MRac Ground Terrace Ⅱ
Installation Guide
Content
1. Product Introduction------------------------------------------------ P2
2. Installation Tools & Components-------------------------------- P3
3. Installation Guide---------------------------------------------------- P6
4. Warranty--------------------------------------------------------------- P10
Xiamen Mibet New Energy Co., Ltd
No 69, Xintian Rd., Jimei District Tel: +86 592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: [email protected]
2
1. Product Introduction
MRac Ground Terrace II is a highly pre-assembled ground mount system can
be applied to large commercial and utility scale installations, totally aluminium
with good corrosion-resistant capability. With the efficient structure design,
MRac Ground Terrace II saves installation time and minimizes costly labour for
developers, operators and installers when delivering large scale projects.
Please read this Installation Guide thoroughly before installing the MRac
Ground Terrace II system. This Guide offers the planning and installation
instruction for MRac GT II.
GT II products, when installed in accordance with this guide, will be structurally
adequate and will meet the local standards. During installation, especially
when working on the roof, be sure to observe the appropriate safety
regulations and please pay attention to the relevant regulations of your local
region. Please check that you are using the current version of the installation
manual by contact Mibet Energy by mail on [email protected], or your
local representative.
The installer is solely responsible for:
Complying with all applicable local or national building codes, including any that may
supersede this manual;
Ensuring that MRac and other products are appropriate for the particular installation
and the installation environment;
Using only MRac parts and installers-supplied parted as specified by MRac
(Substitution of parts may void the warranty and invalidate the letter of certification on
page 2);
How to recycle: according to the local relative statute;
How to disassemble: countermove with installation;
Ensure that there are no less than two professional workers in panel installation;
Ensure the installation of relative electrical equipment is performance by professional
electrician.
Ensure safe installation of all electrical aspects of the PV array.
Xiamen Mibet New Energy Co., Ltd
No 69, Xintian Rd., Jimei District Tel: +86 592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: [email protected]
3
2. Installation Tools & Components
2.1 Installation Tools
Hydraulic Pile Rammer
L Inner Hexagon Allen Key
Electrical Tool
Wrench
Infrared calibration instrument
Tape 5m
Total station
2.2 Components List
Components
End clamp kit Inter Clamp Kit C Clamp Kit Post Plate A Post Plate B Pre-assembled GT2
support
Post Rail Splice for rail
Hexagon Bolt Kit
with corrugated
gasket M12*110
Hexagon Bolt Kit
M12*95
Hexagon Bolt Kit
M12*35
Xiamen Mibet New Energy Co., Ltd
No 69, Xintian Rd., Jimei District Tel: +86 592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: [email protected]
4
2.3 System Overview
Rail
Pre-assembled support
Post plates
Post
Xiamen Mibet New Energy Co., Ltd
No 69, Xintian Rd., Jimei District Tel: +86 592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: [email protected]
5
2.4 Unit Installation
Step 1: Ramming the Post into ground Step 2: Install the Square Jointer Kit onto
head of the Post
Step 3: Install Pre-assembled GT2 Support Step 4: Install the Rail
Step 5: Install solar panels
Xiamen Mibet New Energy Co., Ltd
No 69, Xintian Rd., Jimei District Tel: +86 592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: [email protected]
6
3. Installation Guide
3.1 Install the post
3.1.1 Please make sure
you have all the installation
tools and components
ready before your
installation; Especially the
hydraulic pile hammer can
perform well on-site.
3.1.2 Check the provided
planning and positioning
with the Total Station, mark
the location where each
U-shape Post should to be
rammed. Please make
sure all the posts for one
row are in a line and at the
same height.
Note: The deviation of
Height between Posts
must NOT exceed 5 mm.
3.2 Install post plates
3.2.1 As shown on the
right, place post plate B on
post plate A, and fasten
two plates with Hexagon
Bolt Kit M12*35. Do not
fasten the bolt too tight.
3.2.2
Fasten pre-assembled
plates onto the post with
Hexagon Bolt Kit M12*95.
Do not fasten the bolt too
tight.
Xiamen Mibet New Energy Co., Ltd
No 69, Xintian Rd., Jimei District Tel: +86 592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: [email protected]
7
3.3 Install the Pre-assembled GT2 Support
3.3.1
Unfold the Pre-assembled
GT2 Support, connect the
support to post plates with
Hexagon Bolt kit M12*110.
Connect the other side of
the pre-assembled support
to the post with Hexagon
Bolt Kit M12*95.
Do not fasten the bolts too
tight.
Complete the installation of
the rest of pre-assembled
GT2 supports in the same
way.
Note: Please make sure
the lower end of the
support to be in the same
level and all bolts to be
fastened tightly.
Recommended torque
force: 65N.m.
3.4 Install the Rail
3.4.1 The chart shows the
installation of Cross Module,
all C Clamp Kit, Inter Clamp
Kit and End Clamp Kit are all
installed in the same way.
Xiamen Mibet New Energy Co., Ltd
No 69, Xintian Rd., Jimei District Tel: +86 592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: [email protected]
8
3.4.2 Please check length of
Rail 105 before place it onto
the beam, otherwise extend it
with Rail Splice first. We
strongly recommend NOT to
extend the rails above the
beam.
3.4.3 Mark a line between
beams and upper surface
of rails by the marker
according to the drawing.
And mark lines along the
edge of rail on the beams
where to lay the rail and on
the rails. planned in the
drawing.
3.4.4 Fasten all the rails on
beams of Pre-assembled
support by C Clamps.
Fasten the bolts with 6mm
Allen Key. Recommended
torque force: 15 N.m.
Note: Use two C Clamp
Kits to fix each side of the
Rail 105.
3.4.5 Complete the
installation of rest of the
rails in the same way
above. Please make sure
the end of rails are in a line.
Rail Splice
for
Rail
Xiamen Mibet New Energy Co., Ltd
No 69, Xintian Rd., Jimei District Tel: +86 592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: [email protected]
9
3.5 Install Solar Panels
3.5.1 Place the panel
above the Rail 105 and fix
it with Inter Clamp Kit and
End Clamp Kit.
(Kind Advise: put one
Inter Clamp Kit between
two panels, remove it after
the panels fixed.)
3.5.2
Now the installation has
been finished successfully.
The installation of inter
clamp kit
The installation of
inter clamp kit
Remain a slot around
thickness of one Inter
Clamp’s between two
panels.
Xiamen Mibet New Energy Co., Ltd
No 69, Xintian Rd., Jimei District Tel: +86 592 3754999
Xiamen, China 361022 Fax: +86 592 6771575
www.mbt-energy.com Email: [email protected]
10
4. 10 Years Warranty Declaration
Mibet (Xiamen) New Energy Co., Ltd. (hereinafter as “Mibet Energy”) warrants
to the original purchaser (“Purchaser”) of product(s) that it manufactures
(“Product”) at the original installation site that the Product shall be free from
defects in material and workmanship for a period of ten (10) years, except for
the anodized finish which shall be free from visible peeling, or cracking or
chalking under normal atmospheric conditions.
Warranties and guarantees can only be claimed if the installation and
commissioning of the photovoltaic system was done by professional personnel,
as can be proved. We guarantee a 10 year warranty for the durability of all our
MRac PV mounting products that are correctly mounted, installed and used as
our Installation Guide says.
Mibet Energy shall not be liable for consequential, contingent or incidental
damages arising out of the use of the Product by Purchaser under any
circumstances. If within the specified Warranty periods the Product shall be
reasonably proven to be defective, then Mibet Energy shall repair or replace
the defective Product, or any part thereof, in Mibet Energy’s sole discretion.
Such repair or replacement shall completely satisfy and discharge all of Mibet
Energy’s liability with respect to this Limited Warranty. Under no
circumstances shall Mibet Energy be liable for special, indirect or
consequential damages arising out of or related to use by Purchaser of the
Product. Manufacturers of related items, such as PV modules and flashings,
may provide written warranties of their own. Mibet Energy’s Limited Warranty
covers only its Product, and not any related items.
The warranty period begins from the delivery or pick up date from Mibet
Energy factory or warehouse. The replacement or repair of defective
components does not extend the warranty period.