ANNUAL GENERAL MEETING22 November 2010
Monday, 22 November 2010
ANNUAL GENERAL MEETING22 November 2010
Andrew Woskett, Managing Director
Minotaur Exploration LimitedACN: 108 483 601
ASX: MEP
Monday, 22 November 2010
I joined Minotaur on 1 March 2010 and I am delighted to be part of such a great team I am an engineer with 30 years multi-disciplinary, mining industry experience & in technology plus a Masters in Commercial Law, Fellow of AusIMM I have been directly responsible for creating numerous large, new gold & copper processing
operations, such as: Bougainville Copper concentrator & mine area infrastructure Kalgoorlie Super Pit, Fimiston plant & Gidgee fluidised bed Roaster Kanowna Belle Marymia, Granny Smith mods Ballarat Goldfields
Iv’e managed studies for a range of new projects in gold, silica, coal, iron ore, copper and coal-to-liquid fuels, such as:
Cockatoo Island - restructured the high grade {64% Fe} iron ore fines operation, defined new mineable reserves and extended the life of mine by several years, saving it from closure Olympic Dam - planned the new open pit operation & organisation (for WMR) Pilbara Iron - planned the Hamersley iron expansion to 230Mtpa Extension Hill - PFS for a 5Mtpa hematite/magnetite plant and open pit mine Eneabba Coal - PFS for a 500ktpa DRI pig iron nugget plant & open pit mine
Background
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
today’s Agenda:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
1. About Minotaur today; facts & figures2. Minotaur’s achievements through 20103. Minotaur’s aims for the end of 20114. Minotaur’s aims for the end of 20125. Cloncurry IOCG exploration6. Mutooroo Fe exploration and a regional perspective7. Poochera Kaolin; the pathway to commercialisation8. usual Disclaimer9. Q & A
today’s Agenda:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
About Minotaur
Equity: 92.7M shares on issue
Top 5 hold 23.7%: Oz Minerals (8.67%); Newmont (5.74%)
52 week range: 16.5c - 38c
Last Price (as @ 19 Nov): $0.245
Market Capitalisation: $22.7M
Cash (31 Oct): $6.2M Listed Investments: $7.5M
Enterprise Value: =$9.0M (the disturbingly low value that the market ascribes to our real assets)
Exploration Assets valued @: $0.097 per share (as @ 19 November 2010)
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
Minotaur’s priorities through 2010:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
Minotaur’s priorities through 2010:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
exploration mainly in:
Queensland New South Wales South Australia
and
Victoria
Monday, 22 November 2010
Minotaur’s priorities through 2010:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
exploration mainly in:
Queensland New South Wales South Australia
and
Victoria
where the focus has been on:
defining and drilling new IOCG Copper-gold targets defining and drilling new Base metals (Pb, Zn) targets investigating IOCG style (Cu-Au), Magnetite, Kaolin,
and Gold prospects acquiring new VMS style base metal targets & Gold
Monday, 22 November 2010
Minotaur ‘s achievements in 2010:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
Project diversity, well funded by JV’s, investing $7 million through 2010:
Cloncurry (Qld): geophysics completed on multiple IOCG targets, first drillhole successfully completed, but program now hampered by early onset of ‘wet‘ season
Aphrodite (SA): IOCG target 35km SE of Olympic Dam. Access approvals gained.Drilled to 829m depth in October. The gravity anomaly was tested but not explained by core. New downhole geophysical methods needed to assess and understand the anomaly
Border (SA): AEM & EM surveys completed on base metals targets, drill in 2011
Mutooroo (SA): High quality sedimentary hosted magnetite deposit discovered.Drilling delayed by wet, to re-commence in January 2011
Poochera (SA): Highest quality, ‘world class’ kaolin resource characterised. Planning for a new mine operation from end 2012; +50 year life. Production to ramp from 50,000 tpa @ start up to +100,000 tpa (assumes 2 x wet processing modules)
Victoria: Successfully tendered for new VMS tenure; Option taken on exploration & acquisition of 2 historic gold fields, drilling started
Minotaur ‘s achievements in 2010:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
Minotaur’s vision for end 2011:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
Minotaur’s vision for end 2011:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Project outcomes:
Cloncurry: drill testing done on multiple IOCG anomalies for new mineral deposits
Mutooroo: have completed a Scoping Study of 1 billion tonne Magnetite target with possible mineralisation upside to 3 billion tonnes. An initial JORC Inferred resource reported. A case made to JV to proceed to PFS from March 2012
Poochera: have completed PFS & DFS studies into Kaolin commercialisation. Offtake agreements in place, ready to make an Investment decision to proceed to design, construction and commissioning in 2012
Victoria: have delineated and drilled VMS style base metals targets. Identified Gold resource and potential production prospects
Monday, 22 November 2010
Minotaur’s vision for end 2012:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
Minotaur’s vision for end 2012:
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Project outcomes:
Cloncurry: intensive drilling completed on several new IOCG mineral deposits
Mutooroo: PFS completed. A case made to JV for progression of a $50M BFS, from March 2013, into a 40Mtpa magnetite mining & processing operation
Poochera: design, construction & commissioning complete; readying for first commercial production early in 2013
Victoria: VMS base metals targets advanced to new discovery stage. Gold resources advanced to production proposition
Monday, 22 November 2010
looking for ‘Ernest Henry’ style iron oxide, copper-gold (IOCG) orebodies
multiple IOCG targets over 546 km2
30km N of Ernst Henry IOCG mine
JV with Japan Oil Gas & Metals Corp
JOGMEC earning 51%
JOGMEC funding $4M over 3 years
Cloncurry IOCG
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Cloncurry
Ernest Henry
Australia’s most productive copper belt, but
surface deposits are depleted vast areas are under cover (obscured)
and are under-explored geophysics “sees through” the cover
to locate potentially mineralised targets (anomalies)
Monday, 22 November 2010
Drill Targets at: Gypsy Plains, drilled 12 Nov to
401.5m target depth, core being transported to Adelaide for full technical assessment
Cormorant
Cotswold
Woolshed Flat
Cloncurry IOCG
www.minotaurexploration.com.au
MINOTAUREXPLORATION
ground geophysics completed geophysical anomalies
selected for drilling aka Eloise, Osborne,
Ernest Henry drilling to resume in
2011, after Wet season
Monday, 22 November 2010
Cloncurry River flows (Saturday 13 November) as a result of first rains overnight
Cloncurry
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
Mutooroo Fe
www.minotaurexploration.com.au
MINOTAUREXPLORATION
a major new magnetite deposit JV: Minotaur 40.1%, Sumitomo 59.9%
Australia’s next big iron province? 90km SW of Broken Hill
35km from E-W rail line
Heavy duty rail link 300km to Port Pirie
a case could well arise for regional consolidation of new infrastructure to deliver multi-user Processing, Rail, Port, Power, Water supply facilities etc, supporting all magnetite mines in the area
Monday, 22 November 2010
The term "Explora/on Target" should not be misconstrued as an es/mate of Mineral Resources and Reserves as defined by the JORC Code (2004), and the term has not been used in that context. It is uncertain if further explora/on will result in the
determina/on of a Mineral Resource. Refer Cl 18 of the JORC Code (2004).
Mutooroo Fe
www.minotaurexploration.com.au
MINOTAUREXPLORATION
2 RC holes drilled to 200m thick magnetite beds
intersected under thin cover consistently high quality (~69%)
magnetite concentrates made from composited drill chips
low level Heli-Mag data reveals extensive regional arrangement of magnetised siltstone beds Work Plan (rain delayed):★ 8 x RC & Diamond holes planned along 40km strike extent of highly magnetised sedimentary beds★ Concentrate quality testing ★ to estimate size of the potential Exploration Target(s); aiming for ~3b tonnes
Monday, 22 November 2010
Mutooroo Fe
www.minotaurexploration.com.au
MINOTAUREXPLORATION
08RCMUT-‐02 08RCMUT-‐01
Monday, 22 November 2010
Mutooroo Fe
www.minotaurexploration.com.au
MINOTAUREXPLORATION
08RCMUT-‐02 08RCMUT-‐01Magnetite Pellet Fines - Quality CriteriaMagnetite Pellet Fines - Quality CriteriaMagnetite Pellet Fines - Quality CriteriaMagnetite Pellet Fines - Quality CriteriaMagnetite Pellet Fines - Quality Criteria
SpeciesBF Pellet
fines grade(target %)
MUT01/02DTRC % Comment Result
Fe >60.0 69.3 pure magnetite is 72.4% Fe (maximum grade achievable)
FeO >25 ~26.4 calculated by differences
SiO2 <5.5 3.57SiO2<5% preferred for Blast Furnace (‘BF’) feed.For DRI grade Si+Al <2% (preferred) and certainly <3%
Al2O3 1.0-1.5 0.36 low Al2O3 can be considered ‘preferred’ by BF
CaO <3.0 0.10 moderate CaO can offset flux addition in BF
MgO <3.0 0.05 moderate MgO can offset flux addition in BF
TiO2 <0.75 0.06 Concentrate is unsaleable if TiO2 > 1%
Mn <0.050 0.02 Mn increases coke rate in BF
P <0.030 0.01 P<0.08% preferred as P reports to pig iron smelt
S <0.010 <0.01 S contributes to acid rain (SO2) gases in BF exhaust
Mutooroo DTRC grade, to date, ticks all the boxesDTRC: Davis Tube Recovery ConcentrateBF: Blast Furnace; a steel making furnace
Monday, 22 November 2010
Mutooroo Fe
www.minotaurexploration.com.au
MINOTAUREXPLORATION
A Regional Vision: Australia’s next big iron province?
several aspiring developers side-by-side
multiple zones each potentially hosting hundreds of millions of tonnes of magnetite rich siltstones
Regional potential for ~10bt ore, with a foreseeable 100 year life of mining @ nominal 100Mtpa mining rate, producing 25Mtpa of concentrate, comprising:
4-5 processing operations for 5-10Mtpa concentrate each, at ~$2b Capex each, or
one 25Mtpa Super Plant and assoc infrastructure at ~$6b, saving ~$5b overall, with scale to include a Pellet Plant (producing a value added product)
equal to CITIC’s $5.5b for 28Mtpa huge magnetite project at Cape Preston, WA (see photos)
6 autogenous grinding mills @ 28MW each
450MW Power station, combined cycle, gas fired(photos sourced from http://www.citicpacificmining.com/resources/news)
Monday, 22 November 2010
Poochera Kaolin
www.minotaurexploration.com.au
MINOTAUREXPLORATION
!
Granite decomposes to granitic kaolin through tropical weathering
Finished product size is 92% passing 2 microns (or 2 thousandths of one millimetre).
World trade of highest quality ‘China Clay’ exceeds 10 million tonnes per year.
Used in plastics, paints, paper coatings, tyres, pharmaceuticals, ceramics
Monday, 22 November 2010
MEP 100%
20Mt Inferred Kaolin resource
5m - 30m below surface, soft digging
92% < 2um hydrous kaolin product world class ‘Ultra white’ & ‘Ultra bright’
hydrous kaolin qualities; Reflectance (ISO): R457 = 90.7
pilot plant producing world class calcined product: R457 = 92.4
potential for new operation producing +100kt pa for over 50 years
100km from Port Thevenard, SA
marketing exposure expected to lead to preliminary Offtake discussions
Pre-feasibility study in H1 of 2011
Poochera Kaolin, ‘world class’
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Note: * elevated Alumina level is beneficial
* *
Poochera kaolin ticks all the quality boxes
Monday, 22 November 2010
so, to conclude......Minotaur has:
a diversified portfolio with real growth assets
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
Disclaimer and Competent Person’s Statement
Information in the foregoing presentation that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Dr A. P. Belperio, who is a Director and full-time employee of the Company and a Fellow of the Australasian Institute of Mining and Metallurgy. Dr A. P. Belperio has a minimum of 5 years experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr A. P. Belperio consents to inclusion in the presentation of matters based on his information in the form and context in which it appears.
www.minotaurexploration.com.au
MINOTAUREXPLORATION
This presenta/on has been prepared by the management of Minotaur Explora/on Limited (ASX: MEP) for the general benefit of analysts, brokers and investors and does not cons/tute specific advice to any par/cular party or persons. Informa/on herein is based on publicly available informa/on, internally developed data and other sources. Where an opinion, projec/on or forward looking statement is expressed in this presenta/on, it is based on the assump/ons and limita/ons men/oned herein and is an expression of present opinion only. No warran/es or representa/ons are made or implied as to origin, validity, accuracy, completeness, currency or reliability of the informa/on. MEP specifically disclaims and excludes all liability (to the extent permiVed by law) for losses, claims, damages, demands, costs and expenses of whatever nature arising in any way out of or in connec/on with the informa/on, its accuracy, completeness or by reason of reliance by any person on any of it. Where MEP expresses or implies an expecta/on or belief as to the success of future explora/on and the economic viability of future project evalua/ons, such expecta/on or belief is expressed in good faith and is believed to have a reasonable basis. However, such projected outcomes are subject to risks, uncertain/es and other factors which could cause actual results to differ materially from projected future results. Such risks include, but are not limited to, explora/on success, metal price vola/lity, changes to current mineral resource es/mates or targets, changes to assump/ons for capital and opera/ng costs as well as poli/cal and opera/onal risks and government regulatory outcomes. MEP disclaims any obliga/on to advise any person if it becomes aware of any inaccuracy in or omission from any forecast or to update such forecast.
Monday, 22 November 2010
and if imitation is the highest form of flattery. . . .
www.minotaurexploration.com.au
MINOTAUREXPLORATION
Monday, 22 November 2010
ANNUAL GENERAL MEETING22 November 2010
Questions please............then a cup of tea.
Minotaur Exploration LimitedACN: 108 483 601
ASX: MEP