(B)PREFEASIBILITY REPORT
OF
PROPOSED SAND MININGPROJECT
OFPintu Gopiji Vanzara
AT VILLAGE:- PETHAPUR, TALUKA:-GANDHINAGAR , DIST.:-GANDHINAGAR
CONTENTS
1.0 INTRODUCTION
1.1 PREAMBLE
2.0 EXECUTIVE SUMMARY
3.0 INTRODUCTION OF THE PROJECT /BACKGROUND INFORMATION
4.0 PROJECT DESCRIPTION
4.0 AVAILABLITY OF RAW MATERIAL
5.0 SELECTION OF SITE & LOCATION OF STONE MINE
6.0 PLANNING BRIEF
7.0 PROPOSED INFRASTRUCTURE
8.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN
9.0 PROJECT SCHEDULE & COST ESTIMATES
10.0 ANALYSIS OF PROPSAL (FINAL RECOMMENDATION)
1.0 INTRODUCTION
1.1 Preamble
Ordinary Sand is base of all types of Building works, Construction of Road,
Construction of Cement Concrete road, The need of Ordinary Sand is in all
fields are very essential as it is a compulsory material for all types of
construction, and Industries fields, Ordinary Sand Mines are providing
employments to the local Labour in Rural area, as the labour of rural area
have no any work for labour, They are Unemployed, Thus this proposed mine
is providing work to many labours and it is a good employment.
2.0 Executive Summary
Pintu Gopiji Vanzara is a proposed mine, as the demand of construction
material in all sectors are highly necessary, and This project is providing and
trying to fulfil major demands of Ordinary Sand in complete around area.
About 00-76-00 hectare of land is under possession of Pintu Gopiji VanzaraAt, Village : Pethapur, Taluka : Gandhinagar, Dist : Gandhinagar.
As per the statuary obligation this project needs environmental clearance from
department of Environment and forest dept. (GPCB) Gujarat. it is proposed
lease and to renew and start quarrying operations (production) Accordingly
project proponent has submitted form 1, pre-feasibility report and copy of
Approval letter from department of mines and geology Gujarat, to the state
level environmental assessment authority of Gujarat constituted by MOEF,
GOI for issuing environmental clearance, as per EIA, September 14.2006
notification.
3.0 Introduction of the Project/Background information :
3.1 Name of the proposed unit : Pintu Gopiji Vanzara
Registered Office : Pintu Gopiji Vanzara
67/ 68, Sector-2,
Nirnay Nagar, Ranip Road,
Ahmedabad.
Location of proposed unit : Village : Pethapur,
On River bed Sabarmati River
Patt Paiky S. No. 3030,
3031, 3053
Taluka : Gandhinagar.
Dist: Gandhinagar. (Gujarat)
Name of Owner : Pintu Gopiji Vanzara
3.2 Brief description of nature of the project :
It is a Ordinary Sand Quarrying, it contains Ordinary Sand which is used
in construction of infrastructures and road, railways and building
construction etc.
3.3 Demand - Supply Gap : As sand is used as raw material in
construction of building and infrastructure projects, the demand of sand
is increasing day by day. In past, demand was not too much but now a
days due to rapid industrialization and urbanization its demand
increasing with pace of time. At present, demand of sand is more than
the supply.
3.4 Imports vs. Indigenous Production : In Gandhinagar of Gujarat, a
number of sand mines are there. There is abundance of sand in the
area; it had become a major source of economy in the area/region.
3.5 Export Possibility : There is ban on sand export to other states in the
Gujarat by Govt. so export possibility of river sand from this area is
marginal. Major consumers of sand located almost in nearby areas in
the district.
3.6 Domestic / Export Markets : Sand produced is used locally as well as
circulated in nearby area. So clearly there is a huge market of sand in
the area.
3.7 Employment Generation (Direct and Indirect) due to the project :
By this mining project of river sand in the area, peoples get
employment, The project directly generates the employment for the
local people and indirectly for the others. Also the marketing of the
product generates the employment for peoples. By this project,
approximately Skilled labours-3 and Unskillled-10 to 15 labours on
project site.
4.0 Project Description :
4.1 Type of project including interlinked and interdependent project ifany : No others material is interlinked with this mining work.
4.2 Location (map showing general location, specific location andproject boundary & project site layout) with co-ordinates : The area
has been marked on Google map including the mining lease location.
This comprises the mining lease near village : Pethapur, Taluka :
Gandhinagar, Dist Gandhinagar of Gujarat location of the mining lease
is as under.
The geographical location of the project is as follows :
N E
230.15'34.78" 720 40'48.97"
4.3 Details of alternate sites, considered and the basis of selecting theproposed site, particularly the environmental considerations goneinto should be highlighted : No other site is considered for the
proposed project. The land has been allocated by government for the
mining only. As sand in the river is replenished every year by river so,
site is adequate for sand mining.
4.4 Size or magnitude of operation : B category manual.
The proposed Capacity / year is 3500 TPM. Total area of mining lease
is 00-76-00 Ha. The mining operation will be @ 3500 Tonne Production
of River sand per annum.
4.5 Project description with process details (a schematic diagram/flowchart showing the project layout, components of the project etc. isgiven below:
Open cast mining
OB removal
Loading
Transportation to end use
4.6 Raw material required along with estimated quantity, likely source,marketing area of final products. Mode of transport of rawmaterials And finished products :
No raw material is required during the mining process.
4.7 Resource optimization / recycling and reuse envisaged in the
project. If any, should be briefly outlined :
As a result of extraction of mineral, the rate of recharging of ground
water is likely to be increased considerably.
4.8 Availability of water its source, Energy/power requirement and
source should be given :
Total water requirement in the mine will be about 2.0 KLD for drinking &
domestic use, dust suppression and plantation. Drinking water will be
brought by water tanker from nearby village Pethapur. Diesel will be
used in dumpers and tractors.
Nearby village Pethapur is well electrified.
4.9 Quantity of wastes to generated (liquid and solid) and scheme for
their Management/disposal :
No waste will be generated. All the material is saleable.
4.10 Schematic representations of the feasibility drawing which give
information of EIA purpose :
According to MOEF mining project containing area ≤5 Ha. are
considered in category B2. Schematic representations of the feasibility is
as under.
Project Concept and Site selection
Form 1 pre-feasibility project report
with proposed TOR to MOEF (EAC)
Scoping by SEAC (site visit by
sub group of SEAC, if necessary
Category B2 - EIA not required
Appraisal and recommended by SEAC
Approval by SEIAA
Display on the SPCB/UTPCC website
& project proponent website
5.0 Site Analysis :
5.1 Connectivity :
Mine site is well connected with rail and road transport. Nearest railway
station is at Gandhinagar Railway Station (5.95 km) of mine site.
Gandhingar Vijapur Highway Road (1.68 km). Nearest highway is a
National highway No. 8C Passes in about (1.70 km).
5.2 Land Form - Land use and land Ownership :
The area of lease is 00-76-00 Ha. Land is Govt. land (Sabarmati River
Patt Paiky). The lease area forms part of S. No. 3030, 3031, 3053, No
forest land is involved in leased area. Details are given in below table.
S.
No.
Type of
Land
Area
in
(Ha.)
Near
Village
Tehsil District State
1 On River
bed
Sabarmati
River Patt
Paiky
00-
76-00
Pethapur Gandhinagar Gandhiangar Gujarat
5.3 Topography (Google image) :
The lease area is situated of village Pethapur. Topographically, the area
is almost flat & river bed area.
5.4 Proposed land use pattern (agriculture, non-agriculture, forest,water bodies including area under CRZ), shortest distances fromthe periphery of the project to periphery of the forests, nationalpark, wild life sanctuary, eco sensitive areas, water bodies(distance from the HFL of the river), CRZ. In case of notifiedindustrial area, a copy of the Gazette notification should be given:
Nearest SensitiveArea
Name Distance fromthe Project
within 10 kms
a) Reserve Forest There is no
reserve or
protected forest
within 10.0 km
of lease area.
b) National Park There is no
national park or
wild life
sanctuary within
10.0 km of
lease area.
c) Wild life
Sanctuary
d) Eco sensitive
areas
There is no eco
sensitive area
within 10.0 km
of lease area
e) Water source
(a) Ground water
Map
No big water
reservoir is
within 10.0 km
of lease area.
The grounder
water level is
10 to 15 mt.
deep
(b) Surface water
bodies map
The project is
located in seismic
zone-III. There is no
flood. cloudburst and
landslide reported so
far.
f) CRZ N.A. There is no
C.R.Z. within
10.00 km
periphery of
lease area.
5.5 Proposed infrastructure :Mine office is proposed in lease area. A well equipped first aid facility is
proposed to be available at there. Temporary rest shelter urinal and
latrine are proposed. Water will be purchased from nearby tube well
from nearby villages. A small water tank is also proposed in mine office
premises. This can be used for supply of water to drinking purposes.
5.6 Soil classification :
Soil of the region falls within medium rain fall zone of 703-750 mm. Thesoils are sandy loam, shallow depth reddish-black soils.
5.7 Climatic data from secondary sources :
Mansa has a tropical climate. In winter there is much more rainfall inMansa than in summer. According to Köppen and Geiger climate isclassified as As. The average annual temperature in Mansa is 27.1 °C.About 703 mm of precipitation falls annually.
1. Climate graph - Year 2013
2. Temperature graph - Year 2013
3. Climate table - Year 2013
5.8 Social Infrastructure available : N.A.
6.0 Planning Brief :
6.1 Planning Concept (type of industries, facilities, transportation etc.)Town and country planning development authority classification :
No industries and town planning programmers in the proposed area.
6.2 Population projection :
No Human settlements near project area.
6.3 Land use planning (breakup along with green belt etc) :
Details will be given in land use pattern of quarry plan.
6.4 Assessment of Infrastructure Demand (Physical & Social) :
There is no large infra structure demand near to proposed area.
6.5 Amenities / Facilities :
Not applicable as it is a small project.
7.0 Proposed Infrastructure :
7.1 Industrial Area (processing Area) : --NA--
7.2 Residential Area (Non Processing Area) : --NA--
7.3 Green Belt :
The plant is following the norms and is in process to developing 33%green belt in lease area.
7.4 Social Infrastructure : N.A..
7.5 Connectivity (Traffic and Transportation Road/Rail/Metro/Waterways etc) :
Well connected with Road/Rail. No metro and water ways.
7.6 Drinking Water Management (Source & Supply of water) :
Drinking water is procured from tube well proposed nearby.
7.7 Sewage system :
The domestic wastewater treat in the septic tank followed by soak pit.
7.8 Industrial waste management : --NA--
7.9 Solid waste management : --NA--
7.10 Power Requirement & Supply / Source : --N.A.--
8.0 Rehabilitation and Resettlement (R & R) Plan :
Policy to be adopted (Central / State) in respect of the project affectedpersons including home outstees, land outstees and landless labourers(a brief outline to be given) : --NA--
9.0 Project Schedule & Cost Estimates :
Project cost
No. Particulars Amounts (Rs.)
1 Mining equipments 50,000/-
2 Tanker based trolley with Tractor 1,50,000/-
Total 2,00,000/-
9.1 Likely date of start of construction and likely date of completion(Time schedule for the project to be given) :
It is a proposed project.
9.2 Estimated project cost along with analysis in terms of economicviability of the project :
The proposed cost of the project is Rs. 2,00,000 and it is economically10.0 Analysis of proposal (Final Recommendation) :
Financial and social benefits with special emphasis on the benefit to theThis project is creating employment potential for approximately about 10to 15 local people.