Page 1: OLD SCHOOL RD. DIXIE RD. BRAMALEA RD. HWY 410 MAYFIELD …

X X X

20.0m TEMP. 500ØCSP CULVERT

20.0m TEMP. 500ØCSP CULVERT

TEMPORARY SEDIMENT POND 1

SIDE SLOPES: 4:1 MAXDRAINAGE AREA: 15.8 ha

EMERGENCY SPILLWAY WIDTH: 4.0mORIFICE SIZE: 110mm

PERMANENT POOL (185m3/ha): 2,923m3EXTENDED POOL (125m3/ha): 1,975m3

REQUIRED:

PERMANENT POOL: 3,135m3EXTENDED POOL: 4,394m3

PROVIDED

BOTTOM ELEVATION = 264.46

EXTENDED POOL ELEVATION = 266.96 TOP OF POND ELEVATION = 267.47

PERMANENT POOL ELEVATION = 265.96

LENGTH TO WIDTH RATIO: 3.5:1

(TO BE INSTALLED IN PHASE 1)

X

X

X X X X X

X

X

X

50.6m - 300Ø

TEMPORARYPOND 1

INSTALL MUD MAT ATPROPOSED DRIVEWAY

INSTALL MUD MAT ATPROPOSED DRIVEWAY

INSTALL MUD MAT ATPROPOSED DRIVEWAY

HICKENBOTTOM DRAINOUTLET INV. 265.58BOTTOM DRAW INV. 254.46

4.0m WIDE EMERGENCY SPILLWAY

PIPE OUTLET TO RIP-RAP FLOW SPREADERSPLASH PAD LENGTH 2M, WIDTH 1.5M, DEPTH0.30M AND UNDERLAIN BY GEOTEXTILE(TERRAFIX 270R OR EQUIVALENT) PER DETAILON DWG. ERD3.

SINGLE-ROW SILT FENCE

DOUBLE-ROW SILTFENCE

DOUBLE-ROW SILTFENCE

SINGLE-ROW SILT FENCE

TOPSOIL STOCKPILE

3:1

3:1

APPR.DATEBYREVISIONS TO DRAWINGNo.

ALL PREVIOUS ISSUES OF THIS DRAWING ARE SUPERSEDED

CLIENT

MUNICIPALITY

PROJECT TITLE

SHEET TITLE

DWG. NUMBER

DATE

CHECKEDDRAWNDESIGNED

SCALE

PROJECT NUMBERC:\U

sers

\CAW

G07

4021

\BIM

360

\WSP

Can

ada

proj

ects

(AM

ER)\L

and

Dev

elop

men

t Ont

ario

\Pro

ject

File

s\20

1-11

545

- 128

92 D

ixie

Roa

d\M

UN

\Eng

inee

ring

Dra

win

gs\2

01-1

1545

-ESC

1.dw

gFe

b 23

, 202

1 - 7

:23p

m, C

AWG

0740

21FI

LEN

AME:

PLO

TDAT

E:

CONSULTANT

TRIBAL PARTNERS CANADA INC.

12892 DIXIE ROAD

J.G. 10/12 CAD A.W.

1:500 FEBRUARY 2021

201-11545

1 SUBMITTED FOR S.P.A. J.G. FEB. 24/21

STAMP

KEY PLAN NTS

www.wsp.comf: 905.882.0055t: 905.882.1100Thornhill, ON Canada L3T 0A1100 Commerce Valley Dr. West,

HEA

RT

LAKE

RD

.

BRAM

ALEA

RD

.

DIX

IE R

D.

MAYFIELD RD.

OLD SCHOOL RD.

HWY 410

ESC1

EROSION AND SEDIMENTCONTROL PLAN - 1A

LEGENDPROPERTY LINE

MUD MAT(CONSTRUCTION ACCESS)

SILTATION CONTROL FENCE

OVERLAND FLOW DIRECTION

TEMPORARY SILT TRAP

TREE PROTECTION HOARDING

EXISTING CONTOUR

EXISTING ELEVATION

EXISTING TREE

EX. C

UR

B

Min. 300mm THICK, 50mm CRUSHER RUN LIMESTONE

6.0m

15.0m

6.0 m

30050 mm CRUSHER RUN

LIMESTONE

MUD MAT DETAIL

EX. R

OAD

TEMPORARY CATCHBASIN SILTATIONCONTROL DEVICE (for pavement area)

ASPHALT ROADWAY OR TERRAFIX 2700R FILTERFABRIC

NOTE:1. TO BE USED UNDER APPROPRIATE DRAINAGE CIRCUMSTANCES. BETWEEN APRIL ANDDECEMBER.2. WOVEN GEOTEXTILE TO HAVE A MINIMUM EQUIVALENT OPENING SIZE OF 0.25mm.3. WOVEN GEOTEXTILE TO BE REPLACED PERIODICALLY WHEN ACCUMULATED SEDIMENTSINTERFERES WITH DRAINAGE.

GRANULAR SUB-BASE

WINTERIZATION PLAN:

SECTION 2: CONSTRUCTION TIMING

MIGRATORY BIRDSCONVECTION ACT,

IN-WATER/NEAR-WATER ACTIVITIES, MAY ONLY OCCUR

SECTION 3: FISH AND WILDLIFE RELOCATION

SECTION 4: ENVIRONMENTAL COMPLIANCE

2m1.5m

0.3m

200mmØ RIP-RAPUNDERLAIN BYGEOTEXTILE (TERRAFIX270R OR APPROVEDEQUIVALENT)

debbiema