Portishead Branch Line (MetroWest Phase 1) TR040011 Applicant: North Somerset District Council 2.36 - Cross Section Plans The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, regulation 5(2)(o) Planning Act 2008 Author: CH2M Date: November 2019
2.36 Cross Section Plans The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, regulation 5(2)(o)
467470.BQ.04.20-104 Rev B 467470.BQ.04.20-219 Rev B 467470.BQ.04.20-292 Rev B 467470.BQ.04.20-410 Rev B 467470.BQ.04.20-531 Rev B 467470.BQ.04.20-630 Rev B 467470.BQ.04.20-SK300-SK304 Rev H 674946.BD.29.01-SK33 Rev A 674946.BD.29.01-SK35-SK36 Rev A
Document Index
35.718.13 9.7 3.85 24 3.16 13.95
2.3
1.533.515.17 3
4.9 4.5 16 4.25 9.8 3 7 3.6
6.9 4.5 22.8
1.1
4.15 4.73 3 5.2 8.2
6.31 9.5 1.25
Proposed scrub
planting
Proposed planting
including trees
Footway
Proposed noise barrier
Track level
Proposed station forecourt including
platform and station building
Bollard
Car park pick up/drop off
area and carriageway
Footway
Car park row
Footway
Car park row and
carriageway
Proposed planting
including trees
Footway including
boundary wall
Phoenix Way
Paved area
Proposed planting
including trees
Footway
Swale ditch with
proposed trees
Proposed planting
including trees
Proposed planting
including trees
Footway/
Cycleway
Car park
Harbour Road
Proposed Parallel
(Pedestrians and Cyclists)
crossing on Harbour Road
FootwayFootway including
boundary wall
Proposed
planting
Car park
Footway/
Cycleway
Footway
Footway/
Cycleway
Proposed
landscape area
Proposed
security fence
SECTION A SECTION B
SECTION C
+106.38
+107.32
+107.30
+107.54
+106.92
+107.46
+107.43
+107.54
+109.31
+107.83
+107.71
+108.56
NOTES:
1. Refer to drawing 467470.BQ.04.20-100 to
102 for section locations
KEY:
Proposed Levels
Existing Levels
+115.34
+113.60
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\91.1 P
ortishead [O
S]\ 467470.B
Q.04.20-104 R
ev B
.dw
g
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
PORTISHEAD STATION
CROSS SECTIONS
OHP 10/03/2019
ADL 25/03/2019
ADL 25/03/2019
467470.BQ.04.20-104 B
1:200 @ A1 or 1:400 @ A3
A
Minor amendmentsOHP ADL ADL 31/07/2019
50 10 20
SCALE 1:200 (A1)
SCALE 1:400 (A3)
METRES
B
Station building outline and spot levels addedOHP ADL ADL 10/10/2019
12.87.324.528.74
19 10 12.23
SECTION A
SECTION B
Existing vegetation
Proposed
planting
Network Rail and
field access track
Proposed planting
including trees
Area of field within
the limits of deviation
Proposed temporary
access track
Network Rail
access track
Proposed embankment
with woodland planting
Existing lakeside
trees
+126.19
+113.60
+111.56
+115.34
NOTES:
1. Refer to drawing 467470.BQ.04.20-220 to
221 for section locations
KEY:
Proposed Levels
Existing Levels
+115.34
+113.60
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\91.3 P
ill T
unnel\ 467470.B
Q.04.20-219 R
ev B
.dw
g
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
PILL TUNNEL EAST
CROSS SECTIONS
OHP 20/03/2019
ADL 25/03/2019
ADL 25/03/2019
467470.BQ.04.20-219 B
1:100 @ A1 or 1:200 @ A3
A
Minor amendmentsOHP ADL ADL 31/07/2019
0 5 10
SCALE 1:100 (A1)
SCALE 1:200 (A3)
METRES
B
Minor amendmentsOHP ADL ADL 02/10/2019
2.56.847.45
Lodway
Footpath
Widened footpath
for bus stop
Pill Memorial
Club car park
SECTION A
Relocated
boundary wall
Existing kerb
Existing
boundary wall
NOTES:
1. Refer to drawing 467470.BQ.04.20-290 to
291 for section locations
2. Proposed footway and carriageway to
match with existing levels except for
localised adjustment at Pill Memorial Club
boundary wall
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\91.2 P
ill\ 467470.B
Q.04.20-292 R
ev B
.dw
g
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
PILL MEMORIAL CLUB
CROSS SECTION
OHP 25/03/2019
ADL 25/03/2019
ADL 25/03/2019
467470.BQ.04.20-292 B
1 :100 @ A1 or 1:200 @ A3
A
Minor amendmentsOHP ADL ADL 31/07/2019
0 5 10
SCALE 1:100 (A1)
SCALE 1:200 (A3)
METRES
B
Minor amendmentsOHP ADL ADL 10/10/2019
9.03 5.9 9 4.8 131.531
SECTION A
Proposed
grass
Proposed
grass
Proposed
grass
Proposed footway/cyclway
Sheepway
Existing embankment
and verge
Existing embankment
and verge
Existing access
track to remain
Sheepway compound
access
NOTES:
1. Refer to drawing 467470.BQ.04.20-400 to
401 for section locations
2. Proposed access and footway/cycleway to
match with existing levels
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\91.4 S
heepw
ay\ 467470.B
Q.04.20-410 R
ev B
.dw
g
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
SHEEPWAY
CROSS SECTIONS
OHP 20/03/2019
ADL 25/03/2019
ADL 25/03/2019
467470.BQ.04.20-410 B
1:100 @ A1 or 1:200 @ A3
A
Minor amendmentsOHP ADL ADL 31/07/2019
0 5 10
SCALE 1:100 (A1)
SCALE 1:200 (A3)
METRES
B
Minor amendmentsOHP ADL ADL 02/10/2019
3.589.81.857.5
dw
gm
od
els
.co
m
d
w
g
m
o
d
e
ls
.c
o
m
SECTION A
Royal
Portbury Dock
Road
Existing vegetation
Existing vegetation
Footway
Bridleway
Fence to separate
uncontrolled bridleway
crossing from uncontrolled
pedestrian crossing
Bridleway
NOTES:
1. Refer to drawing 467470.BQ.04.20-530 for
section locations
2. Proposed access and footway/cycleway to
match with existing levels except for
localised adjustment at crossing point
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\91.5 N
CN
26\ 467470.B
Q.04.20-531 R
ev B
.dw
g
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
ROYAL PORTBURY DOCK ROAD
CROSS SECTIONS
OHP 20/03/2019
ADL 25/03/2019
ADL 25/03/2019
467470.BQ.04.20-531 B
1:100 @ A1 or 1:200 @ A3
A
Minor amendmentsOHP ADL ADL 31/07/2019
0 5 10
SCALE 1:100 (A1)
SCALE 1:200 (A3)
METRES
B
Minor amendmentsOHP ADL ADL 02/10/2019
2 97.3 5.7 33.01 4.9247.78
SECTION A
Proposed
vegetation
Clanage Road
Overrun area/
flush footwayExisting vegetation
and boundary wall
Network Rail
compound
Network Rail ramp to
access railway tracks
Railway tracks
Gated access to
track
+107.40
+107.66
+109.40
+108.12
+107.56
NOTES:
1. Refer to drawing 467470.BQ.04.20-621 for
section locations
KEY:
Proposed Levels
Existing Levels
+115.34
+113.60
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\91.62 C
lanage R
oad\ 467470.B
Q.04.20-630 R
ev B
.dw
g
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
CLANAGE ROAD
CROSS SECTION
OHP 10/03/2019
ADL 25/03/2019
ADL 25/03/2019
467470.BQ.04.20-630 B
1:200 @ A1 or 1:400 @ A3
A
Minor amendmentsOHP ADL ADL 31/07/2019
50 10 20
SCALE 1:200 (A1)
SCALE 1:400 (A3)
METRES
B
Minor amendmentsOHP ADL ADL 02/10/2019
2 9.18 49.21
1.883.028.173.495.654.038.09
Path
Verge
Ve
rg
e
11.24
Path
Existing VegetationVergeCarriageway
FrontHouseRear Garden
Garden
Pumping Station
166208
Section AA
Crane Jib within Wessex
Water pumping station
Fence
Security fence
Noise barrier
Peartree Field
1.56
0.4
2
3.073.782.88.731.91
5 2.1 27.08 5.13 9.66
Ga
rd
en
House Garden
Vegetation
Path
Cle
ara
nce
Footbridge
Ve
rg
e
Proposed
Vegetation
Path
Existing Grassland (inc. Trees) Carriageway
Garden
166208
Section AA
Section BB
Fence
Security fence
Noise barrier
Tansy Lane
Trinity Primary
School Bridge
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\ 467470.B
Q.04.20-S
K300 to 303 R
ev H
.dw
g
Notes:
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
TYPICAL SECTIONS
SHEET 1 OF 4
OHP 13/03/2018
ADL 27/03/2018
ADL 27/03/2018
467470.BQ.04.20-SK300 H
1:200 @ A1 or 1:400 @ A3
A
Block of Rail Class 166 Turbo added to each sectionOHP ADL ADL 04/04/2018
B
Minor amendmentsOHP ADL ADL 10/04/2018
C
Minor amendmentsOHP ADL ADL 27/06/2018
1. All dimensions are in metres unless noted otherwise
2. The levels for the rail corridor are based upon a
Topographical Survey dated September 2015.
3. The levels beyond the Network Rail fence line have
been derived from data captured using airborne RADAR
technology that provides elevation point data every five
metres with a vertical accuracy of +/-60cm - which is
then subsequently interpolated. Therefore these levels
should be used for contextual information only and are
subject to confirmation.
4. Refer to drawing 467470.BQ.04.20-SK304 for section
locations
D
Minor amendmentsOHP ADL ADL 07/01/2019
E
Minor amendmentsOHP ADL ADL 25/03/2019
Notes:
F
Further location detail added to sectionsOHP ADL ADL 31/07/2019
50 10 20
SCALE 1:200 (A1)
SCALE 1:400 (A3)
METRES
G
Note amendmentsOHP ADL ADL 02/10/2019
H
Note amendmentsOHP ADL ADL 31/10/2019
5.49 2.12 4.22 8.51 10.52 4.51 2 16.77
8.07 50
Carriageway
Path Garden House Garden
Existing
Vegetation
Path
Existing
Vegetation
Proposed
Vegetation
Trinity Primary School
Playing Fields
166208
Section CC
Trinity Primary School Bridge is located
approximately 125m west of Section CC location
Security Fence
Security Fence
Fence
Tydeman Road
39.26 8 9.6 11.15 3.65 10.71 2.79
Field Haul Road
Existing
Vegetation
Existing
Vegetation
Garden House Garden
166208
Section DD
Security FenceSecurity Fence
FenceProperty on
Fennel Road
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\ 467470.B
Q.04.20-S
K300 to 303 R
ev H
.dw
g
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
TYPICAL SECTIONS
SHEET 2 OF 4
OHP 13/03/2018
ADL 27/03/2018
ADL 27/03/2018
467470.BQ.04.20-SK301 H
1:200 @ A1 or 1:400 @ A3
Notes:
A
Block of Rail Class 166 Turbo added to each sectionOHP ADL ADL 04/04/2018
B
Minor amendmentsOHP ADL ADL 10/04/2018
C
Minor amendmentsOHP ADL ADL 27/06/2018
D
Minor amendmentsOHP ADL ADL 07/01/2019
E
Minor amendmentsOHP ADL ADL 25/03/2019
1. All dimensions are in metres unless noted otherwise
2. The levels for the rail corridor are based upon a
Topographical Survey dated September 2015.
3. The levels beyond the Network Rail fence line have
been derived from data captured using airborne RADAR
technology that provides elevation point data every five
metres with a vertical accuracy of +/-60cm - which is
then subsequently interpolated. Therefore these levels
should be used for contextual information only and are
subject to confirmation.
4. Refer to drawing 467470.BQ.04.20-SK304 for section
locations
F
Further location detail added to sectionsOHP ADL ADL 31/07/2019
50 10 20
SCALE 1:200 (A1)
SCALE 1:400 (A3)
METRES
G
Note amendmentsOHP ADL ADL 02/10/2019
H
Note amendmentsOHP ADL ADL 31/10/2019
47.11 8 5.04
45.82
4.5
Existing
Vegetation
Haul RoadField
FieldExisting
Vegetation
166208
Section EE
Security FenceSecurity Fence
3.6
Proposed
Vegetation
50
Field
11.82
1.1815.593.74
Existing Vegetation
Garden
HouseGarden/Drive
Existing
Vegetation
166208
Section FF
Combined security fence and noise barrier
Fence
Security fence
Station House,
Portbury
Station
Road
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\ 467470.B
Q.04.20-S
K300 to 303 R
ev H
.dw
g
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
TYPICAL SECTIONS
SHEET 3 OF 4
OHP 13/03/2018
ADL 27/03/2018
ADL 27/03/2018
467470.BQ.04.20-SK302 H
1:200 @ A1 or 1:400 @ A3
Notes:
A
Block of Rail Class 166 Turbo added to each sectionOHP ADL ADL 04/04/2018
B
Minor amendmentsOHP ADL ADL 10/04/2018
C
Minor amendmentsOHP ADL ADL 27/06/2018
D
Minor amendmentsOHP ADL ADL 07/01/2019
E
Minor amendmentsOHP ADL ADL 25/03/2019
1. All dimensions are in metres unless noted otherwise
2. The levels for the rail corridor are based upon a
Topographical Survey dated September 2015.
3. The levels beyond the Network Rail fence line have
been derived from data captured using airborne RADAR
technology that provides elevation point data every five
metres with a vertical accuracy of +/-60cm - which is
then subsequently interpolated. Therefore these levels
should be used for contextual information only and are
subject to confirmation.
4. Refer to drawing 467470.BQ.04.20-SK304 for section
locations
F
Further location detail added to sectionsOHP ADL ADL 31/07/2019
50 10 20
SCALE 1:200 (A1)
SCALE 1:400 (A3)
METRES
G
Note amendmentsOHP ADL ADL 02/10/2019
H
Note amendmentsOHP ADL ADL 31/10/2019
50
Field
8.13
10.1 6.89 9.17 3.08 1.91 7.71
Existing
Vegetation
Existing
Vegetation
Garden House Garden Path
Carriageway
166208
Section GG
Security Fence
Security Fence
Elm Tree Park
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\ 467470.B
Q.04.20-S
K300 to 303 R
ev H
.dw
g
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
TYPICAL SECTIONS
SHEET 4 OF 4
OHP 13/03/2018
ADL 27/03/2018
ADL 27/03/2018
467470.BQ.04.20-SK303 H
1:200 @ A1 or 1:400 @ A3
Notes:
A
Block of Rail Class 166 Turbo added to each sectionOHP ADL ADL 04/04/2018
B
Minor amendmentsOHP ADL ADL 10/04/2018
C
Minor amendmentsOHP ADL ADL 27/06/2018
D
Minor amendmentsOHP ADL ADL 07/01/2019
E
Minor amendmentsOHP ADL ADL 25/03/2019
1. All dimensions are in metres unless noted otherwise
2. The levels for the rail corridor are based upon a
Topographical Survey dated September 2015.
3. The levels beyond the Network Rail fence line have
been derived from data captured using airborne RADAR
technology that provides elevation point data every five
metres with a vertical accuracy of +/-60cm - which is
then subsequently interpolated. Therefore these levels
should be used for contextual information only and are
subject to confirmation.
4. Refer to drawing 467470.BQ.04.20-SK304 for section
locations
F
Further location detail added to sectionsOHP ADL ADL 31/07/2019
50 10 20
SCALE 1:200 (A1)
SCALE 1:400 (A3)
METRES
G
Note amendmentsOHP ADL ADL 02/10/2019
H
Note amendmentsOHP ADL ADL 31/10/2019
34
T
Y
D
E
M
A
N
R
O
A
D
L
e
v
e
l C
r
o
s
s
in
g
D
is
u
s
e
d
2
52
1
7
2
9
4
2
1
8
F
I
E
L
D
2
6
P
u
m
p
in
g
S
t
a
t
io
n
5
0
4
3
6
4
4
B
L
A
C
K
T
H
O
R
N
D
R
I
V
E
5
6
4
3
1
4
0
36
8
2
1
8
1
5
6
4
5
4
7
38
1
0
11
LA
DY
ME
AD
3
G
A
L
I
N
G
A
L
E
W
A
Y
1
2
T
H
E
P
A
R
K
1
5
R
a
ilw
a
y
1
2
2
2
1
4
2
9
1
6
M
U
L
B
E
R
R
Y
A
V
E
N
U
E
2
4
4
0
8
5
2
12
3
4
G
A
L
I
N
G
A
L
E
W
A
Y
CONFERENCE AVENUE
1
1
1
1
8
6
1
M
U
L
B
E
R
R
Y
32
D
r
a
i
n
1
7
1
1
1
5
T
H
E
B
R
A
M
L
E
Y
S
1
5
6
1
2
1
8
7
2
7
21
20
2
5
4
4
8
2
3
5
5
8
1
5
7
3
6
12
4
2
1
9
8
44
1
2
6
P
E
A
R
T
R
E
E
D
r
a
in
1
1
Sluice
6
0
Lake
6
6
3
T
Y
D
E
M
A
N
R
O
A
D
4
4
1
4
D
r
a
in
5
4
2
4
4
8
4
C
L
O
S
E
3
4
ESS
1
0
42
3
E
l
S
u
b
S
t
a
1
7
Q
U
E
E
N
S
C
O
T
E
2
0
1
H
O
L
M
L
E
A
3
2
1
5
C
O
N
F
E
R
E
N
C
E
A
V
E
N
U
E
1
7
1
9
1
7
1
5
L
A
M
B
O
U
R
N
E
W
A
Y
25
The Vale
3
7
4
9
5
1
4
1
1
T
H
E
P
I
P
P
I
N
S
11
2
7
4
5
3
5
P
o
s
t
Playground
1
1
4
1
1
0
R
O
S
E
M
A
R
Y
C
R
E
S
C
E
N
T
9
6
El Sub Sta
1
5
1
1
6
El Sub Sta
2
3
7
4
T
A
N
S
Y
L
A
N
E
19
24
23
7
16
1
5
90
Playground
16
2
0
26
S
O
R
R
E
L
G
A
R
D
E
N
S
Trinity Anglican
Methodist
Primary School
28
18
8
1
0
7
T
A
R
R
A
G
O
N
P
L
A
C
E
15
1
0
7
6
7
2
109
113
19
F
E
N
N
E
L
R
O
A
D
2
1
C
D
Ward B
dy
Def
R
a
ilw
a
y
(
D
is
u
s
e
d
)
128.5
6.7m
D
r
a
in
D
ra
in
MP
D
r
a
i
n
S
H
E
E
P
W
A
Y
8.8m
D
r
a
in
1
S
H
E
E
P
W
A
Y
Springfield
Cottage
Rose
Drain
Pond
Cottage
Well
MP 128.75
Drain
R
a
ilw
a
y
(
d
is
u
s
e
d
)
12.5m
D
ra
in
T
r
a
c
k
D
r
a
in
Pond
W
H
A
R
F
L
A
N
E
2
Sheepway
D
r
a
in
S
h
e
e
p
w
a
y
C
o
t
t
a
g
e
s
MP 129
Gate Farm
ET
L
ET
L
2
6
4
1
3
5
Pond
Pond
FENNEL ROAD
45
2
4
3
0
2
0
5
1
4
9
6
3
34
2
8
1
7
1
3
5
3
3
8
6
7
S
O
R
R
E
L
GARDENS
1
9
5
0
4
2
7
1
95
89
81
85
6
2
6
4
5
6
7
0
2
T
A
R
R
A
G
O
N
P
L
A
C
E
5
101
1
97
6
Moor Farm
31
1
4
25
1
5
3
4
39
2
6
30
9
Pond
D
r
a
i
n
45
47
12
2
1
0
3
1
1
4
5
9
2
T
H
E
B
R
A
M
L
E
Y
S
1
4
1
1
1
5
7
7
T
H
E
R
U
S
S
E
T
S
1
8
1
0
24
8
16
2
9
1
9
2
5
3
3
1
1
1
0
1
5
1
7
1
9
2
1
5
1
5
5
3
7
t
o
4
3
2
2
t
o
3
0
3
1
t
o
3
6
5
0
4
6
4
4
B
e
e
c
h
B
a
r
n
Willow Barn
Pond
D
e
f
T
A
N
S
Y
L
A
N
E
P
E
A
R
T
R
E
E
F
IE
L
D
T
Y
D
E
M
A
N
R
D
F
E
N
N
E
L
R
D
S
H
E
E
P
W
A
Y
PORTISHEAD
D
r
a
in
2
7
1
9
8
Pond
2
8
THE PORTBURY HUNDRED
B
a
r
n
E
n
d
D
ra
in
S
H
E
E
P
W
A
Y
D
rain
2
b
L Twr
7.9m
2
a
D
r
a
i
n
T
h
e
O
l
d
C
h
a
p
e
l
P
R
IO
R
Y
R
O
A
D
4
0
3
5
3
0
D
ra
in
E
lm
T
re
e
F
a
rm
MP 128
2
L Twr
Priory Croft
Cole Acre
3
8
8.5m
1
1
0
MP 128.25
Elm Tree Park
1
3
16
Depot
MP 127.75
L Twr
T
r
a
c
k
2
2
3
5
13
P
o
n
d
21
3
7
Z
i
l
l
e
r
t
a
l
1
9
D
r
a
i
n
D
r
a
in
The
3
3
2
c
47
1
0
D
r
a
in
T
H
E
D
R
O
V
E
18
Pond
L Twr
Meadows
13.7m
D
ra
in
Station House
E
a
s
t
le
a
c
h
A 3
69
Footbridge
R
ailw
ay (dis
used)
Low Barn
2
5
FB
4
4
4
5
Balancing Pond
E
l S
u
b
S
ta
48
Pond
D
r
a
in
s
5
T
ra
ck
El Sub Sta
D
r
a
i
n
Cott
D
r
a
i
n
D
r
a
i
n
Playing Field
D
r
a
in
M
P
1
2
7
.
5
D
r
a
i
n
D
r
o
v
e
R
h
y
n
e
T
H
E
D
R
O
V
E
(
T
r
a
c
k
)
1
M 5
Tanks
T
H
E
P
O
R
T
B
U
R
Y
H
U
N
D
R
E
D
A
3
6
9
D
r
a
in
Church
Tks
St Mary's Church
D
r
a
i
n
D
ra
in
R
a
ilw
a
y
(
D
is
u
s
e
d
)
D
ra
in
Posts
S
T
A
T
IO
N
R
D
ELM TREE
PARK
M5
A
3
6
9
P
O
R
T
B
U
R
Y
H
U
N
D
R
E
D
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\467470 N
SC
F
ram
ew
ork 2013\B
Q.04.20 M
W P
hase 1 H
ighw
ay E
ngineering\90 A
utoC
AD
\91 A
utoC
AD
P
relim
\ 467470.B
Q.04.20-S
K300 to 303 R
ev H
.dw
g
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
TYPICAL SECTIONS
LOCATION PLAN
OHP 04/04/2018
ADL 04/04/2018
ADL 04/04/2018
467470.BQ.04.20-SK304 H
1:2000 @ A1 or 1:4000 @ A3
1. All dimensions are in metres unless noted otherwise
2. The levels for the rail corridor are based upon a
Topographical Survey dated September 2015.
3. The levels beyond the Network Rail fence line have
been derived from data captured using airborne RADAR
technology that provides elevation point data every five
metres with a vertical accuracy of +/-60cm - which is
then subsequently interpolated. Therefore these levels
should be used for contextual information only and are
subject to confirmation.
Notes:
A
Block of Rail Class 166 Turbo added to each sectionOHP ADL ADL 04/04/2018
B
Minor amendmentsOHP ADL ADL 10/04/2018
C
Minor amendmentsOHP ADL ADL 27/06/2018
500 100 200
SCALE 1:2000 (A1)
SCALE 1:4000 (A3)
METRES
100023397
North Somerset Council
D
Minor amendmentsOHP ADL ADL 07/01/2019
E
Minor amendmentsOHP ADL ADL 25/03/2019
F
Further location detail added to sectionsOHP ADL ADL 31/07/2019
G
Note amendmentsOHP ADL ADL 02/10/2019
H
Note amendmentsOHP ADL ADL 31/10/2019
8311.25
Existing vegetation
Footway to tie into
existing levels Winterstoke Road
SECTION A
Existing railway
tracks
10.45
Fence
NOTES:
1. Refer to drawing 674946.BD.29.01-SK31
for section locations
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
WINTERSTOKE ROAD
CROSS SECTION
OHP 20/03/2019
ADL 25/03/2019
ADL 25/03/2019
674946.BD.29.01-SK33 A
1:100 @ A1 or 1:200 @ A3Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
:D
raw
ing file path &
nam
eU
:\P
rojects\674946 N
SC
- 2016 B
ristol F
ram
ew
ork\674946.B
D.29.01 A
shton V
ale A
lternate A
ccess\90 A
utoC
AD
\91 A
utoC
AD
\ 674946.B
D.29.01-S
K33 R
ev A
.dw
g
A
Minor amendmentsOHP ADL ADL 10/10/2019
0 5 10
SCALE 1:100 (A1)
SCALE 1:200 (A3)
METRES
12.70
FGL 7.18
1
21
5.51
6.09
7x9300=65100
FGL 7.18
8.02
MJ
+0.00
EGL
5.98
Voided Box =31500
Open U-Trench=13400
Overall length (ramp ℄)=113002
Pile cap type 1 Pile cap type 1 Pile cap type 1 Pile cap type 1 Pile cap type 1
Existing ditch invert level. To be
replaced by new pipe culvert.
Abutment Pile Cap
3300x3700mm
Pile cap type 1
Continuous slab
500mm Thick
Existing 600mm diameter
culvert. Depth to be confirmed.
Bollard
Existing headwall
1225 mm culvert
Abutment wall
700mm thick
Pile cap type 2
Detail A
Bollard
Access hatch for
inspection
1350 1350
5000 5000 5000 5000 5000 5000 5000 5000
135013501350135013501350
PCJ
PCJ
PCJ PCJ
Storage chamber
for surface water
runoff
Proposed
manhole
Proposed
manhole
Runoff storage chamber = 13350
3000
2%
℄
50
U
psta
nd
Pedestrian parapet
integrated with
2000mm mesh screen
handrail at 1000mm
design to BS7818
1500 1500
2%
10mm anti-skid surfacing and
waterproofing
Cast in situ RC deck slab
250mm thick
Permanent formwork
Cross beam - S355J2W,
UB 254x146x43
10
00
40
0
-10.0 toe level (TBC)
34
10
Main girder -
S355J2W
UC
356x406x235
Fin plate -
S355J2W
bolted to the
main girder
Columns -
S355J2W UC
254x254x167
Cross bracing -
S355J2W
PFC 150x90x24
Base plate
S355J2W
3x1 Ø450mm
RC piles
RC Pile cap
Type 2
4000x1200mm
Shear studs omitted
for clarity
Precast edge girder
bolted(or similar) to the main
girder for temporary
conditions
15001500
RC Plinth at
column base
500500
25
00
Painted corrosion
protection at column
base
4000
12.70
Existing stone wall to
be partly demolished
(Position and levels
of existing wall TBC).
No additional load
will be introduced on
to the wall
6N backfill
Surfacing to tie in
with
existing footway
Type 6 expansion
joint to BD 33/94
Ø50 half round
drip detail
Proposed capping
beam
40
0
VA
RIE
S (4
09
0 m
axim
um
)
Varies
10
00
Ø1200
min 500
-10.0 toe level (TBC)
10mm anti-skid surfacing and
waterproofing
2%
℄
Cast in situ RC deck slab
250mm thick
50
U
psta
nd
Permanent formwork
Pedestrian parapet
integrated with
2000mm mesh screen
handrail at 1000mm
design to BS7818
1500 1500
Cross beam - S355J2W,
UB 254x146x43
2%
Varies, min 1000
Fin plate - S355J2W
bolted to the main girder
Columns - S355J2W
UC 254x254x167
Cross bracing - S355J2W
PFC 150x90x24
Base plate
S355J2W
RC Pile cap Type 1
2400x2400mm
2x2 Ø450mm RC
piles
Network Rail fenceBabcock fence
Precast edge girder
bolted(or similar) to the main
girder for temporary
conditions
25
00
1350
Painted corrosion
protection at column
base
RC Plinth at column
base
525525
Network rail drainage. Depth and
pipe diameter to be confirmed.
Varies, 1360 at pinch point
Concrete surround shown
indicatively
3711 to cess rail
DETAIL A
Scale 1:50
DEVELOPED ELEVATION VIEW A-A
Scale 1:200
TYPICAL SECTION B-B
Scale 1:25
TYPICAL CROSS SECTION C-C
Scale 1:25
B
B
C
C
D
D
E
E
0 1 32 4 5
SCALE 1:50 (A1)
SCALE 1:100 (A3)
METRES
0 0.5 1.51 2
SCALE 1:25 (A1)
SCALE 1:50 (A3)
METRES
20 4 86 10 20
SCALE 1:200 (A1)
SCALE 1:400 (A3)
METRES
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
:D
ra
win
g file
p
ath
&
n
am
eU
:\P
ro
je
cts\6
74
94
6 N
SC
- 2
01
6 B
risto
l F
ra
me
wo
rk\6
74
94
6.B
D.2
9.0
1 A
sh
to
n V
ale
A
lte
rn
ate
A
cce
ss\9
0 A
uto
CA
D\9
1 A
uto
CA
D\ 6
74
94
6.B
D.2
9.0
1-S
K3
5 R
ev A
.d
wg
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
NOTES:
1. All levels are in meters AOD unless stated
otherwise.
2. This drawing should not be scaled and only
written dimensions should be used
3. Drawing to be read in conjunction with drg.
674946.BD.29.01-SK34 and
674946.BD.29.01-SK36
A
Issue for DCO Application, drawing previously called
674946-CH2-SBR-AVAA-DR-CB-0017
FG ADL ADL 22/08/2019
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
ASHTON VALE RAMP
SHEET 1 OF 2
FG 04/17/2018
SW 04/17/2018
JM 04/17/2018
674946.BD.29.01-SK35
A
AS SHOWN AT A1
100
0
Ø1200
2%2%
22
85
-10.0 toe level (TBC)
℄1500 1500
500
Abutment pile cap
3300x3700mm
2x3 Ø450mm RC
piles
Abutment wall
700mm thick
Stub column-
S355J2W
UC 305x305x240
Main girder -
S355J2W
UC 356x406x235
Cross beam -
S355J2W,
UB 254x146x43
Holding down anchor
bolts with cradle
Fin plate - S355J2W
bolted to the stub column
Varies, min 1000mm
1800
25
0
750 750
500
Ø1200
2%
℄1500 1500
2%
Ramp Wall
250 mm Thick
Continuous slab
2700 wide,
500mm thick
2 x Ø450mm RC piles
5000mm spacing
1800
250
450 450
Varies, min 1000mm
50
0
Ø1200
Continuous slab
2700 wide,
500mm thick
2 x Ø450mm RC piles
5000mm spacing
1800450 450
2%
℄
2%Varies, min 1000mm
1500 1500
6N infill to U-through
250
Va
rie
s
500 250 500
TYPICAL CROSS SECTION E-E
Scale 1:25
TYPICAL CROSS SECTION D-D
Scale 1:25
0 0.5 1.51 2
SCALE 1:25 (A1)
SCALE 1:50 (A3)
METRES
TYPICAL CROSS SECTION F-F
Scale 1:25
Drawing Scale:
Drawing No.
Checked by:
Approved by:
Drawn by:
Drawing
Revision
Date:
Date:
Date:
Apprvd
Project
ByRev Chkd Date Description
:D
ra
win
g file
p
ath
&
n
am
eU
:\P
ro
je
cts\6
74
94
6 N
SC
- 2
01
6 B
risto
l F
ra
me
wo
rk\6
74
94
6.B
D.2
9.0
1 A
sh
to
n V
ale
A
lte
rn
ate
A
cce
ss\9
0 A
uto
CA
D\9
1 A
uto
CA
D\ 6
74
94
6.B
D.2
9.0
1-S
K3
6 R
ev A
.d
wg
CH2M HILL
www.ch2m.com
1 The Square Temple Quay Bristol BS1 6DG
Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581
NOTES:
1. All levels are in meters AOD unless stated
otherwise.
2. This drawing should not be scaled and only
written dimensions should be used
3. Drawing to be read in conjunction with drg.
674946.BD.29.01-SK34 and
674946.BD.29.01-SK35
A
Issue for DCO Application, drawing previously called
674946-CH2-SBR-AVAA-DR-CB-0023
FG ADL ADL 22/08/2019
PORTISHEAD BRANCH LINE
(METROWEST PHASE 1)
ASHTON VALE RAMP
SHEET 2 OF 2
FG 04/17/2018
SW 04/17/2018
JM 04/17/2018
674946.BD.29.01-SK36
A
AS SHOWN AT A1