8/22/2019 Presentation r5
1/24
A SEMINAR PRESENTATIONON
2012-2013
ELECTRICAL ENGINEERINGGOVERNMENT ENGINEERING COLLEGE ,AJMER
ABHISHEK MATHUR
VII thsemesterElectrical Branch
Mr. K.G SHARMA
Associate professor
Guided By :- Presented By :-
Kota thermal power station
8/22/2019 Presentation r5
2/24
KOTA THERMAL POWER STATION
8/22/2019 Presentation r5
3/24
REASON FOR CHOOSING KOTA FOR THERMAL
PLANT SETUP
Availability of large amount of clean cooling waterrequired for the station.
Location of station on broad gauge main Delhi- Mumbai
Railway line
Concentration of load in Kota city and Kota region.
Constant power supply.
Proximity to M.P. Coal fields.
Transmission and Grid substation are quite nearer to the
site.
8/22/2019 Presentation r5
4/24
INTRODUCTION
KSTPS is first coal based power plant in Rajasthan.
It is located ideally on the left bank of CHAMBAL
River at the upstream of KOTA BARRAGE.
Its first unit of capacity 110 MW is synchronized on 17
jan 1983.
It is one of highest power generating plant with
installed capacity of 1240 MW.
8/22/2019 Presentation r5
5/24
STAGES
Unit 6195 MW
Unit 1110 MW
Unit 2110 MW
Unit 3210 MW
Unit 4210 MWUnit 5210 MW
Unit 7195 MW
Stage I
Stage II Stage III Stage IV
Stage V
DESIGN
110 + 110 + 210 + 210 + 210 + 195 +195 = 1240 MW
8/22/2019 Presentation r5
6/24
CONTENTS OF THE PRESENTATION
GENERAL LAYOUT
COAL HANDLING PLANT
PROCESS OF STEAM GENERATION
TURBINE
GENERATOR
SWITCHYARD
8/22/2019 Presentation r5
7/24
PLANT OVERVIEW
8/22/2019 Presentation r5
8/24
COAL HANDLING PLANT
Is called the HEARTof thermalpower plant because it provided thefuel for combustion in boiler.
The coal is brought to the KSTPSfrom BHARAT COAL LTD.
There are 14 tracks fortransportation.
Everyday 3- 4 trains of coal areunloaded, each train consists 58wagons.
Coal is unloaded from wagons bymeans of WAGON TRIPPLER
8/22/2019 Presentation r5
9/24
Bunkers Crusher house Hoppers
Row coal feeders
Coal mills
(pulverization)
BOILER FURNACE
TANGENTIAL FIRING OF PULVERISED
COAL
OVERVIEW OF COAL HANDLING PLANT
Row coal from Bharat
coal ltd. Dhanbad &
bilaspur(MP)
To KSTPS from gurla via
a single railway trackWagon trippler
CONVEYING SYSTEM
Coal size reduced by 20 mm
8/22/2019 Presentation r5
10/24
PROCESS OF STEAM GENERATION
K.S.T.P.S
8/22/2019 Presentation r5
11/24
TURBINE
Turbine is a machine in which a shaft is rotated
steadily by impact of steam it converts heat
energy into mechanical energy.
8/22/2019 Presentation r5
12/24
BOILER & SUPERHEATER
M P TURBINE
H P TURBINE
L P TURBINE
REHEATER
STEAM AT
545 C
STEAM AT
545 C
STEAM AT
535 C
STEAM AT
535 C
STEAM TURBINE
8/22/2019 Presentation r5
13/24
TURBO GENERATOR
Designed for continuous operation at the rated output.Directly coupled with steam turbine, rotated at high speed
of 3000 RPM.
Two major parts:-
STATOR AND ROTOR
Major parts of stator are Major parts of rotor are
Stator frame Rotor frameStator core Rotor Windings
Stator bars
Stator windings
8/22/2019 Presentation r5
14/24
SWITCHYARD
The 220 KV Switch yard is the main part of the KTPS
it has two buses arrangement with a bus coupled breaker.
There are 11 feeders connected at 220 KV switchyard
8/22/2019 Presentation r5
15/24
Main parts of Switchyard
CIRCUIT BREAKER
ISOLATOR
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
LIGHTNING ARRESTOR
8/22/2019 Presentation r5
16/24
CIRCUIT BREAKER
Circuit breaker is basically a mechanical device used
to make or break an electrical circuit under normal &
abnormal condition.
A circuit breaker is switched on or off under loadconditions an arc is produced in between the breaker
contacts.
This arc produced between the breaker contacts is
quenching by some suitable medium.
8/22/2019 Presentation r5
17/24
TYPES OF CIRCUITS BREAKER
MINIMUM OIL CIRCUIT BREAKER SF6 CIRCUIT BREAKER
In M.O.C.B separating contact of the
breakers are made to separate within
an insulating oil.
In SF6 separating contact of the
breakers are made to separate within
SF6 material.
8/22/2019 Presentation r5
18/24
ISOLATORS & ARRESTORS
Isolators are device which disconnect the instruments
from power supply, the isolators provided at 220 KVswitchyard are motor operated.
Lightening Arresters are used in switchyard for preventingfrom Lightening phenomena and are installed at entranceof switchyard.
8/22/2019 Presentation r5
19/24
CURRENT TRANSFORMER
Current transformers are provided for measuring
and protection. All Current Transformers at 220KV switchyard are BHEL manufactured .
Designed to provide a current in its secondary coil
proportional to current flowing in its primary coil.
Primary winding consists of very few turns.
Secondary winding consists of large no. of turns
Current to be measured is passes through
primary winding.
8/22/2019 Presentation r5
20/24
POTENTIAL TRANSFORMER
Used for the measurement of high voltages.
Primary winding is connected to voltage to be
measured.
Voltmeter is connected across the secondary
winding.
8/22/2019 Presentation r5
21/24
SWITCHYARD LAYOUT
8/22/2019 Presentation r5
22/24
CONTROL PANEL
Turbine desk
Fan control
deskFuel control
desk
Generator
control desk
Steam pressure &
control desk
8/22/2019 Presentation r5
23/24
8/22/2019 Presentation r5
24/24
QUERIES ????