+ All Categories
Transcript
Page 1: MM 1 · 2015-12-03 · MM1/MM4/MM5/MM8/MMIO/ Pile & Deck Wharf Edge MM12/MM14/MM15/MMe1t8 To Ma Wan Chung Ball Courts Amphitheater Surface Proposed Recreational Area Mead MM1(MYW/MM3/MM4ŽMM5

KW 09/15 CY STNTS

A

A 09/15Mitigation Measures Update CY

Mitigation Measures Plan for TCW site (Sheet 2 of 3)

Figure 11.5ba

Legend:

1

Mitigation MeasuresMitigation Measure Code

Summary Description Mitigate Landscape Impacts

Mitigate Visual Impacts

Construction PhaseMM 1 Optimization of Construction Areas &

Providing Temporary Landscape onTemporary Construction

√ √

MM 2 Minimize Topographical Changes √ √MM 3 Preservation of Potentially Registrable OVTs,

Rare and Protective Vegetation √

MM 4 Transplanting of Existing Trees √MM 5 Screen Hoarding √MM 6 Adopting Non-dredge Method for the

Reclamation√

MM 7 Protection of Natural Rivers and Streams √

MM 8 Preservation of Natural Coastline √MM 9 Providing Natural Rock Material/ Planting for

Artificial Seawall√ √

Operational PhaseMM 10 Compensatory Planting √MM 11 Woodland Restoration √MM 12 Screen Planting √ √MM 13 Roadside Planting √ √MM 14 Aesthetic Design of Built Development √

MM 15 Maximise Greening on Structures √ √MM 16 Noise Barrier Design √MM 17 Landscape Treatment for Polders &

Stormwater Attenuation and Treatment Ponds √ √

Construction Phase & Operation PhaseMM 18 Landscaping on Slopes √ √

MM 19 Landscape Treatment on ChannelizedWatercourses

√ √

MM 20 Lighting Control √

B Mitigation Measures Renamed KS 11/15

B

Top Related