Rhône-Méditerranée River Basin DistrictPOM : process and implementationPOM : process and implementation
Keys for successKeys for successRIOB, Sibiu 2-3/10/2208
Philippe DupontJean-Louis SimonnotChristian Lasnier (ill.)
Regional public bodies consultation
Public Consultation
RBMP and POM : Final version
04 - 10/2008
01 - 05/2009
11/2009
Characteristics of RBD…
Draft of RBMP (SDAGE) and POM
Where are we ?
2005 - 2007
2007 - 2008
The POM at the level of 200 sub basinsAgriculture• reduction of non point pollution• buffer stripes, hedges,…
Artificialisation• physical restoration : meanders, riparian forest, • dead arms restoration
Water quantity management• reduction of water abstractions
Example(~ 500 km2) :
Implementation : different relevant scales
RegionsState coordinationLand planning
DepartementsRegulationsSubsidies for local authorities
Sub basinsLocal managementPack of measures
District : Water Agency = polluter pays principle
WWTP Directive
Nitrates Directive
Drinkable Water Directive
Bathing water Directive
Hasardous substancesDirective
…
WWTP Directive
Nitrates Directive
Drinkable Water Directive
Bathing water Directive
Hasardous substancesDirective
…
Droit français
Décrets, arrêtés, circulairesCode de l’environnementCode minierCode des collectivités terr.Code pénal…
Droit français
Décrets, arrêtés, circulairesCode de l’environnementCode minierCode des collectivités terr.Code pénal…
BasicMeasures
BasicMeasures
First step : regulation
EuropeanDirectives EuropeanDirectives
National translation National translation
Monitoring programmMonitoring programm
A pragmatic implementation
ObjectivesObjectives Programme of measuresProgramme of measures
Water policy assessment to develop !Water policy assessment to develop !
Good status2015
Good status2015
Good status 2021Good status 2021
Good status 2015Good status 2015Basic
measuresBasic
measuresSupplementary
measuresSupplementary
measuresNWBNWB
HMWBHMWB
NWBNWB