PT. INDO TEHNIK INDUSTRICompany Profile
keep the best specialty of the past and pursue
the best quality in the future
keep the best specialty keep the best specialty of the past and pursue of the past and pursue
the best quality in the futurethe best quality in the future
keep the best specialty of the past and pursue
the best quality in the future
CONTENTS3 Company Information
11 Performance Record
13 Project Highlight
23 Project Experience
29 License & Certification
35 Contact US
Company Information
In order to meet your need, we are stepping forward to you with our abundant engineering technology and construction experience accumulated over21 years.
Our highly advanced technology and prominent management structure lead all projects promptly and effectively. We will secure to satisfy all your needs.
PT. INDO TEHNIK INDUSTRI
3
To keep the best specialty of the past and pursue the best quality in the future.
MISSION
VISIONTo be a leading construction company providing Internationally accepted qualification.
To continue enjoying good reputation from clients with their full satisfaction.
MOTTO
4
5
We, PT. INDO TEHNIK INDUSTRI,
was established on January 21, 1997
newly as one of the engineering and construction
company with 100% Foreign Investment (PMA)
Specialized for Mechanical Erection,
Piping Fabrication and Installation,
Steel Structure fabrication and Installation,
Plumbing, H.V.A.C., Fire Fighting, Sanitary Work.
HISTORY
1997
COMPANY INFORMATION
6
Utilizing the unique experience of all our
management and members in
Indonesia and South East Asia
for more than 21 years,
We, PT. INDO TEHNIK INDUSTRI, has been
growing rapidly since its establishment and
enjoying good reputation on
our diversified service executed.
It is our firm belief that our service will provide
customers with full satisfaction in terms of
quality and schedule.
21 Years
Now, we are ready to serve you.
7
COMPANY INFORMATION
OUR BUSINESS LINES
Major Field of Engineering and Construction
Steel Structure Fabrication / Installation
Piping Fabrication / Installation
Mechanical Erection
Plumbing. H.V.A.C., Fire Fighting, Sanitary Work
8
GeneralAffair
Engineering ProjectExecution Marketing
Vice PresidentCHUNG SOK KIM
President DirectorKIM SOO YONG
DirectorHO SOK KIM
Board Director
Administration
Procurement
Financing
Accounting
Steel Structure
Mechanical
Piping
QA / QC
Steel Structure
Mechanical
Piping
QA / QC
CAD
Cost Schedule
Government Relation
ORGANIZATION
9
COMPANY INFORMATION
KEY PERSONNEL
President Director Kim Soo Yong
Vice President Kim Chung Sok
Director Kim Ho sok
Site Manager Jung Hyun Mo
Project Manager Abdul Rohim
Engineering Manager Gunadi
Cost & Schedule Andi Syamsudin
Administration Manager Johannes Endro Sulistyo
Financing & Accounting Mintari Rimadaniati
Procurement Gatut Sugeng Wiyono
NitaHuman Resource Development
10
Our EmployeeMax.
Mobilization
Description Korean Indonesia
Managing Staff
Administration
Engineering
CAD/DWG
DWG Drafter
Construction
QA/QC, Safety
Sch. / Cost
Supervisor
Foreman & Others
Total 6 114
3 1
6
1 20
5
8
2
UAE
2
1
1
10
10
3
16
35
Description Manpower
Welder (6G/3G)
Pipe Filter
Millwright /Mechanical
Rigger
Scaffolder
Steel Fabricator
Insulator
Painter
Equipment Operator
Semi Skilled Labor
Carpenter
Concrete Worker
Total 1,850
200
300
350
150
100
100
100
100
100
50
150
150
PERFORMANCERECORD
Performance DuringThe Past 20 Years
Project Performanceper Year
Total Contract Amount ExecutedUSD 119,000,000
Biggest Contract Amount for Single ProjectUSD 17,750,000
Highest Manpower Mobilized for Single Project2,000 persons
Highlights for Single Project Executed Steel Structure Fabrication & Erection : 11,800 tons,
Mechanical Equipment Erection of 8,600 tons, Piping Fabrication and Installation of 260,000 DI
93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14
500.0
0
1500.0
2000.0
1000.0
USD 11,000
12
PROJECTHIGHLIGHTS
Project Location : QatarProject Summary : Customer : Umm Al-Houl Power CompanyMain Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 30.000.000Time Frame : May 2016 ~ August 2018
Umm Al-Houl Power Plant Project
OVERSEAS PROJECT
EMAL Phase 2 CCPP Project
PRAI CCGT Project
Project Location : Prai, Penang, MalaysiaProject Summary : MWCustomer : TNB Prai Sdn BhdMain Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 4,100.000Time Frame : May 2014 ~ September 2015
Project Location : Al Taweelah, Abu DhabiProject Summary : 1,023 MW Customer : Emirates Alumminium Company LimitedMain Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 12.670.000Time Frame : March 2012 ~ June 2014
OVERSEAS PROJECT
PROJECT HIGHLIGHTS
14
UAE Shuwaihat S2 IWPP Project
Project Location : Ruwais, UAE Project Summary : 1510 MW and 100 MIGDCustomer : Ruwais Power Company Main Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 17.750.000Time Frame : September 2009 ~ October 2010
Al- Ezzel Power Plant
Project Location : BahrainProject Summary : 4 Unit HRSG Power PlantCustomer : Al Ezzel Power Co.Main Contractor : Doosan Heavy Industries & Const. Co., Ltd.Work Scope : - Installation of Mechanical Equipment, - Fabrication and Installation of Piping : 98,000 DIContract Amount : USD 2,745,000Time Frame : January 2006 ~ August 2006
15
OVERSEAS PROJECT
PROJECT HIGHLIGHTS
Khurais Central Gas Facilities Project
Project Location : Khurais, Saudi ArabiaCustomer : Saudi Arabia Oil Company (Saudi Aramco)Main Contractor : Hyundai Eng. & Const. Co., Ltd.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 5.000.000Time Frame : August 2007 ~ August 2008
FCFC Aroma II, ISBL Chemical Plant
Project Location : Mai-Liao complex, TaiwanCustomer : Formosa Chemical & Fiber Corp.Main Contractor : Daelim Industrial. Co., Ltd.Work Scope : - Installation of Mechanical Equipment : 8,600 tons, - Fabrication and Installation of Piping : 520,000 DI, - Steel Structure : 11,800 tons, Maintenance and Commissioning Contract Amount : USD 6,000,000 excluding additional work
Time Frame : June 1998 ~ March 2000
16
17
LOCAL PROJECT
PROJECT HIGHLIGHTS
Project Location : Anyer, Banten, IndonesiaProject Summary : Customer : PT. Asahimas Chemical (ASC)Main Contractor : Lotte Engineering & Construction.Work Scope : - Steel Structure Erection, - Equipment Erection, - Piping Fabrication and Installation - Pipe Support, Painting Insulation Maintenance & Commissioning AssistanceContract Amount : USD 6,000,000Time Frame : December 2014 ~ December 2015
ASC Phase-VI VCM Project
Project Location : Grati, Pasuruan, IndonesiaProject Summary : Customer : PT. Indonesia PowerMain Contractor : Lotte Engineering & Construction.Work Scope : - Equipment Erection, - Piping Fabrication and Installation, - Pipe Support, Painting & Insulation - Hydrotesting & Commissioning AssistanceContract Amount : USD 8,659,000Time Frame : March 2017~ August 2018
Grati CCPP (Peaker) Ext. Pjt. 450MW
Khurais Central Gas Facilities Project
18
Cilacap RFCC Project
Khurais Central Gas Facilities Project
Project Location : Cikarang, West Java, Indonesia Customer : Hankook Tire Main Contractor : Lotte Engineering & Construction.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning Assistance - Equipment Erection, Contract Amount : USD 5,000,000Time Frame : December 2011 ~ September 2012
Project Location : Cikarang, West Java, Indonesia Customer : Hankook Tire Main Contractor : Lotte Engineering & Construction.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning Assistance - Equipment Erection, Contract Amount : USD 5,000,000Time Frame : December 2011 ~ September 2012
Hankook Tire Indonesia Plant Ph2
Project Location : Cilacap, Central Java, IndonesiaProject Summary : Customer : PT. Pertamina Main Contractor : GS Engineering & Construction.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning Assistance - Steel Structure Erection, Equipment Erection,Contract Amount : USD 16,200,000Time Frame : March 2013 ~ May 2015
Hankook Tire Indonesia Plant
19
LOCAL PROJECT
PROJECT HIGHLIGHTS
Cibinong Phase III Extension Project
Project Location : Cibinong, West Java, IndonesiaProject Summary : 6,000 MTPD Cement PlantCustomer : PT. Semen CibinongMain Contractor : Hyundai Eng. & Const. Co., Ltd.Work Scope : - Steel Structure : 2,637 tons - Erection : 8,071 tons - Piping Fabrication and Installation : 426 tons, Maintenance and Commissioning Contract Amount : USD 6,700,000 excluding additional work
Time Frame : March 1990 ~ July 1992
Cirebon CFPP : 660 MW x 1 Unit
Project Location : Cirebon, West Java, IndonesiaProject Summary : 660 MW x 1 UnitCustomer : Cirebon Electric Power Main Contractor : Doosan Heavy Industries & Construction, Co.. Ltd.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 3,300,000Time Frame : September 2009 ~ December 2010
20
OBL & Revamping for L Project
Project Location : Dumai, Sumatra, IndonesiaProject Summary : Lube Base Oil Plant, VDU unit 25,000 BPSD, CDW unit 9.000 BPSD Customer : PT. Pertamina & SK EnergyMain Contractor : SK Eng. & Const. Co., Ltd.Work Scope : - Equipment Erection : 792 tons, - Piping Fabrication and Installation : 209,000 DI, - CommissioningContract Amount : USD 4,392,000Time Frame : May 2007 ~ April 2008
Project Location : Batu Licin, Kalimantan, IndonesiaProject Summary : 1,000 MTPH Cement ConveyorCustomer : PT. Indocement Tunggal Prakarsa, TbkMain Contractor : PT. Indo Tehnik IndustriWork Scope : - Design & Engineering, Civil Work, Steel Structure Fabrication - Erection, Equipment Fabrication & Erection, - Electrical and Instrument, Start Up and CommissioningContract Amount : USD 1,975,000Time Frame : March 2006 ~ October 2006
Bulk Loading Conveyor Project
21
LOCAL PROJECT
PROJECT HIGHLIGHTS
Project Location : Muara Tawar, West Java, IndonesiaProject Summary : 6 x 143 MW Gas Turbine Power PlantCustomer : PT. PLNMain Contractor : Samsung Eng. & Const. Co., Ltd.Work Scope : - Equipment Erection, - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 2,475,000Time Frame : October 2003 ~ May 2004
Project Location : Jombang, East Java, IndonesiaCustomer : PT. Cheil Jedang IndonesiaMain Contractor : PT. Indo Tehnik IndustriWork Scope : - Detail Design & Engineering for Piping - Piping Fabrication and Installation 120,000 DI Contract Amount : USD 1,400,000Time Frame : February 2003 ~ January 2004
Muara Tawar GTPP Project
Refinery / Fermentation Plant
22
Project Location : Jombang, East Java, IndonesiaCustomer : PT. Cheil Jedang IndonesiaMain Contractor : PT. Indo Tehnik IndustriWork Scope : - Detail Design & Engineering for Piping - Piping Fabrication and Installation 120,000 DI Contract Amount : USD 1,400,000Time Frame : February 2003 ~ January 2004
Project Location : Gresik, East Java, IndonesiaProject Summary : Exhaust gas firing for PA PlantCustomer : PT. PetrowidadaMain Contractor : Envirotect, GermanyWork Scope : - Piping and Duct Fabrication & Refractory - Steel Structure Fabrication & Erection, Work - Equipment Erection, Contract Amount : USD 1,600,000Time Frame : 2001
Project Location : Paiton, East Java, IndonesiaProject Summary : 400 MW Coal Fired Stem Power PlantCustomer : PT. PLNMain Contractor : Hyundai Eng. & Const. Co., Ltd.Work Scope : - Equipment Erection : 2.548 tons, - Piping Fabrication and Installation : 1.124 tons - Fabrication and Installation of Fuel Oil Storage Tank, Contract Amount : USD 4,890,000 excl. Additional WorkTime Frame : August 1992 ~ August 1994
Thermal Incineration Unit
Paiton Power Plant Unit No. 1 & 2
PROJECTEXPERIENCE
24
ProjectName
Owner/Client
ContactValue Period Workspace
Hankook Tire Ph 2 IndonesiaCikarang, Indonesia
Hankook Tire Indonesia /
Lotte E & C Co., Ltd.
Equipment ErectionPiping Fab. & Installation
Commissioning Assistance
September 2014 ~
May 2015
USD 3,800,000-
Prai CCGT ProjectPrai, Penang, Malaysia
TNB Northern Bhd. /Samsung C&T
Piping Fabrication & InstallationCommissioning Assistance
May 2014 ~September
2015
USD 5,500,000-
Cilacap RFCC ProjectCilacap, Indonesia
PT. Pertamina /GS E & C Co., Ltd.
Steel Structure Fab. & ErectionEquipment Fab Erection
Piping Fab. & Installation
March 2013 ~May 2014
USD 16,200,000-
Additional Clay StorageKalimantan, Indonesia
PT. Indocement Tbk.
Steel Structure Fab. & ErectionMarch ~ July 2013
USD 375,000-
EMAL Ph 2 CCPP Project -1,023 MWAl Taweelah, UAE
Emirate Aluminum /
Samsung C & T
Piping Fab. & Installation : 150,000 DI - Pipe Support,
Maintenance & Commissioning Assistance
March 2012 ~June 2014
USD12,670,000-
Hankook Tire IndonesiaCikarang, Indonesia
Hankook Tire Indonesia /
Lotte E & C Co.,Ltd.
Equipment ErectionPiping Fab. & Installation
Commissioning Assistance
December 2011 ~
September 2012
USD 5,000,000-
Piping Engineering J ProjectJombang, Indonesia
PT. Cheil Jedang Indonesia
Basic Design & Piping Design,Drawing & As-Built2011
USD 500,000-
UAE S2 IWPP Project1,310MW & 100 MIGD Ruwais, UAE
Ruwais Power Company /
Samsung C & T
Piping Fab. & Installation : 260,000 DI
Pipe Support,Maintenance & Commissioning
Assistance
September 2009 ~
December 2010
USD 17,750,000-
Cirebon Coal Firing Power Plant (660MW 1 Unit) Cirebon West Java, Indonesia
Cirebon Elektric Power /
Doosan Heavy Industry
Piping Fab. & Installation : 100,000 DI - Pipe Support,Commissioning Assistance
September 2009 ~
August 2010
USD 3,300,000-
ASC Phase VIVCM, Anyer,Indonesia
Asahimas Chemical/
Lotte E & C Co., Ltd.
December2014 ~
December 2015
USD 7,700,000-
Steel Structure ErectionEquipment Fab Erection
Piping Fab. & InstallationPainting, Insulation
Umm Al Houl Power Plant Project
Umm Al Houl Power Company / Samsung C&T
May 2016 ~ June 2017
USD 30,000,000-
Piping Fab. & InstallationCommissioning Assistance
Grati CCPP (Peaker) Ext. Project 450MW
PT. Indonesia Power / Lotte
E&C (Consortium)
March 2017 ~ May 2018
USD 8,569,000-
Equiment ErectionPiping Fab. & Installation
Painting & insulationCommissioning Assistance
New Jetty - B4 ProjectKalimantan, Indonesia
PT. Indocement Tbk.
Piling & Jetty Installation,Dredging2008
USD 2,000,000-
OBL & Revamping for L-Project - Lube Base Oil Plant
PT. Pertamina & SK Energy
Equipment Erection : 792 Ton Piping Fab. & Installation :
209,000 DI Commissioning
May 2007 ~April 2008
USD 4,392,000-
ProjectName
Owner/Client
ContactValue Period Workspace
Khurais Dentral Gas FacilitiesKhurais, Saudi Arabia
Saudi Arabia Oil Company
(Aramco Energy) /Hyundai E & C
Piping Fab. & Installation : 25,000 DI Pipe Support,
maintenance & Commissioning
August 2007 ~
August 2008
USD 5,000,000-
AL-EZZEL Power Plant4 Unit HRSGBahrain
Al-Ezzel Power Co. /
Doosan Heavy Industri
Equipment ErectionPiping Fab. & Installation :
98,000 DI
January 2006 ~
August 2006
USD 2,745,000-
Bulk Loading Conveyor 1,000
MTPH ConveyorKalimantan, Indonesia
PT. Indocement Tbk.
2006USD 1,975,000-
Steam LineGresik East Java, Indonesia
Piping Fab. & Installation
Methanol RecoveryGresik East Java, Indonesia
PT. Petrowidada
PT. Petrowidada
Steel Structure Fab. & ErectionEquipment Fab Erection
Piping Fab. & Installation
USD176,000-
Dismantling PA No. 2 PlantGresik East java, Indonesia
Dismantling & Recondition
USD 130,000-
Drying & Washing ColumnBio Diesel PlantGresik East Java,
Equipment Erection2005
USD 245,000-
USD 75,000-
Steam & Hydrant for PA PlantGresik East Java, Indonesia
Tank RepairPiping Fab. & Installation
Electrical, Commissioning
USD 295,000-
PROJECT EXPERIENCE
2006
2006
2005
2004
PT. Petrowidada
PT. Petrowidada
PT. Anugerah Intitama
Design & Procurement for Conveyor System, Civil & Found
tionSteel Structure Fab. & ErectionEquipment Fab. & Erection Electric
& Instrument, up &Co missioning
25
26
ProjectName
Owner/Client
ContactValue Period Workspace
Piping Engineering P ProjectJombang, Indonesia
T. Cheil Jedang Indonesia
Basic Design & Piping Design,Drawing & As-Built2003
USD 150,000-
Muara Tawar GTPP Project6 x 143 MW Gas Tbn Power Plant
PT. PLN /Samsung C & T
Co., Ltd.
Equipment Erection,Piping Fab. & Installation : 45,000 DI Commissioning
USD 2,475,000-
Refinery / Fermentation Plant Jombang, Indonesia
PT. Cheil Jedang Indonesia
Piping Fab. & Installation : 120,000 DI
USD 1,400,000-
Furnace Steel WorkTuban East Java, Indonesia
Stone & Webster, UK
Dismantle & Recondition of Furnace System
USD 780,000-
Suban Gas PlantSuban Sumatra, Indonesia
Gulf Indonesia /Hyundai E & C
Co., Ltd.Field Tank Erection
USD455,000-
Paper Bag Storage & Hydrant SystemKalimantan,
PT. Indocement Tbk
Civil & FoundationSteel Structure Fab. & Erection
Equipment Fab. & ErectionPiping Fab. & Installation
USD 150,000-
ThermalIncineration Unit Exhaust Gas FiringGresik East java, Indonesia
PT. Petrowidada /Envirotech,
Germany
USD USD 1,600,000-
Jetty Bulk Loader ModificationKalimantan, Indonesia
Steel Structure Fab. & ErectionEquipment Fab. & Erection
Piping Fab. & InstallationCommissioning
USD 200,000-
Sumpal Gas Plant Sumpal, Sumatra, Indonesia
Gulf Indonesia /Hyundai E & C
Co., Ltd.Field Tank Erection
USD 75,000-
Dismantle for PA 1 & MA PlantGresik, East Java, Indonesia
Dismantle & Recondition PlantUSD
250,000-
Coal & Laterite Storage BLDG.Kalimantan, Indonesia
PT. Indocement Tbk.
Civil & FoundationSteel Structure Fab. & Erection
USD 570,000-
2004
2003
PT. Petrowidada
2003
2003
2002
2002
2002
2001
2001
2001
Main Reactor Fab. & Erection, Civil & Foundation Steel Structure Fab. &
Erection Equipment Fab. & ErectionPiping Fab. & Installation, Electric &
Instrument Refractory, Insulation, Start up &Commissioning
PT. Indocement Tbk
PROJECT EXPERIENCE
27
ProjectName
Owner/Client
ContactValue Period Workspace
ASPEX Substation70KVCibinong,Indonesia
PT. Aspex /Hyundai E & C
Co., Ltd.
Electrical2000USD
60,000-
Darajat Geotherm Power Plant 55MW GeothermDarajat West Java,
HVAC
Bosowa Cement PlantUjung Pandang, Indonesia
PT. Bosowa Cement /
Daewoo E & C Co., Ltd.
1999USD 120,000-
Irian Jaya Co-Gen Power Plant 13 MW Wood Chip Firing Irian jaya,
Equipment ErectionPiping Fab. & Installation
Refractory, Electric & Instrument,Insulation, Commissioning
Paiton Steam Power Plant 1,200 MW Coal FiringPaiton East Java,
PT. PLN /Shinwha
Costruction
PT. Korindo /Hyundai E & C
Co., Ltd.
T. Amoseas Indonesia /
Hyundai E & C Co., Ltd.
USD500,000-
TPPI Olefine PlantTuban East Java, Indonesia
Steel Structure ErectionPiping Fab. & Installation
USD 5,500,000-
O-Xylene & Raw
Water Storage Tank
10,000 & 2,000 M3
Gresik East Java,
Indonesia
Tank Fab. & Erection,Piping Fab. & Installation,1997
USD 4,600,000-
USD 950,000-
1998
1998
1997PT. TPPI /
Daelim Industri Co., Ltd.
PT. Petrowidada
USD 420,000- 1999
HVAC
Piping Fab. & Installation : 1,124 Ton
Fire Fighting, Electrical,Insulation, Commissioning
Scrubber UnitGresik, East Java, Indonesia
Equipment Feb. & Erection,Piping Fab. & Installation
USD 200,000-
FCFC Aroma II Chemical PlantMai-Liau Comlex Taiwan
Formosa Corporation /
Daelim Industrial Co., Ltd.
Steel Structure Erection : 11,800 TonEquipment
Erection : 8,600 Ton
Piping Fab. & Installation :
520,000DI,Maintenance & Commissioning
USD 6,000,000-
2001
2000
PT. Petrowidada
28
ProjectName
Owner/Client
ContactValue Period Workspace
Miwon Co-Gen
Power Plant 6 MW
Gas Tbn 3 & 4 Unit
Surabaya, Indonesia
PT. Miwon Indonesia 1996
USD 560,000-
Irian Jaya Co-Gen
Power Plant 13 MW
Wood Chip Firing
Irian jaya, Indonesia
PT. Korindo /Hyundai E & C
Co., Ltd.
USD 600,000-
Seram Co-Gen Power Plant13 MW Wood Chip Firing Seram Island, Indonesia
PT. PLN /Hyundai E & C
Co., Ltd.
Equipment Erection : 1,024 TonPiping Fab. & Installation : 210 Ton
Refractory 428 Ton, Electric & Instrument,Insulation, Commissioning
USD 595,000-
Miwon Co-Gen Power Plant 6 MW Gas Tbn 1 & 2 Unit Surabaya, Indonesia
Equipment Erection : 382 TonPiping Fab. & Installation : 120 Ton
Refractory 98 Ton, Electric & Instru-ment, Insulation, Commissioning
USD 5,000,000-
Paiton Steam Power Plant 400 MW Coal FiringPaiton East java, Indonesia
PT. PLN /Hyundai E & C
Co., Ltd.
USD4,890,000-
Equipment ErectionPiping Fab. & Installation
HVAC Commissioning
USD 540,000-
Semen Cibinong Phase III 6,000 MTPD Cement Plant Cibinong, West Java, Indonesia
PT. Semen Cibinong/
Hyundai E & C Co., Ltd.
USD 6,700,000-
Darajat Geotherm Power Plant55MW GeothermDarajat West Java, Indonesia
PA Storage Tank1,000 M3Gresik East Java, Indonesia
Tank Fab. & Erection,Piping Fab. & Installation,
Steal Tracing w/jacket
USD 400,000-
Butyl Acetate Plant20,000 MTPYMerak, West Java, Indoneisa
Equipment Erection.Piping Fab. & Installation,
Commissioning
USD 540,000-
MA Chemical Plant
3,000 MTPY
Gresik, East Java,
Indonesia
Equipment Erection.Piping Fab. & Installation,
Electric & Instrument,Commissioning
USD 470,000-
1997
1996
1997
PT. Petrowidada /
LG E & C Co., Ltd.
PT. Petrowidada
PT. Petrowidada
1995
1995
1995
1994
1994
1992 ~1993
Steel Structure Erection : 2,637 TonEquipment Erection : 8,071 Ton
Piping Fab. & Installation : 426 TonCommissioning
Equipment Erection : 328 TonPiping Fab. & Installation : 120 Ton
Refractory 98 Ton, Electric & Instru-ment, Insulation, Commissioning
PT. Miwon Indonesia
Equipment Erection : 2,548 TonPiping Fab. & Installation : 1,124 Ton
Fuel Oil Storage Tank Commissioning
PT. PLN /Hyundai E & C
Co., Ltd.
Equipment Erection : 328 TonPiping Fab. & Installation : 120 Ton
Refractory 98 Ton, Electric & Instru-ment, Insulation, Commissioning
LICENSE & CERTIFICATION
Dinas Perdagangan, Perindustriandan Penanaman Modal
Pemerintah Kota Surabaya
Tanda daftar perusahaan13.0.1.1.41.13185
Tanda Daftar PerusahaanPT. Pembangkitan Jawa-Bali
0244/611/SPA/2015
Certificate of Compliancehas been assesed
and complied against the ISO 9001:2008 Standard
Sertifikat Kesepakatan Jaminan Sosial Tenaga Kerja
NN130091
Assesment Contractor Safety Management
System ResultGrade High
Kementrian Energi dan Sumber Daya Mineral Republik Indonesia
Direktorat Jenderal Minyak dan Gas Bumi
044/SKT-01/DMT/2013
30
COMPLETION CERTIFICATION
31
PT. Cheil Jedang IndonesiaCJ P Project
LOTTE Eng. & Const. Co., Ltd. Hankook Tire Indonesia Project
GS Engineering & ConstructionPertamina RFCC, Cilacap Project
32
Hyundai Eng. & Const. Co., Ltd.KCPF Project Saudi Arabia
SK Eng. & Const. Co., Ltd.SK L Project Dumai
Samsung Eng. & Const. Co., Ltd
UAE S2 IWPP Project
COMPLETION CERTIFICATION
33
Shinwha Const. Co., Ltd.Paiton Power Plant
PT. Artika Optima Inti
Hyundai Eng. & Const. Co., Ltd.
KCPF Project Saudi Arabia
34
Daelim Industrial Co., Ltd.FCFC Aroma II, Project, Taiwan
Samsung Eng. & Const. Co., Ltd.Muara Tawar DTPP Project
PT. Petrowidada
35
Plaza Segi 8, Blok D, No. 875, Jl. Pattimura, Surabaya, East Java, 60189, Indonesia
Tel.: +62 31 732 7280, 81 Fax.: +62 317327278E-mail : [email protected] : www.itisby.com
CONTACT US
HEAD OFFICE Surabaya
Complex Wijaya Grand Centre (Gedung Citra) 3rd Floor, Room 10, Blok F No. 48. Jakarta Selatan, 12160, Indonesia
Contact Person : Kim, Young Eon/DirectorTel.: +62 21 726 9045, 720 1674 Fax.: +62 21 720 1862E-mail : [email protected]
LIAISON OFFICE Jakarta
11th floor, Cho Hoon Building. 59-7 Mung-Dong 1Ga, Jung-Gu, Seoul, Korea
Contact Person : Dong Youl, Kim/ ChairmanTel.: +82 2 7562235/6, Fax.: +82 2 7562234E-mail : [email protected]
LIAISON OFFICE Korea
36
PO.BOX 107729, L L J Business Centre No. 123, Abu Dhabi – U.A.E
Contact Person : Nawaf S. Mohammed Al Amoudi/ RepresentativeTel.: +971 -2-4950700Mob: +97155 - 8897777E-mail : [email protected]
BRANCH OFFICE UAE, Abu Dhabi
B4-3 Jalan Ampang Utama 2/2, Taman Ampang Utama , 6800 Selangor , Malaysia
Contact Person : Ho Sok, Kim/ RepresentativeTel.: +60 1124250747E-mail : [email protected]
Indo Tehnik Industri Sdn. Bhd.
Indo Tehnik Industri
Plaza Segi 8, Blok D, No. 875, Jl. Pattimura, Surabaya, East Java, 60189, Indonesia
Tel.: +62 31 732 7280, 81 Fax.: +62 31 732 7278E-mail : [email protected] : www.itisby.com