CURRICULUM VITAE
Khairul Azlan Bin Mohd Nor
Current Address
No,1212 blok 9,Felda Tunggal,81900Kota Tinggi,Johor
H/P : 017 2910282 Tel: 07-8278968Email : [email protected]
Personal Particular
Date of Birth : 17 July 1981 Nationality : MalaysiaGender : Male Marital Status : MarriedNew IC No. : 810717-01-5379 Race : Malay Religion : MuslimSex : Male Age : 29 yearsHeight : 1.72m Weight : 65 kg
Education
Highest Level
Level : Certificate Field of study : Mechanical Engineering Major : Mechanical Graduation: December 2000
Name of Institute : Entrepreneurs Development Institute
Level : Certificate Field of study : Gas Pipe Fitting ( Level 1 ) Major : Piping Graduation: July 2003
Name Of Institute : Akademi Binaan Malaysia Wilayah TimurSijil Pelajaran Malaysia
Sekolah Menengah Kebangsaan Adela,Kota Tinggi Johor1998
Skills
Development tools : Knowledge on such as Microsoft Word, Power
Point, Excel, etc.
COMMUNICTION SKILLS
Language-Written/Spoken : 1. Malay- fluent : 2. English- working knowledge
Course Attended
Construction Industry Development BoardConducted by CIDB
Safety Orientation CourseConducted by Sime Semcorp Eng
Best Welding Technique-SMAWConducted by Sime Semcorp Eng
Defects and Preventives Measures Conducted by Kobe Welding (S’pore) Pte.Ltd
Working Experience
A) Jan 2009 – June 2010 Company : OILFAB SDN BHD Position : QC Inspector (Structure/Piping) Project Involved : Tangga Barat Cluster Development Client : Petronas Carigali Sdn. Bhd. ( PCSB )
B) May 2008 – Jan 2009Company : OILFAB SDN BHD Position : QC Inspector (Structure/Piping)
Project Involved : JDA BLOCK B17 DEVELOPMENT (EPCC) FOUR WELL HEAD AND JACKET Client : CARIGALI – PTTEPI OPERATING COMPANY SDN BHD.(CPOC)
C) July 2007 – May 2008Company : TCTL Engineering Sdn.Bhd At Muhibbah Steel Industries Sdn.Bhd. Position : QC Coordinator (Structure)Project Involved : Yemen Lng Project – Package JTIClient : YEMEN LNG COMPANY
D) Nov 2006 – July 2007Company : JR Construction At Ramunia Fabricator Sdn Bhd Position : QC Inspector (Structure/Piping)Project Involved : ( EPCC ) Of Sumandak Selatan ( SUPG-B )and Sumandak Tepi ( SUJT-C ) Deveploment Project (PHASE 2 )Client : Petronas Carigali Sdn. Bhd. ( PCSB )
E) Aug 2006 – Oct 2006Company : MB Petroleum Services (M) Sdn Bhd At Ramunia Fabricator Sdn. BhdPosition : QC Inspector ( Piping )Project Involved : Abu Custer A MIRIPP Jacket and TopsideClient : Petronas Carigali Sdn. Bhd. ( PCSB
F) Oct 2005 – Aug 2006Company : Hasrat Construction. Sdn.Bhd
At Ramunia Fabricator Sdn. Bhd. Position : QC Inspector ( Structure ) Project Involved : RONG DOI Gas Field DevelopmentClient : Korea National Oil Corp.( KNOC) / HYUNDAI (Heavy Industries Co.Ltd)
G) Aug 2005 – Oct 2005Company : Hasrat Construction. Sdn.Bhd
At Ramunia Fabricator Sdn. Bhd. Position : QC Inspector ( Structure ) Project Involved : STINGER FOR HD60 BARGEClient : HYUNDAI (Heavy Industries Co.Ltd)
H) Jan 2005 – Aug 2005Company : Technical Business Group Sdn. Bhd.
At Ramunia Fabricator Sdn. Bhd. Position : QC Inspector ( Structure ) Project Involved : Guntung E ( Jacket, Tripod and BSF )
Client : Exxon Mobile ( EMEPMI )
I) July 2004 – Jan 2005Company : Sekata Tulen Sdn. Bhd.
At Sime Semcorp Eng. Teluk RamuniaPosition : QC Inspector ( Structure ) Project Involve : Amenam / Kpono Oil & Gas Export Project Phase 2Client : SAIBOS
J) April 2004 – July 2004Company : Sekata Tulen Sdn. Bhd.
At Ramunia Fabricator Sdn. Bhd.Position : QC Inspector ( Structure ) Project Involved : South Farious Field SFK-A Compression PlatformClient : Sabah Shell Petroleum
SCOPE OF WORK AND EXPERIENCE
Performing of good inward inspection, material verification and visual inspection as for QA/QC manual and client specification.
Daily monitoring during welding to verify compliance with specification, procedure and sequence including any preheat, interpass temperature control and consumable control.
Prepare / request the NDT as per client specification and requirement.
Perform in process inspection such as marking fit up,visual and dimension check as per ITP(Inspection Test Plan).
Update and complete all inspection report for record and traceability.
Monitoring welding activities and ensure only qualified welder on board and following welding procedure.
Meeting to clarify all outstanding documentation and punch list for welding and NDT.
Coordinate with Eng.Dept, Project Management Team and client report regarding the project progress and activities to ensure the project requirement are follow.
Carry out final visual and dimensional check (DC) to ensure all measurement are within tolerance prior to acceptance.
Monitoring on NDT activities and repair activities. Performing final punch list inspection. QA/QC documentation review and report.
References
1. Mr. Yusuf Bin Mat SallehQA/QC Manager Oilfab Sdn Bhd
# 2, Jalan Sungai Chandong 13,Pulau Indah Industrial Park,42920 Pulau Indah,Selangor, Malaysia
Tel: 013-7715288