SGN 2011 Ad-hoc Tender Interruption Requirements
24th November 2011
2
2011 Ad-hoc Interruption Process • Scotia Gas Networks publish Interruption
Requirements 24th November 2011
• Tender window opens Monday 12th December 2011
• Tender window closes 5pm Friday 16th December 2011
• On or before 20th January 2012 SGN publish results of the Ad-hoc tender
3
Ad-hoc Interruption Requirements November 2011
• Scotia Gas Networks have published it’s Interruption Requirements, details are summarised below or on the SGN website; www.sgn.co.uk
• or contact for assistance
Steven Howells tel 07773 284161 Scott Duncan tel 01293 818256
Email [email protected]
2011 Ad-hoc Tender Process Interruption Website
4
Scotland Zones -figures
• Interruption Requirements
Zone Requirements 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019SOQ Volume (GWh/Day) 0.7 0.7 0.7 0.7 0.7 0.7Min No Int Days 30 30 30 30 30 30Max No Int Days 53 59 62 69 69 69
Zone Requirements 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019SOQ Volume (GWh/Day) 1.9 2.1 2.1 2.2 2.2 2.2Min No Int Days 30 30 30 30 30 30Max No Int Days 33 37 37 40 40 42
Zone Requirements 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019SOQ Volume (GWh/Day) 0.35 0.35 0.35 0.35 0.35Min No Int Days 5 5 5 5 5Max No Int Days 15 20 20 34 38
Scotland Zone; (Kilmarnock-Darvel
Scotland Zone; Angus
Scotland Zone; Moray
5
South Zones -figures
• Interruption Requirements
Zone Requirements 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019SOQ Volume (GWh/Day) 1.04 1.04 1.04 1.04 1.04 1.04Min No Int Days 5 5 5 5 5 5Max No Int Days 38 38 38 40 40 40
South Zone; Milton Keynes