+ All Categories
Transcript

EM01

A701

1

2

3

4

1

A101

1

A401

1

A201

EXISTING EXIT SIGN

PROPOSED EXIT SIGN

EMERGENCY LIGHT

OCCUPANT LOAD

COMBINED OCCUPANT LOAD

TOTAL OCCUPANT LOAD

EXIT DISCHARGE

INTERIOR ELEVATION

MARKER

REVISION TAG

EXIT SIGN WITH EMERGENCY

LIGHT COMBO

PROPOSED EXIT SIGN

BUILDING SECTION

LEVEL NAME

(ELEVATION)

+8'-3"

1

25

50

E

EM01

EM01

EM01

STAIR

24" 48"

DRAWING NUMBER

SHEET NUMBER

BUILDING ELEVATION

DRAWING NUMBER

SHEET NUMBER

DETAIL CALLOUT

DRAWING NUMBER

SHEET NUMBER

LEVEL MARKER

SPOT ELEVATION

DRAWING NUMBER

SHEET NUMBER

DIRECTIONAL

ILLUMINATION

PROPOSED WIDTH

CODE REQ. WIDTH

101

STOKES

ARCHITECTURE

1A2

L01

PARTITION TAG

DOOR TAG

WINDOW TAG

LIGHT FIXTURE TAG

FINISH TAG

1HR FIRE RATED PARTITION

2HR FIRE RATED PARTITION

3HR FIRE RATED PARTITION

1HR FIRE RATED

SHAFT ASSEMBLY+

2HR FIRE RATED

SHAFT ASSEMBLY

3HR FIRE RATED

SHAFT ASSEMBLY

ACCESSIBLE PATH

OF EGRESS

FEPATH OF EGRESS

ROOM TAG

W1

F-01 FIXTURE TAG

101-01

W-2

FIRE RATING

ASSEMBLY SUBTYPE

ASSEMBLY TYPE

DOOR NUMBER

ROOM NUMBER

ROOM NAME

ROOM NUMBER

PORTABLE FIRE

EXTINGUISHER

► ► ►

SHOPPES AT BELMONT 1569 FRUITVILLE PIKE

LANCASTER, PA 17601

2103 SANSOM STREET

PHILADELPHIA, PA 19103

PH: 215.523.9190

p. j. WHELIHAN'S- LANCASTER

11.07.2017

SYMBOLS KEY PROJECT RENDERING (S) DRAWING LIST

GENERAL NOTES LOCATION PLAN ENLARGED LOCATION PLAN

ABBREVIATIONS

OPERATOR

PJW RESTAURANT GROUP

520 HADDON AVE

HADDONFIELD, NJ 08033

PH: 856.216.0856

FX: 856.216.8447

STRUCTURAL ENGINEERS

ANH STRUCTURES, LLC

216 COPPELS LANE

WALLINGFORD, PA 19086

PH: 610.812.5465

MEP ENGINEERS

FXB ENGINEERING

5 CHRISTY DRIVE, SUITE 307

CHADDS FORD, PA 19317

PH: 610.558.3464

KITCHEN DESIGNER

SINGER EQUIPMENT

180 HELLER PLACE

BELLMAWR, NJ 08031

PH: 800.443.2212

PROPERTY OWNER

R.J. WATERS & ASSOCIATES INC.

200 OLD FORGE LANE SUITE 201

KENNETT SQUARE, PA 19348

PH: 610.388.6600

FX: 610.388.6605

PERMIT SET

N N

1. ALL WORK AND MATERIALS SHALL MEET THE REQUIREMENTS OF LOCAL AND STATE CODES AND THE SPEC'S OF THE NATIONAL BOARD OF FIRE UNDERWRITERS. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE TOWNSHIP AND/OR APPROPRIATE AUTHORITY

HAVING JURISDICTION OVER CONSTRUCTION WHERE THE PROJECT IS LOCATED. CONTRACTOR SHALL CHECK AND VERIFY ALL PLAN DIMENSIONS AND CONDITIONS BEFORE PROCEEDING WITH CONSTRUCTION AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT FOR CORRECTION

PRIOR TO BEGINNING ANY WORK. DO NOT SCALE DRAWINGS. ALL WRITTEN DIMENSIONS GOVERN.

2. THE GENERAL CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR, WHETHER IMPLIED BY, OR DIRECTLY STATED ON THESES DRAWINGS, IN ORDER TO COMPLETE THE WORK AS INDICATED HEREIN.

3. THE ARCHITECT IS NOT RESPONSIBLE FOR ANY DEVIATIONS FROM THE PLANS AND SPECIFICATION INFORMATION.

4. THE ARCHITECT SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES, FOR SAFETY PRE-CAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, OR THE ACTS OR OMISSIONS

OF THE CONTRACTOR, SUBCONTRACTORS, OR ANY OTHER PERSONS PERFORMING ANY WORK, OR FOR FAILURE OF ANY OF THEM TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS.

5. ANY WORK SHOWN OR REFERRED TO ON ANY PORTION OF THE DOCUMENTS SHALL BE PROVIDED AS THOUGH SHOWN ON ALL DOCUMENTS, WHERE DISCREPANCIES OCCUR IN THE DOCUMENTS, GC SHALL OBTAIN CLARIFICATION IN WRITING PRIOR TO SUBMITTING HIS BID. OTHERWISE, IT WILL

BE ASSUMED THE HIGHER COST ITEM WAS BID ON. IN ORDER TO ENSURE COORDINATION, PARTIAL SETS OF DRAWINGS SHALL NOT BE ISSUED TO ANY CONTRACTOR, SUB-CONTRACTOR, OR VENDOR. ONLY COMPLETE SETS OF DOCUMENTS ARE TO BE ISSUED.

6. THE FOLLOWING SET OF DRAWINGS IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND SHALL REMAIN THE PROPERTY OF STOKES ARCHITECTURE, WHETHER THE PROJECT IS EXECUTED OR NOT. NO CHANGES, ALTERATIONS, OR DELETIONS MAY BE MAKE HERETO EXCEPT BY THE

ARCHITECT.

7. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR AT THE SITE.

8. HOLD INDICATED DIMENSIONS. DO NOT SCALE DRAWINGS. RESOLVE ANY DISCREPANCIES BEFORE BEGINNING WORK.

9. ALL EXISTING CONSTRUCTION AND LANDSCAPE FEATURES THAT ARE TO REMAIN AS PART OF THE PROJECT SHALL BE PROTECTED FROM DAMAGE THROUGHOUT THE PERIOD OF CONSTRUCTION WORK. ANY DAMAGED CONSTRUCTION OR FEATURES SHALL BE REPLACED AT THE EXPENSE OF

THE CONTRACTOR TO THE SATISFACTION

10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND ALL SUBCONTRACTORS TO VERIFY ALL DIMENSIONS AND INSPECT CONDITIONS OF PRIOR WORK OF OTHER TRADES BEFORE PROCEEDING WITH ANY WORK. UNACCEPTABLE OR INCORRECT PRIOR WORK SHALL BE REPAIRED OR

REPLACED BEFORE STARTING WORK. PROCEEDING WITH THE WORK SHALL CONSTITUTE ACCEPTANCE OF PRIOR WORK.

11. REFER TO SPECIFICATION AND/OR SCHEDULES.

12. ALL CONTRACTORS SHALL VISIT THE SITE AND THOROUGHLY ACQUAINT THEMSELVES WITH THE CONDITIONS IN THE FIELD AND THE NATURE AND THE EXTENT OF THE WORK TO BE PERFORMED.

13. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS IN CONNECTION WITH THE WORK. THE CONTRACTOR SHALL GIVE NOTICES AND COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, RULES, REGULATIONS AND

ORDERS OF ANY PUBLIC AUTHORITY BEARING ON THE SAFETY OF PERSONS AND PROPERTY, AND THEIR PROTECTION FROM DAMAGE, INJURY AND LOSS. THE CONTRACTOR SHALL INSURE THAT THE JOB SITE IS MAINTAINED AT ALL TIMES IN SUCH A WAY AS TO PREVENT INJURY OR DAMAGE TO

ALL PERSONS WORKING ON OR VISITING THE PREMISES AND TO PERSONAL PROPERTY.

14. THE CONTRACTOR REPRESENTS THAT HE HAS THOROUGHLY REVIEWED THE DRAWINGS, SPECIFICATIONS AND CONTRACT DOCUMENTS AND THAT THEY ARE SUITABLE FOR SUBMITTING A VALID BID. CONTRACTOR SHALL SUBMIT A WRITTEN DESCRIPTION OF ALL DEFICIENCIES AND

AMBIGUITIES IN THE CONTRACT DOCUMENTS TO THE OWNER WITHIN 30 DAYS OF SIGNING THE CONTRACT. CHANGE ORDERS FOR DESIGN DEFICIENCIES OR AMBIGUITIES NOT INCLUDED IN CONTRACTORS DESCRIPTION WILL NOT BE AUTHORIZED.

PERMIT CONSTRUCTION REV 1

COVER SHEET

CS COVERSHEET • •

LS101 CODE REVIEW & LIFE SAFETY PLAN • •

CS101 ACCESSIBLE DETAILS • •

PLANS AND RCP'S

A101

GROUND & BASEMENT FLOOR

PLANS

• •

A102

GROUND & BASEMENT REFLECTED

CEILING PLANS

• •

A103 GROUND LIGHTING PLANS • •

A104

GROUND & BASEMENT FINISH

PLANS

A105 FURNITURE & EQUIPMENT PLANS •

ENLARGED (PLAN AND SECTION) DETAILS

A501 RESTROOM PLANS & ELEVATIONS • •

A502 BAR PLANS & ELEVATIONS •

A503 BAR SECTIONS & DETAILS •

A504 BAR DETAILS •

SPECS, SCHEDULES, DIAGRAMS

A601 PARTITION & CEILING SCHEDULE • •

A602 FINISH SCHEDULE • •

A603 DOOR & WINDOW SCHEDULE • •

INTERIOR ELEVATIONS

A701 INTERIOR ELEVATIONS •

A702 INTERIOR ELEVATIONS •

A703 INTERIOR ELEVATIONS •

INTERIOR DETAILS

A801 INTERIOR WALL SECTIONS •

A802 BOOTH DETAILS •

A803 MILLWORK ELEVATIONS & DETAILS •

A804 MILLWORK & VESTIBULE DETAILS •

MECHANICAL

M1.0 SYMBOLS & NOTES •

MD1.0 MECHANICAL DEMOLITION PLAN •

M2.0

MECHANICAL FLOOR PLAN - NEW

WORK

M2.1

MECHANICAL FLOOR PLAN - NEW

WORK

M3.0 MECHANICAL SCHEDULES •

M4.0 MECHANICAL DETAILS •

M5.0 MECHANICAL SPECIFICATIONS •

M6.0 KITCHEN EQUIPMENT PLANS •

M6.1 KITCHEN EQUIPMENT PLANS •

M6.2 KITCHEN EQUIPMENT PLANS •

M6.3 KITCHEN EQUIPMENT PLANS •

M6.4 KITCHEN EQUIPMENT PLANS •

M6.5 KITCHEN EQUIPMENT PLANS •

PERMIT CONSTRUCTION

PLUMBING

P1.0 PLUMBING SYMBOLS & NOTES •

PD1.0

PLUMBING FLOOR PLANS -

DEMOLITION

P2.0

PLUMBING SANITARY FLOOR PLAN

- NEW WORK

P2.1

PLUMBING DOMESTIC WATER &

NATURAL GAS FLOOR PLAN- NEW

WORK

P2.2

PLUMBING ROOF PLAN - NEW

WORK

P3.0 PLUMBING SCHEDULES •

P4.0 PLUMBING DETAILS •

P5.0 PLUMBING SPECIFICATIONS •

ELECTRICAL

E1.0 ELECTRICAL SYMBOLS & DETAILS •

E1.1

ELECTRICAL NOTES &

ABBREVIATIONS

E2.0

ELECTRICAL 1ST FLOOR PLAN -

LIGHTING

E3.0

ELECTRICAL 1ST FLOOR PLAN -

POWER

E3.1 ELECTRICAL ENLARGED PLANS •

E3.2

ELECTRICAL 1ST FLOOR PLAN -

HVAC POWER

E3.3 ELECTRICAL ROOF PLAN - POWER •

E4.0 ELECTRICAL ONE-LINE DIAGRAM •

E4.1 ELECTRICAL PANEL SCHEDULES •

E4.2 KITCHEN EQUIPMENT SCHEDULE •

E4.3 KITCHEN EQUIPMENT SCHEDULE •

E5.0 ELECTRICAL DETAILS •

E5.1

ELECTRICAL DETAILS - CAPTIVE

AIRE

E5.2

ELECTRICAL DETAILS - CAPTIVE

AIRE

E5.3

ELECTRICAL DETAILS - CAPTIVE

AIRE

E5.4

ELECTRICAL DETAILS - CAPTIVE

AIRE

E6.0 ELECTRICAL SPECIFICATIONS •

FIRE PROTECTION

FA1.0

FIRE ALARMS SYMBOLS, NOTES &

DETAILS

FA2.0 1ST FLOOR FIRE ALARM PLAN •

FP1.0

FIRE PROTECTION SYMBOLS &

NOTES

FP2.0 FIRE PROTECTION FLOOR PLAN •

ABV

AP

ACS

ACT

AD

ADD

ADDL

ADH

ADJ

ADJT

AFF

AGG

AC

ALT

ALUM

AB

ANOD

APPROX

ARCH

ASPH

AUTO

AVG

BBD

BP

BSMT

BM

BEL

BMK

BET

BYD

BIT

BLK

BLKG

BLS

BD

BS

BOT

BOC

BOF

BOS

BOW

BRCG

BRKT

BRK

BC

BRZ

BLDG

CAB

CPT

CB

CK

CLG

CEM

CTR

CL

CT

CHBD

CHAM

C

CO

CLR

CLO

CW

COL

COMB

COMP

COMPR

CONC

CMU

COND

CNDT

CONN

CONST

CONT

CONTR

CJT

COORD

CPR

CORR

CNTR

CFL

CS

CRS

CVR

CFT

CYD

CUS

DPR

DMPF

DL

DEMO

DEPT

DEPR

DET

DTL

DIA

DIFF

DIM

DISP

DIV

DR

DBL

DWL

DN

DS

D

DWR

DWG

EA

E

ELAS

ELEC

EP

EWC

ELEV

EL

EMER

ENC

ENT

EPX

EQ

EQP

EST

EXC

EXH

EXG

ED

EPS

EB

EJT

EXP JT

EXP

EXT

EXTR

FAB

FB

FO

FOB

FOC

FOM

FOS

FOW

FCU

FDV

FND

FNV

FBD

FGL

FIN

FFL

FFE

FGD

FF

FA

FEC

FRC

FRT

FPF

FXD

FLG

FLX

FLR

FD

FLUOR

FT

FTG

FDN

FR

FS

FBO

FOIC

FURN

FUR

FUT

GA

GAL

GALV

GSM

GSTL

GL

GFRG

GLZ

GBR

GD

GRN

GND

GWP

GT

GWB

HNRL

HDW

HDWD

HDR

HTR

HTG

HVAC

HT

HEX

HP

HM

HMDRF

HK

HORIZ

HW

HWH

HR

HYD

IN

INCL

ID

INSUL

INT

INV

JAN

JT

JTF

KPL

LBL

LAD

LAM

LAV

LCCPR

L

LH

LNG

LT

LTG

LW

LMS

LIN

LTL

LL

LKG

LVR

LP

MACH

MH

MFR

MRB

MAS

MO

MARL

MAX

MECH

MED

MEMB

MTL

MM

MWK

MIN

MIR

MISC

MOD

MLDG

MR

MRT

MT

MOV

MUL

NAT

NEO

NOM

N

NIC

NTS

NUM

OC

OPQ

OPNG

OPP

OPPF

OPPH

OPPS

OZ

O TO O

OD

OVHD

OA

P

PNT

PR

PNL

PTD

PTR

PARA

PAR

PBD

PTN

PVMT

PERF

PERI

PERP

PLAS

PLAM

PL

PNT

PLYWD

PWD

PSF

PSI

PIP

PFB

PFN

PFM

PMF

PRT

PROJ

QT

QTR

RAD

REC

RECT

REF

RP

RFL

REFR

REG

REINF

RLF

RMV

REQ

RES

RTN

RA

REV

RH

R

RD

RFG

RM

RO

RND

RBR

SFGL

SCHD

SCN

SNT

SEC

SSK

SB

SHTH

SHT

SHL

SHRG

SIM

SLV

SP

S

SPK

SPL

SPEC

SFP

SQ

SF

STAG

SST

STD

STL

STOR

STRUCT

SUR

SUSP

SW

SYM

SYN

SYS

TKBD

TEL

TEMP

TC

THER

THRSHLD

THK

TLT

T&G

TO

TOC

TOF

TOS

TOW

TD

TRANS

TR

TYP

UCT

UL

UNF

UON

URTH

U/S

UTIL

VB

VNR

VENT

VIF

VERT

VCB

VCT

VSB

VOL

WSCT

WC

WR

WS

WPF

WT

WWF

W

WF

WDW

WM

W/

W/O

above

access panel

acoustical

acoustical ceiling tile

area drain

addendum

additional

adhesive

adjacent

adjustable

above floor finish

aggregate

air conditioning

alternate

aluminum

anchor bolt

anodized

approximate

architect, -ural

asphalt

automatic

average

base board

base plate

basement

beam

below

bench mark

between

beyond

bituminous

block

blocking

bluestone

board

both sides

bottom

bottom of concrete

bottom of footing

bottom of steel

bottom of wall

bracing

bracket

brick

brick course

bronze

building

cabinet

carpet

catch basin

caulk

ceiling

cement

center

center line

ceramic tile

chalkboard

chamfer

channel

clean out

clear, clearance

closet

cold water

column

combination

computer

compress, -ed, -ion, -ible

concrete

concrete masonry unit

condition, -al

conduit

connect, -or, -ion

construction

continuous

contract, -or

control joint

coordinate

copper

corrugated

counter

counterflashing

countersunk

course, -s

cover

cubic foot

cubic yard

custom

damper

dampproofing

dead load

demolish, demolition

department

depress, -ed

detail

detail

diameter

diffuse

dimension

dispenser

division

door

double

dowel

down

down spout

drain

drawer

drawing

each

east

elastomeric

electric, -al

electrical panel

electrical water cooler

elevation

elevator

emergency

enclosure

entrance

epoxy

equal

equipment

estimate

excavator, excavation

exhaust

existing, existent

existing dimension

expanded polystyrene

expansion bolt

expansion joint

expansion joint

expose, -d

exterior

extrusion

fabricate, fabricator

face brick

face of

face of building

face of concrete

face of masonry

face of stud

face of wall

fan coil unit

fire department valve

feminine napkin disposal

feminine napkin vendor

fiberboard

fiberglass

finish

finish floor

finish floor elevation

finish grade

finished face

fire alarm

fire extinguisher cabinet

fire-resistant coating

fire-retardant

fireproof, -ing

fixed

flashing

flexible

floor

floor drain

fluorescent

foot, feet

footing

foundation

frame, -d, -ing

full size

furnish by others

furnished by owner,

installed by contractor

furnish, -ed

furred, -ing

future

gauge

gallon

galvanize, -d

galvanized sheet metal

galvanized steel

glass

glass fiber reinforced gypsum

glaze, -d, -ing

grab bar

grade, -ing

granite

ground

grounded waterproof outlet

grout

grypsum wall board

handrail

hardware

hardwood

header

heater

heating

heating, ventilating, & air

conditioning

height

hexagonal

high point

hollow metal

hollow metal door frame

hook

horizontal

hot water

hot water heater

hour

hydrant

inch

include, -d,- ing

inside diameter

insulate, -d, -ing

interior

invert

janitor

joint

joint filler

kick plate

label

ladder

laminate, -d

lavatory

lead coated copper

left

left hand

length, long

light

lighting

lightweight

limestone

linoleum

lintel

live load

looking

louver

low point

machine

manhole

manufacturer

marble

masonry

masonry opening

material

maximum

mechanical

medium

membrane

metal, -ic

millimeter

millwork

minimum

mirror

miscellaneous

modular

molding

mop receptacle

mortar

mount, -ed

movable

mullion

natural

neoprene

nominal

north

not in contract

not to scale

number

on center

opaque

opening

opposite

opposite face

opposite hand

opposite side

ounce

out to out

outside diameter

overhead

overall

page

paint, -ed

pair

panel

paper towel dispenser

paper towel receptacle

paragraph

parallel

particle board

partition

pavement

perforate, -d

perimeter

perpendicular

plaster

plastic laminate

plate

paint, -ed

plywood

plywood

pounds per square foot

pounds per square inch

poured in place

prefabricated

prefinished

preformed

premolded filler

pressure treated

project

quarry tile

quarter

radius

recessed

rectangular

reference

reference point

reflect, -ed

refrigerator

reglet

reinforcing, -ment

relief

remove, -able

require, -d

resilient

return

return air

revise, -d, -ion

right hand

riser

roof drain

roofing

room

rough opening

round

rubber

safety glass

schedule

screen

sealant

section

service sink

setting bed

sheathing

sheet

shelf, shelving

shoring

similar

sleeve

soundproof, -ing

south

speaker

special

specification, -s

spray fireproofing

square

square foot

staggered

stainless steel

standard

steel

storage

structure, -al

surface

suspended

switch

symmetrical

synthetic

system

tackboard

telephone

temperatire

terra cotta tile

thermostat

threshold

thick, -ness

toilet

tongue and groove

top of

top of concrete

top of footing

top of steel

top of wall

towel dispenser

transparent

tread

typical

undercut

underwriter's laboratory

unfinished

unless otherwise noted

urethane

underside

utility

vapor barrier

veneer

ventilating

verify in field

vertical

vinyl cove base

vinyl composite tile

vinyl straight base

volume

wainscot

water closet

water repellent

water stop

waterproof, -ing

weight

welded wire fabric

west

wide flange

window

wire mesh

with

without

Top Related