HIGHWAY NETWORK DEVELOPMENT PLAN (HNDP)
JKR SABAH ROAD DAY 22 23 Oktober 2013
MINISTRY OF WORKS
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
3 HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
4 HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
To provide / improve mobility, connectivity, accessibility through a
systematic approach
Stimulate nations
economic growth in various sectors such as
industry, tourism, agriculture
Inter-Urban / Inter State
Highway Network Development Plan (HNDP)
5 HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
Planning By
State JKR/UPEN/JPBD/Corridor Authorities /
Local Authorities
Input From States / Agencies
NATIONAL / REGIONAL PLANNING
6 HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
HNDP BACKGROUND
NO YEAR STUDY STUDY AREA AGENCIES CONSULTANTS TIME
HORIZON
(UP TO)
1 1991-
1993
1ST HNDP
STUDY
COST :RM 0.8m
WEST &
EAST OF
MALAYSIA
JICA (Japan),
HPU MoW,
EPU Prime
Minister
Department
Fukuyama
Consultants
International,
Ranhill Berhad,
Perunding Atur
2010
2 2003-
2007
HNDP Review
Study Phase 1
COST :RM 3.0m
PENINSULAR
MALAYSIA
HPU MoW,
EPU, JKR,
UPEN
Maju Integrated
Engineers
Consultant,
Perunding Atur
2020
3 2008-2010
HNDP Review
Study Phase 2
COST:RM3.5m
SABAH,
SARAWAK &
LABUAN
HPU MoW,
EPU, JKR,
UPEN
Jurutera
Perunding
Mustapa Dan
Rakan-Rakan,
Perunding Atur
2025
7
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
8
ESTABLISHED INTERNATIONAL
AND LOCAL CONSULTANTS
WITH HIGH REPUTATION
HIGH QUALITY MANAGEMENT
EXPERTISE WITH VAST EXPERIENCE
IN ROAD &
TRANSPORTATION PLANNING
INVOLVED IN HIGH
PROFILE PROJECTS
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
http://images.google.com.my/imgres?imgurl=http://www.ukm-center.org/new/tfiles/image/Logo JICA 09.png&imgrefurl=http://www.ukm-center.org/new/page.php?lang=id&menu=news_list&category_id=11&hal=2&usg=__SSrj6S0IuHdU6gaEB7-JfnpY6L8=&h=243&w=309&sz=36&hl=en&start=6&itbs=1&tbnid=6eXMkC0aOL8x0M:&tbnh=92&tbnw=117&prev=/images?q=JICA+LOGO&hl=en&gbv=2&tbs=isch:1http://images.google.com.my/imgres?imgurl=http://www.ranhill-watertech.com/RANHILL-FINAL-LOGO1.jpg&imgrefurl=http://www.ranhill-watertech.com/home.htm&usg=__XK7tevUQGjkdjVskIaDoKvdDce8=&h=191&w=150&sz=8&hl=en&start=3&um=1&itbs=1&tbnid=s_7ROcaQDwuqXM:&tbnh=103&tbnw=81&prev=/images?q=ranhill&um=1&hl=en&rlz=1R2GPEA_en&tbs=isch:1
9 HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
To formulate a Highway Network Master Plan to serve the economy as articulated in the national planning policies.
To prioritise new and improved linkages in the Master Plan based on technical and economic considerations and recommend road development programs.
10
SOCIO ECONOMY - Gross Domestic Product
(GDP), Population
LANDUSE
Rancangan Fizikal Negara (RFN), Corridor
Development Plan
TRAFFIC & TRANSPORTATION
- Traffic Demand, Origin-Destination (OD), Modal Split
ENVIRONMENTAL
Sensitive Area, Wildlife Crossing
SOCIAL IMPACT
- Socially Sensitive Area, Pedestrian
Facilities
COST
- Optimization
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
11 HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
PRIORITISATION OF PROJECTS IN HNDP
Aspiration Of
National
Development, North
- South & East -
West Movement
SCORE, SDC
(Considered in
HNDP Review
Phase 2)
IRR, NPV, Benefit
Cost Ratio
12 HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
13 HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
14 HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
15 HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
16
STRATEGY NO. 5
To Enhance Pan Borneo Network
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
STRATEGY NO. 7
To Provide Accessibility To Interior Development (According
To SCORE)
STRATEGY NO. 6
To Provide Accessibility To Interior Development (According To SDC)
17
Blue Print of Highway Planning in Malaysia was
briefed at Majlis Tindakan Negara Meeting No 1/2010 on 4th March 2010 under Item 4(a)
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
18
HNDP
FOCUSSING
SABAH
19
ROAD STATISTIC SABAH
ROAD CATEGORIES
FEDERAL ROAD
1,501.84km
STATE ROAD 20,893.07km
TOTAL
22,394.91 km
Pan Borneo :
Blue Line+ (Tawau-Merotai-
Kalabakan-Sapulut-Nabawan-
Keningau-Kimanis)
Perception about Pan Borneo Highway
New Road 4/6 lanes
dual carriageway as
per Highways in West
Malaysia (PLUS, LPT
& others)
Ugrading Existing
Federal Road to 4
lanes dual
carriageway in
phases
Public Ministry
of Works
Interpretation
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
Road Development Plan
21
Upgrading Pan Borneo Road Network
Upgrading Accessibility to Interior Region
supporting Sabah Development Corridor (SDC) )
Upgrading Accessibility to Interior Region
supporting Sarawak Corridor Renewable Energy
(SCORE)
HNDPs Strategies
HNDPs Road Characteristics
Effective, High Economical Return (value for money)
Safe and Comfort
High Impact to Community
Provide Accessibilty to People
Generate and Enhance Economics Activities
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
PROJECTS LIST BASED ON HNDP (SABAH)
Bil. Nama Projek Panjang (km)
Kos
(RM juta)
1. Membina Jalan Kimanis Kuala Penyu
30 166.500
2. Menaiktaraf Jalan Tun Fuad, Kota Kinabalu Termasuk Empat Persimpangan Bertingkat
10 200.00
3. Menaiktaraf Jalan Lintas, Kota Kinabalu Termasuk Empat Persimpangan Bertingkat
15 260.00
4. Menaiktaraf Jalan Sulaman/UMS, Kota Kinabalu Termasuk 3 Persimpangan Bertingkat
15 240.00
5. Menaiktaraf Dongongan Papar Spur, Kota Kinabalu
40 480.00
6. Menaiktaraf Papar Spur - Beaufort, Kota Kinabalu
55 430.750
7. Membina Jala Kota Kinabalu Outer Ring Road
50 650.00
8. Membina Jalan Coastal Tuaran Kota Belud Sikuati
100 658.00
9. Menaiktaraf Jalan Tamparuli Ranau
75 807.500
Bil. Nama Projek Panjang (km)
Kos
(RM juta)
10. Menaiktaraf Jalan Ranau Telupid 100 1,140.00
11. Menaiktaraf Jalan Telupid Batu 32, Sandakan
100 1,090.00
12. Membina Jalan Libaran Bypass, Sandakan
40 523.00
13. Membina Jalan Pintas, Sandakan 8 156.00
14. Menaiktaraf Jalan Batu 32, Sandakan Bukit Garam
30 314.500
15. Menaiktaraf Jalan Bukit Garam Lahad Datu
110 873.50
16. Menaiktaraf Jalan Kunak Tawau 95 1,031.750
17. Menaiktaraf Jalan Lahad Datu - Kunak
75 676.750
18. Membina Jalan Pintas Tawau 14 215.000
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
Bil. Nama Projek Panjang (km)
Kos
(RM juta)
19. Membina Jalan Tawau Coastal Highway ( Dari Tawau Ke Jalan Apas Parit), Tawau
35 280.00
20. Membina Jalan Tamparuli Kiulu Randagong
80 540.00
21. Membina Jalan Pintas Ranau 15 117.00
22. Membina Jalan Kalabakan Serudong
50 377.00
23. Membina Jalan Kunak Tingkayu Merotai
70 388.00
24. Membina Jalan Tongod Pinangah
30 191.50
25. Membina Jalan Sapulut Pagalungan
30 234.00
26. Menaiktaraf Jalan Kuala Penyu Menumbok
80 643.00
27. Menaiktaraf Jalan Beaufort Sindumin
65 520.00
Bil. Nama Projek Panjang (km)
Kos
(RM juta)
28. Membina Jalan Pinangah Sapulut
80 491.00
29. Membina Jalan Pagalungan Semendapi
20 180.500
30. Membina Jalan Sapulut Kemabong
100 719.500
31. Menaiktaraf Jalan Kalabakan Sapulut
90 450.00
32. Membina Jalan Sindumin Maligan Long Pasia
110 848.00
33. Membina Jalan Melinsau Lingkabau
80 487.00
34. Membina Jalan Tulid Kaingaran 60 462.00
35. Membina Jalan Tongod Sinuab Kaingaran Tambunan
120 858.500
36. Membina Jalan Sukau Tomanggong Tambisan
84 606.500
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
PROJECTS LIST BASED ON HNDP (SABAH)
Category
RMKe-10 RMKe-11
Total
(RM mil) Projects no
Length
(km)
RM
(mil)
Projects
no
Length
(km)
RM
(mil)
Upgrading 13 800 8,187.75 2 155 970.00 9,157.75
New Road 13 552 4,496.00 8 654 4,653.00 9,149.00
Total 1,352 12,683.75 809 5,623.00 18,306.75
HNDP By Rancangan Malaysia Lima Tahun (Sabah)
Category
RMK-10 RMK-11
Total
(RM mil) Projects Length (km)
RM
(mil)
Projects Length
(km)
RM
(mil)
Upgrading 12 720 7,544.75 1 65 520.00 8,064.75
HNDP Involving Pan Borneo Sabah
HNDP UPGRADING OF INTERSECTIONS (SABAH)
Jalan Kuhara, Tawau
Bulatan, Lahad Datu
Bulatan Sandakan
Simpang 4, wawasan, KK
Simpang 4, Lido, KK
Airport, KK
Bulatan, Beaufort
Bulatan Masjid Likas KK
Simpang 4 Kuburan Cina
Bulatan Dogongan KK
Simpang Lok Kawi
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
SUMMARY HNDP PROPOSALS (SABAH)
HNDP Proposal Sabah
New Road Projects No 21
Length (km) 1,206
Cost (RM mil)
9,149
Ugrading Projects No 15
Length (km) 955
Cost (RM mil)
9,158
Total Projects No 36
Length (km)
2,161
Cost (RM mil)
18,307
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
Implementation of Projects (Pan Borneo Road Sabah)
3 approaches :
HNDP in phases within 14 years (2011-2025)
Aku Janji Kerajaan within 5 years (2014-2018)
Privatization UKAS (PFI, PDP or others )
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
Perancangan Jangka Panjang Highway Network Development Plan Phase 2 (HNDP 2)
Perancangan pembangunan Jalan Raya Pan Borneo berasaskan cadangan Highway Network Development Plan Phase 2 (HNDP 2) telah disediakan pada tahun 2010.
Dalam pelan induk tersebut, Jalan Raya Pan Borneo sepanjang 2,239 km ini dinaiktaraf ke tahap dual carriageway secara berperingkat-peringkat mulai tahun 2011 sehingga 2025, iaitu dalam tempoh 14 tahun.
Anggaran kos terkini untuk menaiktaraf keseluruhan Jalan Raya Pan Borneo adalah sebanyak RM22.0 bilion (RM12.5 bilion di Sarawak dan RM9.5 bilion di Sabah).
Memandangkan kos untuk menaiktaraf Jalan Raya Pan Borneo ke tahap dual carriageway sangat tinggi, maka Kerajaan mencadangkan supaya kerja-kerja naiktaraf ini dibuat secara berperingkat, teratur dan terancang dengan mengambilkira keperluan trafik semasa dan keupayaan kewangan Kerajaan.
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
Source BPP KKR
Perancangan Jalan Raya Pan Borneo Secara Penswastaan Di Sabah
Terdapat cadangan daripada pihak swasta, UEM & MMC
secara usahasama (Project Delivery Partner) melalui
UKAS, JPM untuk membina Jalan Raya Pan Borneo di
Sabah (2014-2041)
Melibatkan 3 fasa pembinaan:
i) Naiktaraf Rangkaian Jalanraya ( Penyediaan lorong mendaki dan lorong memotong)
ii) Pelebaran jalanraya (apabila mencapai kapasiti maksimum) ketahap Dual-Carriageway
iii) Lebuhraya baru (apabila jalanraya yang dilebarkan mencapai kapasiti maksimum) dengan tol
Melibatkan anggaran kos sebanyak RM 41.7 bilion bagi
Sabah sahaja
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA
Source BPP KKR
31
HIGHWAY NETWORK DEVELOPMENT PLAN (HNDP)
SABAH
HIGHWAY PLANNING DIVISION
MINISTRY OF WORKS, MALAYSIA