SMART CITY: HUBBALLI- DHARWAD
Major Junctions of ABD
Area Profile (ABD)
Project Overview
Financial Plan
• Total 37 Projects
• ABD - 26 Projects (1410
Cr.)
• PAN City - 11 Projects (
252 Cr.)
FUND ALLOCATION (PROJECT WISE)
Sl. Name of the project
Fund Allocation (in Cr.)
Project TypeEstimated Cost
(Total)SCM PPP
GoI/Go
K
1 Solid Waste Management – Litter Free Zones 0.54 0.24 -- 0.3 ABD
2 Electric Crematorium -- -- -- -- ABD
3 IPT Connectivity (PBS) 4.75 4.75 -- -- ABD
4 e-Toilets 0.96 0.96 -- -- ABD
5 Rain water harvesting 2 1 -- 1 ABD
6 Storm Water Drains 5 2.5 -- 2.5 ABD
7 LED street Lighting 6.86 6.2 -- 0.66 PAN City
8 Roof top Solar 128.76 12.9 77.3 38.6 ABD
9 Multi Level Car Parking 66.1 59.5 6.6 -- ABD
10 Renovation of Core city market area 114.78 114.8 -- -- ABD
FUND ALLOCATION (PROJECT WISE) .. Contd.
Sl. Name of the project
Fund Allocation (in Cr.)
Project TypeEstimated Cost
(Total)SCM PPP
GoI/Go
K
11 Smart IT-Solid Waste Management System 31 31 -- -- PAN City
12 Wi-fi Corridor
130
-- --
130.1
PAN City
13 Integrated Command and Control Centre -- -- PAN City
14 Cashless and Paperless office at HDMC -- -- PAN City
15 Smart Property taxes management system -- -- PAN City
16Smart Public Advertisement Management System
-- -- PAN City
17 Smart Public Works Management System -- -- PAN City
18 People Empowerment Platform/One stop Solution 84 50.4 -- 33.6 PAN City
19 Street Scape Redesign, footpath improvement, underground ducting 83 83 -- -- ABD
20 Junction Improvement 21.75 21.75 -- -- ABD
21 Underground Drainage System 18.64 9.3 -- 9.3 ABD
22 Underground Ducting of electrical /data with Electrical Smart Metering 190 190 -- -- ABD
23a Nehru Stadium
89.65 89.65
-- -- ABD
23b Nalla Renovation & Green Corridor -- -- ABD
23c MG Park -- -- ABD
23d Tolankere -- -- ABD
FUND ALLOCATION (PROJECT WISE) .. Contd.
Sl. Name of the project
Fund Allocation (in Cr.)
Project TypeEstimated Cost
(Total)SCM PPP
GoI/Go
K
24 Green Corridor 10 -- -- 10 ABD
25 Supermarket at Dharwad N/A N/A ABD
26Affordable Housing
103.32 41.3 -- 62 ABD
27 Railway Station Redevelopment 54.45 -- 54.5 -- ABD
28 Smart Parking and Payment System -- -- -- -- ABD
29 Smart Poles -- -- -- -- ABD
30 SPV Website -- -- -- PAN City
31 NMT Zones 4 4 -- -- ABD
32 Industrial Development 99.32 -- -- 99.32 ABD
33 Upgradation of SME 72.27 -- -- -- ABD
34 Ropeway to Hillock -- -- -- -- ABD
35 Intelligent Transport Management System -- -- -- -- PAN City
36 24x7 Water Supply 24.39 24.39 ABD
37 Transport Terminal Hub 316.49 284.8 31.6 ABD
PROJECT STATUS AS ON 31ST OCT 2017
Sl. Name of the project
FR DPR RFP
Estimated Cost
(Total)
Submitted
(Yes/No)
Submitted
(Yes/No)
Submitted
(Yes/No)
SMALL SCALE PROJECTS (To be Approved in SPV level as per recent G.O. No.) – below 5 Cr.
1 Solid Waste Management – Litter Free Zones 0.54 Prepared Prepared Under Process
2 Electric Crematorium 1.8 Prepared Prepared Under Process
3 IPT Connectivity (PBS) 4.75 Prepared Prepared Under Process
4 e-Toilets 0.96 Prepared Prepared Under Process
5 Rain water harvesting 2 Prepared Prepared Under Process
6 Storm Water Drains 5 Prepared Under Process Under Process
PROJECTS CLEARED BY TECH. COMMITTEE, AWAITING IDD APPROVAL (DUE TO PPP PROJECT)
7 LED street Lighting 6.86 As per instructions provided in KUIDFC
tech. committee meeting, FR & DPR not
required for these projects
Yes
8 Roof top Solar 128.76 Yes
PROJECTS AWAITING TECH. COMMITTEE(KUIDFC) APPROVAL
9 Multi Level Car Parking 66.1 Prepared Under Process Under Process
10 Renovation of Core city market area 114.78 Prepared Under Process Under Process
ICT PROJECTS
11 Smart IT-Solid Waste Management System 31
As per instructions
provided in KUIDFC
tech. committee
meeting, FR not
required for these
projects
Draft DPR
Prepared and
Submitted to
KUIDFC
Technical
Committee for
Scrutiny
Under Process
12 Wi-fi Corridor
130
Under Process
13 Integrated Command and Control Centre Under Process
14 Cashless and Paperless office at HDMC Under Process
15 Smart Property taxes management system Under Process
16Smart Public Advertisement Management System
Under Process
17 Smart Public Works Management System Under Process
18 People Empowerment Platform/One stop Solution 84 Under Process
PROJECT STATUS (…Contd.)
Sl. Name of the project
FR DPR RFP
Estimated Cost
(Total)
Submitted
(Yes/No)
Submitted
(Yes/No)
Submitted
(Yes/No)
TECHNICAL SCRUTINY IS DONE BY KUIDFC FOR THE FOLLOWING PROJECTS ON 27 SEPT,2017
19Street Scape Redesign, footpath improvement, underground
ducting83 Prepared Under Process Under Process
20 Junction Improvement 21.75 Prepared Under Process Under Process
21 Underground Drainage System 18.64 Prepared Under Process Under Process
22Underground Ducting of electrical /data with Electrical Smart
Metering190 Prepared Under Process Under Process
23a Nehru Stadium
89.65
Prepared Under Process Under Process
23b Nalla Renovation & Green Corridor Prepared Under Process Under Process
23c MG Park Prepared Under Process Under Process
23d Tolankere Prepared Under Process Under Process
24 Green Corridor 10 Prepared Under Process Under Process
25 Supermarket at Dharwad 212 Prepared Under Process Under Process
PROJECT STATUS (…Contd.)
Sl. Name of the project
Fund Allocation
(in Cr.)FR DPR RFP
Estimated Cost
(Total)
Submitted
(Yes/No)
Submitted
(Yes/No)
Submitted
(Yes/No)
OTHER PPP PROJECTS
26Affordable Housing
103.32 Prepared Under Process Under Process
27 Railway Station Redevelopment 54.45 Under Process Under Process Under Process
28 Smart Parking and Payment System Under Process FR Not reqdDraft DPR
PreparedUnder Process
29 Smart Poles Under Process FR Not reqdDraft DPR
PreparedUnder Process
OTHER PROJECTS
30 SPV Website -- Project Complete. Website launched on 7th Oct 2017
31 NMT Zones 4 Prepared Under Process Under Process
32 Industrial Development 99.32Under Process
33 Upgradation of SME 72.27
34 Ropeway to Hillock --Survey under process with NOC from Forest Dept &
KSPCB
35 Intelligent Transport Management System -- Being implemented by BRTS project
36 24x7 Water Supply 24.39 Being implemented by Water Project ILFS Company
37 Transport Terminal Hub 316.49 Being implemented by DULT, Discussion in progress
PROJECTS
TO BE
TENDERED
SOON
1
2
3
4
5
6
• Locations: HDMC buildings
Components: Storage Pits, Storage Tanks, Recharge
Trenches, Percolation Tanks, Recharging of Bore Wells &
Dug Wells
RAIN WATER
HARVESTING(by 3rd Week of Nov)
E-TOILET(by 3rd Week of Nov)
• Locations: Akshay Park Bus Stop, MG Park, CBT.
Tolankere, HDMC office
• Components: Automatic payment & Cleaning,
Remote Monitoring, Sensor enabled interior
ELECTRICAL
CREMATORIUM(by 3rd Week of Nov)
• Locations: Harischandraghat
• Components: AWL Cremator,
Combustion Air Supply, Wet
Scrubber, Stack, Control Panel
LITTER FREE
ZONE(by 3rd Week of Nov)
• Locations: Major Junctions (54 Nos), All Bus Stops
(170 Nos), HDMC market area, Dharwad market area
• Components: RFID Tagged Bins, Mobile App, Sign
Boards
PUBLIC BIKE
SHARING(by 3rd Week of Nov)
• 30 Docking Stations
ICT PACKAGE
1. ICCC
2. E-GOV(DPR by 1st Week of Nov
Need Govt. Approval)
• Locations: ICCC at Hosur Junction
• Proposed ICONIC Building to cater ICCC control room
• Components ICCC: Smart SWM, Transport, Public Safety,
Utilities management, traffic management • Components E-GOV: Cashless &
Paperless office, Smart property taxes
management system, Smart Public
works management system, Smart
advertisement management system
CITIZEN ENGAGEMENT ON SMART CITY PROJECTS
• Date: 7 Oct 2017
• Venue: Kannada Bhavan, Hubli
• Smart City Website was launched by Hn. Dist. Minister Shri
Vinay Kulkarni , GoK
• Citizen Engagement Brochure was released
• Key Experts from PMC explained the projects to the citizen
• Questions and Suggestions were taken and being
considered in applicable projects
Citizen Engagement Brochure
Citizen Engagement Workshop
Social Media Links Are created:
http://www.facebook.com/hubballidharwa
dsmartcityltd
http://twitter.com/hdsmartcity
http://www.Instagram.com/hubballidharw
adsmartcity/
http://hubballidharwadsmartcity.com/
Release of Brochure
MAJOR SMART CITY PROJECT DIAGRAMS
Janta Bazar
MG Market
MLCP
Smart Poles
Smart Solid Waste Management
MAJOR SMART CITY PROJECT DIAGRAMS
Nehru Stadium
Tolankere