RecentBond
Accomplishments
Bordeaux Elementary Remodel
New Evergreen Elementary
New Olympic Middle School
Upgrades to CHOICE School
Upgrades to CHOICE School
• New 40-year roof
• New windows
• New carpet in office and classrooms
• Hallways and office re-lamped with T-8 technology
• New ADA compliant restrooms
• New ADA compliant rear entry with elevator and foyer
Upgrades to Shelton High School
Upgrades to Shelton High School
• Some new HVAC units
• New seating, lights and sound in auditorium
• New 40-year roof on stadium
• New, more effective and efficient lighting in gym
• New, quieter and more efficient HVAC system in gym
Upgrades to Shelton HS (con’t)
• New, hardwood gym floor
• New, more efficient gas boilers for heating swimming pool
• New, more effective ventilation system for swimming pool
• New swimming pool back wall and roof
• New deduct water meter
• Installation of full natural gas capacity
Upgrades at Mt. View Elementary
Upgrades at Mt. View Elementary
• Parking and traffic improvements: - safer, more efficient traffic flow - new student drop off area - additional parking • Site improvements: - improved field drainage - retention pond - better storm water management
Upgrades at Mt. View (con’t)
• Safety improvements:
- improved fire loop
- additional fire hydrant
- new breezeway and playshed
• Interior and exterior paint
Other Bond Accomplishments:
• Purchased Administrative Services Building
• Purchased Maintenance Facility
• Demolished Angle Education Center
• Purchased portables at all 3 elementary schools
CurrentFacilityNeeds
Mt. View Elementary
• Complete modernization of school:- New heating and ventilating system- Upgraded restrooms- Improve kitchen facilities- Increase natural light / add windows- New interior finishes- Upgraded exterior finishes
Mt. View Elementary (con’t)
• Additional space to connect library building to main building
• Relocate administration office to west end by new parking lot
- New main entry to building
• Complete modernization of annex
Mt. View Elementary (con’t)
Shelton High School
• Replace buildings 300, 400, 500, 600 and 700 with 57,000 sq. ft. of new building
• Demolish buildings 300, 400, 500, 600 and 700
• The new building would “connect” remaining buildings 100, 200, 1100 and 1200 to make a single school structure
• Buildings 100, 200, 1100 and 1200 would be modernized
Shelton High School (con’t)
• The single structure would enhance student safety and staff supervision
• The new structure would be built completely outside the airport “no-fly zone”
• Gym building and shop building would be completely modernized
• Increase parking facilities
• Provide for future school expansion
Shelton High School (con’t)
Shelton High School Athletic Needs
• Build new visitor bleachers• 1,200 seats• covered seating• press box
• Build visitor ticket booth / concession stands / restrooms
• Remodel restrooms and concessions below existing grandstands and add new area for locker rooms and offices
Shelton HS Athletic Needs (cont’)
• Provide new artificial turf football / soccer field
• Replace existing track surface
CHOICE School
• Provide new heating / ventilating system
• Improve electrical system
• Replace P.A. system
• Improve water piping
• Remodel kitchen and add area to increase size
• New kitchen equipment
CHOICE School (con’t)
• Improve lighting and sound system in auditorium
• Provide operable wall at stage to create additional teaching space
• Provide science lab classroom
• Provide “manufacture” classroom
Transportation Facility
• Remodel existing garage and 4 service bays
• Increase bus parking area
• Remodel existing office space
• Add on to office space to provide• Larger staff meeting room• More restroom fixtures• Improved office layout
Administrative Services Building
• Improve heating / ventilating system
Maintenance Facility
• Demolish existing unused outer buildings
• Build a 3,000 sq. ft. addition to existing metal building
• Remodel existing metal building, shop and office areas
• Create a lobby / entrance area with elevator to second floor
Maintenance Facility (con’t)
• Improve parking
• Improve site security• Lighting• Fencing• Electronic locks
RECOMMENDATIONS
• Mountain View Elementary Modernization & Addition
• Shelton High School New-in-Lieu & Modernization
• Shelton High School Athletic Needs• CHOICE School Remodel• Technology Upgrades• Administrative Services Building Upgrades• New Elementary School #4• Maintenance Building• Transportation Facility