` Concrete expected to give trouble free service
throughout design life.
` Concrete decay is cancerous caused by
carcinogenic agents.` Physical damage caused due to fire,explosion and
restraints both external and internal.
8/3/2019 Protection Repair and Maintenance of Rcc Structures
3/32
8/3/2019 Protection Repair and Maintenance of Rcc Structures
4/32
` Seal the surface of the concrete
` Modify the concrete to reduce its permeability
` Protect the reinforcing bars to reduce the effect of
chlorides
8/3/2019 Protection Repair and Maintenance of Rcc Structures
5/32
` ood concrete practice
` Latex modified concrete
` Silica fume concrete
` Epoxy coated reinforcement` Providing membranes and sealers
` Cathodic protection
` Electro osmosis
` Inorganic corrosion inhibitors
` Organic corrosion inhibitors
8/3/2019 Protection Repair and Maintenance of Rcc Structures
6/32
` Specify and introduce Chloride limit
` Maintain a low water-cement ratio in concrete
` Provide adequate cover to the reinforcing steel
`
Provide adequate curing` Use of water-reducing admixtures
` Consolidating the concrete thoroughly
` Use post tensioning
`
Include provision for immediate repair of cracks
8/3/2019 Protection Repair and Maintenance of Rcc Structures
7/32
` Latex modified concrete is prepared by adding
liquid styrene butadiene latex to conventional
concrete
` Latex modified concrete should be placed in theevening or at night to reduce cracking
8/3/2019 Protection Repair and Maintenance of Rcc Structures
8/32
` Silica fume reacts with calcium hydroxide to form
additional cementitious material
` Silica fume is extremely puzzolonic material that
reacts with calcium hydroxide` Performance of concrete is good to excellent
8/3/2019 Protection Repair and Maintenance of Rcc Structures
9/32
` Pre-cleaned reinforcing steel bars are protectedwith a coating of powdered epoxy
` Coating blocks chloride ions
` Performance is poor to excellent
8/3/2019 Protection Repair and Maintenance of Rcc Structures
10/32
8/3/2019 Protection Repair and Maintenance of Rcc Structures
11/32
8/3/2019 Protection Repair and Maintenance of Rcc Structures
12/32
` Membranes and sealers help prevent chloride
entry
` Urethanes, neoprene, or epoxies are usually used
to built up in multiple layers of membranes` The performances of these materials vary
depending upon the base of the sealer
` Sealers- linseed oil and sophisticated silanes and
siloxanes
8/3/2019 Protection Repair and Maintenance of Rcc Structures
13/32
` controls corrosion of steel by applying direct
current
` is a complicated process that requires extensive
pre installation and monitoring` Corrosion of steel in concrete is a electrochemical
process
` Steel (reinforcement) inside the concrete act as
cathode and provide protection` Concrete act as anode
` Not recommended for carbonated concrete
8/3/2019 Protection Repair and Maintenance of Rcc Structures
14/32
` Electro Osmosis makes it possible to restore the
initial alkalinity of the concrete
` externally applied alkaline gel covering the
external conductor is drawn` alkalinity increase of a carbonated concrete
restores the passivation
` The carbonate problem is solved
8/3/2019 Protection Repair and Maintenance of Rcc Structures
15/32
` combine other organic chemicals for successfully
inhibiting corrosion
` inhibitor forms a protective barrier on the
reinforcing steel` barrier prevents reaction between the iron and
chloride
8/3/2019 Protection Repair and Maintenance of Rcc Structures
16/32
` . Experience has shown that there are certain
portions of exposed concrete structures more
vulnerable than others to deterioration from
weathering in freezing climates` Concrete sealing compounds and coatings that
provide good protection from weathering
8/3/2019 Protection Repair and Maintenance of Rcc Structures
17/32
` Determine the cause(s) of damage
` Evaluate the extent of damage
` Evaluate the need to repair
` Select the repair method` Prepare the old concrete for repair
` Apply the repair method
` Cure the repair properly
8/3/2019 Protection Repair and Maintenance of Rcc Structures
18/32
` Surface Grinding
` Using Portland Cement Mortar
` Dry Pack and Epoxy-Bonded Dry Pack
` Preplaced Aggregate Concrete` Replacement Concrete
` Epoxy-Bonded Epoxy Mortar
` Polymer Concrete
` Silica Fume Concrete
8/3/2019 Protection Repair and Maintenance of Rcc Structures
19/32
` It can be used to repair some bulges, offsets andother irregularities.
` Grinding of sufaces subjected to cavitation erosionshould be limited in depth so that no aggregateparticles more than 1/16th inch in cross section areexposed to finished surface.
` Grinding of surfaces exposed to public viewshould be limited in depth so that no aggregate
particles more than 1/4 inch in cross section areexposed at the finished surface
8/3/2019 Protection Repair and Maintenance of Rcc Structures
20/32
` Dry pack is a combination of Portland cement and
sand passing a No. 16 sieve
` Dry pack should be used for filling holes having a
depth equal to, or greater than, the least surfacedimension of the repair area; for cone bolt, she
bolt etc.
8/3/2019 Protection Repair and Maintenance of Rcc Structures
21/32
` Preplaced aggregate concrete is made by
injecting portland cement grout, with or without
sand, into the voids of a formed, compacted mass
of clean, graded, coarse aggregate` The preplaced aggregated is washed and
screened to remove fines before placing into the
forms
8/3/2019 Protection Repair and Maintenance of Rcc Structures
22/32
` Concrete repairs made by bonding new concrete
to repair areas without use of an epoxy bonding
agent or mortar grout applied on the prepared
surface should be made when the area exceeds 1square foot and has a depth greater than 6 inches.
` Replacement concrete repairs are made by
bonding new concrete to the repair areas without
the use of a bonding agent or Portland cementgrout
8/3/2019 Protection Repair and Maintenance of Rcc Structures
23/32
` Portland cement mortar may be used for repairing
defects on surfaces not prominently exposed
` Repairs may be made either by use of shotcrete
or by hand application methods
8/3/2019 Protection Repair and Maintenance of Rcc Structures
24/32
` Epoxybonded epoxy mortar should be used where
the depth of repair is less than 1-1/2 inches and
the exposure conditions are such that relatively
constant temperatures can be expected` Epoxy mortars have thermal coefficients of
expansion that may be significantly different from
conventional concrete
8/3/2019 Protection Repair and Maintenance of Rcc Structures
25/32
8/3/2019 Protection Repair and Maintenance of Rcc Structures
26/32
` difference in potential can result in the formation of
a galvanic corrosion cell with accelerated
corrosion at the repair perimeters
` The epoxy bond coat and epoxy mortar createzones of electrical potential that are different from
the electrical potential in the surrounding concrete
8/3/2019 Protection Repair and Maintenance of Rcc Structures
27/32
` Polymer concrete (PC) is a concrete systemcomposed of a polymeric resin binder and fine andcoarse aggregate
` Water is not used to mix polymer concrete
` PC is commonly used to repair potholes inconcrete highway bridge decks,
` thereby eliminating the necessity of long andcostly road closures or detours
` the monomer molecules are chemically linked andcross linked to form a hard, glassy plastic knownas a polymer.
8/3/2019 Protection Repair and Maintenance of Rcc Structures
28/32
8/3/2019 Protection Repair and Maintenance of Rcc Structures
29/32
` Silica fume concrete is conventional portland
cement concrete containing admixtures of silica
fume
`
Silica fume is a finely divided powder byproductresulting from the use of electric arc furnaces
8/3/2019 Protection Repair and Maintenance of Rcc Structures
30/32
8/3/2019 Protection Repair and Maintenance of Rcc Structures
31/32
` Repair and prepared corrected area should be
carried out systematically
` application of protective coatings are required to
be properly supervised and carried out.` Surface defects like bugs holes and honey comb
require immediate repairs