Nashik Municipal Corporation, Nashik
Management, Operation and Maintenance of New J.D.C Bytco Hospital, Nashik Road under Public Private Partnership (PPP)
1. INTRODUCTION
Nashik Municipal Corporation has 4 major hospital, 5 Maternity homes and 25 UPHC all over
Nashik considering the workload of current Bytco Hospital which is 200 beded started in 1981. It
was the need of time and people to have bigger & sophisticated hospital in Nashik Road.
Considering the parameters of big hospital with keeping in mind to start Medical or Post
graduate college new building is built up. NMC Invites Expression of Interest (EOI) from
resourceful and willing Institutions / individuals for Management, Operation and Maintenance of
J.D.C Bytco Hospital, Nashik Road under Public Private Partnership (PPP) to start super specialty
hospital.
2. ABOUT THE HOSPITAL
Detailed specifications of the building
Total Area : 26100 Sqmt
Constructed Area : 18712 Sqmt (2 Basement + G+3)
Parking Area : 2 Basements
Doctors Chambers / Consultation Rooms
: 12
Wards : Total 15 wards and 85 Private rooms. Medicine - Male, Female separate Surgery - Male, Female separate Ortho - Male, Female Pediatric separate ENT Urology Dialysis & Day Care Family Planning Gynecology Maternity Post Natal Pediatric Ward Pediatric Intensive Care Unit Neonatal Intensive Care Unit ICU - 20 beded
O.T. Complex 6 Major OT with 2 recovery rooms + 2 Gynaec OT
Diagnostic : X-ray, Pathology, Ultrasound, Radiology, CT Scan, MRI Scan
Facilities : Canteen, Fire Fighting system with pump house, DG set room.
Other Facilities : Area for chemist shop
Other : Administrative wing, Store Rooms, Record Room, Cash Room, RNTCP room, Billing Section, Admission & OPD registration Section. Post Martum room, Laundry section
Bidders are requested to visit the site to appraise them about the infrastructure available.
3. PPP FRAMEWORK
PPP Model Management Contract
Concessions a. Land, Building and infrastructure on “as-is-where-is basis” shall be provided by the Board. b. Concessionaire shall procure plant and machinery and equipments to meet the project objectives of setting up 300 bed hospital. c. Concessionaire shall operate and manage the hospital. d. Private Player shall form Special Purpose Vehicle (SPV) for execution of project. e. Concession Period shall be 3 years, renewable upto 5 years. f. Concessionaire shall: Reserve 20 % of total capacity of IPD and 20% of total capacity of OPD for BPL patients and employees of the NMC to be treated free/concessional rates (as per guidelines framed by The Board) from time to time. h. Shall be free to charge other patients at CGHS / Govt Approved rates after informing NMC in this regard.
Concessioning Authority Nashik Municipal Corporation
Confirming Party Preferred Bidder
Concession period Three (03) years renewable up to five (05) years.
Land, Building, fixed and movable assets as handover by the NMC to the concessionaire be transferred to NMC after the end of concession period.
4. REVENUE POTENTIAL
The hospital will have various revenue earning options. Selected bidder shall prepare a business
model and submit to the Board for approval. Some of these could be:
Primary Services (medical in nature): Rentals and fees from IPD patients
Fees from surgeries/ medical procedures
Rental from OPD slots
Diagnostic Services
Rental from pharmacy/ chemist shop
Auxiliary Services (non-medical): Ambulance Charges
Canteen/ Café
Parking
5. MONITORING MECHANISM
To ensure that the project is being developed and run in accordance with the Concession Agreement between NMC & Concessionaire, a Governing Council shall be constituted by the NMC to administer the functioning of the Hospital.
6. OBJECTIVE AND SCOPE OF WORK
Objective To provide healthcare services at Nashik Municipal Corporation Area, by equipping, financing, running and maintenance of a Hospital on Public Private Partnership (PPP) Mode.
Project Name Management, Operation and Maintenance of New JDC Bytco Hospital, Nashik Road under Public Private Partnership (PPP)
Proposed Facilities 300 beds New JDC Bytco Hospital, Nashik Road complying norms laid under Bureau of Indian Standards (BIS)/ Indian Public Health Standards (IPHS) / NABH (National Accreditation Board for Hospitals) besides applicable Guidelines/Policies of State and Central Government. The hospital should have following fully equipped departments/wings: OPD IPD Cardiology Nephrology Urosurgery Cardiothoracic Surgery Pediatric Surgery Gastroenterology Endocrinology IVF Center General Surgery Medicine Orthopedic Gynecology Pediatric Ophthalmic Dental ENT Dermatology, Psychiatry Physiotherapy Emergency/ICU Urology Dialysis & Day Care DOT centre and designated microscopy centre X Ray/CT Scan/MRI Scan/ Sonography /Diagnostic/
Pathology The above list is indicative and the Concessionaire shall however be free to add / delete services with the approval of the Board.
Proposed Ancillary Services and Amenities
Ambulance Services Dietary Services Laundry and Linen Services Waste Management Including Biomedical Waste Nursing Services Parking Pharmacy/ Chemist Shop ATM/Canteen/Coffee Shop STD/Fax/Internet The above list is indicative and the Concessionaire shall however be free to add / delete services with the approval of the Board.
Expression of Interest :
Nashik Municipal Corporation
Public Health Department
Nashik Municipal Corporation invites expression of Interest from various
Organizations, Doctor/Registered group of doctors, Corporate group of Hospitals for 300
bed New Bytco Hospital equipped with CT Scan, MRI Scan for Public Private Partnership.
Proposals are invited for Operation; Maintenance and Management of 300 bed
new Bytco Hospital appropriate for medical college or post graduate institute. You are
requested to see details of hospital building plan etc. on the website of Nashik Municipal
Corporation www.nashikcorporation.com. You can also contact Public Health
Department, Rajiv Gandhi Bhavan or Nashik Road PWD Office if you desire to visit the
site of new Bycto Hospital and then submit appropriate proposal. Details available at
Public Health Department, 3rd floor, Rajiv Gandhi Bhavan, Nashik.
Medical Officer of Health Commissioner Nashik Municipal Corporation, Nashik Nashik Municipal Corporation, Nashik
0.60
1.85
0.75
0.75
0.27
0.68
2.25
1.14
0.65
0.49
1.59
0.72
0.91
1.36
0.57
2.86
1.71
1.16
0.74
0.75
1.09
0.75
2.31
1.95
2.95
0.75
1.04
0.75
0.41
0.75
1.32
0.75
1.70
1.90
0.491.24
1.24
0.75
1.70
0.94 1.46
1.12
1.75
2.40
1.95 0.60
0.49 0.75 1.20 0.75 1.20 0.75 0.76
0.49 0.75 1.20 0.75 1.20 0.75 1.01
1.95
1.11
0.78
1.02
1.32
0.941.01 0.82 1.10
1.15
1.40
1.98
0.85
0.82 1.10
1.62
0.88 1.07
1.62
1.081.83
0.87
0.75
0.95
0.75
0.92
0.75
0.71
1.08
0.75
0.87
0.75
0.95
0.75
2.38
2.20
0.74
1.19
0.75
2.67
0.76
1.08
1.17
1
.6
5
0
.7
5
1
.3
2
0
.7
5
0
.7
5
1
.9
7
0
.7
5
1
.2
2
0
.7
5
1
.2
2
0
.7
5
1
.2
2
0
.7
5
1
.1
6
1
.1
6
1
.9
1
1
.2
2
0
.7
5
1
.2
2
0
.7
5
1
.2
2
0
.7
5
2
.1
5
3
.6
5
3
.2
3
3
.1
9
2
.6
4
2
.7
5
4.4
7
1.01
0.75
0.95
0.75
1.29
0.75
1.13
0.75
0.75
1.70
0.75
1.16
0.75
3.02
1.41
0.99
1.72
1.09 0.62 1.28
0.99
1.45
1.07
0.75
1.17
0
.7
5
1
.1
5
0
.7
5
1
.1
5
0
.7
5
1
.1
5
0
.7
5
1
.1
5
0
.7
5
0
.8
8
1.13
0
.7
5
1
.0
8
0
.7
5
0
.8
8
0
.7
5
3.90
0.75
1.35
0.75
0
.7
5
1
.1
1
0
.7
5
1
.0
1
0
.7
5
1
.0
6
0
.7
5
1
.9
5
1
.1
0
1
.6
2
1
.3
1
1
.1
2
1.401.53
1.591.47
1.69
1.72
1.70
1.70
0.75 2.57 0.75 1.34
0.752.500.752.150.75 2.10 0.75 1.37
1.95
1.10
1.95
3.00
1.95
0.750.75 1.38
0.75 2.44 0.75 0.89
1.35 2.49
1.29 1.21
1.22
1.90
1.19
1.40
0.75
1.85
1.74 1.51 2.03
0.75 2.03
1.20
2.46
3.34
0.81 1.16
1.18 1.38
1.14
1.600.95
0.49
0.75
1.22
0.75
2.16
0.75
1.95
0.75
1.57
1.00
2.78
2.78
0.70
2.35
2.10
1.12 0.68
0.55
1.05
2.55
0.57
1.44
1.24
1.68
1.00
1.29
1.35
0.47
2.75
3.79
2.83
2.05
2.23
1.30
1.05
2.47
0.60
0.60
1.04
1.65
2.95
1.71
0.75
0.44
0.751.65 0.75 1.70
0.74 0.75 1.78 0.75 0.98
3.44
0.94 0.75 1.13 0.72 1.46
2.25
1.37
1.500.75 0.75
1.12 0.75 1.09 0.75 1.31
0.75
1.20
0.75 1.52 0.75 1.26 0.75
2.45
0.75
1.70
1.33 2.19
1.51
1.21
2.80
2.11
2.22
FIRST FLOOR PLAN
DIALYSIS
D
A
Y
C
A
R
E
T - 300 mm
R - 150 mm
T - 300 mm
R - 150 mm
T - 3
00
m
m
R - 1
50
m
m
T - 300 mm
R - 150 mm
R
- 1
5
0
m
m
GLAZING
GLAZING
GLAZING
GL
AZ
IN
G
+3.90 M.
W2
W2
W2
W2
W
2
W
2
W2
W2
WET
AREA
WET
AREA
WET
AREA
WET
AREA
W2
URINALS
tile drop tile drop tile drop tile drop tile drop tile drop
HC
WC
WC
WC BATH
100MM THICK
BRICK WALL
100MM THICK
BRICK WALL
WC WC WC HC
BATH
tile drop tile drop tile drop tile drop tile drop
GENERAL LADIES TOILET
8.22 X4.03M
GENERAL GENTS TOILET
8.22 X4.03 M
SHAFT FOR FIRE
SPRINKLER
RISER FOR
FIRE HYDRANT
ELECTRICAL
RISER
RISER FOR LV
SYSTEM
SH
AF
T F
OR
FIR
E
SP
RIN
KL
ER
RIS
ER
F
OR
FIR
E
HY
DR
AN
T
EL
EC
TR
IC
AL
RIS
ER
RIS
ER
F
OR
L
V
SY
ST
EM
SH
AF
T F
OR
FIR
E
SP
RIN
KL
ER
RIS
ER
F
OR
FIR
E
HY
DR
AN
T
EL
EC
TR
IC
AL
RIS
ER
RIS
ER
F
OR
L
V
SY
ST
EM
S
H
A
F
T
F
O
R
F
I
R
E
S
P
R
I
N
K
L
E
R
R
I
S
E
R
F
O
R
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
A
L
R
I
S
E
R
R
I
S
E
R
F
O
R
L
V
S
Y
S
T
E
M
WC
WC
tile drop
HER
HIS
tile drop
PLATFORM
URINALS
WC
HIS
HER
WC
WC
WC
tile drop
tile drop
P
L
A
T
F
O
R
M
U
R
IN
A
L
S
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
1.00 0.95 0.95 0.95
eq.
eq.
COUNSELLING
SISTERS ROOM
WC
DRAWING TITLE:-
THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR
WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH
WAS COMMISSIONED.
ACCEPTS NO RESPONSIBILITY FOR THIS
DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.
1. DRAWINGS SHALL BE READ AND NOT TO SCALED.
2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE
REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.
3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES
DRAWINGS.
KK ASSOCIATEELECTRICAL CONSULTANTS
EPICONS CONSULTANTS
STRUCTURAL CONSULTANTS
PROJECT TITLE :-
NASHIK MUNICIPAL
CORPORATION.
NMC BYTCO HOSPITAL
BUILDING IN S.NO.240(P) &
241(P) AT.VILLAGE DEOLALI
NASHIK,MAHARASTRA
ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]
DATE SCALE
DRWG NO:- LB-FP
1:100
REVISIONR-2
FIRST FLOOR PLAN
2 wash basins added
2 wash basins added
2 wash basins
addedAluminum partition
wall demolish for dooropening
tile drop
Toilet tobe ADD
Wash basinsadded
ALUMINUMDOOR
2 wash basins added
toilet tobe ADD
2 wash basins added2 wash basins added2 wash basins added
collapsible gate
2 wash basins added
WALLS TO BE REMOVED
WALLS TO BE ADDED
15 -WASH BASINS ADDED
2.22
W2
W2
W2
W2
W
2
W
2
W2
W2
W2
tile drop tile drop tile drop tile drop tile drop tile drop
100MM THICK
BRICK WALL
100MM THICK
BRICK WALL
tile drop tile drop tile drop tile drop tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
1.00 0.95 0.95 0.95
eq.
eq.
CLIENT :-
tile drop
NEW ADDED A.C
wall to beconstruct
wall to beconstruct
Aluminum partition
4 NO TOILET ADDED
4-WB WITH PLATFORM IN TOILET
3
.4
3
0.42
0.75 1.90 0.75
1.72
2.19
0.60
2.12
1.05
1.95
2.19
2.08
3.31
2.84
2.96
0.75
2.18
0.75
1.13
0.67
0.75
1.95
0.75
0.38
0.34
0.75
2.09
0.75
0.75
0.75
0.75
1.40
1.30
1.61
0.99
2.01
0.59
1.15
1.990.59
1.35
0.71
0.75
1.06
0.74
1.12
1.35
0.96
0.79
2.20
0.75 1.79 0.75 1.51 0.75
0.60
2.41
0.75
1.42
0.75
2.72
1.19
0.75
1.33
0.75
1.36
0.75
2.23
0.75
1.73
2.01
0
.7
5
1
.0
9
0
.7
5
1
.2
0
0
.7
5
0
.7
5
1
.9
5
0
.8
2
1
.5
1
0
.8
6
0
.7
5
1
.4
0
0
.7
5
1
.0
1
0
.9
0
1
.5
6
1
.4
2
1
.1
1
0
.7
6
0
.7
5
0
.7
5
0
.9
8
0
.7
5
0
.4
9
1
.0
0
1
.3
0
1
.3
8
2.66
0.50
3.07
0.75
2.06
0.75
1.12
0.75
2.50
2.00
1.73
0.75
1.30
2.05
0.75
1.15
0.75
1.31
0.75
1.15
0.74
0.75
1.30
0.75
1.30
0.75
1.33
0.75
1.30
0.75
1.30
0.75
1.81
1.81
0.75
1.30
0.75
1.30
0.75
1.33
0.75
1.30
0.75
1.30
0.75
0.74
0.75
1.30
0.75
1.30
0.75
1.06
0.75
2.22
0.75
3.20
1.09
0.75
1.09
0.75
1.09
0.75
1.07
0.75
3.84
0.01
0.570.751.570.753.62
0.90
0.60
0.60
0.90
0.60
1.20
0.60
1.20
0.60
1.20
0.60
1.20
0.60
1.20
0.60
1.20
0.60
0.75 1.23 0.75 0.92
0.75 1.48 0.75 1.74
3.97
2.32
3.10
1.68
1
.1
4
1
.4
1
1
.0
7
1
.1
0
1
.1
4
0
.4
9
1
.
0
0
2.94
0.751.170.742.44
0.75
1.18
0.75
1.37
0.75
6.38
0.75 1.37 0.75 2.41
0.98
0.97
0.75 1.37 0.75 2.41
0.75
3.67
1.76
1.26
1
.3
2
0
.7
5
1
.6
5
0
.7
5
1
.5
0
1.45
0.75
2.07
0.75
1.10
0.75
2.22
0.75
3.43
1.43
0.75
2.07
0.75
1.10
0.74
2.23
0.75
0.80
0.75
1.13
0.75
1.95
0.75
3.62
0.56
1.38
V5
LAB MEDICINE
SECOND FLOOR PLAN
T - 300 mm
R - 150 mm
T - 300 mm
R - 150 mm
T - 300 m
m
R - 150 m
m
R
- 1
5
0
m
m
W3
W3
W3
GLAZING
GLAZING
W1W1
W1 W1 W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W3
W3W3
W3 W3
W3
W3W3 W3
W3
W3
W3
W4 W4
W3
GLAZING
+ 7.80 M.
W2
W2
W2
W2
W
2
W
2
W2
W2 W3W3W3W3W3W3W3
W3
W1
W3
W3
W3
W3
W3
W3
W4
W3
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
WET
AREA
WET
AREA
W6
WET
AREA
W5
W6
W6
W6
W6
V4
V4
V4
V4
V4
V4
V4
V4 V4 V4
V4
SH
AF
T F
OR
FIR
E
SP
RIN
KL
ER
RIS
ER
F
OR
FIR
E
HY
DR
AN
T
EL
EC
TR
IC
AL
RIS
ER
RIS
ER
F
OR
L
V
SY
ST
EM
SH
AF
T F
OR
FIR
E
SP
RIN
KL
ER
RIS
ER
F
OR
FIR
E
HY
DR
AN
T
EL
EC
TR
IC
AL
RIS
ER
RIS
ER
F
OR
L
V
SY
ST
EM
SHAFT FOR FIRE
SPRINKLER
RISER FOR
FIRE HYDRANT
ELECTRICAL
RISER
RISER FOR LV
SYSTEM
S
H
A
F
T
F
O
R
F
I
R
E
S
P
R
I
N
K
L
E
R
R
I
S
E
R
F
O
R
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
A
L
R
I
S
E
R
R
I
S
E
R
F
O
R
L
V
S
Y
S
T
E
M
W3
V4
V4
V4V4
V4
V4
W1 W1 W1 W1W1 W1 W1 W1 W1
V5
W1
V
5
W1 W1
W1
W3
V5
V5
V
5
V
5
V4
/S
T
O
R
E
/STORE
URINALS
tile drop
tile drop tile drop tile drop tile drop tile drop tile drop
HC
WC WC WC WCBATH
100MM THICK
BRICK WALL
100MM THICK
BRICK WALL
WC WC WC HC
BATH
tile drop tile drop tile drop tile drop tile drop
tile drop
GENERAL LADIES TOILET
8.22 X4.03M
GENERAL GENTS TOILET
8.22 X4.03 M
V V V V V
VV V V V
V
V
5
V
WC
HER
V
V
V
V
HIS
HER
WC
WC
WC
tile drop
tile drop
P
L
A
T
F
O
R
M
U
R
IN
A
L
S
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
V
2
V5
V4 V4
V4
V4
PEDIATRIC WARD
W3
D1
D1
D1
DD
tile drop
tile drop
DRAWING TITLE:-
THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR
WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH
WAS COMMISSIONED.
ACCEPTS NO RESPONSIBILITY FOR THIS
DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.
1. DRAWINGS SHALL BE READ AND NOT TO SCALED.
2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE
REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.
3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES
DRAWINGS.
CLIENT :-
KK ASSOCIATEELECTRICAL CONSULTANTS
EPICONS CONSULTANTS
STRUCTURAL CONSULTANTS
PROJECT TITLE :-
NASHIK MUNICIPAL
CORPORATION.
NMC BYTCO HOSPITAL
BUILDING IN S.NO.240(P) &
241(P) AT.VILLAGE DEOLALI
NASHIK,MAHARASTRA
ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]
DATE SCALE
DRWG NO:- LB-FP
1:100
REVISION
SECOND FLOOR PLANWALLS TO BE REMOVED
WALLS TO BE ADDED
8-WASH BASINS ADDED
NEW ADDED TOILETS
TOILET TOBE ADD
4' HEIGHT WALLAND GLASSWINDOWABOVE
wall to beconstruct
toilet tobe ADD
WALL TOBE ADD
ANDREMOVE
toilet tobe ADD
PLATFORMSWITHWASH
BASINSADDED
Toilet tobe ADD
LOWHEIGHT
PARTITION
WALL TOBE ADDto close
door
Wall to beadd toclosedoor
Wall to beremove tofor door
Newtoiletadded
partitionTO BEADD
window tobe closed
srcub sinkadded
2-SCRUB BASINS
ALUMINUMPARTITION
brick wall+slidingwindow
tile drop
tile drop tile drop tile drop tile drop tile drop tile drop
100MM THICK
BRICK WALL
100MM THICK
BRICK WALL
tile drop tile drop tile drop tile drop tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
D1
D1
D1
DD
tile drop
tile drop
NEW ADDED A.C
wall to beconstruct
wall to beconstruct
granite platform withwash basin
Wall to beremove to
8 NO TOILET ADDED
sink
sink
2-SINK ADDED
9-WB WITH PLATFORM IN TOILET
1.49
1.39
1.98
0.70
1.50
2.19
5.54
1.49
0.96
2.46
2.19
2.19
2.19
0.70
2.19
2.19
0.88
W3
W3
W3W3
W6
V
V
WC
tile drop
HIS
tile drop
PLATFORM
URINALS
WC
tile drop
tile drop
0.24
1.98
0.9
01
.9
70
.9
01
.0
70
.9
01
.0
70
.9
01
.0
70
.9
0
0.90
0.9
0
2.3
5
2.6
2
3.6
10
.9
01
.5
3
1.0
70
.9
01
.0
70
.9
01
.0
70
.9
01
.0
70
.9
0
0.4
5
1.0
0
0.4
5
1.0
0
0.4
5
1.0
0
0.4
5
1.0
0
0.4
5
1.0
0
0.4
5
1.0
0
2.3
5
0.60
2.3
5
0.60
1.98
0.9
01
.0
70
.9
01
.0
70
.9
01
.0
70
.9
01
.0
70
.9
0
1.9
8
0.90
0.9
0
1.9
8
0.90
1.0
70
.9
01
.0
70
.9
01
.0
70
.9
01
.0
70
.9
0
0.9
00
.9
0
2.2
71
.9
0
1.79
1.9
01
.9
01
.9
0
1.562.971.75
2.00
1.98
1.98
1.98
1.98
1.98
1.98
THIRD FLOOR PLAN
CHANGING
2.86X4.29
C
H
A
N
G
IN
G
2
.5
0
X
3
.2
0
C
H
A
N
G
IN
G
3
.0
8
X
4
.2
9
(
A
P
P
R
O
X
)
4.15 X 3.554.08 X 3.55INFECTIOUS O.T
RECOVERY (A.C.)8.30 X 6.07
RECOVERY (A.C.)8.30 X 6.33
RECOVERY (A.C.)8.30 X 4.95
RECOVERY (A.C.)8.22 X 7.53
OPERATION THEATRE 48.38 X 7.53
(A.C.)
OPERATION THEATRE 3
9.95 X 3.98(A.C.)
OPERATION THEATRE 2
8.30 X 6.38
(A.C.)
OPERATION THEATRE 1
8.30 X 5.09
(A.C.)
T - 300 mm
R - 150 mm
T - 300 mm
R - 150 mm
T - 3
00
m
m
R - 1
50
m
m
T
- 3
0
0
m
m
R
- 1
5
0
m
m
W3W3
W3
W3
GLAZING
GLAZING
W3 W3
W1W1
W1
W1
W1
W3
W3
W4
W4
W4
W4
GLAZING
+11.70M.
W2
W2
W2
W2
W
2
W
2
W2
W2
W3
W3
W1
W1
W3W3W3W3
W3 W3 W3 W3 W3W3
W3
W3
W3
W4
W3
W3
W1
WET
AREA
WET
AREA
WET
AREA
WET
AREA
W5
W6
W6
W6
W6
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
URINALS
tile drop
tile drop tile drop tile drop tile drop tile drop tile drop
HC
WC WC WC WC BATH
100MM THICK
BRICK WALL
100MM THICK
BRICK WALL
WC WC WC HC
BATH
tile drop tile drop tile drop tile drop tile drop
tile drop
GENERAL LADIES TOILET
8.22 X4.03M
GENERAL GENTS TOILET
8.22 X4.03 M
V V V V V
VV V V V V
V
V
V
V
HIS
HER
WC
WC
WC
tile drop
tile drop
P
L
A
T
F
O
R
M
U
R
IN
A
L
S
tile drop
tile drop
tile drop
W7
V4V4
V4
V4
V4
V4
W1
W1
W1
W1 W1
V4
V4
V4 V4 V4
V4
V4V4
V4 V4
V4 V4
W1 W1 W1W1
W1 W1 W1 W1 W1 W1
V5
W1
V5
W1
W1
V5
V5
V2
SH
AF
T F
OR
FIR
E
SP
RIN
KL
ER
RIS
ER
F
OR
FIR
E
HY
DR
AN
T
EL
EC
TR
IC
AL
RIS
ER
RIS
ER
F
OR
L
V
SY
ST
EM
SH
AF
T F
OR
FIR
E
SP
RIN
KL
ER
RIS
ER
F
OR
FIR
E
HY
DR
AN
T
EL
EC
TR
IC
AL
RIS
ER
RIS
ER
F
OR
L
V
SY
ST
EM
SHAFT FOR FIRE
SPRINKLER
RISER FOR
FIRE HYDRANT
ELECTRICAL
RISER
RISER FOR LV
SYSTEM
S
H
A
F
T
F
O
R
F
I
R
E
S
P
R
I
N
K
L
E
R
R
I
S
E
R
F
O
R
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
A
L
R
I
S
E
R
R
I
S
E
R
F
O
R
L
V
S
Y
S
T
E
M
W1W1
V5
V4
V4
V4 V4
OPERATION THEATRE 58.38 X 3.90(A.C.)
OPERATION THEATRE 68.38 X 3.90(A.C.)
WALLS TO BE REMOVED
WALLS TO BE ADDED
4.41 x 3.58
DRAWING TITLE:-
THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR
WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH
WAS COMMISSIONED.
ACCEPTS NO RESPONSIBILITY FOR THIS
DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.
1. DRAWINGS SHALL BE READ AND NOT TO SCALED.
2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE
REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.
3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES
DRAWINGS.
CLIENT :-
KK ASSOCIATEELECTRICAL CONSULTANTS
EPICONS CONSULTANTS
STRUCTURAL CONSULTANTS
PROJECT TITLE :-
NASHIK MUNICIPAL
CORPORATION.
NMC BYTCO HOSPITAL
BUILDING IN S.NO.240(P) &
241(P) AT.VILLAGE DEOLALI
NASHIK,MAHARASTRA
ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]
DATE SCALE
DRWG NO:- LB-FP
1:100
REVISIONR-2
THIRD FLOOR PLAN
4-WASH BASINS ADDED
srcub sinkadded
opening is to bemade 3 x 1.2
sill at 1m
gran
ite p
latf
orm
gran
ite p
latf
orm
gran
ite p
latf
orm
RECOVERY
RECOVERY
RECOVERYRECOVERY
toilet added
5-SCRUB BASINS
FULL HEIGHTALUMINUM
PARTITION WITHGLASS WINDOW
ABOVE 3'
DUCT OPENINGTO BE CLOSE
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop tile drop tile drop tile drop tile drop tile drop
100MM THICK
BRICK WALL
100MM THICK
BRICK WALL
tile drop tile drop tile drop tile drop tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
tile drop
NEW ADDED A.C
wall to beconstruct
wall to beconstruct
sink
1 -KITCHEN SINK
2-WB WITH PLATFORM IN TOILET
water cooler
water cooler
water cooler
water
cooler
CASULTY WARD
GROUND FLOOR PLAN
D D
V V V V V
V
V
VVV V
W1 W1 W1 W1
W1
W1
W3
W3
W3
W3
W3
W3
W3
W3
W3
W3
W3
W3
W3
W3W3
W4
V
V
V
V1
T - 300 mm
R - 150 mm
T - 300 mm
R - 150 mm
T - 300 m
m
R - 150 m
m
T - 300 mm
R - 150 mm
W3
RAMP SLOPE 1: 10
W3
LVL +0.00 M
-
GLAZING
W1
W4
W1
W3W3W3
W1
W1
W1
W3
W2
W2
W2
W
2
W2
PLINTH LEVEL
4.50
WET
AREA
WET
AREA
WET
AREA
W5
W6
W6
W6
W6
W6
52.2713
95.45
95.45
1
0
1
.
2
5
W1 W1
V2
V2
V2
W1
W7
W3
W7
W7
W3
W1
W3
V2
W3
W1 W1W1
V
W1 W1
W1 W1 W1 W1 W1
V
V
V
V
HIS
HER
WC
WC
WC
tile drop
tile drop
P
L
A
T
F
O
R
M
U
R
IN
A
L
S
tile drop
tile drop
tile drop
V
V
V
WC
WC
tile drop
HER
HIS
tile drop
PLATFORM
URINALS
WC
URINALS
tile drop
tile drop tile drop tile drop tile drop tile drop tile drop
HC
WC WC WC WC BATH
100MM THICK
BRICK WALL
100MM THICK
BRICK WALL
WC WC WC HC
BATH
tile drop tile drop tile drop tile drop tile drop
tile drop
GENERAL LADIES TOILET
8.22 X4.03M
GENERAL GENTS TOILET
8.22 X4.03 M
SHAFT FOR FIRE
SPRINKLER
RISER FOR
FIRE HYDRANT
ELECTRICAL
RISER
RISER FOR LV
SYSTEM
W9
V4
V4 V4V4 V4 V4
V4
V4V4
V4V4 V4 V4 V4
V4
V4
V4
V4
V4
V4
V4V4
V4
V4
V4
W3
SH
AF
T F
OR
FIR
E
SP
RIN
KL
ER
RIS
ER
F
OR
FIR
E
HY
DR
AN
T
EL
EC
TR
IC
AL
RIS
ER
RIS
ER
F
OR
L
V
SY
ST
EM
SH
AF
T F
OR
FIR
E
SP
RIN
KLE
R
RIS
ER
F
OR
FIR
E
HY
DR
AN
T
ELE
CT
RIC
AL
RIS
ER
RIS
ER
F
OR
LV
SY
ST
EM
S
H
A
F
T
F
O
R
F
I
R
E
S
P
R
I
N
K
L
E
R
R
I
S
E
R
F
O
R
F
I
R
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
A
L
R
I
S
E
R
R
I
S
E
R
F
O
R
L
V
S
Y
S
T
E
M
V4
V4
V4
V4
W1
V5
V5
V5
V5
V5
W9
W9
W1
V5 V5 V5
PORCH
RADIAL RIBS
FRAMING FOR
DOME
EMERGENCY ENTRY
HELP DESK
DISPLAY BOARD
DISPLAY BOARD
WALLS TO BE REMOVED
WALLS TO BE ADDED
DRAWING TITLE:-
THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR
WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH
WAS COMMISSIONED.
ACCEPTS NO RESPONSIBILITY FOR THIS
DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.
1. DRAWINGS SHALL BE READ AND NOT TO SCALED.
2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE
REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.
3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES
DRAWINGS.
GROUND FLOOR PLANS
CLIENT :-
KK ASSOCIATEELECTRICAL CONSULTANTS
EPICONS CONSULTANTS
STRUCTURAL CONSULTANTS
PROJECT TITLE :-
NASHIK MUNICIPAL
CORPORATION.
NMC BYTCO HOSPITAL
BUILDING IN S.NO.240(P) &
241(P) AT.VILLAGE DEOLALI
NASHIK,MAHARASTRA
ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]
DATE SCALE
DRWG NO:- G-FP
1:100
REVISION ALL EXTERNAL WALLS 230MM THICK.
ALL INTERNAL WALLS 150MM THICK.
CASUALTY
BED
Registration
granite platform
granite platform
tile drop
tile drop
CASUALTY
MEDICAL
OFFICER
granite platformgranite platform granite platform
HIV CONSULTING
ROOM
granite platform
COLLECTION
ROOM
granite platform
granite platform
COLLECTION
ROOM
COLLECTION
ROOM
HISTOPATH
HISTOPATH
HISTOPATH
W3
granite platform
Aluminumpartition
wall demolish forwindow opening
wall demolishfor dooropening
wall demolish forwindow opening
polycarbonatesheet above
gran
ite p
latf
orm
glass openingprovided
glass openingprovided
granite platformwith wash basin
provided
wall to beconstruct
toilet to beconstruct
aluminum door
collapsible gate
wall to bedemolish
wall to beconstruct
wall to beconstruct
Aluminumpartition
WINDOW CLOSEDBY ACP CLADDING
wall to beconstruct
Aluminumpartition
Aluminumpartition
Aluminumpartition
Aluminumpartition
door
9 -WASH BASINS ADDED
2-SCRUB BASINS
PLATFORMSWITHWASH
BASINSADDED
polycarbonatesheet above
polycarbonatesheet above
polycarbonatesheet above
NEW ADDED A.C
2.00
2.00
5.70
6.0868
colla
psib
le g
ate
2.00 2.00
5.70
6.3583
RAMP ENTRY
RAMP ENTRY
UP
UP
2.2
2
1.5
8
4.01
0.6
0
5.39
0.9
91
.0
00
.9
91
.0
00
.9
91
.0
00
.9
9
2.50
0.6
00
.9
0
0.60
0.60
4.15
8.22
2.14
0.60
4.11
1.11
0.60
3.25
0.45
2.74
1.01
1.552.74
1.62
2.74
1.62
2.66
7.13 1.73
2.16
2.16
1.01
2.74
1.01
2.16
3.28
1.62
0.6
0
1.5
20
.5
0
1.1
5
0.60
1.9
5
0.75
0.6
0
1.30
1.48
1.0
0
0.9
5
1.9
5
0.75
0.6
0
0.4
80
.6
0
0.98
1.9
5
1.2
9
0.61
1.50
1.50
0.6
0
0.9
0
1.43
0.6
0
1.9
5
0.75
0.45
0.3
8
1.80
0.9
0
1.9
5
0.75
1.80
0.6
2
0.60
1.0
2
1.95
0.7
5
0.4
5
1.8
5
0.60
1.62
1.4
5
0.6
0
1.9
5
0.75
0.45
1.50
0.9
0
1.9
5
0.75
1.80
0.6
0
0.9
2
0.60
1.9
5
0.75
1.50
0.9
3
1.95
0.7
5
0.4
5
0.4
8
0.6
8
0.75
1.5
0
3.50
1.2
0
0.7
7
1.720.93
1.9
5
0.9
8
0.75
0.60
0.93
0.48
1.6
2
3.25
1.6
2
2.1
6
2.2
1
3.1
8
3.2
31
.0
5
2.7
0
0.80
1.9
1
1.95
0.7
5
1.95
0.7
5
1.95
0.7
5
0.9
01
.0
2
0.8
9
1.9
5
1.50
0.75
1.4
0
1.5
0
1.5
7
1.2
0
2.72
0.5
9
1.83 0.60
1.3
11
.2
0
1
.2
0
0
.6
0
1
.9
9
0
.9
1
2
.8
3
0
.4
5
1
.
4
1
1
.0
8
1
.0
4
1
.2
0
0
.6
0
1
.
2
0
0
.
6
0
1
.
2
3
0
.
6
2
1
.2
2
0
.6
0
1
.2
0
0
.7
2
0
.8
8
0
.7
5
0
.9
1
1
.2
0
0
.6
0
0
.8
0
1
.3
5
0
.6
0
1
.7
2
0
.6
5
1
.4
7
0
.6
0
8.75
1.3
5
0.6
0
3.20
1.4
2
1.05
2.28 2.14
0.6
3
3.53
0.60
2.1
4
4.83
0.6
0
6.30
0.4
5
0.4
84
.2
8
1.1
00
.6
00
.6
0
3.53
3.03
6.88
0.98 0.98 0.98 0.98
2.07
1.5
1
0.8
50
.6
2
1
.9
8
0
.
7
5
0.8
0
1.28
2.7
9
1
.
2
7
0
.
6
0
2
.3
6
0
.4
9
1
.
3
5
0.6
5
0.76
0.76 0.62
0.75 2.00 0.75
1.9
5
0.5
6
1.80 2.07
0.38
1
.3
0
2.9
5
1.07 0.63
1.7
5
2.3
5
1.692.230.840.910.961.030.56
3.7
1
0.56 1.03 0.59 0.94 0.91 0.96 0.74
1.50 1.34
1.6
9
0.75
1.9
5
0.6
0
1.95
1.1
1
1.58
0.74
2.7
0
3.28
4.6
9
2.1
31
.5
8
1.2
7
1.23
2.1
11
.5
2
0.9
3
0.60
0.6
0
0.6
0
2.19
4.8
0
2.251.20
0.9
5
2.0
7
2.19
1.81
1.48
0.7
3
0.67
1.2
7
1.23
0.8
3
0.7
9
1.21
0.7
1
1.18
0
.7
5
1
.2
0
1
.2
0
1
.6
5
2 NO TOILET ADDED
W.B
W.B
sink sinksink
sink
sink
sink
sink
sinkW.B
W.B
W.B
sink
W.B
W.B
9 -SINK ADDED
0.6
1
1.46
w
a
te
r
ja
r
granite platform withwash basin
granite platform withwash basin
granite platform withwash basin
Rollingshutter with
graniteframe
4.5000
D1
TD TD
TD
TD
TD
TD
TD
TD
TD
RD
RD
TD
TD
TD
FD
FD
FD
FD
TD
TD
TD
FD
FD
RD
D1
D1
D1
T - 300 mm
R - 150 mm
T - 3
00
m
m
R - 1
50
m
m
T - 300 mm
R - 150 mm
TD
TD
TD
T
- 3
0
0
m
m
R
- 1
5
0
m
m
D1
D1
TD
TD
RD
0.8
5
WET
AREA
WET
AREA
WET
AREA
WET
AREA
TD1
TD1
TD1
TD1
7.18
6.00
6.8528
95.01
0.8
5
7.18
95.45
95.45
95.01
95.4594.05
LVL -8.40M
LOWER BASEMENT FLOOR PLAN
1
0
1
.
2
5
TD
TD
TD
TD
D3
0.15
RS
0.6
3
0.9
0
5.75
DRAWING TITLE:-
THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR
WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH
WAS COMMISSIONED.
ACCEPTS NO RESPONSIBILITY FOR THIS
DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.
1. DRAWINGS SHALL BE READ AND NOT TO SCALED.
2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE
REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.
3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES
DRAWINGS.
LOWER BASEMENT FLOOR PLAN
CLIENT :-
KK ASSOCIATEELECTRICAL CONSULTANTS
EPICONS CONSULTANTS
STRUCTURAL CONSULTANTS
PROJECT TITLE :-
NASHIK MUNICIPAL
CORPORATION.
NMC BYTCO HOSPITAL
BUILDING IN S.NO.240(P) &
241(P) AT.VILLAGE DEOLALI
NASHIK,MAHARASTRA
ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]
DATE SCALE
DRWG NO:- LB-FP
1:10027-08-16
REVISIONR-2
65- FOUR WHEELERS
207- TWO WHEELERS
wall to beconstruct
wall to beconstruct
0.23
3.76
8.22
SOILED BINS
0.60
2.02
1.00
2.10
2.00 0.61
2.10
0.75
1.24
6.30
5.10
7.10
7.03
3.78
4.18
1.20
3.48
0.60
4.23
1.50
3.18
3.04
5.60
1.20
6.48
1.20
0.60
1.20
8.40
5.31
1.20
1.20
7.03
0.60
5.40
1
.2
0
3
.3
2
0
.6
0
1.35
1
.5
0
LVL -4.20 M
UPPER BASEMENT FLOOR PLAN
0.23
3.76
8.22
SOILED BINS
WET AREA
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
TD TD
TD
TD
TD
TD
TD
TD
TD
TD
RD
RD
TD
TD
TD
FD
FD
FD
FD
TD
TD
TD
FD
FD
RD
TD
TD
TD
D3
D3
D3
D3 D3
D3
D3
D3
D3
D3
D3
D3
D3
D3
D4 D4
D4
D4
TD
TD
RD
D1
D3
D3
RD
WET
AREA
WET
AREA
V1
V1
V1
V1
V1
V1
V1
V1 V1
V1
V1
V1V1 V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1
V1V1
V1V1
V1
V3
TD1
TD1
TD
1.48
4.5000
RAMP SLOPE 1: 10
RAMP SLOPE 1: 10
+100.80Lvl.
7.5000
52.2713
7.5000
95.45
95.45
95.4594.05
98.25
100.25
7.5000
1
0
1
.
2
5
7.4960
1.18
D1
D1
TD
TD
TD
TD
W2
W2
W2
W2
4.50
0.15
W1
W1
W1
W1
W1 W1
W1 W1
W1
W1
D4
D4
SUNK -0.2M
S
U
N
K
-
0
.
2
M
D1
D
HC
1.45X0.94M
WC
1.45X0.94M
WC
1.45X0.94M
WC
1.45X0.94M
BATH
2.46X1.50M
tile drop
D1
D
WC
1.45X0.95 M
WC
1.45X0.95 M
WC
1.45X0.95 M
WC
1.45X0.95 M
HC
1.40X1.27 M
tile drop
FLOOR MOUNTED WC
FLOOR MOUNTED WC
FLOOR
MOUNTED WC
FLOOR MOUNTED WC
C
D
tile drop
D7
D7
D7
D7
D7
D7
D7
D7
D7
SHAFT FOR FIRE
SPRINKLER
RISER FOR
FIRE HYDRANT
ELECTRICAL
RISER
RISER FOR LV
SYSTEM
URINALS
D
tile drop
tile drop tile drop tile drop tile drop tile drop tile drop
HC
100MM THICK BRICK WALL
WC WC WC WCBATH
100MM THICK
BRICK WALL
100MM THICK
BRICK WALL
D7 D7 D7 D7 D7
WC WC WC HC
BATH
tile drop tile drop tile drop tile drop tile drop
tile drop
D7D7
D7 D7
GENERAL LADIES TOILET
8.22 X4.03M
GENERAL GENTS TOILET
8.22 X4.03 M
tile drop
T - 300 mm
R - 150 mm
SH
AF
T F
OR
FIR
E
SP
RIN
KLE
R
RIS
ER
F
OR
FIR
E
HY
DR
AN
T
ELE
CT
RIC
AL
RIS
ER
RIS
ER
F
OR
LV
SY
ST
EM
T - 300 m
m
R - 150 m
m
SH
AF
T F
OR
FIR
E
SP
RIN
KLE
R
RIS
ER
F
OR
FIR
E
HY
DR
AN
T
ELE
CT
RIC
AL
RIS
ER
RIS
ER
F
OR
LV
SY
ST
EM
T - 300 mm
R - 150 mm
S
H
A
F
T
F
O
R
F
IR
E
S
P
R
I
N
K
L
E
R
R
I
S
E
R
F
O
R
F
IR
E
H
Y
D
R
A
N
T
E
L
E
C
T
R
I
C
A
L
R
I
S
E
R
R
I
S
E
R
F
O
R
L
V
S
Y
S
T
E
M
V4 V4
V4
V4
V4
V4V4
V4
V4
W1
W1W1
1.20 0.93 1.20 0.93 1.20 0.93
V3
V3
D3
D3
DRAWING TITLE:-
THIS DOCUMENT SHOULD NOT BE UTILISED FOR PURPOSES OTHER THAN THOSE FOR
WHICH IT WAS ORIGINALLY PREPARED AND FOR WHICH
WAS COMMISSIONED.
ACCEPTS NO RESPONSIBILITY FOR THIS
DOCUMENT TO ANY PARTY OTHER THAN THE ONE BY WHOM IT WAS COMMISSIONED.
1. DRAWINGS SHALL BE READ AND NOT TO SCALED.
2. PLEASE CHECK EXACT NORTH DIRECTION BEFORE EXECUTION AND DISCREPANCY , IF ANY, SHOULD BE
REPORTED TO THE ENGINEER INCHARGE OR CONSULTANT PRIOR TO EXECUTION.
3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH STRUCTURAL AND ALL OTHER RELEVANT SERVICES
DRAWINGS.
CLIENT :-
KK ASSOCIATEELECTRICAL CONSULTANTS
EPICONS CONSULTANTS
STRUCTURAL CONSULTANTS
PROJECT TITLE :-
NASHIK MUNICIPAL
CORPORATION.
NMC BYTCO HOSPITAL
BUILDING IN S.NO.240(P) &
241(P) AT.VILLAGE DEOLALI
NASHIK,MAHARASTRA
ANANT TECHNOCRATS PVT.LTD.PROJECT PLANNERS-CONCEPT TO COMPLETIONHEAD OFFICE-G-3,CROWN COMM.COMPLEX,OPP.N.M.C. SHARANPUR ROAD, NASHIK-422002PHONE NO:-2317894,2570435.E-Mail - [email protected]
DATE SCALE
DRWG NO:- LB-FP
1:100
REVISIONR-2
UPPER BASEMENT FLOOR PLAN
wall to beconstruct
wall to beconstruct
WALLS TO BE ADDED