Patrick BossertAssociate Partner
EY
Mark BewChairman
PCSG
Intelligent use of Asset Information for a Healthier Economy
| www.pcsg.co.uk
Introduction
1. Introduction2. The macro economic challenge3. What have we done so far?4. What do we plan to do next?5. What does a digital twin look like?6. Summary
| www.pcsg.co.uk
£1,869bn
The UK has a productivity challenge that constrains our economic output (GDP) and living standards
65
100
85
1970
2015
1980
1990
2000
2010
20% gap
Economic output per hour worked (US=100)
Economic Output(GDP)
Source: Building Our Industrial Strategy Green Paper
UK Constructionproductivity
| www.pcsg.co.uk
Constraints in Britain’s built environment infrastructure are acting as a brake on economic growth
Traffic congestion costs the UK
economy £31bn in 2016
Disruption from flooding costs
the UK economy £1bn pa
Train delays in the UK cost
the economy over £1bn
annually
Delayed and cancelled
infrastructure spending in 2015/16
cost the UK economy £6bn
Re-work costs up to
20% of total
construction value
Homes and offices consume up
to 4x more energy usage than
designed
It costs the NHS £600m pa
to treat illnesses caused by
living in poor housing
conditions in England
Transport and Energy supply contribute
to more than 50% to UK’s total
greenhouse gas emissions
| www.pcsg.co.uk
UK GDP
£1,869bn
Where is the Value?
CapEx
£89bn
£597bn£122bn
OpEx Service Provision
£808bn
Sources: ONS, gov.uk, Gazprom, Facilities Management Journal, Arcadis
} 43%
1. Build assets better
2. Build the right assets
| www.pcsg.co.uk
Flow of
information
Flow of
information
}
Information feed-forward and feed-back loops…DATA
…to enable even greater investment
| www.pcsg.co.uk
Systems Engineering “V”
StrategicObjectovesRegulation/Standards
PHEScienceHubUserRequirements
OperationalDesign
HighLevelDesign
DetailDesignUnitTest/Factory
AcceptanceTest(FAT)
SystemIntegrationTest(SIT)
PHEUserAcceptanceTest(ORAT)
ConformityTesting
ScienceHubOperational
PerformanceKPIs
SystemAcceptanceTest(SAT)
UnitTest Design
SystemIntegrationTestDesign
UserAcceptanceTestDesign
SystemAcceptanceTestDesign
ExtendedAftercareSL5
InitialAftercareSL4
Pre-HandoverSL3
Design/Devt ReviewSL2
Inception/BriefSL1
RIBA1
RIBA2/3
RIBA4
RIBA5
RIBA7
RIBA6
SLx Softlandingphase
RIBAx RIBAplanofworkstage
RIBA0
ScienceHubConstruction
EquipmentProduction
UnitTest/FactoryAcceptanceTest(FAT)
SystemIntegrationTest(SIT)
PHEUserAcceptanceTest(ORAT)
ScienceHubOperational
PerformanceKPIs
SystemAcceptanceTest(SAT)
ExtendedAftercareSL5
InitialAftercareSL4
Pre-HandoverSL3
ConformityTesting
| www.pcsg.co.uk
Building Information Modelling – Digital Twins
| www.pcsg.co.uk
Level 2 BIM “Package”
• PAS1192:2 Capital Delivery
• PAS1192:3 Operational Delivery
• BS1192:4 Data Structure
• Data Classification
• Digital Plan of Works (Levels of Data Detail)
• PAS1192:5 Security
• BIM Contract Protocol
• Government Soft Landings
| www.pcsg.co.uk
Key Components - Interfaces
DATA PROCUREMENT
DATA
MANAGEMENT
DATA USE
| www.pcsg.co.uk
Departmental Engagement
· Departmental Strategies
· Early Adopters
· Sustained Embedded
Change
· Implementation Plan
· EIR
· Tender Documents
· Scoring Process
· Framework Training
· Framework Support
Case Study - MoJ
| www.pcsg.co.uk
Level 2 Achievements
| www.pcsg.co.uk
The DBB Programme supports the UK’s Industrial Strategy with information tools, skills and services to support communities and places
| www.pcsg.co.uk
We need a better understanding of how these systems fit together in order to enable integrated strategic financial investment planning
| www.pcsg.co.uk
Level 2 City “Package”
• PAS 180 - Vocabulary
• PAS 181 – SC Concept Model – Guide to establishing a model for data interoperability
• PAS 182 - Smart city concept model
• PAS 183 – Guide to establishing a decision framework for sharing data and information services
• PAS 184 - (Smart Cities – Guide to developing project proposals for delivering smart city solutions)
• PAS 185 – SC – Security Mindedness
• PD 8100 – SC Overview – Guide
• PD 8101 – SC Guide to the role of the Planning & Development Process
| www.pcsg.co.uk
Data Quality
• ISO 8000ue & Trust
• BS1192/4• Correctness
• Completeness
• Continuity
| www.pcsg.co.uk
Top Down- Bottom Up
| www.pcsg.co.uk
Monitoring Structures From Satellites
• Marys Abchurch Building (Bank)
• Waterloo Bridge
• Hammersmith Flyover
• Berlin Central Station
| www.pcsg.co.uk
Sensor 3874985 Sensor 3874945
Sensor 3874923
Monitoring Structures From Satellites
| www.pcsg.co.uk
| www.pcsg.co.uk
Data – Quality & Understanding
| www.pcsg.co.uk
Existing Assets
| www.pcsg.co.uk
Engineering Training & Feasibility
| www.pcsg.co.uk
Engineering Training & Safety
| www.pcsg.co.uk
Engineering Training & Safety
| www.pcsg.co.uk
Summary
Patrick BossertAssociate Partner
EY
Mark BewChairman
PCSG
Intelligent use of Asset Information for a Healthier Economy