MaxCell Installation ReportsBSNL Nagpur Maharashtra circle
India
Amit DubeyMaxCell Market Manager - India
Date: 2nd June 2010End User: BSNL Maharashtra Circle , NagpurInstaller: MillikenVenue: Zero miles, NagpurClassification: in 110-100mm Empty conduit
Amit DubeyMaxCell Market Manager - India
BSNL Nagpur (India)
Installed Rope in 110-100mm
Installed MaxCell
Section Conduit ID, mm
Existing Cable or sub duct OD mm
Pull Length
M
Sweeps, degrees
MaxCell Installations Cable Installation Final Fill
RatioStyle Time, min
Tension, kgs
OD, mm Time, min
Tension, kgs
1 100 empty 147 Straight 5621-3 6 2 ManHand Pull
18 10 3 Man HP3.2%
Remarks:-
- This trial held in Nagpur with BSNL Maharashtra circle Western Telecom Project (WTP) .
- It was an empty 110-100mm and straight site
- A swivel was used to pull in the MaxCell
- One 18mm cable placed and rest two will be deploy later.
- BSNL this circle will send letter to corporate office to let them know procurement guideline of MaxCell.
- DGMs of Telecom Project and Maharashtra circle planning for a small trial order.
Date: 2nd June 2010End User: BSNL Maharashtra Circle , NagpurInstaller: MillikenVenue: Zero miles, NagpurClassification: in 110-100mm Empty conduit
Amit DubeyMaxCell Market Manager - India
Installation Results:
Date: 2nd June 2010End User: BSNL Maharashtra Circle , NagpurInstaller: MillikenVenue: Zero miles, NagpurClassification: in 110-100mm Empty conduit
Installed MaxCell
Thanks Western Telecom Project and Maharashtra Planning team.
Amit DubeyMaxCell Market Manager - India
Cable getting enter in MaxCell Successful Installed Cable