Adoption of Hollow Blocks Insteadof Conventional Clay Bricks
Presented ByMd. Abdul Kader
Registration # 09215002
8/6/2019 Proposal Presentation for Thesis, 18.05
2/11
IntroductionOn the present situation we have threeprojects in hand to be construct of which about19000 sft apartment building whose roof slab has been casted and brick work is yettostart, another project is about 55000 sft whose only piling work has been done andthe last project which is of about 100000 sft and the structural design of this projec isyet to be finish.
Beside these we have other projects which we have finished and handed over toour clients. But those previous projects compare toconstruction cost the companyhas earna minimum profit and for which the management has decided to minimizethe cost as well as tosave time for construction period.
From this point of viewwe have decided to implement the hollowblocktechnology instead of conventional clay brick in our on going projects
8/6/2019 Proposal Presentation for Thesis, 18.05
3/11
Project Perspectives
8/6/2019 Proposal Presentation for Thesis, 18.05
4/11
Objectives with specific Aims and
Possible Outcomes:Objectives:The specific objectives of the study are as follows-y Building projects in the most economic and time efficient
way.y Implementation of hollow blocks and minimize the
construction costy Contribute to minimize the Environmental loss
Possible outcome:y Aproper planning and instruction may be suggested on the
basis of the study which includes structural design, costbenefit analysis and the process of implementation.
8/6/2019 Proposal Presentation for Thesis, 18.05
5/11
Comparison between hollow block and clay
bricky Reduce the cost in wall up to15
to 25% separately & totalconstruction cost up to 20%
y thickness of plaster is 6mm
instead of 12mm on brick wally Weight reduced than brick
used up to 30%y Structural dimension reduced
due to less weight.y Less time required than ick
worky Sound and Heat Proofy Not affected by salinity
Sample of Hollow Block
Sample of Clay Brick
8/6/2019 Proposal Presentation for Thesis, 18.05
6/11
Comparison between hollow block and clay brick
Project Material Total Sftforinteriorwall
Total sftforexteriorwall
TotalWeight(kg)
TotalExpenditure
Project 01 Hollow 17360 6790 443447 600369
Clay Brick 17360 6790 553254 777630
Project 02 Hollow 37864 23113 1139962 1515888
Clay Brick 37864 23113 1402471 1963460
8/6/2019 Proposal Presentation for Thesis, 18.05
7/11
Methodology:
y Necessary data and information collection throughbooks, journals etc.
y
Visit to different company projects and factory.y Interviews of different people who are involved with
Hollow block implementation
y Construction of a sample hollow block wall on aproject and to determine its consequences
y Comparative study between hollow block and claybricks
y Benefit cost analysis
8/6/2019 Proposal Presentation for Thesis, 18.05
8/11
Projects who are using Hollow Block
8/6/2019 Proposal Presentation for Thesis, 18.05
9/11
8/6/2019 Proposal Presentation for Thesis, 18.05
10/11
Time Schedule for Project Completion
Sl. No.
Item of Work
Time Schedule For the Project
May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11
1 Data Collection
2 Comparative Study
3 Cost Benefit Analysis
4 Implementation and its Consequences
5 Report Writing
6 Primary Presentation
8/6/2019 Proposal Presentation for Thesis, 18.05
11/11
ConclusionFrom the above issues, to save the environmental lossand to minimize the construction cost as well as to
save the construction period of projects we areapproaching to adopt the hollow block instead ofconventional clay bricks to our company and todetermine its consequences.
Therefore I have choose this topic for my project/thesis to have better solution and complete
knowledge of about the hollow block technology.