UCB BERKELEY WAY PROJECTPRELIMINARY DESIGN REVIEW PACKAGE
CONTENTS.
VICINITY MAPSHADOW STUDYLANDSCAPE PLANSITE PLANFLOOR PLAN - LEVEL 1FLOOR PLAN - LEVEL 2FLOOR PLAN - LEVEL 3FLOOR PLAN - LEVEL 4FLOOR PLAN - LEVEL 5FLOOR PLAN - LEVEL 6FLOOR PLAN - LEVEL 7FLOOR PLAN - LEVEL 8FLOOR PLAN - MECHANICAL PENTHOUSEBUILDING SECTIONSWEST ELEVATIONSOUTH ELEVATIONEAST ELEVATIONNORTH ELEVATIONCONTEXTUAL ELEVATIONSEXTERIOR MATERIALS
JANUARY 15TH, 2015
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 1" = 50'-0"
01/06/15
VICINTY MAP14001.00
0' 25' 50' 100' 200'
01/15/15
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15
FORUM SECTION14001.00
DECEMBER 21
10 AM WINTER SOLSTICE
NOON WINTER SOLSTICE
3PM WINTER SOLSTICE
SEPTEMBER 21
9 AM EQUINOX
NOON EQUINOX
4PM EQUINOX
JUNE 21
9AM SUMMER SOLSTICE
NOON SUMMER SOLSTICE
4PM SUMMER SOLSTICE
SHADOW STUDY01/15/15
BIKE LANE
+210
+205
+209
+208
+207
+206
+205
+207.5
+210
+TW207.5
+TW 210
+TW 210
+203+197.5 +205
+TW206.5
+TW206.5
+TW206.5
TW 206.5 +
+200.5
+205
+205
204.6 +
204.5+
203 + 203.6+
203.3 ++203.6+203.1
203.4 +
+204.1+204.6
204.1 +204.6 +
204.85+204.85+
204.55+
204.15+
204.35+
204.7+204.7+
+204.7
TW 206.2+
BERKELEY W AY
UP
UP
1
E
F
G
H
D
C
B
A
2 3 4 5 6 7 8 9
PLAZA
47'-0"
35'-0
"34
'-0"
DRIVEWAY
LIFT
(E) ENERGYBIOSCIENCES
BUILDING
(E)RESIDENTIAL
BUILDING
GAS METER
LOADINGAREA
FIRE PUMPROOM
GENERATORROOM
MAINELECTRICAL
ROOM
RETAIL 1
DOM
ESTI
CW
ATER
PUM
P
RETAIL 2
BIKESTORAGE
(99)
COLLOQUIUM75
COMPUTERLAB
CLASSROOM30
CLASSROOM30
CLASSROOM30
SEMINAR
CLASSROOM30
CLASSROOM30
SEMINARCLASSROOM
45
COLLOQUIUM75
SEMINAR
SEMINAR
SECURITY
BDF
FIRECOMMAND
IDF
STORAGE
STAIR 1
MAIL ROOM
SEMINAR
CLASSROOM30
CO
RRI
DO
R
ELEVATORLOBBY
SEMINAR
WATERMETER
SHOWERROOM
ACCESSIBLESHOWER
ROOM
SHOWERROOM
ACCESSIBLESHOWER
ROOM
40'-11"
7'-0"
BACKFLOWPREVENTER
SEATINGAREA
SEATINGAREA
COMPACTOR
1:12 UP
1:12 UP 1:12 UP
1:12
UP
1:12
UP
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 1" = 20'-0"
01/15/15
SITE PLAN14001.00
1
1
1
1
4 56
7
8
9
9
9 99
9
10
11
11
11
12
12
12
2
22
3
3
3
LEGEND
1. INTEGRAL COLOR CONCRETE PAVING2. INTEGRAL COLOR CONCRETE STAIR3. SITE RETAINING WALL, TYP.4. PERMEABLE UNIT PAVERS5. DECOMPOSED GRANITE PAVING6. BENCH, TYP.
7. PICNIC TABLE, TYP.8. BIKE RACKS, TYP.9. PLANTING AREA10. PROPOSED PLAZA TREES11. PROPOSED STREET TREES12. NEW CONCRETE SIDEWALK
BERKELEY WAY
HEARST AVENUE
WA
LNU
TST
REE
T
WA
LNU
TST
REE
T
SHAT
TUC
K A
VEN
UE
OXF
OR
D S
TREE
T
01/15/15
BERKELEY W AYBERKELEY W AY
UP
UP
PLAZA
DRIVEWAY
LIFT
(E) ENERGYBIOSCIENCES
BUILDING
(E)RESIDENTIAL
BUILDING
GAS METER
LOADINGAREA
FIRE PUMPROOM
GENERATORROOM
MAINELECTRICAL
ROOM
RETAIL 1
DOM
ESTI
CW
ATER
PUM
P
RETAIL 2
BIKESTORAGE
(99)
COLLOQUIUM75
COMPUTERLAB
CLASSROOM30
CLASSROOM30
CLASSROOM30
SEMINAR
CLASSROOM30
CLASSROOM30
SEMINARCLASSROOM
45
COLLOQUIUM75
SEMINAR
SEMINAR
SECURITY
BDF
FIRECOMMAND
IDF
STORAGE
STAIR 1
MAIL ROOM
SEMINAR
CLASSROOM30
CO
RRI
DO
R
ELEVATORLOBBY
SEMINAR
WATERMETER
SHOWERROOM
ACCESSIBLESHOWER
ROOM
SHOWERROOM
ACCESSIBLESHOWER
ROOM
BACKFLOWPREVENTER
SEATINGAREA
SEATINGAREA
COMPACTOR
BERKELEY WAY
SHAT
TUC
KAV
ENU
E
HEARST AVENUE
OXF
OR
DST
REE
T
BIKE ENTRANCE
ENTRANCE
ENTRANCE
OHLONE WAY BIKE LANE
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 1" = 20'-0"
01/06/15
SITE PLAN14001.00
BERKELEY W AYBERKELEY W AY
UP
UP
PLAZA
DRIVEWAY
LIFT
(E) ENERGYBIOSCIENCES
BUILDING
(E)RESIDENTIAL
BUILDING
GAS METER
LOADINGAREA
FIRE PUMPROOM
GENERATORROOM
MAINELECTRICAL
ROOM
RETAIL 1
DOM
ESTI
CW
ATER
PUM
P
RETAIL 2
BIKESTORAGE
(130)
COLLOQUIUM75
COMPUTERLAB
CLASSROOM30
CLASSROOM30
CLASSROOM30
SEMINAR
CLASSROOM30
CLASSROOM30
SEMINAR
CLASSROOM45
COLLOQUIUM75
SEMINAR
SEMINAR
SECURITY
BDF
FIRECOMMAND
IDF
STAIR 1
MAIL ROOM
SEMINAR
CLASSROOM30
CO
RRI
DO
R
ELEVATORLOBBY
SEMINAR
WATERMETER
SHOWERROOM
ACCESSIBLESHOWER
ROOM
SHOWERROOM
ACCESSIBLESHOWER
ROOM
BACKFLOWPREVENTER
SEATINGAREA
SEATINGAREA
COMPACTOR
BERKELEY WAY
SHAT
TUC
KAV
ENU
E
HEARST AVENUE
OXF
OR
DST
REE
T
BIKE ENTRANCE
ENTRANCE
ENTRANCE
OHLONE WAY BIKE LANE
WAL
NU
T ST
REE
T
WAL
NU
T ST
REE
T
7'-4"
22'-9"
8'-3
"
6'-6
"
LINE OFBUILDINGABOVE
01/15/15
BERKEL EY WAYBERKEL EY WAY
UP
UP
UP
UP
UP
UP
UP
1
E
F
G
H
D
C
B
A
2 3 4 5 6 7 8 9
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"
240'-0"
30'-0
"30
'-0"
30'-0
"20
'-0"
30'-0
"30
'-0"
30'-0
"
200'
-0"
HEARST AVE.
SHAT
TUC
K AV
E.
BERKELEY WAY
LINE OFBUILDINGABOVE
FIRECOMMAND
STAIR 1
392 SFSEMINAR
403 SFSEMINAR
400 SFSEMINAR
399 SFSEMINAR
700 SF
CLASSROOM30
676 SF
CLASSROOM30
676 SF
CLASSROOM30
710 SF
CLASSROOM30
365 SFSEMINAR
365 SFSEMINAR
806 SF
CLASSROOM45
546 SF
CLASSROOM30
576 SF
CLASSROOM30
1,426 SF
COLLOQUIUM75
1,455 SF
COLLOQUIUM75
2,041 SF
COMPUTERLAB
RAMP UP 1:12RAMP UP 1:12
+205.00'+202.00' +203.75'
218 SFGAS METER
RAM
P U
P 1:
12R
AMP
UP
1:12
+209.00'
+207.00'
+205.00'
1,777 SF
BIKESTORAGE (99)
ELEVATORLOBBY
234 SFSECURITY
+208.50'
+203.75'
+202.00'
141 SF
WATERMETER
639 SF
GENERATORROOM
353 SFCOMPACTOR
773 SF
LOADINGAREA
1,205 SF
MAINELECTRICAL
ROOM
3,823 SFRETAIL 1
4,353 SFRETAIL 2
+205.00'
SHOWERROOM
SHOWERROOM
ACCESSIBLESHOWER
ROOM
ACCESSIBLESHOWER
ROOM
231 SFBDF
157 SF
DOMESTICWATER PUMP
319 SF
FIRE PUMPROOM
193 SFIDF
414 SFMAIL ROOM
180 SFSTORAGE
CO
RRID
OR
LINE OFBUILDINGABOVE
1,322 SF
SEATINGAREA
827 SF
SEATINGAREA
183 SF
BACKFLOWPREVENTER
+205.00'
+200.00'
RAMP UP 1:12
+203.75'
+205.00'
+202.00'
LIFT
SERVICECORRIDOR
GREASEINTERCEPTORBELOW, SPD
INTAKEAIR
BAFFLE
EXHAUSTAIR
BAFFLE
RECESSED FUELING PORT
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"
01/06/15
FLOOR PLAN - LEVEL 114001.00
01/15/15
DN UP
UPDN
UP
1
E
F
G
H
D
C
B
A
2 3 4 5 6 7 8 9
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"
240'-0"
30'-0
"30
'-0"
30'-0
"20
'-0"
30'-0
"30
'-0"
30'-0
"
200'
-0"
OPEN TOBELOW
GYP BD FURRING ATCONCRETE SHEARWALLS TYPICAL WHEREEXPOSED
STAIR 1
STAIR 2
STAIR 3
849 SF
CLASSROOM45
878 SF
CLASSROOM45
409 SFSEMINAR
2,295 SF
STUDENTLOUNGE
395 SFSEMINAR
183 SFAV ROOM
831 SF
STUDENTSERVICES
CANTILEVERED GLASSGUARDRAIL
266 SF
ELEVATORLOBBY
470 SFSEMINAR
IDF
ELECT
128 SFELECT
92 SFSTORAGEIDF
7,922 SFOFFICE
22,041 SFCLINIC
LEVEL 2
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"
01/06/15
FLOOR PLAN - LEVEL 214001.00
01/15/15
UP
UP
DNUP
1
E
F
G
H
D
C
B
A
2 3 4 5 6 7 8 9
LEVEL 3
44,359 SFOFFICE
OPEN TOBELOW
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"
240'-0"
GYP BD FURRING AT CONCRETESHEAR WALLS TYPICAL WHEREEXPOSED
ELEVATORLOBBY
STAIR 2
STAIR 1
STAIR 3
GLASS PARTITIONSPRINKLERED ON BOTHSIDES - 2HR EQUIVALENT
GLASS PARTITIONSPRINKLERED ON BOTHSIDES - 2HR EQUIVALENT
AUTOMATIC MOVEABLE FIREWALL 2-HOUR RATEDAUTOMATIC MOVEABLE FIREWALL 2-HOUR RATED
CANTILEVERED GLASSGUARDRAIL
ELECT
IDF128 SFELECT
92 SFSTORAGE
IDF
30'-0
"30
'-0"
30'-0
"20
'-0"
30'-0
"30
'-0"
30'-0
"
200'
-0"
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"
01/06/15
FLOOR PLAN - LEVEL 314001.00
01/15/15
UP
DNUP
1
E
F
G
H
D
C
B
A
2 3 4 5 6 7 8 9
LEVEL 4
43,600 SFOFFICE
OPEN TOBELOW
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"
240'-0"
GYP BD FURRING AT CONCRETESHEAR WALLS TYPICAL WHEREEXPOSED
CANTILEVERED GLASSGUARDRAIL
ELEVATORLOBBY
STAIR 2
STAIR 1
STAIR 3
160 SFIDF 128 SF
ELECT
155 SFIDFELECT
30'-0
"30
'-0"
30'-0
"20
'-0"
30'-0
"30
'-0"
30'-0
"
200'
-0"
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"
01/06/15
FLOOR PLAN - LEVEL 414001.00
01/15/15
UP
DN
1
E
F
G
H
D
C
B
A
2 3 4 5 6 7 8 9
ROOF
OPEN TOBELOW
LEVEL 5
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"
240'-0"
GYP BD FURRING AT CONCRETESHEAR WALLS TYPICAL WHEREEXPOSED
GLASS PARTITIONSPRINKLERED ON BOTHSIDES - 2HR EQUIVALENT
AUTOMATIC MOVEABLE FIREWALL 2-HOUR RATEDAUTOMATIC MOVEABLE FIREWALL 2-HOUR RATED
CANTILEVERED GLASSGUARDRAIL
STAIR 3
ELEVATORLOBBY
STAIR 2
STAIR 1
2,294 SF
MECHANICALPENTHOUSE
ELECT
IDF
IDF128 SFELECT
92 SFSTORAGE
30'-0
"30
'-0"
30'-0
"20
'-0"
30'-0
"30
'-0"
30'-0
"
200'
-0"
36,602 SFOFFICE
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"
01/06/15
FLOOR PLAN - LEVEL 514001.00
01/15/15
1
E
F
G
H
D
C
B
A
2 3 4 5 6 7 8 9
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"
240'-0"
ELEVATORLOBBY
23,300 SFOFFICE
MECHANICALPENTHOUSE ROOF
ROOF
SKYLIGHT
92 SFSTORAGE
128 SFELECTIDF
30'-0
"30
'-0"
30'-0
"20
'-0"
30'-0
"30
'-0"
30'-0
"
200'
-0"
ROOFBELOW
STAIR 2
LEVEL 6
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"
01/06/15
FLOOR PLAN - LEVEL 614001.00
01/15/15
1
E
F
G
H
D
C
B
A
2 3 4 5 6 7 8 9
LEVEL 7
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"
240'-0"
ELEVATORLOBBY
STAIR 1
STAIR 2
128 SFELECT
160 SFIDF
30'-0
"30
'-0"
30'-0
"20
'-0"
30'-0
"30
'-0"
30'-0
"
200'
-0"
23,276 SFOFFICE
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"
01/06/15
FLOOR PLAN - LEVEL 714001.00
01/15/15
1
E
F
G
H
D
C
B
A
2 3 4 5 6 7 8 9
LEVEL 8
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"
240'-0"
ELEVATORLOBBY
STAIR 1
STAIR 2
92 SFSTORAGE
128 SFELECTIDF
30'-0
"30
'-0"
30'-0
"20
'-0"
30'-0
"30
'-0"
30'-0
"
200'
-0"
22,726 SFOFFICE
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"
01/06/15
FLOOR PLAN - LEVEL 814001.00
01/15/15
1
E
F
G
H
D
C
B
A
2 3 4 5 6 7 8 9
900 SFBOILER ROOM
ELEVCONTROL
ELEVATORLOBBY
605 SF
PLUMBINGROOM
8,350 SF
MECHANICALPENTHOUSE
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"
240'-0"
ROOF
30'-0
"30
'-0"
30'-0
"20
'-0"
30'-0
"30
'-0"
30'-0
"
200'
-0"
STAIR 2
IDEC UNIT, SMD
SUPPLY FAN WALL, SMD
DIRECT EVAP SECTION, SMD
ROOF
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"
01/06/15
FLOOR PLAN - MECH PENTHOUSE14001.00
01/15/15
FF LEVEL 223'-0"
FF LEVEL 335'-9"
FF LEVEL 448'-6"
FF LEVEL 561'-3"
FF LEVEL 674'-0"
FF LEVEL 786'-9"
FF LEVEL 899'-6"
PH ROOF131'-3"
1
FF LEVEL 15'-0"
23456789
FF LEVEL 9112'-3"
18'-0
"12
'-9"
12'-9
"12
'-9"
12'-9
"12
'-9"
12'-9
"12
'-9"
19'-0
"
126'
-3"
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
RETAILCLASSROOM
107'
-3"
STUDENTLOUNGE
2A.330
FF LEVEL 223'-0"
FF LEVEL 335'-9"
FF LEVEL 448'-6"
FF LEVEL 561'-3"
FF LEVEL 674'-0"
FF LEVEL 786'-9"
FF LEVEL 899'-6"
PH ROOF131'-3"
FF LEVEL 15'-0"
EFGH D C B A
FF LEVEL 9112'-3"
1A.330
18'-0
"12
'-9"
12'-9
"12
'-9"
12'-9
"12
'-9"
12'-9
"12
'-9"
19'-0
"
126'
-3"
107'
-3"
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 1/16" = 1'-0"
01/06/15
BUILDING SECTIONS14001.00
1/16" = 1'-0"1 BUILDING SECTION LOOKING SOUTH
1/16" = 1'-0"2 BUILDING SECTION LOOKING WEST
01/15/15
PENTHOUSE
PARAPET
LEVEL 2
AVG GRADEAVG GRADE
PODIUM
70’-8”
18’-0”
110’-3”
127’-9”
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15
WEST ELEVATION14001.00
0' 5' 11' 21' 43'
01/15/15
PENTHOUSE
PARAPET
LEVEL 2
AVG GRADE
18’-0”
110’-3”
127’-9”
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15
SOUTH ELEVATION14001.00
0' 5' 11' 21' 43'
01/15/15
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15
EAST ELEVATION14001.00
0' 5' 11' 21' 43'
PENTHOUSE
PODIUM
PARAPET
LEVEL 2
AVG GRADE AVG GRADE
18’-0”
110’-3”
127’-9”
70’-8”
01/15/15
PENTHOUSE
PODIUM
PARAPET
LEVEL 2
AVG GRADE
18’-0”
110’-3”
127’-9”
70’-8”
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15
NORTH ELEVATION14001.00
0' 5' 11' 21' 43'
01/15/15
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15
FORUM SECTION14001.00
CONTEXTUAL ELEVTATIONS1” = 30’
01/15/15
SCALE:PROJECT #:
BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15
FORUM SECTION14001.00
WHITE GRFC ANODIZED CHAMPAGNE ALUMINUM NEUTRAL PORCELAIN TILE
EBONY BRICK
CRYSTAL GREY GLASS CORRUGATED METAL (PAINTED)
NEUTRAL/TAN/WHITE BRICK
RETAIL
WHITE GRFC EXTERIORENVELOPE
ANODIZED CHAMPAGNEALUMINUM MULLIONS
PORCELAIN TILEEBONY BRICKNEUTRAL BRICK
BASE:
TOP:
CRYSTAL GREY GLASS
MECHANIZEDINTERIOR SHADES
INTERIOR LIGHT SHELF
SCHEMATIC ENLARGED ELEVATION
OPTIONS
SOLARBAN 72 GLASS
LANDSCAPE MATERIALS
CORRUGATED METAL
EXTERIOR MATERIALS
SOLARBAN 72 GLASS
RICH PORCELAIN TILE
BASE OPTION 1
BASE OPTION 2
BASE OPTION 3BASE OPTION 4
01/15/15