WORLD WIDE
Headquarters
Development facilities
Manufacturing
Local office/Service location
Founded in Philips (1909) Independent since 2009
The Netherlands (HQ-Best)
UK (London)
Slovakia
Poland
Hongkong
India
Singapore
Indonesia (Batam)
Melbourne
IEC 15118 (EN61851-23/24 / DIN 70121) For both CCS & Pantograph
STANDARDISATION FAST CHARGING
Interoperability
Foto: OV magazine
Temperature -10 to 55 °C (-30 °C option) Charging Standards IEC61851-1/23/24; DIN 70121 / ISO15118 Output Voltage Range 460-790Vdc Power factor Unity Efficiency >97% Network connection GSM / 3G modem / OCPP / OSCP* Protection IP55 Operational noise level <55 dBA
Depot Charging 2x30kW | 50kW | 150kW
Opportunity Charging 300kW | 450kW | 600kW
Temperature -10 to 55 °C (-30 °C option) Liquid Cooling Charging Standards IEC61851-1/23/24; DIN 70121 / ISO15118 Output Voltage Range 460-790Vdc Power factor Unity Efficiency >97% Network connection GSM / 3G modem / OCPP / OSCP* Protection IP54; IP55 Operational noise level <35 dBA
Designed and available for a full lifecycle o Change proposal o Life cycle management o Track & Trace o Availability o Robustness o Reliability
Foto: OV magazine
Real-time insights and control o Energy consumption o Charging sessions o Availability o Soft-reset o Payment & billing o Open Source (OCPP)
Service & Maintenance
o 1st level o 2nd level o 3th level o Remote monitoring o Local service o Local storage
Reference NL Limburg/Wadden
o 2 e-bus operations o ~30 x 10/12m busses o 5 MW Installed base (Q4 2016)
Reference NL Eindhoven o Largest full operation e-bus project in
Europe o 43 x 18m e-busses o Depot charging @ 30 kW o Opportunity Charging @ 450 kW o 4 MW Installed base (Q4 2016) o Roof-mounted pantograph for depot &
opportunity charging
Large scale depot charging Eindhoven o 42 x 18m busses o 4 MW Installed base (Q4 2016) o Largest full operation e-bus project in
Europe o Charging by roof-mounted pantograph o Combination of fast & slow charging
Grid Connection Available? Eindhoven o 42 x 18m busses o 4 MW Installed base (Q4 2016) o Largest full operation e-bus project in
Europe o Charging by roof-mounted pantograph o Combination of fast & slow charging
Desgin Award Eindhoven
o 42 x 18m busses o 4 MW Installed base (Q4 2016) o Largest full operation e-bus project in
Europe o Charging by roof-mounted pantograph o Combination of fast & slow charging
Smart Charging Eindhoven
o 42 x 18m busses o 4 MW Installed base (Q4 2016) o Largest full operation e-bus project in
Europe o Charging by roof-mounted pantograph o Combination of fast & slow charging
o 42 x 18m busses o 4 MW Installed base (Q4 2016) o Largest full operation e-bus project in
Europe o Charging by roof-mounted pantograph o Combination of fast & slow charging
Smart Charging Eindhoven
o ISO15118 o CCS Type 2 o Mode 4 communication o 200-1000V o 350kW Fast charging
Future of Car Charging
Car charging times
Charger kWMinutes to 100% SOC
80% kW Battery
350 4,11 24 30350 5,49 32 40350 6,86 40 50350 8,23 48 60350 10,97 64 80
Heliox 350kW Water-cooled CCS
Production facility
Michael Nuiten M: +31 6 46 393 009 E: [email protected] I: www.heliox.nl/automotive