Shaping the future of digital standards, requirements and information management
1
A Joint Industry Program (JIP), call for participation, plan forward
Initiated by the Sector Board Petroleum
LO - Norwegian
Confederation of
Trade Unions
DNV GL ©
Commercial in confidence
23 May 2018
Purpose and Content
Part 1:
▪Context
▪Scope and deliverables
Part 2:
▪Overall plan for execution
▪Budgets and financing
▪Project governance
▪Agreement
▪Next step
2
My goal is to provide an overview of the scope, deliverables and plans for the NORSOK Z-
TI JIP. I will also try to clarify what we need from you towards a possible kick-off.
DNV GL ©
Commercial in confidence
23 May 2018
NORSOK Z-TI is important to DNV GL, and we are proud to be given the task of establishing this initiative as a Joint Industry Project
3
3
▪ More than 150 years history with standardization and assurance; we classify, certify, verify and test
▪ Long experience with solving challenges in close collaboration with industry
▪ Currently DNV GL manages more than 100 Joint Industry Projects in the global Oil and Gas industry
▪ Together with the industry, we have started our digitalization journey
▪ Projects with our customers and partners
▪ Digitalization of all core services and DNV GL standards, Assurance, Risk Management, Classification and
Certification
DNV GL ©
Commercial in confidence
23 May 2018
Taking over a «sailing ship»: A lot of very good work has been done already
4
Managed by: Bjørn Berli on behalf of Standard Norway
Funded by: Sector Board Petroleum
Contribution from the following: Statoil, ConocoPhillips, AkerBP, EPIM, Aibel, Aker Solution, UiO/SIRIUS and DNVGL
Input from EPIM’s Standardisation Project (STI)
Managed by: DNV GL
Funded by : JIP participants
All players in the Norwegian Oil and Gas Industry are invited to participate.
Siginificant contributions from participating organisations are required
Input from EPIM’s Standardisation Project (STI)
Pre-project Joint Industry Project(JIP)
DNV GL ©
Commercial in confidence
23 May 2018
WP3- Proposal for updated and digital NORSOK Z-TI (Technical Information) requirements
Z-001 - Documentation for operation (DFO) Z-018 - Supplier’s documentation of equipment Z-DP-002 - Coding System Z-CR-002 - Component identification system
WP2- Framework for requirements governance and distribution
The JIP will have three main deliverables: Standards, Technology and Services
Access and distributionZ-003 - Technical information flow requirements
WP1 - Methodology and tools for digital
requirements
5
WP4 - ISO Standardisation: ISO 15926 – 14 Technical Report Common language
WP0 -JIP Management
Standards
ServicesTechnology
Note: Final scope and list of deliverables will be set by the JIP steering committee. The NORSOK owners represented by Standards Norway will have the ownership to the final deliverables from the JIP.
Implementing World Wide Web Consortium
(W3C) recommendations for semantics
DNV GL ©
Commercial in confidence
23 May 2018
Relevant results from the project will be fed into international standards like ISO/IEC for standardisation and to organisations like IOGP for alignment
6
Standardisation
AlignmentEtc.
ISO 15926
Basic principlesfor modellingrequirements
NORSOK requirements
Facility/company Specif ic requirements
IOGP
IECISO
International
Association of Oil
& Gas Producers
DNV GL ©
Commercial in confidence
23 May 2018
WP1 - Methodology and tools for digital requirements and technical information
7
Systematic method for representing asset information, vocabularies and
requirements (rules)
Tool support for capturing, structuring and digitalizing requirements
Standards Compliant Asset Model• Test and explore effect of requirements• Support sharing of digital asset
information along the life cycle, and along the value chain
DNV GL ©
Commercial in confidence
23 May 2018
WP2- Framework for requirements governance and distribution
▪ Common web based services ensuring
access for humans and machines
▪ Governance model including business
case/plan
▪ Update of NORSOK Z-003 Information
Flow
8
Database with
NORSOK Z-TI
requirements
DNV GL ©
Commercial in confidence
23 May 2018
ISO
API
WP3 - Proposal for updated and digital NORSOK Z-TI (Technical Information) requirements
9
Z-018
(2013)
Z-001
(1998)
Database with
NORSOK Z-TI
requirements
Other
standards
Z-CR-
002
(1996)
Aibel MMDAker PUSH
etc.
NORSOK
Z-001
Intelligent data
STI
Z-DP-
002
(1996)
Z-003
(1998)
Company
specific
requirements
Vocabularies
Requirements
Methodology Tools Asset model
Work
gro
ups
DNV GL ©
Commercial in confidence
23 May 2018
WP4 - ISO Standardisation: ISO 15926 – 14 TR (Technical Report)
10
Etc.
ISO 15926
Basic principlesfor modellingrequirements
NORSOK requirements
Facility/company Specif ic requirements
• A standardised «digital language»
for representing technical
information and requirements
• Full and faithfull implementation of
W3C OWL2 DL (Web Ontology
Language Direct Semantics)
• Enables automated reasoning - a
key requisite for quality, efficiency
and scalability
NORSOK Z-TI
Methodology
NORSOK Z-TI
requirements
Generic
Specific
DNV GL ©
Commercial in confidence
23 May 2018
To minimise risk and keep momentum, the project will be executed in three phases
▪ Steering commitee Decision Gates between phases
▪ Financial commitment for participants per phase. Current commitment will be for Phase 1
▪ Planning (SoW, budget and schedule) for next phase included in ongoing phase
▪ Total duration is estimated to 24 months after kick-off
11
2017 2018 2019
Phase 1
2020
Kick-Off DG1 EndInitiation DG2Phase 1 Phase 2 Phase 3
Phase 2
Phase 2
Solid outline = JIP Phase 1 Scope
DNV GL ©
Commercial in confidence
23 May 2018
Possible interfaces, related initiatives and projects
12
2017 2018 2019
Phase 1
2020
Kick-Off DG1 EndInitiation DG2Phase 1 Phase 2 Phase 3
Phase 2
Phase 2Standardisation Initiative – STI
“Tverrsektoriell digitaliseringspilot” – Standard Norge
Company/Industry value realisation projects
Digitalising other NORSOK standards
NORSOK Z-TI Standardisation
TIRC - Technical Information Requirements Catalogue (Separate contract)
Solid outline = JIP Phase 1 Scope
DNV GL ©
Commercial in confidence
23 May 2018
Scope Phase 1: Information requrements for a valve segment from early phase engineering to operations
▪ WP3:
– Re-structured and digital NORSOK Z-018, Z-001 and Z-CR-002 and Z-DP-002
covering valve segments (Initial update)
– Including elements from several disciplines and systems (valves, control loop,
instrumentation, piping, etc)
▪ WP2:
– Initial web based service (Minimum Viable Product/Proof of Concept)
– Initial update of NORSOK Z-003, efficient information sharing
WP1:
– Capture learning from work group, and update accordingly
▪ WP4:
– ISO 15926-14 TR Proposal ready for ballot
▪ WP0:
– JIP Initiation
– Project Management
– External communication
– Specification of next Phase
13
DNV GL ©
Commercial in confidence
23 May 2018
The total budget is estimated to NOK 27.5 mill In addition approximately 14 000 hours in-kind is requested from participants
14
WP Title
Phase 1 Total
Cash
[kNOK]
In-kind
[hrs]
Cash
[kNOK]
In-kind
[hrs]
0 JIP Management 2 300 0 6 800 0
1Methodology and supporting tools for digital
requirements500 300 1 700 900
2Framework for requirements governance and
distribution1000 300 4 600 900
3 Update of NORSOK Z-TI 1 300 1 200 12 600 12 000
4 ISO Standardisation: ISO 15926-14 Technical Report 700 0 1 300 0
Travel and other expenses 200 0 500 0
Total 6 000 1 800 27 500 13 800
DNV GL ©
Commercial in confidence
23 May 2018
Operators will have to carry the main part of the cash contributions Contractors and suppliers will mainly provide in-kind contributions to the project
15
Category
Requested for Phase 1 Remaining phases Total
Cash
[kNOK]
In-kind
[hrs]
Cash
[kNOK]
In-kind
[hrs]
Cash
[kNOK]
In-kind
[hrs]
Large sized owner/operator1) 2 000 500 7 000 1 000 9 000 1 500
Medium sized owner/operator1) 1 500 500 3 500 1 000 5 000 1 500
Small sized owner/operator1) 300 250 900 750 1 200 1 000
EPC Contractor 50 2) 700 502) 1 300 100 2) 2 000
Equipment/System Vendor 0 400 0 600 0 1 000
Authorities3) 50 200 50 – 950 400 100 – 1 000 600
Others 50 2) 200 502) 400 1002) 600
1) Operators categorized according to http://www.norskpetroleum.no/en/developments-and-operations/number-and-diversity-of-companies/ ..and the corresponding spreadsheet http://www.norskpetroleum.no/wp-content/uploads/71-Aktører-på-norsk-sokkel-fordelt-på-størrelse-2000-2016-03022017.xlsx
2) Can be compensated as in-kind. 3) Authorities are also invited to participate as “Observer”
DNV GL ©
Commercial in confidence
23 May 2018
Each signing party will have a seat in the steering committee, which is the governing body of the project
16
Work Group n etc...
Steering CommitteeAll partners have one representative
Project ManagerDNV GL
JIP supportContract, economy, etc.
WP 3 - Proposal for updated and digital NORSOK Z-TI
WP 4 - ISO 15926-14 Technical ReportWP 2 - Framework
and governance
WP 1 - Methodology and tools
Work Group 1 – «Valve Segment»
Project sponsorDNV GL
Quality
DNV GL ©
Commercial in confidence
23 May 2018
DNV GL’s “Multiparty Project Agreement” is the contractual basis
▪ Customised to be aligned with the Sector Board
Petroleum’s intentions for the NORSOK Z-TI project
▪ The principles are approved by an Interim Steering Group
appointed by the Sector Board Petroleum, and any
amendments will only be entered into in exceptional cases
▪ The intention is that all parties shall sign identical
Agreements
▪ The Agreement will be submitted to potential parties after
the launch meetings
DNV GL ©
Commercial in confidence
23 May 2018
Next steps: Towards Kick-Off
1. Flag interest to participate
2. Sign contract
3. The project starts when
1. The whole value chain is represented in the project, ideally at least 3
operators, 2 EPC Contractors, 3 Equipment/System Vendors
2. Sufficient cash funding is committed to cover Phase 1
4. Kick-Off meeting
– Tentative dates are June 20th or August 14th 2018
– Only for contracted JIP members, letter-of-intent organisations or
authorities (observers)
– Only contracted members will have a vote in the Steering Committee
– For June 20th: The agreement needs to be signed by all parties by June
15th
18
DNV GL ©
Commercial in confidence
23 May 2018
Summary
19
NORSOK Z-TI JIP will deliver standards, services and technology
JIP results will be fed into global standard organisations and initiatives for further standardisation and alignment
The JIP depends on contributions from players in the entire value chain. To join phase 1 of the project, please flag your interest to: [email protected]
DNV GL ©
Commercial in confidence
23 May 2018
SAFER, SMARTER, GREENER
www.dnvgl.com
The trademarks DNV GL®, DNV®, the Horizon Graphic and Det Norske Veritas®
are the properties of companies in the Det Norske Veritas group. All rights reserved.
http://www.dnvgl.com/NORSOK-Z-TI-JIP
20
Pål Rylandsholm
+47 976 73 822
DNV GL ©
Commercial in confidence
23 May 2018
Work
Groups
The work groups will be the “engine” of the JIP
21
Steering Committee (project status and decision forum)
Seek and document solution/proposal
Send out solution/proposal to JIP members
Go through comments from JIP members
Workshop
Sessions
Review proposal
Review/close out comments
Propose decision, agreement
Core Work Group: Planning
DNV GL ©
Commercial in confidence
23 May 2018
Key stakeholders have agreed to key principles regarding deliverables and IPR
The right to exploit the project results will be governed by the following
general principle:
1. The NORSOK owners represented by Standards Norway have exclusive
rights to exploit project results that reflect what is currently the content of
the NORSOK Z-TI standards.
2. Generic final deliverables, in particular methodology and generic
ontologies, shall be released for use, distribution and further development
and commercialisation once the JIP/Z-TI has finished, subject to "adequate"
license terms safeguarding the purpose of the project.
22
DNV GL ©
Commercial in confidence
23 May 2018
Regarding background IP, owners of deliverables and user rights
▪ Any input IPR remains with the originators and only materials developed as part of
the JIP will be regarded as deliverables.
▪ JIP deliverables must have designated owners (one owner per deliverable)
▪ All members of the JIP will have full access to input, work-in-progress materials and
deliverables during the JIP as part of the JIP execution.
▪ Upon completion of the JIP all members will be granted user rights to the
deliverables at given conditions reflecting JIP participation.
▪ Business/governance models as developed in the JIP will regulate terms and
conditions for the deliverables after completion of the JIP.
23