NEW HAMPSHIRE
2018 QUALIFIED ALLOCATION PLAN
FOR THE LOW INCOME HOUSING TAX CREDIT PROGRAM
July 10, 2017
FINAL
TABLE OF CONTENTS
Page
HFA: 109.01 Introduction 1
HFA: 109.02 Primary Allocation Priorities 1
HFA: 109.03 LIHTC Availability and Set-Asides 1-2
A. LIHTC Available
B. Non-Profit Set-Aside
C. Supplemental Set-Aside
HFA: 109.04 Primary Program Policies 2-4
A. Maximum Amount of LIHTC per Project
B. Maximum Number of Applications and Projects
C. Per Unit Cost Standards/Housing Investment Limits
D. Preservation Project Initiative
E. Developer Fee
F. CDBG Funded Projects
G. Basis Boost
HFA: 109.05 Application Process 4
A. Preliminary Applications
B. Application Deadline
C. Application Submittals
HFA: 109.06 Threshold Criteria 4-6
A. Feasibility and Appropriateness
B. Demand
C. Capacity
D. Completion of Prior Phase
E. Site Control
F. Cost Reasonableness
G. Readiness
H. Services
I. Environment
HFA: 109:07 Scoring and Tiebreakers 6-13
A. Scoring Criteria
B. Tiebreakers
HFA: 109.08 Allocation Process 13-15
A. Reservation of LIHTC
B. Appeal Process
C. Conversion to Out-of-Cap Project
D. Post Reservation Processing
E. LIHTC Exchange
F. Project Representations
HFA: 109.09 Fees to the Authority 15
A. Program Fees
B. Compliance Monitoring Fees
HFA: 109.10 Long-Term Affordability Compliance 15-16
A. Recorded Affordability Commitment
B. Right of First Refusal
C. Compliance Monitoring
HFA: 109.11 Miscellaneous Authority Provisions 16-18
A. Waiver Authority
B. Authority to Amend Regulatory Documents
C. Compliance with Federal, State and Authority Regulations
D. References
E. Warrant and Liability
F. Amendments to the QAP
G. Board Role
H. Consistency with IRC 42
I. New Hampshire Right to Know Law
HFA: 109.12 Projects Financed By Tax-Exempt Bonds 18
LIST OF APPENDICES
Appendix A Progress Phase Requirements
Appendix B Carryover Allocation Requirements
Appendix C Final Allocation Requirements
Appendix D Right of First Refusal – Sample Document
Appendix E Developer's Certification of Development Costs
Appendix F Developers Certification of Equity Proceeds
Appendix G "As-Built" Architect Certification
Appendix H Election of Gross Rent Floor
Appendix I Guidelines for Service Enriched Housing
Appendix J Homeless or At Risk of Becoming Homeless Certification
Appendix K LIHTC Compliance Monitoring Requirements
NEW HAMPSHIRE
2018 QUALIFIED ALLOCATION PLAN
LOW INCOME HOUSING TAX CREDIT PROGRAM
Program Rules
(HFA:109)
HFA:109.01 INTRODUCTION
The Low Income Housing Tax Credit (LIHTC) program is currently the single largest source of
federal capital subsidy to create and preserve affordable rental housing. The program was added to
Section 42 of the Internal Revenue Code (“IRC 42”) in 1986. Under IRC 42, the Internal Revenue
Service allocates LIHTCs to states on a per capita basis. States in turn designate an agency to
allocate LIHTCs using competitive criteria established in accordance with IRC 42. The State of
New Hampshire has designated New Hampshire Housing Finance Authority, (Authority) as the
agency to allocate LIHTCs. The Authority has developed this Qualified Allocation Plan (“QAP”)
to establish the criteria and process for allocation of LIHTCs in New Hampshire.
The Authority has addressed most of the Statutory selection criteria and preferences in the scoring
criteria (HFA:109.07), with the exception of projects intended for eventual tenant ownership, on
which the Authority expresses no preference or emphasis.
HFA:109.02 PRIMARY ALLOCATION PRIORITIES
The Authority uses the U.S. Department of Housing and Urban Development’s Consolidated Plan
process to assess New Hampshire’s affordable housing and community development needs and
market conditions. The Consolidated Plan is also used as a tool to coordinate several federal
housing resources that are administered at the state level. The priorities of this QAP are based on
conclusions contained in the 2016-2020 Consolidated Plan, public forums on QAP priorities, and
extensive discussions with the affordable housing community. These priorities are:
New construction (adding new units to housing markets)
Non-age restricted housing
Readiness to proceed (i.e. ability to get to construction in a relatively short period)
Non-profit sponsored housing
High quality of construction, including energy efficiency
Projects that achieve broad community development objectives, including “smart growth”
and neighborhood revitalization
Cost containment
Preservation
HFA:109.03 LIHTC AVAILABILITY AND SET-ASIDES
A. LIHTC Available
New Hampshire’s 2018 LIHTC amount is approximately $3,136,768.
B. Non-Profit Set-Aside
IRC 42 requires that at least 10% of New Hampshire’s annual LIHTC allocation must be set aside
for qualified non-profit organizations that:
2018 New Hampshire Qualified Allocation Plan
2
meet the tax exempt requirements of IRC 501(c)(3) or (c)(4);
own a controlling interest in a project and materially participate in the development and
management of the project throughout the compliance period; and
have exempt purposes including the fostering of low-income housing.
Wholly owned affiliates of a non-profit are eligible as qualified non-profit organizations.
C. Supplemental Set-Aside
$60,000 of the annual LIHTC allocation shall be set aside for projects returning for supplemental
LIHTCs after having received a carryover allocation in an earlier year. Allocations made under this
set-aside can be up to $30,000. The decision will be made by the Authority staff, and projects must
meet one or more of the following criteria:
it incurred or faces substantial, unforeseen cost increases.
it is subject to an unanticipated reduction in equity yield on the sale of the LIHTCs.
supplemental LIHTCs would reduce the level of Authority capital subsidy funding.
supplemental LIHTCs would improve the project’s financial feasibility but keep it
consistent with the Authority’s Multi-Family Underwriting Standards.
Any amounts of the supplemental set-aside pool remaining after September 1, 2018, will be made
generally available. However, if tax credits are still available after the reservations are approved,
Authority staff can make additional supplemental reservations under the same program guidelines.
HFA:109.04 PRIMARY PROGRAM POLICIES
A. Maximum Amount of LIHTC per Project
The maximum LIHTC that any single non age-restricted project may receive in any single funding
round is $800,000. The maximum LIHTC that any single age-restricted project may receive in any
single funding round is $600,000. “Out-of-cap” tax-exempt bond financed project allocation
amounts are not limited.
B. Maximum Number of Applications and Projects
No applicant (defined as a general partner, property owner and/or development agent) may submit
more than one 9% project application in a LIHTC round, unless it is a supplemental application for
a previously approved project.
The Authority will not accept a new application if an applicant (including any general partner) has
two or more LIHTC projects that have not yet been completed (i.e. Certificate(s) of Occupancy
issued for all buildings and construction completion inspection sign off). “Out of cap” tax-exempt
bond financed projects will not be considered as outstanding LIHTC projects. The Authority
reserves the right to limit 4% LIHTC resources based on Authority underwriting criteria.
2018 New Hampshire Qualified Allocation Plan
3
C. Per Unit Cost Standards/Housing Investment Limits
Project applications will be evaluated for cost reasonableness. Applications which indicate
unreasonably high total or specific line item development costs may be rejected. Cost
reasonableness will be evaluated using an index, which is the weighted average of the Total
Development Cost (“TDC”) per unit and the TDC per bedroom. For mixed-use projects, TDC for
only the residential portion of the project, including common areas, will be used for this calculation.
The weighted average will be calculated as follows:
([2 X TDC/unit] + [TDC/bedroom]) divided by 3.
The product of this calculation will be referred to throughout this document as the “TDC weighted
average.” An application will be rejected if the TDC weighted average exceeds $235,000.
For projects using Historic Rehab Tax Credits (HRTCs) in conjunction with LIHTCs, projects with
increased costs due to a Brownfield location, projects designed and built to meet Passive House or
Net Zero standards or projects with an inadequate bidder pool to achieve a competitive bid, as
determined by the Authority at its sole discretion, the TDC weighted average may not exceed
$245,000.
The “investment limit” for all projects of combined Authority capital subsidy funds and LIHTC
equity is $190,000 per unit with the exception of projects targeting Extremely Low Income tenants,
which will be evaluated on a case-by-case basis.
The investment limit is evaluated based on projected equity pricing and Authority subsidy at the
time of application; subsequent changes in equity pricing will not trigger a re-evaluation of a
projects compliance with this limit. Authority staff reserves the right to evaluate equity pricing
included in an application for reasonableness and consistency with the market. Authority staff, at
their sole discretion, may allow for the investment limit to be exceeded after application due to
other circumstances determined to be beyond the control of the developer, i.e. HUD Income Limit
or Utility Allowance fluctuations. If a supplemental or additional credit allocation is made to a
project in this or subsequent years, staff has the authority to use the most recent investments limits
in evaluation and allocating tax credits and other Authority resources to the project.
D. Preservation Project Initiative
The Preservation Initiative will be a maximum of $450,000 in LIHTC credits per LIHTC round for
Preservation Projects. Preservation Projects are existing housing properties that have been funded
with federal subsidies and are currently subject to recorded regulatory documents limiting unit rents
and/or tenant incomes. In the case of a scoring tie, the project with the most efficient use of
LIHTCs (i.e. lowest amount of LIHTCs per rent-restricted unit) is favored. Preservation projects
must submit both a 9% and 4% application at the time of preliminary application (HFA: 109.05 A)
to establish the need for 9% credits. Projects that are determined by the Authority to be feasible
using 4% credits may be converted in accordance with HFA:109.08.C.
2018 New Hampshire Qualified Allocation Plan
4
E. Developer Fee
The maximum developer fee allowed is calculated in accordance with the Developer Fee Schedule,
which may be found in the Authority’s underwriting standards at http://www.nhhfa.org/assets/pdf/underwritingstandards.pdf.
F. CDBG Funded Projects
Projects that are proposing to include CDBG monies as a source of funds must have previously
been awarded the funds or must have an active application for CDBG funding. For CDBG from
entitlement cities, evidence that an application is under consideration by that city must be provided.
In addition, the project must be awarded the CDBG monies before the carryover allocation will be
approved.
G. Basis Boost
The Authority will restrict the 130% basis boost to projects located in the official Difficult to
Develop area (DDA)/Qualified Census Tract (QCT) districts, or to projects which require the 130%
basis boost to be financially feasible as part of a qualified low-income housing project and that
reserve 25% of units to households with income at or below 50% AMI (Area Median Income). The
list of DDA and QCT areas eligible for the basis boost may be found at
http://www.huduser.org/portal/datasets/qct.html.
HFA:109.05 APPLICATION PROCESS
A. Preliminary Applications
The Authority requires the submittal of a preliminary application. The preliminary application
requires submittal of a complete application using the Online Data Manager (ODM) system. For
additional information, please refer to http://www.nhhfa.org/rental-housing-developers-financing-
application.cfm. Preliminary applications are due August 7, 2017, and are mandatory for all
projects, whether or not they were submitted in a previous round.
B. Application Deadline
The application deadline for 2018 LIHTC is November 21, 2017.
C. Application Submittals
Submittal of all preliminary and final application materials (except fees and signed certification
page <Part 3, Section 2>) must be done using the Online Data Manager (ODM)
(www.ctkodm.com/nhhfa). Contact Laurel Treamer at [email protected] for ODM set-up
information.
HFA:109.06 THRESHOLD CRITERIA
Projects must meet the threshold criteria listed below to qualify for a reservation and allocation of
LIHTC. Projects may be rejected at any time during the allocation process for failure to meet
threshold criteria.
2018 New Hampshire Qualified Allocation Plan
5
A. Feasibility and Appropriateness
The proposed project’s characteristics or location must be considered feasible from a financial and
regulatory standpoint.
B. Demand
Potential market demand must be proven, and the proposed project must not negatively affect an
existing publicly-assisted affordable rental property. All applicants applying for LIHTC are
required to submit a market study at the time of application prepared by a disinterested party (i.e.
someone who does not have any interest in the development or have a relationship with the owner
of the development) approved by the Authority.
C. Capacity
The project’s general partner or management agent must:
Have the experience or ability to successfully complete the project;
Have started construction within six months from the date of the carryover allocation on a
current project;
Be compliant or otherwise not in default with this or any other Authority program as
determined by the Authority;
Not have a history of noncompliance in LIHTC or other Authority programs;
Have met the specific requirements of the Land Use Restriction Agreement (LURA) for
previous projects; or
Not have any significant negative LIHTC history with other state allocating agencies.
D. Completion of Prior Phase
If a phased project, the earlier phase(s) of the project must be complete and rent-up must be
substantially completed (meaning at least 50% of units have been leased).
E. Site Control
Applicant must have secure site control.
F. Cost Reasonableness
Proposed development or operating budget must not be unreasonably costly or otherwise
unsatisfactory. The project application must meet the QAP’s investment limit or overall per unit
development cost limit. (HFA:109:04(c)).
G. Readiness
The project must be able to satisfy the criteria of the Progress Phase Requirements (Appendix A)
in a timely manner.
H. Services
Service Coordination is a threshold requirement for all projects to provide residents the opportunity
to access appropriate services, which promote self-sufficiency and maintain independent living.
Service Coordinators connect residents to needed services; develop and implement strategies to
build community among diverse residents; and develop partnerships to bring programs and services
onsite to meet the needs of groups of residents. Incorporating Service Coordination into the
2018 New Hampshire Qualified Allocation Plan
6
ongoing management of the project assists in maintaining the fiscal and physical viability of the
project. See Appendix I for Service Coordination specifications.
I. Environment
Consistent with the Authority’s programmatic and policy focus on creating healthy residential
settings for all residents and cost efficient property management operations, all projects must be
smoke free within the building(s).
HFA:109.07 SCORING
A. Scoring Criteria
Each project will be scored using the criteria listed below. Documentation must be provided at time
of application for points to be awarded. Any supportive documentation is subject to verification,
and the Authority may require additional information as a condition of awarding points. The
Authority may reject any documentation deemed to be insufficient, unsupported, or inadequate for
the particular scoring criteria. Partial points will not be awarded unless specifically provided for in
the description of the points category.
1. Non-Age Restricted Units
Projects cannot have “senior” or other age restricted designation.
a. Non-age restricted projects with greater than or equal to 25% of the units having two
or more bedrooms. A project that has occupancy restrictions or preferences that favor
tenants with special needs and can demonstrate the need for one-bedroom units
exclusively will be given the ten (10) points.
10 points
2. Income Targeting: Use conventional rounding (half round up) to calculate unit count
a. Greater than or equal to 20% of the total number of units are reserved for very low
income (≤ 50% AMI). 5 points
b. 10% of the total number of units are reserved for extremely low income (≤ 30%
AMI)(1
) Units in this category will count towards the calculation of very low income
units for 2a above. 5 points
c. Percentage of Units reserved for market rate units.
at least 25 percent 5 points
at least 40 percent 10 points
3. Supportive Housing Serving Homeless or Veterans(2
) .
(1
) This points category is contingent upon the Authority receiving positive confirmation from HUD that National
Housing Trust Fund money will be available in the fall of 2018 for commitment concurrent with commitment of tax
credit and HOME resources. If the Authority is unable to confirm the availability of these funds in the timeframe
required, this points category will be void. The Authority will issue a notice on its website and inform all developers
who have submitted a preliminary application, to inform them whether this category will be implemented or not, no
later than October 1st, 2017 (2
) “Veteran” shall be as defined in RSA 21:50, I, except that minimum service of 4 years shall not be required for active
duty personnel.
2018 New Hampshire Qualified Allocation Plan
7
An applicant can score points in only one section in this category, a or b.
a. For non-age restricted projects only: Each and every household must be homeless or at
imminent risk of homelessness immediately prior to tenancy or include a veteran and
be identified as needing services to maintain housing. Certification of status must be
obtained from the household. See Appendix J for sample. Eligible projects may be
either transitional or permanent supportive housing and may use the single room
occupancy (SRO) model. Services may be provided for residents through a third party
or the project, but must include at a minimum:
An initial assessment of each resident’s needs prior to or within one week of move-
in and a written plan developed to address each need.
Regular case management, including ongoing assessments of residents’ needs and
the efficacy of the services being provided in meeting the identified needs.
Coordination of benefits and services to assist residents in becoming permanently
housed. 15 points
b. For both age restricted and non-age restricted projects: Greater than or equal to 10%
but fewer than 100% of all units are reserved for households that include a veteran or
are homeless or at imminent risk of homelessness immediately prior to tenancy and be
identified as needing services to maintain housing. Service requirements are the same
as those specified in 3a above. 5 points
4. Service Enriched Housing for Age Restricted Units
Contracting with a VNA/homecare agency to provide onsite health clinics at no cost to
residents (although Medicare and other insurances may be billed for services) for a
minimum of ten years from initial occupancy. Health clinics may include, but are not
limited to flu shots, blood pressure, cholesterol and diabetes screening, and foot care.
Clinics must be provided by a licensed healthcare professional. A minimum of 1/16th
hour per unit per month is required to be provided no less frequently than bi-monthly.
Onsite health clinics cannot be used to meet Threshold Requirements for Service
Coordination per HFA:109.06.H and Appendix I. Sponsors who fail to fulfill tenant
service enrichment commitments will be penalized five points (adjusted proportionally
to the total points possible for any particular year) in the “Developer Experience”
scoring section for all future project applications for a period of five years after the
deficiency is cited by the Authority. 5 points
5. Community Based Supported Housing/Existing Rental Housing Properties
Developer/owners willing to commit, through a formal memorandum of understanding
with the State of New Hampshire and NHHFA, to make existing qualifying units(3
)
available for community based housing for persons with disabilities, as defined in the
Settlement Agreement approved 2/12/14
(3
) Units must have funding through any of the following: Federal Low-Income Housing Tax Credits, Federal HOME
Funds, other State, Federal or Local funding sources. The project must include 5 or more units under a single
ownership entity, be non-age restricted, and one bedroom units.
2018 New Hampshire Qualified Allocation Plan
8
(http://www.drcnh.org/proposedSettlementAgreementMH.pdf), and to enter into a
section 811 Project Assistance Contract with NHHFA for the units committed, will
receive points towards new projects being proposed in the 2018 Rental Production
Program. The points will be allotted as follows:
Units Committed
1-5 2 points
6-10 6 points
11-20 10 points
21-30 14 points
31 plus 20 points
Developers who entered into an MOU in 2015 or 2016 and did not commit to an 811
contract may do so in the 2018 LIHTC round and receive the following points for
existing qualifying units:
Units Committed
1-5 1 point
6-10 3 points
11-20 5 points
21-30 7 points
31 plus 10 points
6. Community Based Supported Housing/Proposed Projects
Projects committing units for individuals with disabilities as defined in the Settlement
Agreement referenced in 4 above, and agreeing to enter into an 811 Contract upon
construction completion for 10% of the total units in the project. For this category only,
round down in all cases to calculate 10% of total units. 5 points
All qualifying units must meet the criteria set forth in the Settlement Agreement
approved 2/12/14 and shall be evidenced by a MOU between the owner, the State of
New Hampshire and NHHFA. Units shall be committed on as available basis subject to
the “next available unit” requirement.
7. Public Housing Waiting List
Projects where the managing general partner is a Public Housing Authority (or affiliate)
that owns and manages public housing or housing with project-based Section 8
vouchers. 3 points
2018 New Hampshire Qualified Allocation Plan
9
8. Location
Non-Age Restricted Projects
Projects in towns with no other previously approved affordable non-age restricted
housing.(4
) 10 points
9. Project Grants and Assistance
An applicant can score points in any of the sections in this category, a and/or b.
a. Projects which have a new rental assistance subsidy for at least 66% of the units
for at least five years. Public Housing Authority project-based vouchers are not
eligible, unless the rent subsidies are a new allocation to the PHA specifically for the
proposed project.
This point category is not available to existing projects requiring minimal
rehabilitation. 15 points
-or-
Projects which have a commitment of new rental assistance subsidy for at least 33% of
the units for at least five years. Public Housing Authority project-based vouchers are
not eligible, unless the rent subsidies are a new allocation from the PHA specifically
for the proposed project. 10 points
-or-
Projects which have a new commitment of project based vouchers for 20% of the units
for at least five years. Public Housing Authority project-based vouchers ARE eligible
for points under this category. 5 points
b. Projects which have a proposed and likely contribution of permanent sources of funds,
including subsidies, loans, historic tax credit equity and land donations. Subsidy
administered by the Authority, developer fee loans, resubordinated debt and LIHTC
equity are specifically not eligible for consideration. All units are counted.
(one category only)
Greater than $ 29,999/unit 20 points
$20,000 to $29,999/unit 15 points
$10,000 to $19,999/unit 10 points
$5,000 to $9,999/unit 5 points
Less than $5,000/unit 0 points
10. Advanced Projects
Additional points may be awarded at the discretion of the Authority for advanced
progress of the development as per the following schedule:
(4
) Project that must have at least 20% of the units affordable to low-income households, with no “senior” or “over age
55” designation, and subject to a recorded long-term use restriction regarding affordability or planning board approval
conditioned upon providing targeted affordable housing. Burden is on applicant to provide documentation.
2018 New Hampshire Qualified Allocation Plan
10
Phase 1 Environmental Completed 3 points
HUD/RD Environmental Checklist Completed (
5) (can score both) 2 points
Submittal of Historic Project Review materials to State 3 points
State Historic Review completed(6
) (can score both) 5 points
Funding commitments: Projects which have a firm commitment for a significant
amount of CDBG, Neighborhood Housing Services, Rural Development, or other
subsidized loans or grants, including the Federal Home Loan Bank Affordable
Housing Program (AHP), at a rate below the Applicable Federal Rate (AFR) and/or
are non-amortizing. Donated land value will be determined by an Authority
commissioned appraisal that must be arranged with Authority staff no later than 60
days prior to the application deadline. Authority-administered funds and developer
fee loans are not eligible for this point category and all units are counted.
(one category only)
Greater than $29,999/unit 5 points
$20,000 to $29,999/unit 4 points
$10,000 to $19,999/unit 3 points
$5,000 to $9,999/unit 2 points
Less than $5,000/unit 0 points
Prior phase of project was approved for LIHTC and rent-up must be substantially
complete (meaning at least 50% of units have been leased)(7
) 5 points
All necessary local planning and zoning permits are in hand, including site plan
approval as evidenced by a permit status letter from the sponsor’s attorney,
project engineer, or town planning official.(8) 15 points
11. Community Development Component
a. Projects that fall into one of these four categories may score up to a maximum of 10
points:
i. Projects located within a Community Center Area (CCA) as shown on the
Planning Metrics Gateway available at: http://granitweb-
dev2.sr.unh.edu/GSFHtml5Viewer/ 10 points
(5
) Checklist must be completed by a third party professional. (6
) Projects which can demonstrate no need to submit to Historic Review will receive eight points. A review completed
with an “adverse impact” will need resolution (e.g. Signed Memorandum of Understanding (MOU)) before points will
be awarded. (7
) Assumes Authority knows of multiple phasing during first phase, and first phase developer is the same sponsor/
entity. (8
) A site plan approval that requires additional planning board approvals will not be given these points. The status letter
need not be a formal legal opinion.
2018 New Hampshire Qualified Allocation Plan
11
ii. Walkscore of 40 or higher. Projects with public sewer and water or within ¼
mile of fixed route public transit may receive these points if the location of
the proposed project or an immediately adjacent site receives a Walkscore of
36 or higher. Projects with public water and sewer and also located within ¼
mile of fixed route public transit may receive these points with a Walkscore
of 32 or higher. 10 points
iii. Projects which are located in formally designated community revitalization
areas (e.g. HUD Enterprise Zones, Main Street Programs, historic districts,
designated blighted areas or otherwise targeted areas). The minimum size
improvement zone for this scoring category is generally a one-block area, but
cannot have been specifically created for the benefit of the proposed project.
The formal designation must come from an official act by a government
agency, such as a city council or town board.(9) 10 points
iv. Smart Growth Components. Projects with the following components
will score 2 points each, maximum total of 10 points:
Public water supply 2 points
Public sewer 2 points
Piped natural gas available 2 points
Appropriate zoning without variance 2 points
Municipally-maintained off-site sidewalks accessible from the
site and leading within ¼ mile to a Community Center Area (see
(i) above), to fixed route public transportation, or to a grocery
store (a self-service retail establishment that primarily sells
food).
2 points
b. Projects approved for points in part a.iii. that are also in Qualified Census Tracts.
3 points
c. Projects approved for points in part a. that preserve and renovate existing housing.
1 point
d. Preservation or restoration of a historic building. The building must be on or eligible
for the State or National Register of Historic Places, or officially designated as a local
historic property by town, state and/or federal agencies, with rehabilitation to be
completed so as to be eligible for and use federal historic rehabilitation tax credits.
5 points
12. Project Cost
Refer to HFA:109.04.C for definition of TDC weighted average.
The four criteria referenced in this section for higher development cost standards are:
Historic rehabilitation project which plans to use Historic Rehabilitation Tax Credits
Located on site which meets the EPA definition of a brownfield
Designed and built to meet Passive House or Net Zero standards
Inadequate bidder pool to achieve a competitive bid
(9
) Federal new market tax credits are eligible. A zoning change or special zoning district (e.g. workforce housing zone)
does not qualify for scoring in this section.
2018 New Hampshire Qualified Allocation Plan
12
Projects that have a projected TDC weighted average of 5% over the average of all
applicants’ TDC weighted averages (and do not meet any of the four criteria for higher
cost standards). -2 points
- or –
Projects that have a projected TDC weighted average of 10% over the average of all
applicants’ TDC weighted averages (and do not meet one of the four criteria for higher
cost standards). -5 points
-or-
Projects that have a projected TDC weighted average of 10% over the average of all
applicants’ TDC weighted averages (and meet one of the four criteria for higher cost
standards). -2 points
-or-
Projects that have a projected TDC weighted average of 10% over the average of all
applicants’ TDC weighted averages (and meet two or more of the criteria for higher cost
standards). -no penalty
13. Sponsor is a Community Housing Development Organization (CHDO)
The project sponsor is a NHHFA-approved Community Housing Development
Organization (CHDO) and is the sole or managing general partner. CHDO designation is
defined in 24 CFR Part 92 of the HOME Investment Partnerships Program. 3 points
14. Management Experience
To receive points for this category, the proposed management agent must submit a
letter of interest and the Management Questionnaire (sheet with this title is in spreadsheet
application). Applications are scored based on specific point scoring shown on the
Management Questionnaire. The scoring gives preference to management agents based
on experience, performance, and satisfaction of LIHTC training requirements.
0 to 10 points
15. Developer Experience with the Authority
The developer or associated entity that is part of the development team:
• has any outstanding obligations (including compliance fees) on any Authority-
financed or Authority tax credit project that is more than 30 days in arrears;
• is involved in or has had other tax credit or Authority-financed projects which
have non-compliance issues;
2018 New Hampshire Qualified Allocation Plan
13
• is or has been non-compliant or otherwise in default with this or any other
Authority Program (as determined by the Authority) or with another state housing
finance agency; and/or
• has been awarded credits in the past that were subsequently returned or otherwise
unused (unless for good cause).
Such determination will be made by the Authority at its sole discretion. 0 to -20 points
16. Development Characteristics
The project design provides for a community room with a minimum of 600 square feet.
5 points
17. Energy Efficient Design and Construction
Project achieves Passive House Certification or The Institute for Living Futures Net Zero
certification. 5 points
-or-
Project achieves LEED Gold certification, NGBS Gold certification, or Enterprise Green
Communities certification. 2 points
If the project fails to achieve certification, the Authority will determine if the Design and
Construction team made a good-faith effort to achieve certification. If so, no penalty will
be imposed. If not, a five-point or two-point penalty will be levied against the next
application for 9% LIHTCs submitted by the project sponsor.
B. 18. Tiebreakers
In the case of a scoring tie, the tiebreakers shall be:
1. The project providing the highest percentage of new housing units to total housing units
is favored.
2. If still tied, the most efficient use of LIHTCs (i.e. lowest amount of LIHTCs per rent
restricted unit) is favored.
HFA:109.08 ALLOCATION PROCESS
A. Reservation of LIHTC
All applications are reviewed for completeness. Incomplete applications will be rejected; though
minor variances may be deemed acceptable. The Authority may reject any documentation deemed
to be insufficient, unsupported, or inadequate for the particular scoring criteria. The Authority is
not required to notify the applicant of inconsistencies or missing information.
Applications are scored and ranked in accordance with the Scoring Criteria (HFA: 109.07).
Projects are recommended for a reservation of LIHTCs based on the competitive scoring results.
However, a project must receive a minimum of 80 points (65 points for age restricted projects) to
be eligible to receive a LIHTC reservation.
2018 New Hampshire Qualified Allocation Plan
14
At least one age restricted project and two non-age restricted projects will be funded per round as
long as threshold criteria are met. Projects may be selected over higher scoring applicants to meet
this requirement.
The non-profit set-aside is generally satisfied through the QAP scoring system. However, since the
state’s entire allocation authority is predicated by IRC 42 on meeting the minimum 10% non-profit
allocation, one or more non-profit projects may be selected over higher scoring applicants until the
10% allocation requirement is met.
When only partial LIHTCs are available for the next highest scoring project, the Authority retains
the right to bypass that project, and either give LIHTCs to other projects lower in the scoring
ranking, which can effectively use the remaining LIHTC amount, or use the LIHTCs in a future
year.
If a partial allocation is offered, the Authority must be convinced that a project can be appropriately
phased or restructured, that the project’s feasibility is not conditioned upon receipt of a future
reservation, and that the project can retain its scoring criteria ranking. The Applicant must
demonstrate the ability to meet these criteria within 21 days of notification.
B. Appeal Process
Applicants may appeal the Authority’s decision, solely with regard to their application. Applicants
must submit a formal request for an appeal within five business days from the date of receipt of
written notification that LIHTCs will not be awarded. The Authority will send denial letters to the
Developer/Sponsor via email the day of Board action. The appeal request is considered by the
Authority’s Multi-Family Housing Committee, which makes a recommendation to the Board of
Directors.
C. Conversion to Out-of-Cap Project
In the interest of making the most efficient use of New Hampshire’s housing related resources, the
Authority reserves the right to remove a project from the competitive process, regardless of
potential score, and convert the project to an “out-of-cap” bond financed project. This would be
premised on project feasibility under a tax-exempt bond financed scenario (construction and/or
permanent) as determined by the Authority. However, once removed from the application round,
the Authority cannot guarantee successful bond financing for the project.
D. Post Reservation Processing
1. Progress Phase
Within 120 days of notification of a reservation of LIHTCs the Applicant must complete
all requirements listed in Appendix A; Progress Phase Requirements. Extensions to the
deadline may be granted.
2. Allocation Phase
Projects that will not be placed in service by December 31, 2018, must complete the
items listed in Appendix B; Carryover Allocation Requirements by October 1, 2018. At
project completion, the Applicant must submit the items listed in Appendix C; Final
Allocation Requirements.
2018 New Hampshire Qualified Allocation Plan
15
3. Cost Certifications
Cost certifications are required for both the carryover allocation (i.e. the 10%
expenditure certification) and for a final allocation. The cost certifications must
incorporate a professional CPA audit in accordance with generally accepted auditing
standards and IRC 42. The line items used in the certification must correspond with the
Authority’s application spreadsheet. The certification must include sources as well as
uses of funds.
E. LIHTC Exchange
The Authority will permit exchanges of LIHTCs to be granted at the discretion of staff when all of
the following apply:
• the appropriate amount of LIHTCs are available;
• the sponsor provides evidence of an inability to meet the placed-in-service, 10% expenditure,
or other funding deadline;
• the situation results from litigation, municipal approval delays, or other unforeseeable
circumstances beyond the sponsor’s control; and
• the project continues to be financially feasible and meets the threshold criteria and other
eligibility requirements in effect at the time the LIHTCs were originally awarded.
Staff has the authority to re-issue a reservation letter for LIHTCs in the same (or lesser) amount
without further Board action.
F. Project Representations
Representations made about the project relating to ownership or management, or factors that are
used in the selection and scoring criteria may not be changed without the express written
permission of the Authority. LIHTC reservations may be rescinded if the project changes in a way
that reduces the competitive score.
HFA:109.09 FEES TO THE AUTHORITY
A. Program Fees
The LIHTC fee is 7% of the final allocation amount for all applicants, with 1% paid with the initial
application. The initial application fees may be refunded, less $1,000, if a project is withdrawn or
otherwise fails to secure a reservation. No fees are refundable after a reservation has been
approved.
B. Compliance Monitoring Fees
The monitoring fee is $600 per LIHTC unit, which is paid at the final allocation stage. The
Authority reserves the right to make adjustments to annual monitoring fees due to increased
monitoring requirements and/or costs.
HFA:109.10 LONG-TERM AFFORDABILITY COMPLIANCE
A. Recorded Affordability Commitment
Prior to issuance of final allocation, the owner of the LIHTC project must execute and record a
Land Use Regulatory Agreement (LURA). The LURA sets forth the conditions wherein the owner
2018 New Hampshire Qualified Allocation Plan
16
and the project must comply with IRC 42. The Applicant must show that the LURA has been
recorded and has precedence over any permanent financing or other liens. The LURA shall remain
in effect for a 99-year compliance period.
B. Right of First Refusal
Owners (except ownership entities ultimately controlled by a qualified non-profit or local housing
authority) must sign a Right of First Refusal (ROFR) in favor of a qualified non-profit, local
housing authority, or the Authority. The ROFR - a sample of which can be found in Appendix D -
shall be executed and recorded in the appropriate County Registry of Deeds prior to final allocation.
C. Compliance Monitoring
In accordance with Treasury Regulation §1.42-5 the Authority is required to monitor project
compliance with IRC 42 and the LURA, and to notify the IRS when it becomes aware of any
noncompliance. The Authority’s monitoring responsibilities begin at the time the first building is
placed in service. Additional information regarding compliance monitoring can be found in
Appendix K
HFA:109.11 MISCELLANEOUS AUTHORITY PROVISIONS
A. Waiver Authority
The Authority reserves the right to waive any of these Rules (HFA:109) within the constraints of
IRC 42. Applicants or potential applicants must submit a written request for a waiver. A hearing
will be scheduled within 45 days of the request by the Authority’s Multi-Family Housing
Committee. Upon a finding of good cause, a waiver may be granted on a case-by-case basis by the
Board of Directors. A waiver of the rules can be initiated by the Board, in which case no hearing is
necessary.
B. Authority to Amend Regulatory Documents
The Multi-Family Committee is authorized to approve amended project regulatory documents
relative to the scope and delivery of services, age, and income targeting, including matters that may
have been part of the original scoring evaluation of the project, in circumstances in which the staff
determines that market conditions and or changes in public funding policies warrant such changes.
The Multi-Family Housing Committee will report quarterly to the Board on all such amendments.
C. Compliance with Federal, State and Authority Regulations
All projects receiving LIHTC allocations (including “out-of-cap” allocations) must comply with all
relevant Authority, state and federal regulations, including but not limited to:
IRC 42
Federal Uniform Physical Condition Standards (UPCS at CFR 5 et al.)
Federal Fair Housing Act 42 USC §3601 et seq.
Federal Section 504 Accessibility requirements
Authority Design and Construction Standards (HFA:111)
Authority Underwriting and Development Policies for Multi-Family Finance
D. References
Applicants are required to provide authorization so that references and credit can be checked.
2018 New Hampshire Qualified Allocation Plan
17
Applicants may be required to submit IRS Form 8821 with their LIHTC applications, including
separate forms for all general partners, to allow Authority access to IRS data on applicants and
partners.
E. Warrant and Liability
The Authority is charged with allocating no more LIHTCs to any given project than are required to
make the project economically feasible. This decision is made solely at the discretion of the
Authority but does not represent or warrant to any applicant, developer, partner, investor, lender, or
others that the project is feasible or risk free.
The Authority’s review of application documents in connection with this QAP is for its own
purposes. The Authority makes no representations to the applicant or anyone else as to compliance
with the IRC 42, Treasury Regulations, or any other laws or regulations governing the LIHTC
Program. To the extent any information in the QAP is inconsistent with IRC 42, the provisions of
IRC 42 shall govern.
No Board member, officer or employee of the Authority shall be personally liable concerning any
matters arising out of or in relation to the allocation of LIHTCs or compliance monitoring.
The Authority’s obligation to monitor for compliance does not make the Authority liable for an
owner’s noncompliance.
F. Amendments to the QAP
The Authority reserves the right to modify the QAP periodically, with the consent of the Governor.
The Authority may make technical clarifications or revisions to comply with changes in federal law
at its sole discretion.
G. Board Role
Unless otherwise specified, the Authority’s Board of Directors delegates LIHTC program
administration to the Executive Director. Pursuant to the Authority’s operating policies, the
Executive Director may delegate the administration authority to staff. Use of the term “staff”
elsewhere in HFA 109 means the Executive Director. The responsibilities of the Board’s Multi-
Family Housing Committee are delineated in Sections HFA:109.11A (Waiver Authority) and
HFA:109.08B (Appeals). The Reservation (or rejection) of LIHTCs shall be made by the
Authority’s Board of Directors (except for supplemental LIHTCs (HFA:109.03C) and LIHTC
exchanges (HFA:109.08E)).
H. Consistency with IRC 42
To the extent any information in the QAP is inconsistent with IRC 42, the provisions of IRC 42
shall govern. This QAP is not intended to present all the rules and regulations of the LIHTC
program. It is strongly recommended that applicants consult with competent legal and tax counsel.
I. New Hampshire Right to Know Law
The Authority is subject to RSA Chapter 91-A, which is known as the “Right-to-Know Law.”
Under the Right-to-Know Law, certain records are considered “governmental records” that are open
to public inspection. Documents and data created under this Program by the Authority or by the
Grantee may be subject to public inspection. Other documents and data, such as confidential
2018 New Hampshire Qualified Allocation Plan
18
financial information, may be considered nonpublic records and thus would not be subject to public
inspection. The Authority and the Grantee shall comply with the Right-to-Know Law. The Grantee
shall provide the Authority with all Right-to-Know requests, and the Authority will determine how
to comply with the Right-to-Know Law. Nevertheless, a court may disagree with the Authority’s
decision, in which case the court’s decision would prevail. The Authority shall not be liable to the
Grantee or to any party for the Authority’s decisions or a court’s decisions related to the Right-to-
Know Law.
HFA:109.12 PROJECTS FINANCED BY TAX-EXEMPT BONDS
Projects financed with tax-exempt bonds may apply for “out-of-cap” LIHTCs at any time. “Out-of-
cap” applicants must satisfy the requirements for allocation in accordance with the QAP.
Carryover allocations are not required for projects financed with tax-exempt bonds. The Authority
issues a “determination letter” stating the estimated amount of tax credits that the project is eligible
for just prior to the bond closing transactions, assuming all other LIHTC Program requirements
have been or will be met.
Fees for tax-exempt bond funded projects are the same as 9% allocations (HFA:109.09), except that
1% of the application fee is due at the time the determination letter is requested.
2018 New Hampshire Qualified Allocation Plan
19
APPENDIX A
PROGRESS PHASE REQUIREMENTS
The documents listed below must be submitted to the Authority via the ODM website within 120
days of notification of a reservation of LIHTCs or 30 days prior to the deadline for carryover
allocation (i.e. December 1st), whichever is sooner.
Projects must meet the requirements of the progress phase to be eligible for an allocation of tax
credits. Progress requirement extensions may be granted at the sole discretion of the Authority.
The tax credit reservation may be rescinded at the sole discretion of the Authority for not meeting
the progress phase requirements or for a failure to meet the general criteria in HFA:109.07B.
1. Letter requesting commitment of tax credits and inclusion of any pages from the
application form related to changes in the project scope or cost, including complete
updated budget
2. Exhibit 2 – Environmental site assessment and related reports (lead, asbestos, historic,
archeological, etc.) if required by the Authority*
3. Exhibit 16 – Appraisal (if required by the Authority)
4. Exhibit 19 – Evidence of zoning/local approvals*
5. Exhibit 20 – Permanent financing letter of commitment or letter of interest with terms
and conditions specified
6. Exhibit 21 – Construction financing letter of commitment or letter of interest with terms
and conditions specified
7. Exhibit 22 – Equity investment letter of commitment or letter of interest with terms and
conditions specified
8. Exhibit 24 – Construction period sources and uses (monthly) (required only for projects
seeking Authority construction financing)
9. Exhibit 27 – Final plans and specifications
10. Evidence of continued site control
11. Soils and/or structural engineering report (if applicable)
12. Copy of the architect contract
13. An executed tenant services agreement binding on both parties
14. Cost estimates (or bids if available) by schedule of value. Must comply with 6-2-6 rule
for contractor overhead and profit
2018 New Hampshire Qualified Allocation Plan
20
15. Copy of contract for consultant services (if applicable)
*Exhibit numbers refer to the ODM website list of exhibits. Certain exhibits may not be applicable – see application.
2018 New Hampshire Qualified Allocation Plan
21
APPENDIX B
CARRYOVER ALLOCATION REQUIREMENTS
1. Update of the Excel application form using ODM
2. Evidence of limited partnership existence, including federal tax identification number,
Certificate of Good Standing for Limited Partnership from New Hampshire Secretary of
State or copy of the Certificate of Limited Partnership stamped by Secretary of State
3. Copy of partnership agreement or offering summary (draft acceptable)
4. Evidence of continued site control
5. Copy of construction proposals (or bids) and executed construction contract. Include a copy
of schedule of values showing contractor overhead and profit breakdown (i.e. 6-2-6 rule)
6. Election of gross rent floor (if applicable) (see Appendix H)
The carryover cost certification must be completed within 12 months of the “date of allocation,”
and must be forwarded to the Authority.
2018 New Hampshire Qualified Allocation Plan
22
APPENDIX C
FINAL ALLOCATION REQUIREMENTS
1. Updated application form into ODM with sources and uses corresponding to final cost
certification
2. Final cost certification
3. Developer Certification of Costs (see Appendix E for required format)
4. Developer Certification of Equity Proceeds (see Appendix F for required format)
5. “As-Built” Architect Certification (see Appendix G for required format)
6. Recorded Land Use Restriction Agreement (LURA) and evidence of its precedence in the
land records (e.g. title search)
7. Executed partnership agreement with equity pay-in schedule
8. Final allocation fee
9. Copy of Certificates of Occupancy
10. Copy of deed including legal description of property
11. Tax credit monitoring fee
12. Certification of tax credit management designation and training
13. Placed in service date for each building
14. Construction contract meets 6-2-6 limits
15. Sign-off by the Authority construction analyst (responsibility of Authority)
16. 10% cost certification completed within one year of carryover allocation
17. Right of First Refusal to Nonprofit (required for for-profit developers only, see Appendix D
for example)
18. Election of gross rent floor (if applicable) (see Appendix H)
2018 New Hampshire Qualified Allocation Plan
23
APPENDIX D
SAMPLE - RIGHT OF FIRST REFUSAL
This Agreement is entered into this ____ day of _____________, 201_ , between
_________________________ (the “Owner”), having an address of
____________________________, County of ________________, and State of _____ and the
New Hampshire Housing Finance Authority, having an address of 32 Constitution Drive,
Bedford, County of Hillsborough and State of New Hampshire (hereinafter referred to as the
“Authority”), and _________________________________ (hereinafter referred to as the
“QUALIFIED NON-PROFIT ENTITY”), having an address of
____________________________________, County of _____________________ and State of
____ and the parties agree as follows:
1. The Owner owns ______________________________ (hereinafter referred to as the
“Property”). See attachment for legal description.
2. A Qualified Non-Profit is defined as meeting the requirements of the Internal Revenue
Code (IRC) Section 42(h)(5)(C)).
3. The Owner and its successors and assigns in interest (as may be approved by the
Authority as per HFA:109.08F of the 2014 Qualified Allocation Plan) are bound to the
Low Income Housing Tax Credit (LIHTC) rent and income limits set forth in the Land
Use Restriction Agreement (hereinafter referred to as the “LURA”) for 99 years from
the beginning of the compliance period as defined in the LURA, unless the Owner uses
the following procedure:
(i) The Owner may make a bona fide offer to sell the Property to the Qualified Non-
Profit Entity or its successor and assigns, subsequent to the initial 30 year
compliance period for a price equal to the minimum set forth in IRC Section
42(i)(7)(B). The offer shall be in writing delivered to the Qualified Non-Profit
Entity, with a copy to the Authority. The Qualified Non-Profit Entity may
accept the offer to sell by notifying the Owner in writing within ninety (90) days
of its receipt of the offer. If the Qualified Non-Profit Entity accepts the offer,
then the Owner and the Qualified Non-Profit Entity shall close the sale of the
Property at the offices of the Authority within 180 days after the acceptance of
the offer. If the Qualified Non-Profit Entity decides to purchase the Property, the
original LURA will be discharged and no rent or income limits shall apply.
(ii) If the Qualified Non-Profit Entity does not accept the offer to purchase the
Property or exercise its right under this Right of First Refusal (“ROFR”) to
purchase the Property as set forth in Paragraph (i) above, then the Owner shall
offer to sell the Property to the Authority for the same price at which it offered to
sell the Property to the Qualified Non-Profit Entity. The offer shall be in writing
2018 New Hampshire Qualified Allocation Plan
24
and delivered to the Authority. The Authority may accept the offer by notifying
the Owner in writing within ninety (90) days of its receipt of the same. If the
Authority gives written notice of its intent to accept this offer, the Authority and
the Owner shall close the sale of this Property at the offices of the Authority
within 180 days after receipt of the Authority’s written notice of acceptance of
this offer. The Authority may purchase this Property for its own purposes or on
behalf of another Qualified Non-Profit Entity. If the Authority purchases the
Property, either for its own purposes or on behalf of another Qualified Non-
Profit Entity, the Authority may discharge the original LURA or negotiate a new
LURA. In the event that the Authority negotiates a new LURA, it shall use its
best efforts to maintain low income residency and affordability substantially the
same as the existing LURA to the extent reasonably possible.
(iii)If the Authority declines the offer to sell the Property or to otherwise exercise its
right under this ROFR, either for its own purposes or on behalf of another
Qualified Non-Profit Entity, the LURA will be discharged by the Authority and
the Owner is free to sell and/or convert the Property to market rents or other uses
after adequate notice to existing tenants and compliance with existing law
(including the 3 year tenant protection period cited at Section 42(h)(6)(e)(ii)).
4. This Agreement may be assigned by the Owner, subject to the written approval of the
Authority, which approval shall not be unreasonably withheld.
IN WITNESS WHEREOF, the parties have caused this Right of First Refusal to be executed by
their duly authorized representatives, as of the day and year first written above.
__________________________________
(the “Owner”)
By:______________________________
Witness Name: ___________________________
Title: ____________________________
__________________________________
(Non-Profit)
___________________________ By:________________________________
Witness Name: _____________________________
Title: ______________________________
2018 New Hampshire Qualified Allocation Plan
25
NEW HAMPSHIRE HOUSING FINANCE
AUTHORITY
By:______________________________
Witness Name: Christopher R. Miller
Title: Managing Director, Management and Development
THE STATE OF NEW HAMPSHIRE
COUNTY OF ___________________
On this ____ day of ____________, 201_, before me the undersigned officer, personally appeared
_____________________, who acknowledged himself/herself to be _________________________, of
_____________________ a New Hampshire _________________________, and that he/she being
authorized so to do, executed the foregoing instrument on behalf of said ___________________.
____________________________
Justice of the Peace/Notary Public
My Commission Expires:
THE STATE OF NEW HAMPSHIRE
COUNTY OF HILLSBOROUGH
On this ____ day of ____________, 201_, before me the undersigned officer, personally appeared
_________________________, who acknowledged himself/herself to be the ___________________ of
___________________, a New Hampshire _____________, and that he/she being authorized so to do,
executed the foregoing instrument on behalf of said ____________________.
____________________________
Justice of the Peace/Notary Public
My Commission Expires:
THE STATE OF NEW HAMPSHIRE
COUNTY OF HILLSBOROUGH
On this ____ day of ____________, 201_, before me the undersigned officer, personally appeared
Christopher R. Miller, who acknowledged himself to be the Managing Director, Management and
2018 New Hampshire Qualified Allocation Plan
26
Development of New Hampshire Housing Finance Authority, a public instrumentality and body politic
and corporate duly created, organized and existing under the laws of the State of New Hampshire, and
that he being authorized so to do, executed the foregoing instrument on behalf of said instrumentality and
body politic and corporate.
____________________________
Justice of the Peace/Notary Public
My Commission Expires:
2018 New Hampshire Qualified Allocation Plan
27
APPENDIX E
DEVELOPER’S CERTIFICATION OF DEVELOPMENT COSTS
I ____________________________________ (“Developer”), developer of
________________________________ (the “Project”) located at
________________________________________________ in ______________________, New
Hampshire, hereby certify that the accompanying Sources and Uses of Funds with the Total
Development Cost totaling $____________, dated _________________, Accountant’s Certification
of Costs (including developer fee), Qualified Basis and Applicable Fraction are a true and accurate
representation of the Project funding and total costs. I certify that all current financing terms
have been disclosed, and I will further inform the Authority of any future changes to project
financing. I further state that the Qualified Basis and Applicable Percentage were calculated in a
manner consistent with the regulations set forth in IRC 42. I recognize that any changes or
misrepresentations from this certification may warrant notification to the IRS of a LIHTC Program
violation via IRS Form 8823.
Date:________________________________
Duly Authorized:______________________________
2018 New Hampshire Qualified Allocation Plan
28
APPENDIX F
DEVELOPER’S CERTIFICATION OF EQUITY PROCEEDS
I ____________________________________ (“Developer”), developer of
________________________________ (the “Project”) located at
________________________________________________ in ______________________, New
Hampshire, hereby certify that the gross equity investment in the Project gained from the sale of
____% interest in the Limited Partnership entitled ___________________________ Limited
Partnership Agreement dated _______________ totaled $________________. This gross equity
investment is based on a final allocation of Low Income Housing Tax Credits of
$_________________ annually for a period of ten years.
Date:________________________________
Duly Authorized:______________________________
2018 New Hampshire Qualified Allocation Plan
29
APPENDIX G
“AS-BUILT” ARCHITECT CERTIFICATION
I have inspected the development known as ________________________________________ (Project
name) located in ____________________________(city, state) and hereby certify that the development
has been built in accordance with the drawings and specifications dated _________________ prepared by
____________________________________.
Based upon this inspection, to the best of my knowledge and belief, the development has been
constructed in conformance with all local, state and federal laws designated as the development
standard for the project, including, but not limited to, the ADA, Section 504 and Fair Housing Laws
as they pertain to handicapped accessibility and adaptability; all state and local health, safety and
building codes; and those requirements as set forth in the Authority’s Design and Construction
Standards.
________________________________
Date
_________________________________
Architect
(Seal)
2018 New Hampshire Qualified Allocation Plan
30
APPENDIX H
ELECTION OF GROSS RENT FLOOR
Pursuant to Internal Revenue Service (IRS) Regulations, an Owner of a Low Income Housing Tax
Credit project may designate the date that the Gross Rent Floor takes effect prior to the date the
building is placed in service. The Gross Rent Floor establishes the initial permitted maximum rents
for the Project. The Gross Rent Floor also limits potential future rent reductions due to decreases in
the applicable median area income limits. The IRS will treat the Gross Rent Floor as taking effect
on the date the New Hampshire Housing Finance Authority (the Authority) initially allocates tax
credits to the building. However, the IRS will treat the Gross Rent Floor as taking effect on a
building’s placed in service date if the Owner designates that date as the date the Gross Rent Floor
takes effect for the building. The Owner must make this designation to use the placed in service
date and inform the IRS no later than when the building is placed in service.
Please make the following designation:
If this box is checked, the Owner hereby elects, pursuant to IRS Revenue Ruling 94-
57, to fix the applicable Gross Rent Floor in accordance with Section 42(g)(2)(A) at
the date the building is placed in service. This document must be submitted to the
Authority prior to the Project’s placed in service date.
If this box is checked, the Owner has made no election pursuant to IRS Revenue
Ruling 94-57, and the applicable Gross Rent Floor for a building shall be set at the
date the Authority initially allocates Low Income Housing Tax Credits, which shall
be earlier of 1) the date of the Carryover Allocation, or 2) the date of the Final
Allocation (IRS Form 8609).
A decrease in the median area income limits will not require a reduction in rents below the Gross
Rent Floor.
2018 New Hampshire Qualified Allocation Plan
31
APPENDIX I
SERVICE COORDINATION
Specifications 1. A minimum of four (4) hours per week of onsite Service Coordination for properties up to 20
units with an additional one hour for every five (5) units over 20. Properties without an onsite
office may provide service coordination remotely with a minimum of monthly onsite visits.
2. Service Coordination must be provided by a person who does not also collect rent, inspect
units, make determinations on requests for reasonable accommodation, investigate lease
violations, or issue eviction notices.
3. Adequate space to meet with residents that provides for confidential conversations and
maintenance of secure records. Meeting with residents in their homes is acceptable.
4. Access to a telephone and the internet when meeting with residents for the purpose of
coordinating services. Use of a smart phone or tablet is acceptable.
5. An assessment of every resident’s service needs within 60 days of move-in and annually
thereafter.
6. Provide follow up as needed to address residents’ needs as identified in their service plans.
7. Develop and implement strategies to build community among diverse residents.
8. Coordination of a minimum of two services/programs to be offered onsite, online, or in close
proximity to the project (within a ½ mile suitable walking distance or with free transportation
provided). Services must be provided to residents at no cost or at a nominal or discounted fee.
Appropriate services will do one or more of the following.
a. Increase resident knowledge of and access to available services.
b. Help residents maintain stability and prevent eviction.
c. Build life skills.
d. Increase household income and assets.
e. Increase health and well being.
f. Improve the educational success of children and youth.
9. The services listed below meet this threshold requirement; however any service that meets
residents’ needs may also be acceptable. One of the two required services must be provided no
less than quarterly.
a. Wellness education or health clinic
b. Literacy/language training
c. Personal safety (fire, identity theft, scams, self-defense, drug awareness)
d. Financial fitness (budgeting, money management, credit counseling)
e. Income and asset building (job coaching, IDAs, homebuyer education)
f. Business center or wireless internet access*
2018 New Hampshire Qualified Allocation Plan
32
g. Transportation*
h. Meals*
i. Childcare*
j. After school program*
* A nominal or discounted fee is allowed for these services. 10. To qualify, services may not be provided by the Service Coordinator or other management company
staff. Services being scored must be available at the property to residents in a format and/or at a
reduced fee because they are residents of the project, not because they meet the financial eligibility
requirements for the service. If people can receive the same service or benefit when they live in
privately financed housing, then the service is not eligible for scoring in this section.
11. If service coordination or any services will be contracted, a letter of intent (LOI) to contract
must be provided with the application containing:
• The type(s) of service and number of hours per week or month each will be provided
• The location(s) where the service(s) will be provided
• The fee for providing the service(s)
The LOI must be on letterhead and signed by a duly authorized person. A fully executed MOU
signed by and binding on both parties will be required within 120 days of notification of a
reservation of LIHTCs or 30 days prior to the deadline for carryover allocation, whichever is
sooner.
12. Conduct an annual survey of all residents regarding need for and satisfaction with the service
coordination, including coordinated services. Reporting Requirements 1. Project Owners will be required to submit an annual certification of:
a. The number of hours of onsite Service Coordination and coordinated services provided;
b. The number of residents served by each; and,
c. The results of the annual resident satisfaction survey.
2. Additionally, project owners will be responsible for ensuring that property managers maintain:
a. Agreements for services on file (if any); and,
b. Evidence that the services are being provided (e.g. sign-in sheets, letters/memos to
tenants advertising the event/service, service logbook and/or activity reports).
2018 New Hampshire Qualified Allocation Plan
33
SERVICE COORDINATION PLAN AND BUDGET (submit with application)
Project name: Number of units: Contact person for service coordination plan:
Email: Phone:
Service Coordination
# of hours/week? Contracted? No Yes (attach letter of intent)
Onsite? Yes No – Reason:
Coordinated Service #1:
Frequency of Service: Cost to Resident:
Onsite? Yes No – Location:
Brief Description:
Coordinated Service #2:
Frequency of Service: Cost to Resident:
Onsite? Yes No – Location:
Brief Description:
The Service Coordination Plan may be amended at any time with written notification to
NHHFA as long as it continues to meet the requirements of this section.
2018 New Hampshire Qualified Allocation Plan
34
Budget
Budget Narrative (Include detail below on expenses and sources of funds other than operating funds for the service coordination to be provided for this project):
Revenue Sources $ Amount
Year 1 Year 2 Year 3 Year 4 Year 5 Total
Property operating budget
Management company budget
Owner contribution
Grant:
Other:
Other:
Total
Expense Annual $
Year 1 Year 2 Year 3 Year 4 Year 5 Total
Personnel (s alary/fringe)
Training
Office Supplies
Transportation
Total
2018 New Hampshire Qualified Allocation Plan
35
APPENDIX J
SAMPLE
HOMELESS OR AT RISK OF BECOMING HOMELESS CERTIFICATION
_______________________
Head of Household Name
Please check the appropriate box below.
Homeless Family: (does not include an individual imprisoned/detained pursuant to an Act of Congress or State
law.)
I am currently homeless, meaning that:
I/We live in a shelter and lack a fixed, regular and adequate nighttime residence and also have a
primary night time residence that is supervised publicly/privately operated shelter designed to
provide temporary living accommodations (including welfare hotels, congregate shelters and
transitional housing), or
I/We live in a hospital or institution that provides a temporary residence for individuals intended to
be institutionalized, or
I/We live in a public/private place not designed for, or ordinarily used for sleeping by human beings.
Please provide the following if you have checked one of the above choices:
__________________________ ________________________ __________________
Name of Shelter or institution Contact Person Phone Number
At Risk of Becoming Homeless: Check the one that applies:
I am at risk of becoming homeless because:
I pay more than half of my gross income towards rent or
I/we live with friends or relatives due to an emergency or homeless situation. This is a
temporary living arrangement. My name is not on the lease. If I were not in this current
living arrangement I would otherwise be homeless, or
I am temporarily living in a substandard living situation, i.e. a campground or other
temporary placement.
Tenant Certification and Release of the Information.
The head of household and spouse or other adult must sign and date this certification. Your signature means that you
agree with the above certification and allow release of verification from the individuals named. I/We certify that the
above information I/We have provided is true and complete to the best of my/our knowledge and belief.
Head of Household Date Spouse/Other Adult Date
2018 New Hampshire Qualified Allocation Plan
36
APPENDIX K
LIHTC COMPLIANCE MONITORING REQUIREMENTS
Section 42 of the Internal Revenue Code requires LIHTC-allocating agencies to monitor for
noncompliance with the provisions of that section, to notify the Internal Revenue Service of such
noncompliance when such agencies becomes aware of it, and to monitor for noncompliance with
habitability standards through regular site visits.
A. Recordkeeping and Record Retention
Under the recordkeeping provision of Treasury Regulation § 1.42-5 (b), the owner must keep
records for each building of the project for each year of the compliance period. Such records
include the following:
(i) The total number of residential rental units in the building (including the number of
bedrooms and the size in square feet of each residential rental unit);
(ii) The percentage of residential rental units in the building that are low-income units;
(iii) The rent charged on each residential rental unit in the building (including any utility
allowances);
(iv) The number of occupants in each low-income unit, but only if rent is determined by the
number of occupants in each unit under section 42(g)(2) (as in effect before the amendments
made by the Omnibus Budget Reconciliation Act of 1989);
(v) The low-income unit vacancies in the building and information that shows when, and to
whom, the next available units were rented;
(vi) The annual income certification of each low-income tenant per unit. For an exception to
this requirement, see section 42(g)(8)(B) (which provides a special rule for a 100 percent
low-income building);
(vii) Documentation to support each low-income tenant's income certification (for example,
a copy of the tenant's federal income tax return, Forms W-2, or verifications of income from
third parties such as employers or state agencies paying unemployment compensation). For
an exception to this requirement, see section 42(g)(8)(B) (which provides a special rule for a
100 percent low-income building). Tenant income is calculated in a manner consistent with
the determination of annual income under Section 8 of the United States Housing Act of
1937 (“Section 8”), not in accordance with the determination of gross income for federal
income tax liability. In the case of a tenant receiving housing assistance payments under
Section 8, the documentation requirement of this paragraph (b)(1)(vii) is satisfied if the
public housing authority provides a statement to the building owner declaring that the
tenant's income does not exceed the applicable income limit under section 42(g);
(viii) The eligible basis and qualified basis of the building at the end of the first year of the
credit period; and
2018 New Hampshire Qualified Allocation Plan
37
(ix) The character and use of the nonresidential portion of the building included in the
building's eligible basis under section 42(d) (e.g., tenant facilities that are available on a
comparable basis to all tenants and for which no separate fee is charged for use of the
facilities, or facilities reasonably required by the project).
Under the record retention provision, §1.42-5 (b)(2), owners are required to keep all records for
each building for a minimum of six years after the due date (with extensions) for filing the federal
income tax return for that year. The records for the first year of the credit period must be retained
for at least six years beyond the due date (with extensions) for filing the federal income tax return
for the last year of the compliance period of the building, bringing the total retention for the first to
21 years.
Under the inspection record retention provision, §1.42-5 (b)(3), the owner of a low-income housing
project must be required to retain the original health, safety, or building code violation reports or
notices that were issued by the State or local government unit for the Agency’s inspection.
B. Certification and Review Provisions
The owner of the LIHTC project must certify at least annually to the Authority that for the
preceding 12-month period the project met the requirements outlined in Treasury Regulation §1.42-
5(c)(1). In addition, the Authority requires owners to submit annually the Certificate of
Compliance with Special Conditions and the Management Agent Certification of Training. The
required reports, certifications, and forms can be found on the Authority’s website, www.nhhfa.org.
Annual reports are due March 1 of each year and must be submitted throughout the Extended Use
Period of the project.
In accordance with Treasury Regulation §1.42-5(c)(2), the Authority must conduct on-site
inspections of all buildings in the project by the end of the second calendar year following the year
the last building in the project is placed in service and, for at least 20% of the project's low-income
units, inspect the units and review the low-income certifications, the documentation supporting the
certifications, and the rent records for the tenants in those units. At least once every 3 years, the
Agency must conduct on-site inspections of all buildings in the project and, for at least 20% of the
project's low-income units, inspect the units and review the low-income certifications, the
documentation supporting the certifications, and the rent records for the tenants in those units.
The Authority will randomly select which low-income units and tenant records are to be inspected
and reviewed. The review of tenant records may be undertaken wherever the owner maintains or
stores the records (either on-site or offsite). The units and tenant records to be inspected and
reviewed must be chosen in a manner that will not give owners of low-income housing projects
advance notice that a unit and tenant records for a particular year will or will not be inspected and
reviewed. However, the Authority will give an owner reasonable notice that an inspection of the
building and low-income units or tenant record review will occur so that the owner may notify
tenants of the inspection or assemble tenant records for review. Such notice will typically be
provided at least 30 days in advance.
2018 New Hampshire Qualified Allocation Plan
38
C. Inspection Provision
As the allocating agency, the Authority has the right to perform on-site inspections throughout the
term of the Land Use Restriction Agreement. For the on-site inspections of buildings and low-
income units required by Treasury Regulation §1.42-5(c)(2)(ii), the Authority must review any
local health, safety, or building code violation reports or notices retained by the owner under
paragraph (b)(3) of Treasury Regulation §1.42-5 and must determine:
(i) Whether the buildings and units are suitable for occupancy, taking into account local
health, safety, and building codes (or other habitability standards); or
(ii) Whether the buildings and units satisfy, as determined by the Authority, the uniform
physical condition standards for public housing established by HUD (24 CFR 5.703). The
HUD physical condition standards do not supersede or preempt local health, safety, and
building codes. A low-income housing project under Section 42 must continue to satisfy
these codes and, if the Authority becomes aware of any violation of these codes, the
Authority must report the violation to the Internal Revenue Service. However, provided the
Authority determines by inspection that the HUD standards are met, the Authority is not
required to determine by inspection whether the project meets local health, safety, and
building codes.
D. Notification of Noncompliance
The Authority will provide prompt written notice to the owner when the Authority does not receive
the required certifications and other forms; does not receive or is not permitted to inspect the tenant
income certifications, supporting documentation and rent records; or discovers by inspection,
review or in some other manner that the project is not in compliance with the provisions of Section
42. The correction period established by the Authority is 30 days from the date of the notice. The
Authority may extend the correction period for up to 6 months, but only if the Authority determines
there is good cause for granting the extension. All requests for an extension must be made in
writing.
The Authority is required to file Form 8823, “Low-Income Housing Credit Agencies Report of
Noncompliance,” with the Internal Revenue Service no later than 45 days after the end of the
correction period (as noted above, including extensions) and no earlier than the end of the
correction period, whether or not the noncompliance or failure to certify is corrected. The Authority
must explain on Form 8823 the nature of the noncompliance or failure to certify and indicate
whether the owner has corrected the noncompliance or failure to certify. Any change in either the
applicable fraction or eligible basis that results in a decrease in the qualified basis of the project
under section 42(c)(1)(A) is noncompliance that must be reported to the Internal Revenue Service.
If the Authority reports on Form 8823 that a building is entirely out of compliance and will not be
in compliance at any time in the future, the Authority need not file Form 8823 in subsequent years
to report that building's noncompliance. If the noncompliance or failure to certify is corrected
within three years after the end of the correction period, the Authority is required to file Form 8823
with the Internal Revenue Service reporting the correction of the noncompliance or failure to
certify.
2018 New Hampshire Qualified Allocation Plan
39
The Authority must retain records of noncompliance or failure to certify for six years beyond the
Authority’s filing of the respective Form 8823. In all other cases, the Authority must retain the
certifications and records described above for three years from the end of the calendar year the
Agency receives the certifications and records.
E. Delegation of Authority
Treasury Regulation §1.42-5(f) permits the Authority to retain an agent or other private contractor
(“Authorized Delegate”) to perform compliance monitoring. The Authorized Delegate must be
unrelated to the owner of any building that the Authorized Delegate monitors. The Authorized
Delegate may be delegated all of the functions of the Authority, except for the responsibility of
notifying the Internal Revenue Service under Section D above. For example, the Authorized
Delegate may be delegated the responsibility of reviewing tenant certifications and documentation,
the right to inspect buildings and records, and the responsibility of notifying building owners of
lack of certification or noncompliance. The Authorized Delegate must notify the Agency of any
noncompliance or failure to certify.
Should the Authority delegate compliance monitoring to an Authorized Delegate, the Authority
must use reasonable diligence to ensure that the Authorized Delegate properly performs the
delegated monitoring functions. Delegation by the Authority of compliance monitoring functions
to an Authorized Delegate does not relieve the Authority of its obligation to notify the Internal
Revenue Service of any noncompliance of which the Authority becomes aware.
The Authority may delegate all or some of its compliance monitoring responsibilities for a building
to another Agency within the State. This delegation may include the responsibility of notifying the
Internal Revenue Service under Section D above.
F. Liability
Compliance with the requirements of Section 42 of the Internal Revenue Code is the responsibility
of the owner of the qualified low-income building for which the credit is allowable. The
Authority’s obligation to monitor for compliance with the requirements of Section 42 of the Code
does not make the Authority liable for an owner’s noncompliance.
G. Other
The Authority reserves the right to revise compliance monitoring policies and procedures as
required by Section 42, including other guidance published by the IRS.
Please refer to http://www.nhhfa.org/rental-housing-mf-asset-mgmt-lihtc-compliance.cfm for
further information and required documents.