MP-ECBC CELL
presentation by
Mr. Rajeev RalhanDirector, PwC India
Let’s build ‘Tomorrow’
HISTORY
MP-ECBC CELL
ENERGY CONSERVATION
BUILDING CODE
(ECBC)
MP-ECBC CELL
source: world energy outlook reports
HISTORY OF INDIA
233
1993
450
2000
values are of PRIMARY ENERGY DEMAND (in MTOE)
MP-ECBC CELL
source: world energy outlook reports
HISTORY OF INDIA
233
1993
450
2000
716
2020
1250 - 1500
2030
values are of PRIMARY ENERGY DEMAND (in MTOE)
MP-ECBC CELL
source: world energy outlook reports
233
1993
450
2000
770 MTOE
2012
716
2020
1250 - 1500
2030
HISTORY OF INDIA(values are of PRIMARY ENERGY DEMAND in MTOE)
MP-ECBC CELL
source: world energy outlook reports
233
1993
450
2000
In 2001
Nations’
Energy Conservation Act
Energy Conservation Act, 2001
MP-ECBC CELL
DESIGNATED CONSUMERS
ENERGY CONSERVATION
FUND
STAR AND LABELLING OF APPLIANCES
ENERGY CONSERVATION BUILDING CODE
INSTITUTIONAL SETUP
5
Energy Conservation Act, 2001
MP-ECBC CELL
DESIGNATED CONSUMERS
ENERGY CONSERVATION
FUND
STAR AND LABELLING OF APPLIANCES
ENERGY CONSERVATION BUILDING CODE
INSTITUTIONAL SETUP
5
Energy Conservation Act, 2001
MP-ECBC CELL
DESIGNATED CONSUMERS
ENERGY CONSERVATION
FUND
STAR AND LABELLING OF APPLIANCES
ENERGY CONSERVATION BUILDING CODE
INSTITUTIONAL SETUP
5
Energy Conservation Act, 2001
MP-ECBC CELL
MPUVNState Designated Agency
Provide legal framework and institutional arrangement to embark energy efficiency drive
Exert leadership and develop policies and provide direction to National Energy Conservation and Efficiency efforts and programs
Section 15 of the Act empowers State Designated Agency to coordinate, regulate and enforce efficient use of energy and its conservation
JOURNEY OF MP-ECBC
MP-ECBC CELL
JOURNEY OF ECBC IN MADHYA PRADESH
MP-ECBC CELL
20072007
Introduced ECBC
for the first time by BEE
20072009
State Level Steering
Committee was established
20072010-2014
ECBC 2007 Amendment
Document was prepared
20072014-2016
SensitizationWorkshops,
Conferences were organized
20072016
established
ECBC CELL(Arch. & Engg.)
2007Progress
from
2016Lets Discuss!
MP-ECBC CELL
Progress
From
2016
Situation Analysis
was performed
Amendmentswere made as per
ECBC -2017
Amendmentswere made as per
ECBC Rules-2018
Steering Committee Meetings were organised
Integrated Enforcement Mechanism
with existing approval system
Stakeholder Consultation
for drafting MP-ECBC documents
MP-ECBC docs prepared in both
English and Hindi
Demo-Projects
with PWD & MPUVN (under process)
NOTIFICATION(under process)
JOURNEY OF ECBC IN MADHYA PRADESH
MP-ECBC COMPLIANCE MECHANISM
MP-ECBC CELL
Difference between ECBC and MP-ECBC?
MP-ECBC CELL
We should follow
ECBC 2017
or
MP-ECBC 2017 ?
MP-ECBC CELL
https://www.google.co.in/imgres?imgurl=https%3A%2F%2Fimage.slidesharecdn.com%2F01introduction-140504232059-phpapp02%2F95%2Fecbc01introduction-27-638.jpg%3Fcb%3D1399245941&imgrefurl=https%3A%2F%2Fwww.slideshare.net%2Fmathangi_advit%2F01-introduction-34276080&docid=ZRdAxMowv5FRcM&tbnid=xGePbqsqjL9tnM%3A&vet=10ahUKEwjE5a6bkqbdAhUZA4gKHfelAd4QMwhAKAIwAg..i&w=638&h=480&safe=active&bih=631&biw=1366&q=ECBC%20CLimatic%20zones&ved=0ahUKEwjE5a6bkqbdAhUZA4gKHfelAd4QMwhAKAIwAg&iact=mrc&uact=8
INDIA STATES & UT’s DIVISIONS 29 STATES and 7 UT’s
HOT-DRY WARM-HUMID COMPOSITE TEMPERATE COLD
MP-ECBC CELL
Bhopal
Ujjain
Indore
Chambal
Shahdol
Rewa
Sagar
JabalpurNarmadapuram
Gwalior
Chambal division
Gwalior division
Bhopal division
Ujjain division
Indore division
Narmadapuram division
Jabalpur division
Shahdol division
Rewa division
Sagar division
http://stcr.gov.in/farmer/HTML/Fertility_Maps_Macro/Maps/MadhyaPradesh/Madhya%20Pradesh%20P.JPG
STATE OF MADHYA PRADESH ADMINISTRATIVE DIVISION 51 DISTRICTS
MP-ECBC CELL
Climatic Division of Madhya Pradesh
Bhopal
Indore
BarwaniWestNimar
EastNimar
Burhanpur
Betul
ChhindwaraSeoni
Balaghat
Dewas
SehoreRaisen
ShajapurUjjain
Neemuch
Harda
Mandla
Dindori
Annupur
Umaria
Sidhi
Rewa
Satna
Shahdol
Jabalpur
Narsimhapur
KatniDamoh
Panna
Chhatarpur
Tikamgarh
SagarVidishaRajgarh
AshoknagarGuna
Shivpuri
Gwalior
BhindMorena
Sheopur Datia
DharJhabua
Ratlam
Mandsaur
Hot-Dry Climatic regions Composite
climatic regions
http://stcr.gov.in/farmer/HTML/Fertility_Maps_Macro/Maps/MadhyaPradesh/Madhya%20Pradesh%20P.JPG
Hoshangabad
MP-ECBC COMPLIANCE MECHANISM
MP-ECBC CELL
MP-ECBC IN BRIEF
New
ConstructionOR
Existing Buildings
(Addition / Alteration)
MP-ECBC CELL
New
Construction
having Connected Load of 100kW or above
Existing Buildings
need to renew its connected load because of addition/alteration
due to which its connected load will be
100kW or above
New
ConstructionOR
Existing Buildings
(Addition / Alteration)
MP-ECBC CELL
BUILDING ELEMENTS
COMFORT SYSTEMS &
CONTROLS
ELECTRICAL &
RENEWABLE ENERGY
SYSTEMS
LIGHTING & CONTROLS
BUILDING ENVELOPE
Exemptions
• Buildings that do not use electricity or fossil fuels
• Equipment and portion of the building systems that use energy primarily for manufacturing processes
• When this Code is in conflict to Safety, Health and Environment codes shall prevail
MP-ECBC CELL
MP-ECBC CELL
COMPLIANCE MECHANISM
COMPLIANCE SUBMITTALS
Energy Efficiency Performance Level
COMPLIANCEPROCESS
Mandatory
Prescriptive
MP-ECBC CELL
EPI RATIO =EPI of Standard Building
EPI of Proposed Building
ENERGY
PERFORMANCE
INDEX (EPI)
=
Built-up Area (in sq. m.)
Annual Energy Consumption
COMPLIANCE SUBMITTALS
MP-ECBC CELL
EPI RATIO
ENERGY
PERFORMANCE
INDEX (EPI)
Prescriptive Method
Whole Building Performance Method
COMPLIANCE PROCEDURE
MP-ECBC ENFORCEMENT MECHANISM
MP-ECBC CELL
WHATS ARE RULES?
ECBC OR MP-ECBC
MP-ECBC CELL
0 100
REGULATION
?RESPONSIBILITIES
CODE
MONITORING& VERIFICATION
CHECKLISTS
TRANSPERANCY
MP-ECBC ENFORCEMENT MECHANISM
MP-ECBC CELL
DEPARTMENTS HAVING THEIR ROLE
AND RESPONSIBILITIES
ADMINISTRATIVE ROLES
MP-ECBC CELL
VIDYUT VITRAN CO. /DISCOM
MP-ECBCImplementation
Committee
Madhya Pradesh
Urja Vikas Nigam
Authority Having
Jurisdiction
MP-ECBC Technical Grievances Redressal
Committee
PROCEDURE OF ENFORCEMENT
MP-ECBC CELL
circulate UBID
MP-ECBC CELL
DESIGNING POST-CONSTRUCTIONCONSTRUCTION
Owner
SDA DISCOM
AHJ
EEA(Building)
Check for minimum
criteria
Will assist in compliance with MP-ECBC 2018
and submit relevant FORMS
Generate UBIDon approval of
submittals
MP-ECBC CELL
Owner
AHJ
EEA(Building)
To construct building as per
submittals
will verify construction process and
submit relevant compliance
FORMS
Grant new-permanent Electrical
Connection
SDA
DISCOM
DESIGNING POST-CONSTRUCTIONCONSTRUCTION
MP-ECBC CELL
OwnerEEA
(Building)
Will take necessary
action if not in compliance
will provide annual energy consumption details of the
UBID’s and share with SDA
Will monitor EPI of UBID
SDA
DISCOM
MP-ECBC Implementation Committee
will resolve appeal raised by Owner
DESIGNING POST-CONSTRUCTIONCONSTRUCTION
MP-ECBC CELL
OwnerEEA
(Building)
Will take necessary
action if not in compliance
will provide annual energy consumption details of the
UBID’s and share with SDA
Will monitor EPI of UBID
SDA
DISCOM
NEC or SECwill resolve appeal raised
by Owner
For multiple-use of single buildings, UBID need to be followed by syntax from
Owner: UBID_T(n)When building is occupied or used by various
tenant(s) and having provision of sub-metering for energy consumption is provided by Owner
DISCOM: UBID_M(n)When building is having multiple owner(s) and
sub-metering for energy consumption is provided by DISCOM
Under such cases, especially when sub-meter is under Owner scope, will be liable to provide necessary annual energy consumption whenever asked by SDA
DESIGNING POST-CONSTRUCTIONCONSTRUCTION
MP-ECBC CELL
Mixed-use Buildings (Sold by Owner)
Hospital
Hospital
Offices
Offices
Retails
BUILDING(with UBID as ‘xxxx/ECBC’ )
having MULTIPLE OWNERS
DISCOM shall need to be add UBID with syntax as
‘xxxx/ECBC-Mn’
Where, Mn = M1, M2, M3, M4 … Mn (n=no.
of multiple of owners)
Relevant energy details need to be shared with SDA
If Owner sales spaces of building to different consumers afterconstruction then,
MP-ECBC CELL
Mixed-use Buildings (Leased by Owner)
Hospital
Hospital
Offices
Offices
Retails
BUILDING(with UBID as ‘xxxx/ECBC’ )
having MULTIPLE OWNERS
OWNER shall be liable to monitor energy consumption
via sub-metering
While DISCOM need to share energy details for whole
building as per UBID shared by AHJ with SDA
If Owner make a lease agreement (rent) for the spaces ofbuilding with different tenants then,
MP-ECBC CELL
EPI Calculation
Annual Energy Consumption
(in kWh)
1,00,000
10,000
20,000
20,000
10,000
40,000
Built-upArea
(in sq.m.)
1000
100
200
300
50
350
EPI (P)(Annual kWh/
sq.m.)
100
100
100
67
200
114
/ =EPI Ratio(EPI (P)/EPI (S))
1.00
1.00
1.00
0.67
2.00
1.14 EPI (S)(Assume to be
100kWh)
(1)
(2)
(3)
(4)
(5)
/ =
/ =
/ =
/ =
/ =
Circulate UBID
MP-ECBC CELL
Owner
SDA DISCOM
AHJ
EEA(Building)
Check for minimum
criteria
Will assist in compliance with MP-ECBC 2018
and submit relevant
documents
Generate UBIDon approval of
submittals
OwnerEEA
(Building)
Will take necessary
action if not in compliance
will provide annual energy consumption details of the
UBID’s and share with SDA
Will monitor EPI of UBID
Owner
SDAAHJ
EEA(Building)
To construct building as per
submittals
will verify construction process and
submit relevant compliance
FORMS
Grant new-permanent Electrical
Connection
SDA
DISCOM
DISCOM
NEC or SECwill resolve appeal raised
by Owner
DESIGNING POST-CONSTRUCTIONCONSTRUCTION
MP-ECBC COMPLIANCE
MP-ECBC CELL
Importance of MP-ECBC Compliance?
MP-ECBC CELL
Importance of MP-ECBC Compliance
Building performance enhancement through out its
life
Reduction in energy demand and peak loads
Providing health and comfort for occupants
Reduction in energy bills and embodied energy
Ease for Government to built-up future policies
Improving building life
THANK YOU
MP-ECBC CELL