BACKGROUNDBACKGROUNDBACKGROUNDBACKGROUND Ensol is an Energy Consulting Company established in 2005. We offer a wide range of high-level energy consultancy services in Energy Efficiency, Alternative Energy and Carbon Management. Ensol is comprised of several professionals and experts in different fields such as energy conservation and management, green building, bioenergy, solar energy and wind energy. Not only technical supports but also we provide consultancy services on financial analysis in developing energy projects. Our working process (Fig. 1) normally starts with obtaining the clients’ requirements. With the sufficient information, our team will customize an effective plan in order to meet the clients’ requirements. During the project, we work with the clients and accompany them until they achieve their goal. We believe that the problem can be solved efficiently with combination of our great teamwork, the right technology and the knowledge. We always ensure that our clients receive the best solution and service. We also comply with the government's regulations and policies in regarding with efficient energy and clean environment.
Fig. 1 : Ensol’s working process.
PROFESSIONAL PROFESSIONAL PROFESSIONAL PROFESSIONAL REGISTRATIONREGISTRATIONREGISTRATIONREGISTRATION
The Energy Conservation Center of ThailandThe Energy Conservation Center of ThailandThe Energy Conservation Center of ThailandThe Energy Conservation Center of Thailand Registration No. 390557Registration No. 390557Registration No. 390557Registration No. 390557
The DatabaThe DatabaThe DatabaThe Database of Thai Consse of Thai Consse of Thai Consse of Thai Consultants ultants ultants ultants Type A No. 2437Type A No. 2437Type A No. 2437Type A No. 2437
Public Debt Management Office, Ministry of FinancePublic Debt Management Office, Ministry of FinancePublic Debt Management Office, Ministry of FinancePublic Debt Management Office, Ministry of Finance
The Engineering Institute of ThailandThe Engineering Institute of ThailandThe Engineering Institute of ThailandThe Engineering Institute of Thailand Membership No. C2Membership No. C2Membership No. C2Membership No. C2----132132132132
Under H.M. the King’s PatronageUnder H.M. the King’s PatronageUnder H.M. the King’s PatronageUnder H.M. the King’s Patronage
CONTACT INFORMATIONCONTACT INFORMATIONCONTACT INFORMATIONCONTACT INFORMATION Ensol Co., Ltd.Ensol Co., Ltd.Ensol Co., Ltd.Ensol Co., Ltd.
7th Floor, The Pann Building, 125 Khlong Lam Chiak Road,
Nawamin, Bueng Kum, Bangkok 10230
Telephone:Telephone:Telephone:Telephone: +66 (0) 2943-9633 to 35
Fax:Fax:Fax:Fax: +66 (0) 2943-9636
EEEE----mail:mail:mail:mail: [email protected]
Website:Website:Website:Website: www.ensol.co.th
3/16
VISION VISION VISION VISION
To be the leading energy solution company moving forward with creativity and a holistic point of view.
MISSIONMISSIONMISSIONMISSIONSSSS
• Continuing professional development for our staff and assets.
• Providing cutting-edge solutions to our clients at a creatively, cost effective and
friendly manner using state of the art technology.
• Working with the clients until they achieve their goal.
KEY COMPETENCYKEY COMPETENCYKEY COMPETENCYKEY COMPETENCY
� Be Creative for innovative energy solutions.
� Be Challenging for new technologies.
� Be Co-operative for multidisciplinary partners.
� Be Competitive in energy market.
4/16
ENSOL BUSINESS & SERENSOL BUSINESS & SERENSOL BUSINESS & SERENSOL BUSINESS & SERVICESVICESVICESVICES We provide our consulting services on:
ALTERNATIVE ALTERNATIVE ALTERNATIVE ALTERNATIVE ENERGYENERGYENERGYENERGY
� Bioenergy
� Waste to Energy
� Solar Energy
� Wind Energy
� Hydro Energy
� New Energy
EFFICIENCY EFFICIENCY EFFICIENCY EFFICIENCY ENERGYENERGYENERGYENERGY
� Demand Side Management (DSM)
� Energy Audit
� Green Building
� ESCO (Energy Service Company)
� Smart Grid
� Electric Vehicle
CARBON MANAGEMENTCARBON MANAGEMENTCARBON MANAGEMENTCARBON MANAGEMENT
� Carbon Footprint
� Carbon Credit
5/16
PROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCE ALTERNATIVE ENERGY
Feasibility and Potential Study for Biomass to LiquidFeasibility and Potential Study for Biomass to LiquidFeasibility and Potential Study for Biomass to LiquidFeasibility and Potential Study for Biomass to Liquid Location: Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Project feasibility and potential study BTL
BioBioBioBio----gas Generator and Fertilizer Machinegas Generator and Fertilizer Machinegas Generator and Fertilizer Machinegas Generator and Fertilizer Machine Location: Lee Pea Island, Thailand Client: Bundhaya Resort Scope: Supply and install bio-gas generator
and fertilizer machine from wet garbage, size 500 kg/day
A study and demonstration project for the biogas A study and demonstration project for the biogas A study and demonstration project for the biogas A study and demonstration project for the biogas producing from the biomassproducing from the biomassproducing from the biomassproducing from the biomass Location: Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Study and construction of the prototypes
to evaluate the impacts in technical, economy and environment
Study and Demonstration on Biomass to Biogas Study and Demonstration on Biomass to Biogas Study and Demonstration on Biomass to Biogas Study and Demonstration on Biomass to Biogas
Location : Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Study on the Potential of Project
Biomass, Potential of Biomass for Biogas Production, Measuring Biomass Properties and Components
6/16
PROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCE
ALTERNATIVE ENERGY
Development of Biogas Production System in Community Development of Biogas Production System in Community Development of Biogas Production System in Community Development of Biogas Production System in Community WasteWasteWasteWaste Location: Municipality of TungSong, HuaHin,
Kampaengpetch, Sakonnakorn and Samchook
Client: Department of Alternative Energy Development and Efficiency
Scope: Development of Biogas Production System in Community Waste
Performance Assessment and BioPerformance Assessment and BioPerformance Assessment and BioPerformance Assessment and Bio----gas plant improvement gas plant improvement gas plant improvement gas plant improvement projectprojectprojectproject
Location: Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Existing Bio-gas plant study,
performance assessment and details improvement plan.
The development of biomass gasification for generatiThe development of biomass gasification for generatiThe development of biomass gasification for generatiThe development of biomass gasification for generating ng ng ng electricityelectricityelectricityelectricity
Location: Prachobkirikant Province, Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Turnkey project of 100 kw power plant.
Double A Ethanol PlantDouble A Ethanol PlantDouble A Ethanol PlantDouble A Ethanol Plant Location: Srakeaw Province, Thailand Client: Double A Ethanol Scope: Construction management and
supervision services for Architectural, Civil, Structural and M&E works
7/16
PROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCE ALTERNATIVE ENERGY
Project Management and Construction Supervision for PV Project Management and Construction Supervision for PV Project Management and Construction Supervision for PV Project Management and Construction Supervision for PV Power Plant ProjectPower Plant ProjectPower Plant ProjectPower Plant Project Location : Prachinburi Province, Thailand Client: L–Solar 1 Co., Ltd. (Parent company :
Loxley Public Company Limited) Scope: Pre-feasibility, Project Management and
Construction Supervision
Project Management and Construction Supervision for PV Project Management and Construction Supervision for PV Project Management and Construction Supervision for PV Project Management and Construction Supervision for PV Power Plant ProjectPower Plant ProjectPower Plant ProjectPower Plant Project, 2x25MW, 2x25MW, 2x25MW, 2x25MW Location: Chaiyaphoom and Ayudhaya
Province,Thailand Client: Bangchak Solar Energy Scope: Pre-feasibility, Project Management and
Construction Supervision
Tesco Lotus Amata Green Store Pre Feasibility Study on Tesco Lotus Amata Green Store Pre Feasibility Study on Tesco Lotus Amata Green Store Pre Feasibility Study on Tesco Lotus Amata Green Store Pre Feasibility Study on EffiEffiEffiEfficiency Initiative & Renewable Energyciency Initiative & Renewable Energyciency Initiative & Renewable Energyciency Initiative & Renewable Energy Location: Chonburi Province, Thailand Client: Tesco Lotus Scope: Pre-feasibility Study, Technology and
Investment Consultancy
Project Management and Construction Supervision for PV Project Management and Construction Supervision for PV Project Management and Construction Supervision for PV Project Management and Construction Supervision for PV Power PlantPower PlantPower PlantPower Plant Phase 3 Phase 3 Phase 3 Phase 3 ProjectProjectProjectProject, 4x8, 4x8, 4x8, 4x8MWMWMWMW Location: Buriram, Nakhonratchasima and Chaiyaphum Province,Thailand Client: Bangchak Solar Energy Scope: Pre-feasibility, Project Management and
Construction Supervision
8/16
PROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCE
ALTERNATIVE ENERGY
Investment Support Deployment oInvestment Support Deployment oInvestment Support Deployment oInvestment Support Deployment of a Solar Drying Systemf a Solar Drying Systemf a Solar Drying Systemf a Solar Drying System Location: Thailand Client: Department of Alternative
Energy Development and Efficiency Scope: Study and determination of specifications
for supporting the installation of the solar drying system
Solar hot water hybrid system project Solar hot water hybrid system project Solar hot water hybrid system project Solar hot water hybrid system project Location: Thailand Client: Department of Alternative
Energy Development and Efficiency Scope: Feasibility study for all grant applications
submitted to DEDE Design development and issue for tender Pre-approval for government subsidy and handover certification
Detail Design for Hybrid SDetail Design for Hybrid SDetail Design for Hybrid SDetail Design for Hybrid System (PV Solar and Wind Turbine)ystem (PV Solar and Wind Turbine)ystem (PV Solar and Wind Turbine)ystem (PV Solar and Wind Turbine) Location: Chiang Mai, Ranong Province, Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Detail Design for Hybrid System
(PV Solar and Wind Turbine)
PV Roof Top Consulting SePV Roof Top Consulting SePV Roof Top Consulting SePV Roof Top Consulting Service Projects rvice Projects rvice Projects rvice Projects
Location: Thailand Client: MQDC Scope: Feasibility Study (FS) of Renewable
Energy Implementation, Sites analysis and other potential renewable energy application, PV roof top system optimization for housing
9/16
PROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCE
ALTERNATIVE ENERGY
Wind TurbinWind TurbinWind TurbinWind Turbine Generator Production Project, at least 250 KWe Generator Production Project, at least 250 KWe Generator Production Project, at least 250 KWe Generator Production Project, at least 250 KW Location: Thailand Client: Department of Alternative
Energy Development and Efficiency Scope: Study, research, design and production of
wind turbine generator with a capacity of at least 250 KW, Field testing of wind turbine generator.
Small Wind Small Wind Small Wind Small Wind Farm 50 kW in RoyaFarm 50 kW in RoyaFarm 50 kW in RoyaFarm 50 kW in Royal project at l project at l project at l project at Doi Mon Larn Doi Mon Larn Doi Mon Larn Doi Mon Larn Location: Chiang Mai Province, Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Engineering, procurement, installation and
commissioning of 10 units of wind turbine generators.
10/16
PROJEPROJEPROJEPROJECTS REFERENCECTS REFERENCECTS REFERENCECTS REFERENCE EFFICIENCY ENERGY
Energy efficiency consulting for Big C groupEnergy efficiency consulting for Big C groupEnergy efficiency consulting for Big C groupEnergy efficiency consulting for Big C group Location: Thailand Client: Big C Supercenter Scope: Energy efficiency consulting for
eastern branches (9 stores)
Makro, SrakeawMakro, SrakeawMakro, SrakeawMakro, Srakeaw Location: New Makro store, Srakeaw Client: Chuchawal Royalhaskoning Scope: Mechanical design for new Makro
Srakeaw
Tesco Lotus Tesco Lotus Tesco Lotus Tesco Lotus ---- HVAC Plant Optimization DesignHVAC Plant Optimization DesignHVAC Plant Optimization DesignHVAC Plant Optimization Design Location : Thailand Client: Ek-Chai Distribution Center Scope: Optimization design for HVAC system
Energy Management consEnergy Management consEnergy Management consEnergy Management consulting services for CPN ulting services for CPN ulting services for CPN ulting services for CPN (Plaza Area)(Plaza Area)(Plaza Area)(Plaza Area) Location: Thailand Client: Central Pattana Pcl. Scope: Consulting in energy measures,
Feasibility study for initiatives and innovation, Measurement and verification for per and post audit
11/16
PROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCE EFFICIENCY ENERGY
LEED Consultation for PLEED Consultation for PLEED Consultation for PLEED Consultation for PEPSICOEPSICOEPSICOEPSICO (Pepsi Factory)(Pepsi Factory)(Pepsi Factory)(Pepsi Factory) Location: Rayong Province, Thailand Client: Chuchawal-Royal Haskoning Scope: LEED Project Consultation Services
and Registration, simulation and commissioning .
LEED Consultation for PEPSICOLEED Consultation for PEPSICOLEED Consultation for PEPSICOLEED Consultation for PEPSICO (Frito Lay Factory)(Frito Lay Factory)(Frito Lay Factory)(Frito Lay Factory) Location: Ayutthaya Province, Thailand Client: Chuchawal-Royal Haskoning Scope: LEED Project Consultation Services
and Registration, simulation and commissioning .
Professional Preventive Maintenance Program Professional Preventive Maintenance Program Professional Preventive Maintenance Program Professional Preventive Maintenance Program Location: Bangkok, Thailand Client: Jones Lang LaSalle Management Ltd. Scope: Preventive Maintenance services for Air
Cooled Chiller and Pump System, CRAC, Control alarm system and UPS, Daily starting and stopping of equipment, making records, and adjustments when require.
Energy Management consulting Energy Management consulting Energy Management consulting Energy Management consulting services for Fashion services for Fashion services for Fashion services for Fashion IslandIslandIslandIsland Location: Rangsit-Nakornnayok Client: Siam Retails Development Scope: Energy Management consulting
services.
12/16
PROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCE EFFICIENCY ENERGY
Chevron New Shore BaseChevron New Shore BaseChevron New Shore BaseChevron New Shore Base Location: Nakorn Srithammarat Province, Thailand Client: Chuchawal Royalhaskoning Scope: Project management and feasibility
study.
Green Air compressor projectGreen Air compressor projectGreen Air compressor projectGreen Air compressor project
Location: Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Establishing of air compressors
database in Thailand, Fine tuning of operations to improve efficiency, Prepare guideline for MEP and HEP
Green Boiler projectGreen Boiler projectGreen Boiler projectGreen Boiler project Location: Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Establishing of steam boilers database
in Thailand, Boiler tuning to improve combustion efficiency.
Development of coal gasification for industryDevelopment of coal gasification for industryDevelopment of coal gasification for industryDevelopment of coal gasification for industry Location: Samutsakorn Province, Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Turnkey project of updraft coal
gasifier.
13/16
PROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCE EFFICIENCY ENERGY
Modified Drawing and Reduced Cost of Project Fire Modified Drawing and Reduced Cost of Project Fire Modified Drawing and Reduced Cost of Project Fire Modified Drawing and Reduced Cost of Project Fire Fighting and Rescue InstituteFighting and Rescue InstituteFighting and Rescue InstituteFighting and Rescue Institute
Location: Thailand Client: Department of Disaster Prevention and
Mitigation Ministry of Interior Scope: Modified construction drawing and
optimized project cost.
Myanmar Brewery Myanmar Brewery Myanmar Brewery Myanmar Brewery –––– Substation studySubstation studySubstation studySubstation study Location : Pyinmabin Industrial Estate Client: Myanmar Brewery
Scope: M&E designer for conceptual and detailed design for the electrical sub-station, New soft drink plant and extension of 36K bottling hall
Thai Beverage Thai Beverage Thai Beverage Thai Beverage –––– Regional DistrRegional DistrRegional DistrRegional Distribution Centeribution Centeribution Centeribution Center Location: Nakhon Ratchasima Province, Thailand Client: Chuchawal Royalhaskoning Scope: Design development and detailed
design for M&E works including Bid evaluation for center of more than
20,000 m2
BTS Stations/TaksinBTS Stations/TaksinBTS Stations/TaksinBTS Stations/Taksin----Bangwa phase IIBangwa phase IIBangwa phase IIBangwa phase II
Location: Thailand Client: BMA Scope: Conceptual design and cost estimation
for the air conditioning, fire protection and sanitary works for turnkey bidding
14/16
PROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCE EFFICIENCY ENERGY
Training for InTraining for InTraining for InTraining for In----house and Customize Training Coursehouse and Customize Training Coursehouse and Customize Training Coursehouse and Customize Training Course Location: Thailand Client: The Department of Alternative Energy
Development and Efficiency Scope: Provide training course for Client as in-
house course and providing for DEDE training department and material for training, seminar and PR
Efficiency Improvement in Production process of NonEfficiency Improvement in Production process of NonEfficiency Improvement in Production process of NonEfficiency Improvement in Production process of Non----Metal productsMetal productsMetal productsMetal products Location: Thailand Client: Department of Alternative Energy
Development and Efficiency Scope: Gathering the energy consumption in all
designate factories within non-Metal products industry and selection of 40 factories to implementation of energy efficiency improvement in the production process
15/16
PROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCEPROJECTS REFERENCE CARBON MANAGEMENT
Initiatives for Carbon footprint reduction of Initiatives for Carbon footprint reduction of Initiatives for Carbon footprint reduction of Initiatives for Carbon footprint reduction of DC Samchok DC Samchok DC Samchok DC Samchok
Location: Pathum Thani Province, Thailand Client: Ek-Chai Distribution System Co.,Ltd Scope: Initiatives for carbon footprint
reduction
CO2 Emission Reduction for Tesco Lotus CO2 Emission Reduction for Tesco Lotus CO2 Emission Reduction for Tesco Lotus CO2 Emission Reduction for Tesco Lotus
Location: Thailand Client: Tesco Lotus Scope: Initiatives, Project management, Audit
and monitoring
ZeroZeroZeroZero----Carbon Store for Tesco Lotus Carbon Store for Tesco Lotus Carbon Store for Tesco Lotus Carbon Store for Tesco Lotus Location: Bangphra, Thailand Client: Tesco Lotus Scope: Technology and Technical Consultancy
Net Zero Enery Building Net Zero Enery Building Net Zero Enery Building Net Zero Enery Building
Location: Thailand Client: Khon Kaen University Scope: Technology and Technical Consultancy
PV system, hybrid system, solar cooling, electricity for cooling pads and LED
Lighting