5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 1 of 13
MAHARASHTRA POLLUTION CONTROL BOARD
Minutes of 4th Consent Appraisal Committee Meeting of 2019-2020 held on 12.06.2019 at 11.30 a.m. in the chamber of Hon’ble Chairman, 3rdFloor, Maharashtra Pollution Control Board, Kalpataru
Point, Sion, Mumbai, Maharashtra.
……….
Following members of the Consent Appraisal Committee were present:
1. Shri Sudhir Shrivastava, Chairman
Chairman, M.P.C. Board, Mumbai.
2. Shri E. Ravendiran Member
Member Secretary M.P.C. Board, Mumbai.
3. Shri P.P. Nandusekhar, Member
Technical Expert, MIDC
4. Shri P. K. Mirashe Member Convener
Assistant Secretary (Technical), M.P.C. Board, Mumbai.
Additional Chief Secretary, Home (Transport) Dept., Mumbai on leave of absence was granted to them.
Following Officer of MPCB were present for the meeting:
1. Shri. V. M. Motghare Invitee Member
Joint Director (APC)
2. Shri. Y.B. Sontakke Invitee Member
Joint Director (WPC)
Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start.
The Minutes of 3rd Consent Appraisal Committee Meeting of 2019-2020 held on 02.05.2019 (Booklet Nos.5 of Consent to Establish/ Operate/ Renewal cases) were confirmed.
The meeting thereafter deliberated on the fresh agenda items [Booklet No. 6 & 7 of Consent to Establish/ Operate/ Renewal cases] placed before the committee and following
decisions were taken:
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 2 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
BOOKLET NO 6
1 MPCB-CONSENT-0000017576
MAHATMA GANDHI
MISSION MEDICAL
COLLEGE HOSPITAL, Sec-1,
Sion -Panvel highway,
Kamothe, Tal. Panvel, Dist.
Raigad (MPCB-CONSENT-
0000017576)
Approved
Combine Consent
and BMW
Authorization
30.06.2021 Committee noted that, PP has applied for combine consent and BMW
authorization for 810 Nos of beds and total plot area 80,000 sq.mtrs and total
BUA 32,932 sq.mtrs.
Committee Also noted the following points:
1. PP has submitted copy of the letter of Environment Department ,GOM dated
07.03.2018 informing that this medical college and hospital does not fall
under the purview of EIA Notification,2006.
2. PP has provided STP for treatment of sewage and treated sewage disposed
on land for gardening.
3. PP has obtained membership of CBMWSTDF and submitted annual report.
In view of it was decided to grant 1st Combine consent and BMW authorization
by imposing following conditions:
1. PP shall submit BG as per HCE regime.
Consent shall be issued after receipt of additional consent fees if any.
2 MPCB-CONSENT-0000041013
INDOWORTH (I) LIMITED
(B-130, MIDC INDUSTRIAL
AREA, BUTIBORI)
Approved
Renewal of
consent to
operate
31.03.2023 Committee noted that, PP has applied for renewal of consent to operate for the
manufacturing of all wool yarn-5300 MT/A.
Committee also noted that, PP has shifted coal fired boiler to their adjacent plot
i.e. B-129 hence trade effluent is nil.
In view of it was decided to grant renewal of consent to operate by imposing
following conditions:
1. PP shall submit BG of Rs.5.0 Lakhs towards compliances of consent condition
and towards O & M of pollution control systems.
Consent shall be issued after receipt of additional consent fees if any.
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 3 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
3 MPCB-
CONSENT-
0000049707
Menon Pistons Ltd. (A/p
Shiroli Tal Hatkanangale
Dist Kolhapur
APPROVED
Renewal of
consent with
increase in CI and
additional
furnaces, shot
blasting unit and
DG set
31.05.2023 It was decided to grant Renewal of consent with increase in CI and additional
furnaces, shot blasting unit and DG set by imposing following conditions;
1. Industry shall submit the undertaking stating that they will not increase the
production quantity more than consented quantity at any given time.
2. Industry shall submit Board Resolution within one month in prescribed
format from company Board, towards increase the CI by 18.7 Cr by
installation of 06 Nos of Induction furnaces, 02 Shot blasting units and 03 DG
sets without obtaining consent from the Board thus violated the provisions
of Environmental Laws and in future, they will not do such violations and
submit the BG of Rs. 2 lakh towards submission of the same.
3. Forfeited the BG of Rs. 5 obtained towards O&M of pollution control system
as JVS results of stack are exceeding the consented standards and obtain
double amount of BG of Rs. 10 lakh towards compliance of the same.
It was also decided to call the industry for presentation about causes of the JVS
exceedance and steps proposed for avoidance of re occurrence.
Consent shall be issued after submission of additional requisite consent fee, if
applicable.
4. MPCB-
CONSENT-
0000054799
CHASYS AUTOMOTIVE
COMPONENTS PRIVATE
LIMITED (GAT NO.41,
NAVLAKH UMBRE, JADHAV
WADI, TALEGAON MIDC)
APPROVED
1st Consent to
Operate for
Additional
Phosphating and
Painting activity
with additional 05
products and
removal of one
product with
increase in CI and
30.04.2021 It was decided to grant 1st Consent to Operate for Additional Phosphating and
Painting activity with removal of one product and additional 05 products and
their amalgamation with existing consent by imposing following conditions;
1. Industry shall submit the undertaking stating that they will not increase the
production quantity more than consented quantity at any given time.
2. Industry shall submit Board Resolution within one month in prescribed
format from company Board, towards increased CI by Rs. 33.13 Cr for
modernization without obtaining consent from the Board thus violated the
provisions of Environmental Laws and in future, they will not do such
violations and submit the BG of Rs. 2 lakh towards submission of the same.
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 4 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
their
amalgamation
with existing
consent
Consent shall be issued after submission of additional requisite consent fee,
if applicable
5 MPCB-CONSENT-0000055588
Sound Casting Pvt. Ltd.(Kagal Unit-2) (Plot No.: C- 10, Kagal-Hatkanangale MIDC, Tal.: Hatkanangale, Dist.: Kolhapur)
APPROVED
Consent to Establish for expansion
Commissioning of the unit or 5
years whichever is earlier
It was decided to grant consent to establish for expansion to manufacture Grey Iron Castings & S. G. Iron Castings- 616 MT/M by imposing following conditions; 1. Industry shall not take any effective steps towards implementation of the
project before obtaining Environmental Clearance as per EIA notification 2006 and amendments thereto if applicable.
2. Industry shall submit the BG of Rs. 5 lakh towards compliance of consent to establish conditions.
3. Industry shall provide primary and secondary fume extraction system to Induction furnaces so as to achieve emission standards.
6 MPCB-CONSENT-0000057314
Force Motors Ltd (Force Motors Ltd. Ltd, Mumbai - Pune Road Akurdi, Pune 411 035 Maharashtra, INDIA
APPROVED
Renewal of consent with increase in CI
30.09.2023 It was decided to grant renewal of consent with increase in CI by imposing following conditions; 1. Industry shall submit the undertaking stating that they will not increase the
production quantity and capacity more than consented quantity at any given time.
2. Industry shall submit Board Resolution within one month in prescribed format from company Board, towards increase the CI by 136.26 Cr for modernization by replacement of old machinery by new automatic machineries without obtaining consent from the Board thus violated the provisions of Environmental Laws and in future, they will not do such violations and submit the BG of Rs. 2 lakh towards submission of the same.
3. Forfeited the BG of Rs. 10 obtained towards O&M of pollution control system as industry has carried out modernization without consent and also JVS result are exceeding the consented standards and obtain double amount of BG of Rs. 20 lakh towards compliance of the same.
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 5 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
4. Industry shall submit the BG of Rs. 25 lakh towards for not to violate the conditions of existing consent in future and shall not carried out any expansion activity without prior permission from the Board.
Consent shall be issued after submission of additional requisite consent fee, if applicable.
7 MPCB-CONSENT-0000057804
Ramesh Sunwire Private Limited, Village : Eklari, Tahsil : Mohadi, Dist : Bhandara.
APPROVED
1st Consent to Operate
30.05.2024 Committee noted that industry has obtained NOC from CGWA dated 30.03.2019. In view of above, it was decided to grant 1st consent to operate by imposing following conditions; 1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution control
system.
It was decided to return the BG of Rs. 5 lakh obtained towards compliance of consent to establish conditions as industry has complied the same.
Consent shall be issued after submission of additional requisite consent fee, if applicable.
8 MPCB-CONSENT-0000059883
Rashtriya Chemicals & Fertilizers Ltd., Thal, Tal. Alibag, Dist. Raigad.
APPROVED Consent to
Establish for expansion
Up to commissioning
of the unit or up to 5 year
whichever is earlier.
Committee noted that industry has applied for grant of Consent to Establish for installation of a new Gas Turbine (GT) driven Process Air Compressor (PAC IV) of capacity 1,20,000 Nm3/Hr and Heat Recovery Steam Generator (HRSG) by replacing 2 nos. of existing condensing steam turbines driven Process Air Compressor of capacity 60,000 Nm3/Hr each in Ammonia Plant and 1 no. Boiler of capacity 275 TPH.
Committee also noted that, industry has obtained EC & Consent to Operate for expansion by de-bottlenecking of Thal Ammonia Plants and Urea Plant.
Committee further noted that, industry has submitted proforma for self-assessment & certificate of no increase in pollution load for proposed expansion. In view of above, it was decided to grant Consent to Establish for installation of a new Gas Turbine (GT) driven Process Air Compressor (PAC IV) of capacity 1,20,000 Nm3/Hrs and Heat Recovery Steam Generator (HRSG) by replacing 2 nos. of existing condensing steam turbines driven Process Air Compressor of
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 6 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
capacity 60,000 Nm3/Hrs each in Ammonia Plant and 1 no. Boiler of capacity 275 TPH by imposing the following conditions: 1. Industry shall obtain amendment in EC for proposed expansion within 3
month.
2. Industry shall obtain Consent to Operate from the Board prior to commissioning of the newly installed PAC IV & HRSG.
3. Industry shall dismantle 2 nos. of existing condensing steam turbines driven Process Air Compressor of capacity 60,000 Nm3/Hr each in Ammonia Plant and 1 no. Boiler of capacity 275 TPH after commissioning of newly installed PAC IV & HRSG.
9 MPCB-CONSENT-0000061766
Force Motors Ltd (Force Motors Ltd. Ltd, Mumbai - Pune Road Akurdi, Pune 411 035 Maharashtra, INDIA
APPROVED
Consent to Establish for expansion
30.09.2023 It was decided to club the application of consent to establish for expansion with application of renewal of consent (UAN no 0000057314) since, industry has already carried out modernization by replacement of old machinery by new automatic machinery and same is incorporated in renewal application.
10 MPCB-CONSENT-0000061017
G E India Industrial Pvt Ltd, Plot No. A-78/1 Phase II, Chakan MIDC, Tal-Khed Pune.
APPROVED
Renewal of consent with increase in CI
31.12.2023 Committee noted the reply and also made the presentation before CAC on 27.05.2019. Considering the presentation made by the industry, It was decided to grant renewal of consent with increase in CI by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 5 lakh submitted towards O&M
of pollution control system. Decision regarding to waive the forfeiture of BG of Rs. 5 lakh obtained towards O&M of pollution control system shall be taken after receipt of SRO’s verification report, till date decision regarding forfeiture of BG shall be kept in abeyance.
Consent shall be issued after submission of additional requisite consent fee, if applicable.
11 MPCB-CONSENT-0000061577
Cummins India Limited, (India Parts Distribution Center), Plot. No A-1, MIDC, Phaltan, Village Survadi, Phaltan- Lonand Road,
APPROVED
1st consent to Operate for
warehouse and amalgamation
30.04.2021 It was decided to grant 1st consent to operate for warehouse and amalgamation with existing consent for Warehouse for Packing & Labelling of goods- 5718 Sq. mtrs by imposing following conditions;
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 7 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
Taluka Phaltan, District Satara.
with existing consent
1. This consent is issued with overriding effect over previous consent no. Format BO/CAC-Cell/UAN No.0000032517-17/CAC-1803000673 dated 14.03.2018 which is valid up to 30.04.2021.
Consent shall be issued after submission of additional requisite consent fee, if applicable.
12 MPCB-CONSENT-0000061480
Mahindra Heavy Engines Limited, Plot No A-1/1, Chakan Industrial Area, Phase IV, Village Nigoje, Taluka Khed, Dist. Pune.
APPROVED
1st Operate for expansion (part)
and amalgamation with existing consent with name change
30.09.2019 It was decided to grant 1st Operate for expansion (part) and amalgamation with existing consent to manufacture 1] Automobile Engine- 1,07,000 Nos./Y and Transmission- 8000 Nos./Y with name change from M/s. Mahindra Heavy Engines Pvt. Limited to M/s. Mahindra Heavy Engines Limited and by imposing following conditions;
1. This consent is issued with overriding effect over previous consent no. BO/CACCell/RO (Pune) /O/CAC-1703000213 dated 03.03.2017 which is valid upto 30.09.2019.
2. Industry shall upgrade the existing pollution control system at paint booth facility so as to control VOC emission.
Consent shall be issued after submission of additional requisite consent fee, if applicable.
13 MPCB-CONSENT-0000062915
Tata Motors Ltd, Pimpri F1 MIDC Pimpri Pimpri Pune.
NOT APPROVED
Consent to Establish to
manufacture Bricks/Paving
Blocks by using Hazardous waste
(ETP Sludge)
--- Committee noted that industry has proposed to setup the unit to manufacture Bricks/Paving blocks by using ETP sludge i.e. Hazardous waste.
Committee also noted that CPCB has not prepared SOP and checklist of minimal requisite facility for utilization of Hazardous waste under rule 9 of the H&OW (M&TM) 2016. Committee also referred the letter dated 04.10.2018 received by the industry from CPCB regarding utilization of ETP sludge. CPCB in their letter clarified that "The applicant is required to submit the application through concerned SPCB in the prescribed format with request to forward their application to CPCB after endorsing the consent to establish granted to the applicant. CPCB advised the industry to approach MPCB to forward their application to CPCB after endorsing the consent to establish.
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 8 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
In view of above, it was decided to call the industry for presentation before CAC regarding composition of sludge and proposed utilization of hazardous waste i.e. ETP sludge to manufacture Bricks/Paving blocks.
14 MPCB-CONSENT-0000063488
TATA Autocomp Systems Ltd (survey no. 280 & 281 Village Maan, Tal Mulshi, Dist. Pune.
APPROVED
Renewal of consent with decrease in CI
28.02.2024 It was decided to grant Renewal of consent with decrease in CI to manufacture Molded & painted plastic component for automobile – 2.25 Crs Nos/M by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards O&M of
pollution control system.
2. Industry shall submit the BG of Rs. 5 lakh towards obtain NOC for raw water uses from CGWA/Irrigation department within 03 months.
Committee noted that the JVS results are exceeding the consented standards, from the JVS results, it seems that industry is not operating the ETP and STP and discharging untreated/substandard effluent on land for gardening. Therefore, it was decided to call the industry before CAC to explain the case of exceedance and steps taken to prevent the same.
Consent shall be issued after submission of additional requisite consent fee, if applicable.
15 MPCB-CONSENT-0000063538
Dicitex Home Furnishing (P) Limited (Plot No. G-7/2/1, MIDC, Tarapur, Palghar.
APPROVED
Renewal of consent to
operate for the same product and
qty. with decrease in CI
31.12.2020. Committee noted that, PP has applied for renewal of consent to operate for
manufacturing of Dyeing Yarn-150 MT/M, Synthetic Materials- 50 MT/M,
Twisted Yarn-60 MT/M and Dyed Fabrics-7,00,000 Mtrs/M.
Committee also noted that, PP has provided ETP for the treatment of trade
effluent. Treated effluent 50% re use in process and 50% disposed to CETP.
Analysis results are within consented limits. PP has provided cyclone dust
collector system to the Boiler section. Analysis results of JVS are within the limits.
Also obtained membership of CHWTSDF for disposal of HW.
In view of above, it was decided to grant consent to operate up to 31.12.2020 by
imposing following conditions:
1. Industry shall extend existing BGs up to consent validity period.
2. PP shall submit a plan for reduction of BOD /COD / Pollution load/volume of
effluent discharged into CETP.
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 9 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
Consent shall be issued after receipt of additional consent fees, if any.
16 MPCB-CONSENT-0000062868
GKN Driveline (India) Ltd. Plot No. 4, Village Lonikand, Pune
APPROVED
1st consent to Operate for
expansion and amalgamation with existing
consent
28.02.2023 It was decided to grant 1st consent to Operate for expansion and amalgamation with existing consent by imposing following conditions;
1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards O&M of pollution control system.
2. Industry shall abstract 78 CMD i.e. 23,400 m3/annum of ground water as per NOC issued by CGWA vide letter dated 18.03.2019.
3. This consent is issued with overriding effect over previous consent no. Format BO/CAC-Cell/UAN No. 0000043816-18/CAC-1811001374 dated 29.11.2018 which is valid upto 28.02.2023.
Consent shall be issued after submission of additional requisite consent fee, if any. It was also decided to call the industry for presentation before CAC to explain the exceedance of JVS results and steps taken towards compliance of the same It was decided to refer the case to categorization committee for change in category from Red to Orange.
17 MPCB-CONSENT-0000064230
Keihin Fie Pvt. Ltd. Plot no B3, Mahalunge, MIDC Chakan, Pune.
NOT APPROVED
1st Consent to Operate for
expansion and amalgamation with existing
consent
--- Committee noted that industry failed to provide evaporator/MEE for treatment of RO reject. Also failed to up-graded the existing STP and ETP of the adequate size so as to take the load from effluent generated from expansion activity. Committee also noted that the work of expansion project is in progress. In view of above, it was decided to call the industry for presentation before CAC to brief the present status of the project and compliance of consent conditions.
18 MPCB-CONSENT-0000064622
Balkrishna Industries Limited, F-20, Gut No. 62, 65, 66, Waluj, Aurangabad.
APPROVED Consent to Establish
Commissioning of the unit or 5 years whichever is earlier
Committee noted the details of APC system submitted by the industry. Industry proposed to provide ESP to CPP to achieve outlet dust concentration less than 30 mg/Nm3. Industry also proposed fume generated during the discharge of mixed rubber compound are exhausted using fume extraction systems having scientifically designed scrubber. Industry has proposed to provide ETP of
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 10 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
designed capacity 360 CMD followed by RO and MEE so as to achieve ZLD. STP of capacity 120 CMD consisting primary, secondary and tertiary treatment system will be provided to achieve COD<150 mg/lit, BOD <20 mg/lit and TSS- <50 mg/lit. Considering the reply of the industry, it was decided to grant consent to establish to manufacture Tire (Tube and tubeless)- 3800 Ton/M and Electricity (CPP)-4.5 MW by imposing following conditions; 1. Industry shall submit the BG of Rs. 5 lakh towards compliance of consent to
establish conditions.
19 MPCB-CONSENT-0000064880
Endress + Hauser Flowtec (India) Pvt. Ltd, M171 TO 176, MIDC Waluj Area, Aurangabad.
APPROVED Renewal of consent with decrease in C
28.02.2024 It was decided to grant renewal of consent with decrease in CI to manufacture Flow Meters & Its Parts- 2000 Nos/M by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards O&M of
pollution control system. It was also decided to return the BG of Rs. 1 lakh obtained towards submission of design details of APC system as industry has submitted the same.
20 MPCB-CONSENT-0000064604
MIRC ELECTRONICS LTD, 234C, 236, 237A/B, 240, 241, 242, 244, 246, 247, 247, 248, 249, 250, 251, 226, 226P, 239 Village Kudus, Bhiwandi – Wada Road, Kalyan.
Not APPROVED
Renewal of consent with decrease in CI
---- In order to have clarity about the present operation .It was decided to call PP for presentation before CAC.
21 MPCB-CONSENT-0000065654
Parker Hannin India Pvt. Ltd. Plot EL-26, MIDC TTC Industrial Area Mahape, Navi Mumbai.
APPROVED
Consent to Establish for expansion
Commissioning of the unit or 5
years whichever is earlier
It was decided to grant consent to establish for expansion to manufacture 1] Instrumentation Products- 350 Nos/A and Electronic Control Unit- 33600 Nos/A by imposing following conditions; 1. Industry shall upgrade the existing pollution control system at paint booth
facility so as to control VOC emission.
22 MPCB-CONSENT-0000065939
Lumax Industries Ltd., 608, Chakan-Talegaon road, mahalunge, chakan, Pune.
APPROVED
Commissioning of the unit or 5
It was decided to grant consent to establish for expansion to manufacture Head Lamp Assembly- 5,80,150 No/M by imposing following conditions;
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 11 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
Consent to Establish for expansion
years whichever is earlier
1. Forfeited 50% BG i.e. 2.5 lakh out of BG of Rs. 5 lakh obtained towards O&M of pollution control system as JVS result dated 26.11.2018 are exceeding the Parameter BOD- 65 mg/lit against std. 30 mg/lit. and obtain top-up BG of Rs. 5 lakh towards compliance of the same.
23 MPCB-CONSENT-0000065215
Siemens Ltd. Plot No. C-1, Additional Industrial Area, MIDC, Ambad, Nashik.
APPROVED
Consent to Establish for expansion
Commissioning of the unit or 5
years whichever is earlier
It was decided to grant consent to establish for expansion to manufacture Electric Motors-1500 Nos/A.
24 MPCB-CONSENT-0000065280
Bhagwati Ferrow Metal Pvt. Ltd. (G-7/G-8, MIDC Malegaon , Tal- Sinnar, Dist- Nashik
APPROVED
Re-validation of two Consent to Establish and
their amalgamation
Commissioning of the unit or up to 13.09.2021
It was decided to grant re-validation of two consent to establish and their amalgamation to manufacture 1] MS Billets (Phase-II)- 12500 MT/M and 2] CTD/TMT Bars- 11,000 MT/M by imposing following conditions; 1. Industry shall submit the BG of Rs. 5 lakh towards compliance of consent to
establish conditions.
2. Industry shall amend the existing EC dated 01.04.2015 for inclusion of plot No. G-08 and product.
3. Industry shall install primary and secondary air pollution control system to induction furnace.
25 MPCB-CONSENT-0000064535
SKF India Limited Sr.No-159 to 162,169,186, Chinchwad, Pune.
APPROVED
1st consent to Operate for
expansion and amalgamation with existing
consent
28.02.2020 It was decided to grant 1st consent to Operate for expansion and amalgamation with existing consent to manufacture Various Types of Bearing- 87 lakh Nos/Annum, Bearing Housing- 45,000 Nos/Annum and 3] Seals- 2.2 lakh/Annum by imposing following conditions.; 1. This consent is issued with overriding effect over previous consent
no.BO/CAC-Cell/EIC No. PN-24638-15/CAC-841 dated 19.01.2016 which is valid up to 28.02.2020.
Consent shall be issued after submission of additional requisite consent fee, if any.
26 MPCB-CONSENT-0000065250
Jubilant Life Sciences Ltd (Jubilant Life Sciences Ltd G.No.25,26,27,28,32,45,Vill
Approved 1st consent to
operate
31.08.2022 Committee noted that, PP has applied for 1st consent to operate for additional bio composting yard of 7.5 Acres.
Committee also noted that, PP has obtained consent to establish for the 5.0 Acres bio composting yard.
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 12 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
age Nimbut Nira, Tal. Baramati, Dist. Pune)
In view of above, it was decided to grant of 1st consent to operate for 5.0 Acres bio composting yard only by imposing following condition:
1. PP shall submit BG of Rs.5.0 Lakhs towards compliances of the consent conditions.
Also it was decided to call explanation from PP about construction of additional bio composting yard without obtaining consent from the Board.
27 MPCB-CONSENT-0000063490
LG Electronics India Pvt Ltd, Plot No. A-5 Ranjangaon Shirur, Dis. Pune.
APPROVED
Consent to Establish for expansion
Commissioning of the unit or 5
years whichever is earlier
It was decided to grant consent to establish for expansion to manufacture 1)
Refrigerator- 2125 No/M 2) Colour T.V.- 2,60,400 No/M 3) Air Conditioner-
80,800 No/M 4) Washing Machine- 28,500 No/M and 5) Mobile Phones- 43,833
No/M by imposing following conditions;
1. Industry shall submit the BG of Rs. 5 lakh obtained towards compliance of consent to establish conditions.
It was also decided to call the industry for presentation before CAC to explain the exceedance of JVS and steps taken towards compliance of the same.
28 MPCB-CONSENT-0000067403
Endress + Hauser Flowtec (India) Pvt. Ltd, M171 To 176, MIDC Walunj, Aurangabad.
APPROVED
Consent to Establish for expansion
Commissioning of the unit or 5
years whichever is earlier
It was decided to grant consent to establish for expansion to manufacture Flow Meters & Its Parts- 2000 Nos/M by imposing following conditions; 1. Industry shall upgrade the existing ETP/STP so as to cater the load generated
form expansion activity.
2. Industry shall submit the BG of Rs. 5 lakh towards compliance of consent to establish conditions.
29 MPCB-CONSENT-0000067615
Hindalco Industries Limited, Village -Dahali, Nagpur-Ramtek Road, Tehsil-Mouda, Dist. Nagpur.
APPROVED
1st Consent to Operate for
modernization of plant and machinery
without increase
28.02.2022 It was decided to grant 1st Consent to Operate for modernization of plant and machinery without increase in existing production capacity and amalgamation with existing consent by imposing following conditions; 1. Industry shall submit the study report carried out by NEERI towards
applicability of pollution control system to furnace no. 2 within 02 months.
5th meeting of 2018-2019 (Book-let no. 6) dated 12.06.2019 Page 13 of 13
Sr.
No.
UAN No Name of Industry and
Address
Decision on
grant of consent
Consent
granted up to
Remarks/Discussion (1)
in existing production
capacity and amalgamation with existing
consent
Consent shall be issued after submission of additional requisite consent fee, if any.
30 MPCB-CONSENT-0000067689
Menon and Menon Limited, F-3, Kagal Five star MIDC, Kagal, Kolhapur.
APPROVED
Consent to Establish for
construction of admin and shed
etc.
Commissioning of the unit or 5
years whichever is earlier
It was decided to grant consent to establish for Construction of Admin Bldg, Canteen, Occupational Health Centre, rest room, storage shed.
The meeting is ended with vote of thanks.