood) UPVC (Alt. Wood) Metal / Painted Metal / Painted
Equipment TBC (Manufacturer) TBC (Manufacturer) TBC (Manufacturer) TBC (Manufacturer) TBC (Manufacturer)
NoteUpper Trasom withTop Hung SingleGlas
with Vent. Grill Fire Exit Door Access Electrical Shaft
Door List
GSPublisherVersion 0.0.100.100
#Pln
Unexpected Company Limited46/29 The Royal Vibhavadee CondominiumSoi Vibhavadee 48, Ladyao, Chatuchak, Bangkok 10900
22
DRAWING NO.
SUB TOTAL
TOTAL
DATE :
DRAWN BY :
DESCRIPTIONDATENO.
REVISION
PROJECT/PROJECT NO.
DRAWING TITLE :ARCHITECTS :
Deutsche Gesellschaft fur Internationale ZusammenarbeitGIZ Office Bangkok for Nexus Project193/63 Lake Rajada Office Complex16th Floor, New Ratchadapisek - Rama 4 RoadKlongtoey, Bangkok 10110
STRUCTURAL ENGINEER :
ELECTRICAL ENGINEER :
OWNER :
PROJECT :
MECHANICAL ENGINEER :
SANITARY ENGINEER :
M.Schoch
31/03/2017
LOW COST HOUSING SANTA ROSA
#Project Status
A6-01
1:50SCALE :
App. Unit Detail
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
Office of the City Engineer Santa RosaProvince of Laguna, Republic of the Phillipines
un_expected
3
2
1 2
3 4 51
10
11
12
13
14
15
16
17
18
BedroomA: 9.81 m2
LivingA: 8.74 m2
BathA: 2.94 m2
Kitchen / DiningA: 7.18 m2
2
12
5 34 1
3
3
1.25 1.20 80 90 1.15
1.80 875 95 90 775
25 80 75 1.00 54 90 735
1.15
825
25
2.90 2.605.50
1.75 3.755.50
2.76
2.20
3.80
5.50
6.00
F1 C1
F1 C1
F1 C1Balcony
F1C1
BathA: 2.94 m2
BedroomA: 9.81 m2
LivingA: 8.74 m2
2
2
2
44 4
4
33 3
3
33 3
3
33 3
3
1 1 1
1
LF 01 LF 01
LF 01LF 01
20
20
40
20
90
S S
S
S
CL
CL
CL
CL
CL
CLCL
SB (180)
50 50 50
20 20
20
20
(30)
30 & 120
(30)
(30)
(30)
(100)
(30)
(30)
A-
Unit Furniture Layout1:50
B-
Unit Finishing1:50
C-
Unit Ceiling1:50
D-
Unit Electrical1:50