CURRICULUM VITAE.

NAME; PIUS,

SURNAME; OKUKPE,

NATIONALITY; NIGERIAN,

STATE OF ORIGIN; DELTA

SEX; MALE

DATE OF BIRTH; 1st JANUARY 1966

MARITAL STATUS; MARRIED

RELIGION; CHRISTIAN

OCCUPATION; PIPE FITTER GENERAL FOREMAN

HOME ADDRESS; 20 OGBE STREET OFF IGBIAYE ST.

MARINE QUARTER WARRI

PHONE NUMBER; 08057494174 AND 08021134095

E-MAIL ADDRESS; [email protected]

SCHOOLS ATTENDED WITH DATES

Petroleum Training Institute, Effurun

Higher National Diploma (HND) on Welding and Fabrication 2001 - 2004

Ordinary National Diploma (OND) on Welding and Fabrication 1990-1991

General Welding Certificate 1986-1986

Secondary School Attended.

Aladja Grammar School Aladja 1978-1983

Primary School Attended

Ogedegbe Primary School Warri 1970-1976

Page 2: Pius Okukpe CV

2

PROFESSIONAL CERTIFICATION WITH DATES.

Radiographic film Interpretation (RFI) America Society of Non Destructive Testing

(ASNT) level 2. Trained by Gennaseret Resources Nigerian Limited September

2011.

Ultrasonic Testing (UT) American Society of Non Destructive Testing (ASNT) level

2. Trained by Gennasaret Resources Nigerian Limited September 2011.

Dye Penetrant Testing (PT) American Society of Non Destructive Testing (ASNT)

level 2. Trained by Gennasaret Resources Nigerian Limited September 2011.

Magnetic Particle Testing (MT) American Society of Non Destructive Testing

(ASNT) level 2 September 2011.

FROM AUGUST 2009 TO JULY 2012I HAVE BEEN TRAINED BY SOUTHERN GAS

CONSTRUCTOR LIMITED ON THE UNDER LISTED SAFETY COURSES.

� Total Safety Task Instruction (TSTI) Practical.

� Total Safety Task Observation (TSTO) Practical.

� Confine Space Safety.

� Crane and Rigging Safety.

� Fall Protection Safety

� Scaffold Safety

� Fire Protection Safety

� Hazard Identification

� Basic Electrical Safety

� Total Safety Task Instruction (TSTI) for Supervisors1 Hand Power Tool

Safety

� First Aid Training

� Excavation Safety

� Basic Personnel Protective Equipment (PPE)

Page 3: Pius Okukpe CV

3

� Lock Out Tag Out (LOTO)

� Grating Removal Safety

� Manual Material Handling

� Ladder Safety

� Incident and Injury Free Refresher Course

� Bench and Angle Grinder Safety.

WORKING EXPERIENCE WITH DATES.

I have worked as a Pipe fitter, Pipe fitter Foreman, Pipe fitter General Foreman,

Pipe fitter Supervisor, QA,QC and Mechanical Supervisor.

August 2009 to July 2012.

Client; Chevron Nigerian Limited.

Project; Escravos Gas To Liquid EGTL. Escravos Delta State

Major Contractor; Southern Gas Constructor Nigerian Limited. SGC.

Sub-Contractor; Daewoo Engineering and construction

Local Content Contractor; Pi-Moff Resources Nigerian Limited.

Department; Mechanical.

Position; Pipe Fitter General Foreman (supervisor) with SGC Barge No 007874

Responsibilities.

� Interpretation of General Arrangement Drawing (G.A)

� Interpretation of Isometric drawing of spools to determine their accurate

orientations and co-ordinates.

� Interpretation of piping and Instrument diagram (P. & I.D.)

� Calculation of lateral coupling of pipe nipple, marked and cut to angles

with hand cutting torch to form elbows of any degree.

� Calculation of orientation of various degree of isometric drawing of spools.

Page 4: Pius Okukpe CV

4

� Threading of small diameter galvanized pipes to fit threaded Elbows

Valves, Tees to required dimension.

� Lateral coupling of branch and run pipes of various diameter for

underground drainage piping system.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Calculations of Lengths of pipe nipples and take-off for 30, 45, 60, 70, 90,

degree elbows, tees, reducers, flanges and valves to fit spools dimensions

during workshop and field fabrications.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong designed spools.

� Erecting of newly fabricated spools in the main Process Area, in unit 30B

train 1 & train 2, unit 20B, the two Boiler’s units, the two Slurry Hoppers,

unit 50H, unit 50A and hanging of pipe Supports for the spools.

� Pressure testing of completed spools in accordance to specifications.

January 2008 to February 2009.

Client; Shell Petroleum Development Company Nigerian Limited,

Project; West Africa Gas Project WAGP Oben Gas Plant. Edo State,

Contractor; Lee Engineering Company Nigerian Limited,

Department; Mechanical,

Position; QA,QC/Mechanical Supervisor,

Responsibilities.

� Prepare the project QA plan in connection with the project manager and

the QA manager in at had office.

� Verify that the quality related activities are in accordance with applicable

code, specification and regulations

� Ensuring recording updating and distribution of documents and

information i.e procedures, drawing plans, reports and certificate

Page 5: Pius Okukpe CV

5

� Identify any deficiency, promote corrective actions and verify their

implementation.

� Verify that contract quality requirement are specified to vendors and

subcontractors.

� Ensuring the surveillance at subcontractor works.

� Ensuring that measures are taken in order to identify and prevent

acceptance or defective materials

� Ensuring collection of documentation and certificates related to materials

purchased by my company and their subcontractors.

� Prepare QC plans for production phase and review quality plans issued by

subcontractors and vendors.

� Ensuring the inspection and testing in compliance with established QC.

Plans

� Ensuring the compliance of final documentation to be issued to client.

November 2006 to December 2007.

Client; Delta Steel Company Limited.

Project; Rehabilitation of Direct Reduction Plant, Repair of Strand Guide in Steel

Rolling Shop and Removal of Storage Hurdles in Rolling Mill Shop.

Contractor; Equilibrium Global Technical Services.

Position; Managing Director.

Responsibilities

� Interpretation of General Arrangement Drawing (G.A)

� Interpretations of welding symbols to fit the desired joint specifies by

drawing.

� Coupling of Beams, Angle Iron, U Channels with hand cutting torch and

assembling them to specifications to form platforms for the plating of the

roof of the Direct Reduction Plant.

Page 6: Pius Okukpe CV

6

� Pre-heating of distorted welded structures and spools with pre-heating

torch to accurate dimensions and shape to conform with specifications of

drawing.

� Accurate cutting of pipes, plate and beams with hand cutting torch with

oxy-acetylene gas.

� Cutting of pipes and plates with oxy-acetylene cutting machine (beveling

and automatic cutting machine for plate).

� The use of Jack Hammer for the breaking of concrete to expose the base of

the beam of the Storage Hurdles for cutting.

� Drilling of holes on the main frame of the Strand Guide for rollers that will

convey the billet from the melting pot.

� Project Management of the entire cost of the project and being

responsible for the welfare of welders and others who worked in the

project.

September to October 2006.

Client; Acergy, Polaris Barge.

Project; Installation of 1800 Tonne J Lay in Port Genty Gabon (Offshore).

Contractor; Globestar Engineering Company Limited

Department; Mechanical.

Position; Pipe fitter.

Responsibilities.

� Coupling of Beams, Angle Iron, U Channels with hand cutting torch and

assembling them to specifications to form platform for the base of the J

Lay

� Gouging of beam structures with hand cutting torch from the deck of the

barge to create enough space for the J Lay.

� Accurate cutting of pipes, plate and beams with hand cutting torch with

oxy-acetylene gas.

Page 7: Pius Okukpe CV

7

� Cutting of pipes and plates with oxy-acetylene cutting machine (beveling

and automatic machine for plate).

� Lateral coupling of branch and run pipes of various diameters to

strengthen the base of the J Lay.

November 2005 to June 2006.

Client; Chevron Nigeria Limited.

Project; Upgrade of Olero Flowstation. Escravos Field (Offshore) Delta State.

Contractor; Idmon Engineering Company Nigeria Limited.

Department; Mechanical

Position; Pipe fitter Supervisor.

Responsibilities

� Interpretation of General Arrangement Drawing (G.A)

� Interpretation of isometric drawing of spools to determine their accurate

orientations and co-ordinates.

� Interpretation of piping and Instrument diagram (P. & I.D.)

� Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,

reducers, flanges and valves to fit spools dimensions during field

fabrication and erection.

� Designing of isometric drawing and fabricating them to conform to field

requirement and specifications.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spool designs.

� Pressure testing of completed spools in accordance to specifications.

Internal trimming with hand cutting torch and grinding of unequal pipe

thickness and fittings to avoid excessive high low

Page 8: Pius Okukpe CV

8

� Erecting of fabricated spools and hanging of pipe Support.

� Threading of small diameter galvanized pipes to fit threaded Elbows

Valves, Tees to required dimension.

� Pressure testing of completed spools in accordance to specifications.

March 2000 to September 2004.

Client; Elf

Project; Amenam-Kpono 1&2 Production Platform

Contractor; Globstar Engineering Company Limited, Warri Yard Delta State

Department; Mechanical.

Position; Pipe fitter.

Responsibilities.

� Accurate cutting of beams, U channels, Angle iron in beam shop with Oxy-

acetylene hand cutting torch in preparation for beam erection to form

various levels of the platform.

� Calculations of pipe nipples and take-off for 30, 45, 60, 70, 90, degree

elbows, tees, reducers, flanges and valves to fit spools dimensions during

spools fabrication in Pipe shop and field erection.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Calculation of lateral coupling of pipe nipple, marked and cut to angles with

hand cutting torch to form elbows of any degree.

� Calculation of orientation of any degree of various isometric drawing of

spools.

� Internal trimming with hand cutting torch and grinding of unequal pipe

thickness and fittings to avoid excessive high low in workshop fabrication.

� Pre-heating of distorted welded structures and spools with pre-heating

torch to accurate dimensions and shape to conform with specifications of

drawing.

Page 9: Pius Okukpe CV

9

� Bending of small diameter pipes with hydraulic pump to form elbow

(degree) of various angle to fabricate a complete spool.

� Threading of small diameter galvanized pipes to fit threaded Elbows, Valves

and Tees to required dimension.

� Cutting of spools and plates with oxy-acetylene cutting machine (beveling

and automatic machine for plate).

� Erecting of fabricated spools in the newly constructed Production Platform

and hanging of pipe Support for spools.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spool design.

� Pressure testing of completed spools in accordance to specifications.

January to October 1999.

Client; Shell Petroleum Development Company.

Project; Upgrade of Ogini flow station Ozoro, Delta State.

Contractor; Grammen Petroserve Engineering Company Limited

Department; Mechanical.

Position; Pipe fitter Foreman.

Responsibilities.

� Interpretation of General Arrangement Drawing (G.A)

� Interpretation of piping and Instrument diagram (P. & I.D.)

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Interpretation of isometric drawing of spools to determine their accurate

orientations and co-ordinates.

� Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,

reducers, flanges and valves to fit spools dimensions for workshop and

field erection

Page 10: Pius Okukpe CV

10

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spool designs.

� Calculation of orientation of any degree of various isometric drawing of

spools.

� Internal trimming with hand cutting torch and grinding of unequal pipe

thickness and fittings to avoid excessive high low during fabrication.

� Erecting of fabricated spools in the flow station and hanging of pipe

Support.

� Pressure testing of completed spools in accordance to specifications.

February 1997 to April 1998.

Client; Mobil

Project; Ekpe Production Platform and 165 meter Flare Bridge,

Contractor; Globestar Engineering Company Limited Warri Yard, Delta State.

Department; Mechanical

Position; Pipe fitter

Responsibilities;

� Interpretation of drawing for spools to determine their accurate

orientations and co-ordinates.

� Calculations of pipe nipples and take-off for 30, 45, 60, 70, 90, degree

elbows, tees, reducers, flanges and valves to fit spools dimensions in

workshop fabrication of spools during workshop fabrication and field

erection.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spool designs.

Page 11: Pius Okukpe CV

11

� Interpretation of General Arrangement Drawing (G.A)

� Internal trimming with hand cutting torch and grinding of unequal pipe

thickness and fittings to avoid excessive high low during spool fabrication

in pipe shop

� Erecting of fabricated spools from pipe shop in the newly constructed

Production Platform and hanging of pipe Support for the spools.

� Coupling of Beams, Angle Iron, U Channels with hand cutting torch and

assembling them to specifications to form platforms for various levels of

decks during the fabrication of the platform.

� Pre-heating of distorted welded structures and spools with pre-heating

torch to accurate dimensions and shape to conform to drawing

specification.

� Bending of small diameter pipes with hydraulic pump to form elbow

(degree) of various angle to fabricate a complete spool.

� Threading of small diameter galvanized pipes to fit threaded Elbows

Valves, Tees to required dimension

� Pressure testing of completed spools in accordance to specification

October to December 1996.

Client; Mobil

Project; Upgrade of Oso Production Platform.

Contractor; Dickson Nigeria Company Limited.

Department; Mechanical,

Position; Pipe fitter

Responsibilities;

� Interpretation of isometric drawing of spools to determine their accurate

orientations and co-ordinates.

� Tie in of 16 inches Riser delivery line lied by Polaris Badge ( Globestar

Offshore)

Page 12: Pius Okukpe CV

12

� Designing of isometric drawing and fabricating them to conform to field

requirement and specifications.

� Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,

reducers, flanges and valves to fit spools dimensions during erection.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spools designs

� Interpretation of General Arrangement Drawing (G.A)

� Calculation of orientation of various degrees of isometric drawing of

spools.

� Erecting of completed fabricated spools from workshop and hanging of

pipe Support for spools.

� Erecting of Riser spools of complicated bend to manifold skid.

� Coupling of Beams, Angle Iron, U Channels with hand cutting torch and

assembling them to specifications to form platforms for extension.

� Pressure testing of completed spools in accordance to specifications.

August to October 1996.

Client; Chevron Nigeria Limited

Project; Upgrade of Meren Water Injection Platform, Escravos Delta State

Offshore

Contractor; Dickson Nigeria Limited,

Department; Mechanical,

Position; Pipe fitter

Responsibilities;

� Interpretation of General Arrangement Drawing (G.A)

Page 13: Pius Okukpe CV

13

� Calculation of orientation of various degrees of isometric drawing of

spools.

� Interpretation of drawing for spools to determine their accurate

orientations and co-ordinates.

� Designing of isometric drawing and fabricating them to conform to field

requirement and specifications.

� Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,

reducers, flanges and valves to fit spools dimensions.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong designs.

� Erecting of completed fabricated spools from workshop and hanging of

pipe Support for spools.

� Erecting of Riser spools of complicated bend to manifold skid.

� Coupling of Beams, Angle Iron, U Channels with hand cutting torch and

assembling them to specifications to form platforms

� Pressure testing of completed spools in accordance to specifications.

June to July 1996.

Client; Mobil

Project; Repair of Boat Landing During Installation of Edoup Water Injection

Platform, Eket Cross River State Offshore

Contractor; Dickson Nigeria Limited,

Department; Mechanical,

Position; Pipe fitter,

Responsibilities;

Page 14: Pius Okukpe CV

14

� Accurate cutting of spools, plate and beams with hand cutting torch using

oxy-acetylene gas.

� Cutting of spools and plates with oxy-acetylene cutting machine (beveling

and automatic machine for plate).

� Lateral coupling of branch and run pipes of various diameter e.g. 4 to 6,

inches, 8 to 10 inches

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from damage area of the boat landing.

January to April 1996.

Client; Chevron in Zaire

Project; Upgrade of Two Production Platform and a One leg Jacket on wellhead in

Zaire

Contractor; Dickson Nigeria Limited,

Department; Mechanical,

Position; Pipe fitter,

Responsibilities;

� Designing of isometric drawing and fabricating them to conform to field

requirement and specifications.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spool designs.

� Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,

reducers, flanges and valves to fit spools dimensions.

� Interpretations of welding symbols to fit the desired joint specifies by

drawing.

Page 15: Pius Okukpe CV

15

� Calculation of orientation of various degrees of isometric drawing of

spools.

� Threading of small diameter galvanized pipes to fit threaded Elbows

Valves, Tees to required dimension

� Accurate cutting of spools, plate and beams with hand cutting torch with

oxy-acetylene gas.

� Lateral coupling of branch and run pipes of various diameter e.g. 4 to 6,

inches, 8 to 10 inches as brackets for deck extensions.

� Pressure testing of completed spools in accordance to specifications.

May to August 1995.

Client; Chevron Nigeria Limited

Project; Upgrade of Esan Production Platform Escrovos Deita State Offshore

Contractor; Dickson Nigeria Limited,

Department; Mechanical,

Position; Pipe fitter

Responsibilities;

� Interpretation of isometric drawing of spools to determine their accurate

orientations and co-ordinates.

� Designing of isometric drawing to conform to field requirement and

specifications.

� Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,

reducers, flanges and valves to fit spools dimensions.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spool designs

� Interpretation of General Arrangement Drawing (G.A)

Page 16: Pius Okukpe CV

16

� Interpretation of piping and Instrument diagram (P. & I.D.)

� Calculation of orientation of various degrees of isometric drawing of

spools.

� Erecting of completed fabricated spools from workshop and hanging of

pipe Support.

� Erecting of Riser spools of complicated bend to manifold skid.

� Coupling of Beams, Angle Iron, U Channels with hand cutting torch and

assembling them to specifications to form platforms extension.

� Pressure testing of completed spools in accordance to specifications.

March to May 1995.

Client; Chevron Nigeria Limited,

Project; Upgrade of Meren Production Platform, Escravos, Delta State,

Contractor; Dickson Nigeria Limited,

Department; Mechanical,

Position; Pipe fitter,

Responsibilities;

� Designing of isometric drawing to conform to field requirement and

specifications.

� Calculations of pipe nipples and take-off for 30, 45, 70, 90, degree elbows,

tees, reducers, flanges and valves to fit spools dimensions during erection

of spools.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spool designs

� Calculation of orientation of various degrees of isometric drawing of

spools.

Page 17: Pius Okukpe CV

17

� Erecting of newly fabricated spools from workshop and hanging of pipe

Support.

� Erecting of Riser spools of complicated bend to the existing manifold of the

Platforms (Offshore)

� Coupling of Beams, Angle Iron, U Channels with hand cutting torch and

assembling them to specifications to form platforms deck extension.

� Pre-heating of distorted welded structures and spools with pre-heating

torch to accurate dimensions and shape to conform to specifications of

drawing.

� Bending of small diameter pipes with hydraulic pump to form elbow

(degree) of various angle to fabricate a complete spool.

� Pressure testing of completed spools in accordance to specifications.

October 1994 to January 1995.

Client; Chevron, Cabinda Angola.

Project; Modification of Alfa and Tsahala 5 Production Platform Cabinda Angola.

Contractor; Dickson Nigeria Limited,

Department; Mechanial,

Position; Pipe fitter,

Responsibilities;

� Hot bolting of in-service line in preparation form shut down

� Flushing of products from the lines and cutting of unwanted lines with cold

cutter to give way for new lines

� Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,

reducers, flanges and valves to fit spools dimensions.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

Page 18: Pius Okukpe CV

18

torch from wrong spool designs.

� Calculation of orientation of various degrees of isometric drawing of spools.

� Disconnecting of old manifold and extending of the manifold area to create

enough space for the new one.

� Erecting of newly fabricated spools from workshop and hanging of pipe

Support.

� Erecting of Riser spools of complicated bend to the existing manifold of the

Platforms (Offshore)

� Coupling of Beams, Angle Iron, U Channels with hand cutting torch and

assembling them to specifications to form platforms for extension

� Designing of isometric drawing and fabricating them to conform to field

requirement and specifications.

� Pressure testing of completed spools in accordance to specifications.

March to May 1994.

Client; Chevron Nigeria Limited,

Project; Installation of four different One leg Platform on Wellhead around

Meren, Delta, Okha and Delta South Production Platform.

Contractor; Dickson Nigeria Limited,

Department; Mechanical,

Position; Pipe fitter,

Responsibilities;

� Continues cutting and chamfering of the 48 inches pipe (the leg) with a

beveling machine and a preheating torch at the same time during piling of

the leg.

� Fitting of the One leg Platform to the already piled leg with the Wellhead

at the center of the 48 inches pipe (leg)

� Connecting of newly fabricated spools and hanging of pipe support.

Page 19: Pius Okukpe CV

19

January to March 1994.

Client; Texaco

Project; Installation of Water Injection Unit in Penninton Production Platform

Offshore River State.

Contractor; Dickson Nigeria Limited,

Department; Mechanical,

Position; Pipe fitter.

Responsibilities.

� Interpretation of General Arrangement Drawing (G.A)

� Interpretation of drawing for spools to determine their accurate

orientations and co-ordinates.

� Designing of isometric drawing and fabricating them to conform to field

requirement and specifications.

� Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,

reducers, flanges and valves to fit spools dimensions.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spool designs.

� Erecting of fabricated spools and hanging of pipe Support

� Connecting of Riser spools to the newly install manifold.

� Pressure testing of completed spools in accordance to specifications.

July to December 1993.

Client; Chevron Nigeria Limited,

Page 20: Pius Okukpe CV

20

Project; Upgrade of Delta South Production Platform, Escravos, Delta State

Contractor; Dickson Nigeria Limited,

Department; Mechanical.

Position; Pipe fitter,

Responsibilities;

� Hot bolting of in-service line in preparation form shut down

� Flushing of products from the lines and cutting of unwanted lines with

cold cutter to give way for new lines

� Disconnecting of old manifold and extending of the manifold area to

create enough space for the new one.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spool designs.

� Calculation of orientation of various degrees of isometric drawing of

spools.

� Designing of isometric drawing and fabricating them to conform to field

requirement and specifications.

� Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,

reducers, flanges and valves to fit spools dimensions.

� Erecting of fabricated spools and hanging of pipe Support.

� Pressure testing of completed spools in accordance to specifications

March to June 1993.

Client; Chevron Nigeria Limited,

Page 21: Pius Okukpe CV

21

Project; Upgrade of Tapa Production Platform Escravos Delta State.

Contractor; Dickson Nigeria Limited.

Department; Mechanical,

Position; Pipe fitter

Responsibilities;

� Hot bolting of in-service line in preparation form shut down

� Flushing of products from the lines and cutting of unwanted lines with cold

cutter to give way for new lines

� Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,

reducers, flanges and valves to fit spools dimensions.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

torch from wrong spool designs.

� Calculation of orientation of various degrees of isometric drawing of spools.

� Disconnecting of old manifold and extending of the manifold area to create

enough space for the new one.

� Erecting of newly fabricated spools from workshop and hanging of pipe

Support.

� Designing of isometric drawing and fabricating them to conform to field

requirement and specifications.

� Pressure testing of completed spools in accordance to specification

January to December 1992.

Client; Elf

Project; Alfia Odudu Production Platform,

Contractor; Globstar Engineering Company Limited, Warri Yard Delta State

Page 22: Pius Okukpe CV

22

Department; Mechanical

Position; Pipe fitter

Responsibilities;

� Calculations of pipe nipples and take-off for 30, 45, 60, 70, 90, degree

elbows, tees, reducers, flanges and valves to fit spools dimensions.

� Interpretations of welding symbols to fit the desired joint design specifies

by drawing.

� Calculation of lateral coupling of pipe nipples, marked and cut to angles

with hand cutting torch to form elbows of various degree.

� Calculating of orientation of various degree of isometric drawing of spools.

� Internal trimming with hand cutting torch and grinding of unequal pipe

thickness and fittings to avoid excessive high low in pipe shop.

� Coupling of Beams, Angle Iron, U Channels with hand cutting torch and

assembling them to specifications to form platforms of various levels.

� Pre-heating of distorted welded structures and spools with pre-heating

torch to accurate dimensions and shape to conform to specifications of

drawing.

� Bending of small diameter pipes with hydraulic pump to form elbow

(degree) of various angle to fabricate a complete spool.

� Threading of small diameter galvanized pipes to fit threaded Elbows

Valves, Tees to required dimension

� Accurate cutting of pipe, plate and beams with hand cutting torch with

oxy-acetylene gas.

� Cutting of spools and plates with oxy-acetylene cutting machine (beveling

and automatic machine for plate).

� Erecting of fabricated spools in newly constructed Production Platform and

hanging of pipe Support for the spools.

� Salvaging of pipe fittings such as elbows, tees flanges with hand cutting

Page 23: Pius Okukpe CV

23

torch from wrong spool designs

� Pressure testing of completed spools in accordance to specifications.

October 1990 to January 1991.

Client; Shell Petroleum Development Company Limited

Project; Rehabilitation of Storage Tanks Ogulagha Forcados Terminal Delta State

Contractor; Harbour-work Nigeria Limited,

Department; Mechanical,

Position; Industrial Attachment,

Responsibilities;

� Accurate cutting of spools, plate and beams with hand cutting torch using

oxy-acetylene gas.

� Cutting of spools and plates with oxy-acetylene cutting machine (beveling

and automatic machine for plate).

� Post weld heat treatment PWHT of nozzles welded with flanges to the wall

of the Tanks for receiving and discharging of products.

February to April 1987.

Client; Nigerian National Petroleum Cooperation NNPC

Project; De-Bottlenecking Project Warri Refinery Ekpan Delta State,

Contractor; Snamprogetti

Department; Mechanical

Position; Pipe fitter.

Responsibilities;

� Erecting of fabricated spools and hanging of pipe Support .

ASSOCIATIONS .

Page 24: Pius Okukpe CV

24

Member of the Nigerian National Fitters Association (NNFA)

Member of the Nigerian Institute of Welding (NIW)

Member of American Welding Society (AWS)

Member of America Society of Non-destructive Testing (ASNT)

OTHER INFORMATION

Computer Literate,

Pass SPDC – Survival Swimming Training

Holder of the Nigerian National Driver’ License

HOBBIES; Table tennis, Volley ball, Swimming and Reading.

REFEREES. Fred Okoh,

Site Manager.

Pi-Moff Resourses Nig. Ltd.

Km 1 NPA Express way off Temile close

Ugbangwe. Warri Delta State.

REFEREES.

Chris Ozegbe,

Personnel Manager,

Globestar Engineering Company Nig Ltd

Warri. Delta State.