VOLUME II
for
SANITARY & PLUMBING WORKS
8/10/2019 Sor Spw 2014 Vqeqeeolume II
2/110
SUBJECT PAGE
GENERAL CONDITIONS ---- i-iv
GENERAL SPECIFICATIOS v-vii
(A) Execution ----
(B) Mode of Measurement ----
(C) Suggested Brand Names ----
SECTION (A) : Plumbing Works
I. Ferrule and Ferrule Connection (Original & Repair Works) ---- 1---1
II. G. I. Pipe Works and Its Fittings (Original & Repair Works) ---- 1--22
III. Cisterns, G. I. Tanks with Parts (Original & Repair Works) ---- 1--5
IV. Basins and sinks with Parts (Original & Repair Works) ---- 1--8
V. Tube-well (Original & Repair Works) ---- 1--9
SECTION (B) : Sanitary and Drainage Works
I. Hydrants and Allied Works (Original & Repair Works) ---- 1--2
II. Soil-pipe and Fittings (Original & Repair Works) ---- 1--17
III. Water Closets and Urinals (Original & Repair Works) ---- 1--6
IV. Inspection Pit, Septic Tank, Soak Pit etc. (Original & Repair Works) ----
A Inspection Pit-Part-I ---- 1--2
B Inspection Pit-Part-II ---- 1--4
SECTION (C) : Materials and Labour etc.
I. Miscellaneous ---- 1--5
II. Cost of Materials ---- 1--11
III. Wages to Various Labourers ----
IV. Selection of pipe diameter ----
V. Drawing of Septic Tank ----
A N N E X U R E - I
I. Table - 1.1 ----
II. FORMAT - A ----
III. FORMAT - B ----
IV. Useful Table ----
INDEX
8/10/2019 Sor Spw 2014 Vqeqeeolume II
3/110
i
GENERAL CONDITIONS
1. If in connection with Sanitary & Plumbing Works etc. any item or items of work relating
to Building works, Road works and Carriage crop up, the contactor shall if so directed,
have to execute such items. In respect of such items the Schedule of Rates for Building
Works, Road Works and Carriage for the Current year including general conditions,general specifications etc. operative in the area will be applicable and the contractual
percentage will be applicable in respect of such works as well.
2. If not specifically indicated in the items themselves, the rates appearing in this schedule
are inclusive of cost of all supply, carriage, handling, fitting, fixing sales tax, royalty,
VAT, toll taxes, ferry charges etc. and all other incidental works involved in any floor, at
any level including all necessary jointing materials, scaffolding to any height, hire
charges of tools and plants, and all helping materials.
3. To arrive at complete rate of different items in this Schedule, 5% Overhead, 10%
Contractors Profit and 1% Labour Welfare Cess has been considered besides Material
cost, Labour Cost and other cost involved to execute the item. All cutting holes, chases,
trenches etc. at any place necessary in connection with works as per items in this
schedule and subsequent mending damage as per original specification and as directed
are included in the rates and shall not be paid extra unless otherwise expressly specified.
4. The issue of Departmental materials, if any required for the work will be at the rates and
under the terms and conditions as stipulated in the General Conditions and General
Specifications embodied in the Schedule of Rates for Building works, Materials and
Labour for the current year operative in the area.
(i) Cement: -
Issue Rate and Basic Price of Cement are shown in Table 1.1 of Annexure I.
All cement related item rates depicted in this Schedule are derived considering
the fact that Cement will be supplied by the Department at Issue Rate.
If Cement is supplied by the Contractor, then item rates are to be deduced as per
Format A of Annexure I.
PPC / PSC Cement is considered for Cement related items.
(ii) Reinforcing Steel:-
Issue rate and Basic Price of Reinforcing Steel is shown in Table 1.1 of
Annexure I. All item rates related to Reinforcing Steel are derived considering
the fact that Reinforcing Steel will be supplied by the Department. If Reinforcing
steel is supplied by the Contractor, then item rates are to be deduced as per
Format B of Annexure I.
Cut pieces of Reinforcing Steel materials left surplus on completion of work shall
not be taken back if the same be considered as unsuitable for utilization in other
works.
8/10/2019 Sor Spw 2014 Vqeqeeolume II
4/110
ii
5. The contractor shall be responsible for the safe custody and proper maintenance in
original condition of all sanitary and plumbing works till all works are completed and
formally handed over to the Department.
6. Renewal works include dismantling and taking out old work, mending good damageafter renewal and removal of the waste materials. The rate for any item of original nature
not provided in this Schedule may be deduced from the rate of similar item of renewal
work by multiplying by a factor 100/105 and conversely the rate of any items of renewal
nature not provided in this schedule may be deduced from the rate of similar item of
original nature by multiplying by a factor 105/100.
7. Where renewals are involved, indigenous materials shall be used without exception even
if this means changing the type. In cases of exceptional areas viz. operation theaters,
chemical laboratories etc., prior approval of the Engineer-in-Charge for using non-
indigenous materials is to be obtained. In such case, due care and scrutiny should be
exercised for selection of type before acceptance and payment.
8. Before application of rate, quantities of all items with metric unit must be calculated with
correction 2 places of decimal when the rate is up to Rs. 100.00 and 3 places of decimal
when the rate is above Rs. 100.00.
9. If not mentioned otherwise in the items themselves, all materials including fitting shall
conform to standard laid down by the Bureau of Indian Standards and bear I.S.I. mark
where such standardization has been made. All other materials must be of best quality
conforming to the standard laid down by the I.S.I. and being approved by the Engineer-
in-Charge. Under very special circumstances materials standardized by B.I.S. with I.S.I.
mark but not bearing I.S.I. mark may be accepted with prior approval of Engineer-in-
Charge with reduction by 20%.
10. Unless otherwise specifically mentioned in the items of this Schedule, all G.I. Pipes are
to be normally of TATA make, all sanitary wares should be of Parry ware, Hindware,
Neycer, C.E.R.A. (1stQuality) or should bear I.S.I. certification marks.
11. For works within the perimeter of Jail where works are permitted within the restricted
hours only, extra rate @ 10% in respect of all items of the schedule will be allowed.
12. Extra rates for difficult / reverine areas in respect of all items of this schedule will beallowed as follows :
(a) In riverine areas connected by the river route and / or ferry crossing under:
(i) 15% Extra for Hsnabd, Bhangore P.S.
(ii) 15% Extra for Haroa, Canning Kultali, Namkhana & Kakdwip P.S.
(iii) 22.5% Extra for Gosaba, Basanti, Manakhan Sandeskhali & Hingalganj P.S.
(iv) 30% Extra for Pathar Pratima & Sagar P.S.
8/10/2019 Sor Spw 2014 Vqeqeeolume II
5/110
iii
(b) 10% Extra for all areas under Kakdwip PWD Sub-Division excluding the
jurisdiction of Kakdwaip P.S. in reverine areas connected by River Route and or
ferry crossing.
(c) For N.C.N.B.C.C.-I/II :
The rates of items that include supply of bricks/brick materials are to be enhancedfor works within Mathabhanga Civil Sub-Division and Mekhliganj Civil Sub-
Division as under:
1. Item requiring bricks @ Rs. 200.00 per 1000 bricks required.
2. Item requiring brick materials @ Rs. 100.00 per m3 of brick materials
required.
The Rates of items of work that include supply of stone materials in the Cooch
Behar District exdcluding the area under Haldibari Police Station are to be
enhanced by (i) 10% for works within Mathabhanga (Civil) Sub-Division and (ii)5% for works within Dinhata (Civil) Sub Division. The said rates in the
Jalpaiguri Dist. are to be enhanced by 10% for works within area of Haldibari
Police Station.
(d) i) Rates of items except Section (B)(iv) ( Item 1 to 6) and items involving labour
only in Section (A) to (C) are to be enhanced by 10% for Darjeeling except
plains of Siliguri Sub Division.
In addition to above extra rate following enhancement will be applicable for all
items except items involving labour only:
ii) 20% for works in the following places : (a) Hill area of Garubathan Block
(b) Kalimpong Municipal area (c) Dow Hill area of Kurseong Sub Division (d)
Miric P.S. (e) Section from Mane Bhanjan to Phalut of Simana Sandakphu Phalut
road (f) Section from Peshoke Khola to Lopchu Tea Garden of S.H.No. 12(g)
Within 10 Km from Mongpu under Takda Block (h) Ghoom Tiger Hill Road (i)
Section Pankhabari Bazar to the starting of Kurseong Municipal Road of
Garidhura-Kurseong Road (j) Kalimpong Block I/II and Mongpo & Tagda
Block.
iii) 20% for works in the following places : Darjeeling Municipal area (b) Kurseong
Municipal area (excluding Dow Hill area) (c) Rangit (d) Health Centers at
Singritam, Pokhriabong, Lodhama, Takling, Gitdabling, Samathahar, Samolbong
& Stittong.
(e) The rates under sections stated above are to be enhanced by 15% for works in
Buxa Hills.
(f) The rates for all types of concrete works, Masonry works (except Dry Rubble
Masonry and allied works) and plastering etc. in the Hills of Darjeeling District
have been arrived at with cost of Balas on variety of stone aggregates and sand.If any work is done with local approved stone aggregates/sand the rate of the item
8/10/2019 Sor Spw 2014 Vqeqeeolume II
6/110
iv
will be reduced by 15% such reduction will however, be 5% if Teesta variety
materials are used.
(g) The rates for all types of concrete works, Masonry works and sand cement
plastering in the District of Uttar Dinajpur and Dakshin Dinajpur have been
arrived at with the consideration that Bansloi sand (Murarai variety) shall be used
in all such works. If any work is done with local sand with the approved of the
Executive Engineer, the rate of the item shall be reduced accordingly on the basisof difference of cost of Bansloi sand and local sand. All cement works in the
District of Uttar Dinajpur and Dakshin Dinajpur shall be done with stone chips of
Pakur variety when no specific mention is made in the description of item.
(h) For W.C.-I
The Schedule of Rates will be enhanced due to various circumstances is
mentioned below :
1. By 5% (five) for works carried out with civil Sub-Divisional Jurisdiction of
Kalna, Durgapur and Bolepur Sub ivision.
2. By 10% (Ten) for works done within the Hills region of Ajodhya in the District
of Purulia (a region will be treated hills in the altitude is more than 200 Meters
from the level of any adjoining area within 10 Km.
3. All the rates appearing in the schedule excepting those which are specifically
mentioned in the schedule are rates valid for Burdwan Division. Extra over
ratres for other division will be added by percentage as mentioned below from the
basic rates.
(a) Asansole Division - 2% (Two)
(b) Birbhum Division- 5% (Five)
(c) Purulia Division- 7% (Seven)
(i) (For W.C. II :
Extra rates will be allowed as follows:
Khanakul block No. I & II)- 5% extra.
(j) In case of any ambiguity or dispute in any matter arising out of this schedule,
Superintending Engineers decision will be final.
8/10/2019 Sor Spw 2014 Vqeqeeolume II
7/110
v
GENERAL SPECIFICATION(Including Mode of Measurement)
A. EXECUTION
General - All works shall be carried out in proper manner. Items of works not covered by the
following shall be carried out as per direction of the Engineer-in-Charge and to his
satisfaction. Unless otherwise specified in this Section or in the description of item
the cost of all stages of works mentioned hereunder shall be deemed to have been
included in the rates of items provided in the Schedule.
1. G.I. Tank:
Before acceptance of any G.I. Tank, proper scrutiny as to the thickness of the
sheets should be made. Due check should also be made on each face of the tank by
punching holes to be subsequently mended and hermetically sealed by the
contractor without any extra charge being paid on this account by Department.
Thickness of M.S. Sheet is exclusive of galvanizing.
2. Flushing Cistern:
Flushing Cistern of I.P.W.C. & E.P.W.C. will be 10 litre pull and let low down
cistern types as specified. Flush pipes for urinals shall be made of G.I. Pipes of
Polythene pipes with fittings or lead pipes as may be directed by the Engineer-in-Charge. Flushing cistern of urinals shall be of approve type. All flush pipes and
cisterns shall have to be painted with 2 coats of paint of approved shade and brand
over a coat of approved primer. The inlets of sanitary fittings and equipments to be
connected with the adjacent distribution line (water supply) with requisite lengths
and size of P.V.C. connection pipe is to be provided with necessary unions at both
ends within the quoted rates of respective items. Cost of these P.V.C. connection
pipe will be paid separately.
3. Fittings for G.I. Pipes:
All G.I. Fittings will be of approved make. For installation of G.I. pipe line all
fittings and specials as may be necessary shall have to be fitted and fixed to the
line.
4. Joints :
The joints of pipes, fitting & accessories shall be made as specified and unless
otherwise specified, no separate payment shall be allowed.
(i) G.I. Pipes fitting, valves and cocks with jute and white lead paint.
(ii) C.I. Soil pipes & fittings: The jointing shall have to be done by either of
the two methods as specified :
8/10/2019 Sor Spw 2014 Vqeqeeolume II
8/110
vi
(a) The half of the depth of the annular space between spigot and socket shall be
packed with spun yarn and the remaining half to be filled up with molten lead wellcaulked with caulking tools.
(b) The half of the depth of the annular space between spigot and socket shall be
packed with tarred gasket and the remaining half will be filled up three quarters
with valamoid and the top quarter with cement mortar (4:1) and shall shall be
finished beveled at 45o.
(i) Stone Ware Pipes & Fittings : The half of the depth of the annular space
between socket and spigot shall be packed with tarred gasket and the
remaining half shall be filled up with Cement mortar (3:1) & shall be
finished beveled at 45o.
(ii) C.I.. Water mainline: The jointing shall have to be done with Tyton joints
as per manufactures specifications.
5. Test of pipe lines valves and cocks:
The pipe lines, valves and cocks shall be tested at the contractors expenses for which no
extra payment shall be allowed. The available water supply sources may however be
allowed to be utilized for testing but in absence of any such arrangement the contractor
shall have to conduct the following tests.
(i)
C.I. Water main pipe line : The pipe shall have to be tested at least for
designed working pressure.
(ii) C.I. soil pipe line : Smoke test.
(iii) S.W. Pipe line : All sections between two inspection pits shall have to be
tested separately. The funnel shall be at least 1.3 meter above the soffit of
the S.W. pipe at the upper inspection pit.
Any defect or defects detected during testing shall be rectified at the contractors
expenses.
6. Septic Tank :
Construction of septic tank shall be done as per approved design. After completion of
the tank, the tank shall have to be filled up with clear water after removing any foreign
materials from the inside of the tank, if any. No separate payment shall be allowed on
this account.
7. Painting :
All pipes (G.I., C.I. water main and soil) and fittings shall have to be painted outsidewith two coats of paint of approved brand and shade.
8/10/2019 Sor Spw 2014 Vqeqeeolume II
9/110
vii
B. MODE OF MEASUREMENT
1. G.I., C.I. Water main & Soil, S.W. Pipe line:
All the pipe lines shall be measured in fitted condition along the central line of the
exposed surface.
2. Strainer:
The strainer as used in the Tube-Well shall be measured in fitted condition along the
central line of the exposed surface.
3. Boring of Tube-Well:
Boring for tube-wells always shall have to be done by the contractors pipe. In no case Deptt.pipes or the pipes which will be actually lowered shall be used for the purpose of boring.
Labour rate of boring is inclusive of hire charge of boring pipes. Generally measurement of the
boring will be taken on the basis of the finished length of the tubewell from the ground line. If
for some special reasons, boring depth is required to be more than the finished length of the
tube-well, previous permission of Engineer-ion-Charge is to be taken to get the payment of extra
boring in excess of the finished length.
8/10/2019 Sor Spw 2014 Vqeqeeolume II
10/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(I) FERRULE AND FERRULE CONNECTIO
Item No. Descr!to" o# Item U"t A$$ Dstrcts o#
West Be"%&$
(&) Or%"&$ Wor's
1 Supplying,fitting and fiing !"a## fe""ule in$luding $onne$tion wit% &.I.
pipe# of '('( )a*e of following dia. and upto 4+0 )) long wit%
#$"ew,a)nut,#o$*et# et$.,$o)plete in all "e#pe$t, in$luding $utting
t"en$%e# in all #o"t# of #oil and filling up t%e t"en$%e# a# pe" di"e$tion of
t%e nginee" - in - %a"ge.
/i 2+ )) dia. a$% 21+.00
/ii 20 )) dia. a$% 144.00
/iii 1+ )) dia. a$% 1102.00
/i3 10 )) dia. a$% 107.00
2 Supplying, fitting and fiing !"a## fe""ule in$luding $onne$tion wit% P.V..
pipe of app"o3ed )a*e upto 4+0 )) long wit% plu)!ing oint,!"a## o3e"
.P. $oupling at !ot% end#, wit% $ap and lining $o)plete in all "e#pe$t,
in$luding $utting t"en$%e# in all #o"t# of #oil and filling up t"en$%e# a# pe"
di"e$tion of t%e nginee"-in-$%a"ge.
/i 2+ )) dia. a$% 210+.00
/ii 20 )) dia. a$% 145.00
/iii 1+ )) dia. a$% 10+1.00
/i3 10 )) dia. a$% 102+.00
() REPAIR WORKS
1 Renewing !"a## fe""ule fo" $onne$ting )ain#.
/i 2+ )) dia. a$% 15.00
/ii 20 )) dia. a$% 1514.00
/iii 1+ )) dia. a$% 4.00
/i3 10 )) dia. a$% 1.00
2 Di#)antling fe""ule wit% all pipe $onne$tion#. a$% Set 174.00
5 Di#)antling ei#ting fe""ule wit% fitting# and "efiing #a)e afte" $leaning. a$% Set 15.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
11/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
() Ori!in" Wor#s
1 Supplying, fitting and fiing !.I. pipe" of #$#$ %a&e wit' all ne(e""a)y
a((e""o)ie", "pe(ial" *i+. "o(&et, end, tee, union, ()o"", elo, nipple,
long"()ew, )edu(ing "o(&et, )edu(ing tee, "'o)t pie(e et(. fitted wit'
'olde) at" (la%p", in(luding (utting pipe", %a&ing t')ead", fitting, fiinget(. (o%plete in all )e"pe(t in(luding (o"t of all ne(e""a)y fitting" a"
)eui)ed,ointing %ate)ial" and two (oat" of painting wit' app)o*ed paint
in any po"ition ao*e g)ound. /Pay%ent will e %ade on t'e (ent)e line
%ea"u)e%ent" of total pipe line in(luding all "pe(ial". o "epa)ate
pay%ent will e %ade fo) a((e"o)ie", "pe(ial". Pay%ent fo) painting will
e %ade "epe)ately
(A) For E$pose% Wor#
()/i 1 %% dia. lig't uality 3t) 202.00
/ii 1 %% dia. %ediu% uality 3t) 220.00
(&)/i 20 %% dia. lig't uality 3t) 20.00
/ii 20 %% dia. %ediu% uality 3t) 250.00
(c)/i 2 %% dia. lig't uality 3t) 06.00
/ii 2 %% dia. %ediu% uality 3t) 4.00
(%)/i 2 %% dia. lig't uality 3t) 4.00
/ii 2 %% dia. %ediu% uality 3t) 406.00
(e)/i 40 %% dia. lig't uality 3t) 400.00
/ii 40 %% dia. %ediu% uality 3t) 475.00
(f)/i 0 %% dia. lig't uality 3t) 25.00
/ii 0 %% dia. %ediu% uality 3t) 524.00
(!)/i 5 %% dia. lig't uality 3t) 55.00
/ii 5 %% dia. %ediu% uality 3t) 77.00
(')/i 60 %% dia. lig't uality 3t) 621.00/ii 60 %% dia. %ediu% uality 3t) .00
(i)/i 100 %% dia. %ediu% uality 3t) 1205.00
/ii 100 %% dia. 'ea*y uality 3t) 1402.00
()/i 12 %% dia. %ediu% uality 3t) 1.00
/ii 12 %% dia. 'ea*y uality 3t) 170.00
(#)/i 10 %% dia. %ediu% uality 3t) 161.00
/ii 10 %% dia. 'ea*y uality 3t) 155.00
() For *once"e% Wor#
/a 1 %% dia. %ediu% uality 3t) 25.00
/ 20 %% dia. %ediu% uality 3t) 2.00
/( 2 %% dia. %ediu% uality 3t) 412.00
2 Supplying, fitting and fiing in po"ition !.I.pipe" of #$#$ %a&e fo)
unde)g)ound wo)&" wit' all ne(e""a)y a((e""o)ie","pe(ial" *i+."o(&et,
end, tee, union, ()o"", elow, nipple, "'o)t pie(e et(.in(luding (o"t of
all %ate)ial",ointing %ate)ial" ,(utting pipe",%a&ing t')ead",(utting
t)en('e" upto 1. %et)e elow "u)fa(e in all "o)t" of "oil and )efilling t'e
"a%e a" di)e(ted wit' two (oat" of painting on !.I. pipe" and "pe(ial"
wit' itu%inou" paint (o%plete in all )e"pe(t. /Pay%ent will e %ade on
t'e (ent)e line %ea"u)e%ent of t'e total pipe line in(luding all "pe(ial"
o "epa)ate pay%ent will e %ade fo) a((e""o)ie", "pe(ial".Pay%ent fo)
painting will e %ade "epe)ately
/i 1 %% dia. %ediu% uality %et)e 24.00
/ii 20 %% dia. %ediu% uality %et)e 274.00
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
8/10/2019 Sor Spw 2014 Vqeqeeolume II
12/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
/iii 2 %% dia. %ediu% uality %et)e 56.00
/i* 2 %% dia. %ediu% uality %et)e 407.00
/* 40 %% dia. %ediu% uality %et)e 451.00
/*i 0 %% dia. %ediu% uality %et)e 504.00
/*ii 5 %% dia. %ediu% uality %et)e 7.00
/*iii 60 %% dia. %ediu% uality %et)e 5.00
/i 100 %% dia. %ediu% uality %et)e 117.00
/ 12 %% dia. %ediu% uality %et)e 126.00
/i 10 %% dia. %ediu% uality %et)e 1760.00
Supplying, fitting and fiing "'owe) of app)o*ed )and and %a&e.
() /i 8')o%iu% plated )ound "'owe) wit' )e*ol*ing oint 100 %% dia
wit' )uid (leaning "y"te% /9ui*alent to 8ode o. 42/ : 3odel -
#)opi(al ; Su%t'ing Spe(ial of 9SS8O o) "i%ila) )and.
ea(' 75.00
/ii 8')o%iu% plated )ound "'owe) wit' )e*ol*ing oint /9ui*alent to
8ode o. 41/ : 3odel - #)opi(al ; Su%t'ing Spe(ial of 9SS8O o)
"i%ila) )and.
ea(' 47.00
/iii 8')o%iu% plated "'owe) a)% 240 %% long /9ui*alent to 8ode o.
5/$ : 3odel - #)opi(al ; Su%t'ing Spe(ial of 9SS8O o) "i%ila) )and.
ea(' 1.00
/ 8')o%iu% plated Ro"e "'owe) wit' )e*ol*ing oint and 10 %% long
"'owe) a)% /9ui*alent to 8ode o. 46 : 3odel - ealt' oo&/9ui*alent to 8ode o.7 : 3odel -$CCI9D of =aua) o) "i%ila).
ea(' 1511.00
/g P#3# o*e)'ead "'owe) / P)ayag o) eui*alent/i 7 %% )ound ea(' 206.00
/ii 10 %% )ound ea(' 400.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
13/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
/' Polyt'ene o*e)'ead "'owe) of app)o*ed %a&e
1 %% B 12 %% ea(' 177.00
(Note Item (&/ %/ e 0 f) to &e %one s per specific %irection of t'e
S1perinten%in! En!ineer)
4 Supplying, fitting and fiing Peet" *al*e fullway gun%etal "tanda)d
patte)n e"t uality of app)o*ed )and ea)ing I.S.I. %a)&ing wit' fitting"
/te"ted to 21 &g pe) ". (%..
/i 100 %% dia ea(' 1406.00
/ii 60 %% dia ea(' 7112.00
/iii 5 %% dia ea(' 070.00
/i* 0 %% dia ea(' 01.00
/* 40 %% dia ea(' 2066.00
/*i 2 %% dia ea(' 16.00
/*ii 2 %% dia ea(' 117.00
/*iii 20 %% dia ea(' 607.00
/i 1 %% dia ea(' 51.00
Supplying, fitting and fiing gun%etal w'eel *al*e of app)o*ed )and and%a&e te"ted to 21 &g pe) ". (%. /fo) wate) line" only.
/i 100 %% dia ea(' 126.00
/ii 60 %% dia ea(' 715.00
/iii 5 %% dia ea(' 04.00
/i* 0 %% dia ea(' 20.00
/* 40 %% dia ea(' 2014.00
/*i 2 %% dia ea(' 146.00
/*ii 2 %% dia ea(' 5.00
/*iii 20 %% dia ea(' 76.00
/i 1 %% dia ea(' 2.00
5 Supplying, fitting and fiing gun%etal w'eel *al*e of app)o*ed )and and
%a&e te"ted to &g pe) ". (%. /fo) ga" line only.
/i 100 %% dia ea(' 1505.00
/ii 60 %% dia ea(' 622.00
/iii 5 %% dia ea(' 541.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
14/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
/i* 0 %% dia ea(' 65.00
/* 40 %% dia ea(' 2741.00
/*i 2 %% dia ea(' 20.00
/*ii 2 %% dia ea(' 142.00
/*iii 20 %% dia ea(' 76.00
/i 1 %% dia ea(' 70.00
7 Supplying, fitting and fiing i (o(& o) "top (o(&.
() /i 8')o%iu% plated Ai 8o(& "'o)t ody /9ui*alent to 8ode o. 11
: 3odel - #)opi(al ; Su%t'ing Spe(ial of 9SS8O o) "i%ila) )and.
ea(' 56.00
/ii 8')o%iu% plated Ai 8o(& long ody wit' wall flange wit' ae)ato)/9ui*alent to 8ode o. 12 : 3odel - #)opi(al ; Su%t'ing Spe(ial of
9SS8O o) "i%ila) )and
ea(' 64.00
(&) /i 8')o%iu% plated Stop 8o(& /9ui*alent to 8ode o. 1/$ :
1/A : 3odel - #)opi(al ; Su%t'ing Spe(ial of 9SS8O o) "i%ila) )and.
ea(' 52.00
/ii 8')o%iu% plated 8on(ealed Stop 8o(& /9ui*alent to 8ode o.
14/$ : 3odel - #)opi(al ; Su%t'ing Spe(ial of 9SS8O o) "i%ila) )and.
ea(' 6.00
(c) /i 8')o%iu% plated Ai 8o(& /angula) "'ape wit' wall flange/9ui*alent to 8ode o. 07 : 3odel -
8/10/2019 Sor Spw 2014 Vqeqeeolume II
15/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
(!)Supplying, fitting and fiing alloy i)on wit' )a"" "pindle i (o(&; "top
(o(& of app)o*ed )and and %a&e, "p)ay painted and te"ted to 21 &g pe)
". (%.
/i 1 %% ea(' 1.00
/ii 20 %% ea(' 2.00
/iii 2 %% ea(' 75.00
(Note Item 2c(i)/(ii) 0 2% (i) /(ii) to &e %one s per specific %irection of
t'e S1perinten%in! En!ineer.)
6 Supplying, fitting and fiing pu"' (o(& of 'ea*y uality and of app)o*ed
%a&e and )and.
() 8a"t i)on
/i 1 %% ea(' 24.00
/ii 20 %% ea(' 2.00
(&) 8a"t i)on wit' )a"" "pindle
/i 1 %% ea(' 242.00
/ii 20 %% ea(' 20.00
(c)/i P#3# Pu"' 8o(& /20 %%
8/10/2019 Sor Spw 2014 Vqeqeeolume II
16/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
/i* 12%% ea(' 7442.00
/* 10 %% ea(' 666.00
/*i 200 %% ea(' 1752.00
/*ii 20 %% ea(' 2414.00
/*iii 00 %% ea(' 26616.00
10Slui(e *al*e ('a%e) wit' 8.I. 'ea*y (o*e) wit' lo(&ing a))ange%ent,
/weig't not le"" t'an 2 &g /"i+e of ('a%e) 40 %% B 500 %% in"ide
upto 00 %% dept' 20 %% t'i(& (e%ent )i(& wall" /5E1, 10 %%
t'i(& (e%ent (on()ete /5EE1 ed wit' "tone ('ip", 20 %% t'i(& (e%ent
pla"te) /5E1 fo) in"ide wall and 1 %% t'i(& (e%ent pla"te) /4E1 fo)oute) wall" in(luding )ounding (o)ne)".
ea(' "et 114.00
11 Supplying, fitting and fiing 8.I. tail pie(e" in pai) (onfo)%ing to I.S.
"pe(ifi(ation".
/i 100 %% ea(' pai) 21.00
/ii 60 %% ea(' pai) 1752.00
12 Supplying, fitting and fiing (a"t i)on "pun pipe (onfo)%ing to I.S.
15;175 wit' all ne(e""a)y "pe(ial" in(luding (utting t)en('e" in any
"oil o) t')oug' %a"on)y, (on()ete et(., if ne(e""a)y,and %ending good allda%age" in(luding ointing pipe" wit' #yton oint" a" pe) %anufa(tu)e)"
"pe(ifi(ation" and filling up t'e t)en('e" all (o%plete ut e(luding t'e
(o"t of %a"on)y o) (on()ete wo)&, if )eui)ed.
() *"ss A
/i 60 %% no%inal dia. %et)e 1447.00
/ii 100 %% no%inal dia. %et)e 1552.00
/iii 12 %% no%inal dia. %et)e20.00
/i* 10 %% no%inal dia. %et)e 21.00
/* 200 %% no%inal dia. %et)e 624.00
/*i 20 %% no%inal dia. %et)e 45.00
/*ii 00 %% no%inal dia. %et)e 5402.00
(&) *"ss
/i 60 %% no%inal dia. %et)e 171.00
/ii 100 %% no%inal dia. %et)e 160.00
/iii 12 %% no%inal dia. %et)e 205.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
17/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
/i* 10 %% no%inal dia. %et)e 261.00
/* 200 %% no%inal dia. %et)e 4152.00
/*i 20 %% no%inal dia. %et)e 411.00
/*ii 00 %% no%inal dia. %et)e 574.00
(c) *"ss +A
/i 60 %% no%inal dia. %et)e 124.00
/ii 100 %% no%inal dia. %et)e 11.00
/iii 12 %% no%inal dia. %et)e 210.00
/i* 10 %% no%inal dia. %et)e 25.00
/* 200 %% no%inal dia. %et)e 465.00
/*i 20 %% no%inal dia. %et)e 426.00
/*ii 00 %% no%inal dia. %et)e 627.00
1 Renewing "pe(ial" only of (a"t i)on "pun pipe (onfo)%ing to I.S.
15;175 in(luding (utting t)en('e" in any "oil o) t')oug' %a"on)y,
(on()ete et(., if ne(e""a)y and %ending good da%age" in(luding ointing
wit' #yton oint" a" pe) %anufa(tu)e)" "pe(ifi(ation" e(luding t'e (o"t
of (on()ete o) %a"on)y wo)&, if )eui)ed, ut in(luding t'e (o"t of filling
up t)en('e" /fo) all dia. "pe(ial", pay%ent will e %ade on t'e a"i" of
a(tual weig't of t'e "pe(ial".
?g 102.00
14 Supplying, fitting and fiing 8.I. 'olde) at (la%p in(luding (utting 'ole"
in wall et(. and %ending good all da%age" in (e%ent (on()ete wit'
'a%a ('ip" /4E2E1 and (e%ent pla"te) /5E1 to %at(' and (u)ing
(o%plete in all )e"pe(t.
/i 1 %% ea(' 26.00
/ii 20 %% ea(' .00
/iii 2%% ea(' .00
/i* 2%% ea(' .00
/* 40 %% ea(' .00
/*i 0 %% ea(' 55.00
/*ii 5 %% ea(' 142.00
/*iii 60 %% ea(' 172.00
/i 100 %% ea(' 15.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
18/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
1 Supplying, fitting and fiing "elf (lo"ing 8.P. wate) tap of app)o*ed )and
and %a&e - 1 %% dia.
ea(' 72.00
15 Supplying, fitting and fiing !.I. g)a*ity ope)ated wate) tap fo) puli( u"e
wit' pilfe) p)oof a))ange%ent of app)o*ed )and and %a&e.
/i 1 %% dia. ea(' 0.00
/ii 20 %% dia. ea(' 40.00
17 Supplying,fitting and fiing "teel )edu(ing u"'.
/i 20 %% B 1 %% and elow ea(' 25.00
/ii 2 %% B 20 %% and elow ea(' 2.00
/iii 1 %% B 10 %% and elow ea(' 25.00
/i* 2 %% B 2 %% ea(' 4.00
/* 40 %% B 2 %% ea(' 5.00
/*i 0 %% B 40 %% ea(' 106.00
16 Caou) fo) fitting and fiing 'ig' den"ity poly-et'ylene pipe" o) P.V.8.
pipe" fo) ao*e g)ound wo)& in(luding (o"t of ointing %ate)ial" paint"
et(. fitting and fiing all ne(e""a)y "pe(ial", (utting pipe", %a&ing t')ead",
(utting 'ole" in wall" o) R.8. floo) w'e)e ne(e""a)y and %ending good all
da%age" e(luding t'e (o"t of %a"on)y o) (on()ete wo)&, if ne(e""a)y,
ut in(luding t'e (o"t and fitting and fiing 'olde) at (la%p"/any floo)
o) fo) unde)g)ound wo)& in(luding (utting t)en('e" upto 1. %et)e and
)efilling t'e "a%e (o%plete a" pe) di)e(tion of t'e 9nginee)-in-('a)ge.
/Pay%ent will e %ade on (ent)e line %ea"u)e%ent of t'e total pipeline
in(luding "pe(ial".
(A)A&o3e Gro1n%
/i 1 %% dia. %et)e 27.00
/ii 20%% dia. %et)e 27.00
/iii 2 %% dia. %et)e 26.00
/i* 2 %% dia. %et)e 26.00
/* 40 %% dia. %et)e 6.00
/*i 0 %% dia. %et)e 40.00
/*ii 5 %% dia. %et)e 47.00
/*iii 7 %% dia. ; 60 %% dia. %et)e 7.00
/i 100 %% dia. ; 110 %% dia. %et)e .00
/ 140 %% dia. %et)e 74.00
/i 150 %% dia. %et)e 7.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
19/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
()Un%er Gro1n%
/i 1 %% dia. %et)e 42.00
/ii 20%% dia. %et)e 4.00
/iii 2 %% dia. %et)e 42.00
/i* 2 %% dia. %et)e 4.00
/* 40 %% dia. %et)e 47.00
/*i 0 %% dia. %et)e 51.00
/*ii 5 %% dia. %et)e 72.00
/*iii 7 %% dia. ; 60 %% dia. %et)e 65.00
/i 100 %% dia. ; 110 %% dia. %et)e 66.00
/ 140 %% dia. %et)e 6.00
/i 150 %% dia. %et)e 5.00
1/I Supplying, fitting and fiing PV8 pipe" of app)o*ed %a&eof /%ediu%
duty (onfo)%ing to $S#3D - 176 and t')eaded to %at(' wit' !I Pipe"
a" pe) IS E 12 /Pa)t - I. wit' all ne(e""a)y a((e""o)ie", "pe(ial" *i+.
"o(&et, end, tee, union, ()o"", elo, nipple, long"()ew, )edu(ing "o(&et,
)edu(ing tee, "'o)t pie(e et(. fitted wit' 'olde) at" (la%p", in(luding(utting pipe", %a&ing t')ead",fitting, fiing et(. (o%plete in all )e"pe(t
in(luding (o"t of all ne(e""a)y fitting" a" )eui)ed,ointing %ate)ial" and
two (oat" of painting wit' app)o*ed paint in any po"ition ao*e g)ound.
/Pay%ent will e %ade on t'e (ent)e line %ea"u)e%ent" of total pipe
line in(luding all "pe(ial". o "epa)ate pay%ent will e %ade fo)
a((e"o)ie", "pe(ial". Pay%ent fo) painting will e %ade "epe)ately
() For E$pose% Wor#
P4* Pipes
(Di)
1 %% %et)e 105.00
20 %% %et)e 15.00
2 %% %et)e 165.00
2 %% %et)e 24.00
40 %% %et)e 06.00
0 %% %et)e 405.00
5 %% %et)e 54.00
60 %% %et)e 611.00
100 %% %et)e 1200.00
12 %% %et)e 12.00
10 %% %et)e 10.00
200 %% %et)e 265.00
20 %% %et)e .00
00 %% %et)e 4.00
(&) For *once"e% Wor#
8/10/2019 Sor Spw 2014 Vqeqeeolume II
20/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
(Di)
1 %% %et)e 141.00
20 %% %et)e 154.00
2 %% %et)e 214.00
1/II Supplying, fitting and fiing PV8 pipe" fo) unde)g)ound wo)& of
app)o*ed %a&e /%ediu% duty (onfo)%ing to $S#3D - 176 and
t')eaded to %at(' wit' !I Pipe" a" pe) IS E 12 /Pa)t - I. wit' all
ne(e""a)y a((e""o)ie", "pe(ial" *i+. "o(&et, end, tee, union, ()o"", elo,
nipple, long"()ew, )edu(ing "o(&et, )edu(ing tee, "'o)t pie(e et(. fitted
in(luding (o"t of all %ate)ial" ,ointing %ate)ial", (utting pipe", %a&ing
t')ead" ,(utting t)en('e" upto 1. %et)e elow "u)fa(e in all "o)t" of "oil
and )efilling t'e "a%e a" di)e(ted (o%plete in all )e"pe(t. /Pay%ent will
e %ade on t'e (ent)e line %ea"u)e%ent of t'e total pipe line in(luding
all "pe(ial" o "epa)ate pay%ent will e %ade fo) a((e""o)ie", "pe(ial".
P4* Pipes
(Di)
1 %% %et)e 122.00
20 %% %et)e 10.00
2 %% %et)e 200.00
2 %% %et)e 25.00
40 %% %et)e 27.00
0 %% %et)e 424.00
5 %% %et)e 52.00
60 %% %et)e 6.00
100 %% %et)e
1226.00
12 %% %et)e 1520.00
10 %% %et)e 14.00
200 %% %et)e 2675.00
20 %% %et)e 6.00
00 %% %et)e 405.00
1/III Supply of PV8 pipe" : fitting" /%ediu% duty (onfo)%ing to $S#3D -
176 and t')eaded to %at(' wit' !I Pipe" a" pe) IS E 12 /Pa)t - I.
(A) P4* Pipes
(Di)
1 %% %et)e 5.0020 %% %et)e 66.00
2 %% %et)e 126.00
2 %% %et)e 17.00
40 %% %et)e 21.00
0 %% %et)e 26.00
5 %% %et)e 462.00
60 %% %et)e 510.00
100 %% %et)e 22.00
12 %% %et)e 12.00
10 %% %et)e 146.00
200 %% %et)e 222.00
20 %% %et)e 110.00
00 %% %et)e 427.00
() Soc#et
8/10/2019 Sor Spw 2014 Vqeqeeolume II
21/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
(Di)
1 %% 9a(' 11.00
20 %% 9a(' 14.00
2 %% 9a(' 24.00
2 %% 9a(' .00
40 %% 9a(' 4.00
0 %% 9a(' 5.00
5 %% 9a(' 117.00
60 %% 9a(' 10.00
100 %% 9a(' 2.00
12 %% 9a(' 25.00
10 %% 9a(' 20.00
200 %% 9a(' 2.00
20 %% 9a(' 57.00
00 %% 9a(' 2.00
(*) E"&o5(Di)
1 %% 9a(' 14.00
20 %% 9a(' 1.00
2 %% 9a(' 2.00
2 %% 9a(' 4.00
40 %% 9a(' 7.00
0 %% 9a(' 11.00
5 %% 9a(' 174.00
60 %% 9a(' 260.00
100 %% 9a(' 05.00
12 %% 9a(' 54.00
10 %% 9a(' 11.00
200 %% 9a(' 1564.00
20 %% 9a(' 2205.00
00 %% 9a(' 2571.00
(D) +on! en% (67 De!ree)
(Di)
1 %% 9a(' 27.00
20 %% 9a(' .00
2 %% 9a(' 50.00
2 %% 9a(' 5.00
40 %% 9a(' 14.000 %% 9a(' 20.00
5 %% 9a(' 420.00
60 %% 9a(' 52.00
100 %% 9a(' 671.00
12 %% 9a(' 1074.00
10 %% 9a(' 1206.00
200 %% 9a(' 5.00
20 %% 9a(' 4160.00
00 %% 9a(' 01.00
(E) Tee
(Di)1 %% 9a(' 1.00
20 %% 9a(' 2.00
2 %% 9a(' 6.00
2 %% 9a(' 50.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
22/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
40 %% 9a(' 10.00
0 %% 9a(' 12.00
5 %% 9a(' 2.00
60 %% 9a(' 56.00
100 %% 9a(' 577.00
12 %% 9a(' 11.00
10 %% 9a(' 260.00
200 %% 9a(' 41.00
20 %% 9a(' 465.00
00 %% 9a(' 47.00
(F) (i) Nipp"e (28 mm "on!)
(Di)
1 %% 9a(' 12.00
20 %% 9a(' 15.00
2 %% 9a(' 20.00
2 %% 9a(' 0.0040 %% 9a(' 5.00
0 %% 9a(' 6.00
5 %% 9a(' .00
60 %% 9a(' 67.00
100 %% 9a(' 100.00
(ii) Nipp"e (977 mm "on!)
(Di)
1 %% 9a(' 16.00
20 %% 9a(' 24.00
2 %% 9a(' 26.00
2 %% 9a(' 7.00
40 %% 9a(' 42.00
0 %% 9a(' 4.00
(iii) Nipp"e (987 mm "on!)
(Di)
1 %% 9a(' 20.00
20 %% 9a(' 27.00
2 %% 9a(' 0.00
2 %% 9a(' 6.00
40 %% 9a(' 47.00
0 %% 9a(' .005 %% 9a(' 100.00
60 %% 9a(' 10.00
100 %% 9a(' 14.00
(i3) Nipp"e (:77 mm "on!)
(Di)
1 %% 9a(' 27.00
20 %% 9a(' 7.00
2 %% 9a(' 0.00
2 %% 9a(' 50.00
40 %% 9a(' 7.00
0 %% 9a(' 1.005 %% 9a(' 17.00
60 %% 9a(' 21.00
100 %% 9a(' 277.00
(3) Nipp"e (77 mm "on!)
8/10/2019 Sor Spw 2014 Vqeqeeolume II
23/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
(Di)
1 %% 9a(' 0.00
20 %% 9a(' 40.00
2 %% 9a(' 5.00
2 %% 9a(' 56.00
40 %% 9a(' 6.00
0 %% 9a(' 10.00
5 %% 9a(' 176.00
60 %% 9a(' 240.00
100 %% 9a(' 5.00
12 %% 9a(' 47.00
10 %% 9a(' 47.00
200 %% 9a(' 71.00
20 %% 9a(' 106.00
00 %% 9a(' 15.00
(G) F"n!e(Di)
1 %% Pai) 0.00
20 %% Pai) 5.00
2 %% Pai) 6.00
2 %% Pai) 10.00
40 %% Pai) 1.00
0 %% Pai) 156.00
5 %% Pai) 257.00
60 %% Pai) 27.00
100 %% Pai) 6.00
12 %% Pai) 4.00
10 %% Pai) 524.00
200 %% Pai) 40.00
20 %% Pai) 106.00
00 %% Pai) 165.00
(;) T're%e% A%opter
(Di)
1 %% 9a(' 12.00
20 %% 9a(' 15.00
2 %% 9a(' 20.00
2 %% 9a(' 40.00
40 %% 9a(' 71.000 %% 9a(' .00
5 %% 9a(' 11.00
60 %% 9a(' 1.00
100 %% 9a(' 166.00
12 %% 9a(' 246.00
10 %% 9a(' 267.00
200 %% 9a(' 0.00
(I) Union
(Di)
1 %% 9a(' 0.00
20 %% 9a(' 44.00
2 %% 9a(' 50.00
2 %% 9a(' 6.00
40 %% 9a(' 12.00
0 %% 9a(' 1.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
24/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
(
8/10/2019 Sor Spw 2014 Vqeqeeolume II
25/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
40 B 2 9a(' 7.00
40 B 2 9a(' 152.00
0 B 1 9a(' 246.00
0 B 2 9a(' 221.00
0 B 2 9a(' 11.00
5 B 2 9a(' 20.00
5 B 40 9a(' 1.00
5 B 0 9a(' 11.00
60 B 2 9a(' 44.00
100 B 2 9a(' 75.00
100 B 5 9a(' 600.00
(N) Re%1cin! E"&o5 (mm = mm)
2 B 1 9a(' 70.00
2 B 20 9a(' 57.00
60 B 0 9a(' 246.00
(O) So"3ent *ement
20 !%. 20 g%. 17.00
20 Supply of >ig' Den"ity Poly-et'ylene Pipe (onfo)%ing to IS - 464 - 16
/Dia FP9 - 5G
A. > K! ? S@.*m. (Wor#in! Press1re)
(Di)
40 %% % 75.00
0 %% % 117.00
5 %% % 164.00
7 %% % 252.00
110 %% % 7.00
. 97 K! ? S@.*m. (Wor#in! Press1re)
(Di)
1 %% % 2.00
20 %% % 2.00
2 %% % 45.00
2 %% % 74.00
21 Supply , Pipes
20 %% /oute) dia % 146.00
2 %% / oute) dia % 16.00
2 %% / oute) dia % 24.00
40 %% / oute) dia % 52.00
II)SDR 99?PN-97 Pipes
0 %% / oute) dia % 65.00
5 %% / oute) dia % 47.00
7 %% / oute) dia % 516.00
0 %% / oute) dia % 67.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
26/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
110 %% / oute) dia % 1252.00
. For *once"e% Wor#
I)SDR 2.?PN-9> Pipes
20 %% /oute) dia % 160.00
2 %% / oute) dia % 25.00
2 %% / oute) dia % 274.00
22 Supply ,
8/10/2019 Sor Spw 2014 Vqeqeeolume II
27/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
/i 1 %% dia. %et)e 47.00
/ii 20 %% dia. %et)e 4.00
/iii 2 %% dia. %et)e 4.00
/i* 2 %% dia. %et)e 60.00
/* 40 %% dia. %et)e .00
/*i 0 %% dia. %et)e 4.00
/*ii 5 %% dia. %et)e .00
/*iii 60 %% dia. %et)e .00
/i 100 %% dia. %et)e 125.00
/ 12 %% dia. %et)e 127.00
/i 10 %% dia. %et)e 12.00
() Caou) fo) fitting and fiing !.I. pipe" ao*e g)ound (conce"e%) in
"t)u(tu)e" wit' 'olde) at (la%p" in(luding (o"t of ointing %ate)ial",
'olde) at (la%p" et(.,a" ne(e""a)y, in(luding (utting pipe, %a&ing
t')ead" et(. (o%plete in all )e"pe(t wit' two (oat" of painting wit'
app)o*ed paint any 'eig't. /Pay%ent will e %ade on t'e (ent)e line
%ea"u)e%ent of t'e total pipeline in(luding "pe(ial". Pay%ent of
painting will e paid "epe)ately.
/i 1 %% dia. %et)e .00
/ii 20 %% dia. %et)e .00
/iii 2 %% dia. %et)e .00
4 Caou) fo) fitting and fiing !.I. pipe" fo) unde) g)ound wo)& in(luding
(o"t of ointing %ate)ial", (utting pipe",%a&ing t')ead" et(. (o%plete in
all )e"pe(t in(luding (utting t)en('e" upto 1. %et)e elow "u)fa(e in all
"o)t" of "oil and )efilling t'e "a%e a" di)e(ted wit' two (oat" of painting
to !.I. pipe" and "pe(ial" wit' itu%inou" paint. /Pay%ent will e %ade
on t'e (ent)e line %ea"u)e%ent of t'e total pipeline in(luding "pe(ial".
Pay%ent of painting to e paid "epe)ately.
/i 1 %% dia. %et)e 51.00
/ii 20 %% dia. %et)e 56.00
/iii 2 %% dia. %et)e 5.00
/i* 2 %% dia. %et)e 60.00
/* 40 %% dia. %et)e 66.00
/*i 0 %% dia. %et)e 0.00
/*ii 5 %% dia. %et)e 0.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
28/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
/*iii 60 %% dia. %et)e 1.00
/i 100 %% dia. %et)e 114.00
/ 12 %% dia. %et)e 115.00
/i 10 %% dia. %et)e 117.00
Caou) fo) fitting and fiing !.I. "pe(ial" in(luding (o"t of ointing
%ate)ial".
() P"1!.
/i @pto 2 %% dia. ea(' 6.00
/ii $o*e 2 %% upto 0 %% dia. ea(' 10.00
/iii $o*e 0 %% upto 60 %% dia. ea(' 12.00
/i* $o*e 60 %% upto 10 %% dia. ea(' 14.00
(&) Soc#et/ Re%1cin! soc#et/ en%/ P"in e@1" e"&o5/ Re%1cin! e"&o5/
Nipp"e/ S'ort piece.
/i @pto 2 %% dia. ea(' 6.00
/ii $o*e 2 %% upto 0 %% dia. ea(' 10.00
/iii $o*e 0 %% upto 60 %% dia. ea(' 12.00
/i* $o*e 60 %% upto 10 %% dia. ea(' 14.00
(c) P"in tee/ Re%1cin! tee/ Pen%ent tee/
8/10/2019 Sor Spw 2014 Vqeqeeolume II
29/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
/ii 00%% inte)nal dia. %et)e 12.00
/iii 400%% inte)nal dia. %et)e 10.00
/i* 500%% inte)nal dia. %et)e 4476.00
(&) Repir Wor#s
1 Caou) fo) di"%antling !.I. pipe wit' fitting".
/i 1 %% %et)e 5.00
/ii 20 %% %et)e 5.00
/iii 2 %% %et)e 5.00
/i* 2 %% %et)e 5.00
/* 40 %% %et)e 6.00
/*i 0 %% %et)e 6.00
/*ii 5 %% %et)e 6.00
/*iii 60 %% %et)e 11.00
/i 100 %% %et)e 11.00
2 Refiing !.I. pipe wit' fitting" afte) (leaning w'e)e ne(e""a)y.
/i 1 %% %et)e 5.00
/ii 20 %% %et)e 7.00
/iii 2 %% %et)e 7.00
/i* 2 %% %et)e 6.00
/* 40 %% %et)e .00
/*i 0 %% %et)e .00
/*ii 5 %% %et)e 1.00
/*iii 60 %% %et)e 15.00
/i 100 %% %et)e 15.00
Re%o*ing ('o&age in !.I. pipe in(luding (leaning pipe.
/i 1 %% %et)e 7.00
/ii 20 %% %et)e 7.00
/iii 2 %% %et)e 7.00
/i* 2 %% %et)e .00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
30/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
/* 40 %% %et)e .00
/*i 0 %% %et)e .00
/*ii 5 %% %et)e 11.00
/*iii 60 %% %et)e 11.00
/i 100 %% %et)e 11.00
4 Renewing 8.I. (la%p fo) pipe in(luding (utting 'ole in wall et(. and
%ending good all da%age" wit' (e%ent (on()ete/4E2E1 wit' 'a%a ('ip"
and (e%ent pla"te) /5E1 to %at(' wit' and (u)ing.
/i 1 %% ea(' 26.00
/ii 20 %% ea(' .00
/iii 2 %% ea(' 5.00
/i* 2 %% ea(' 2.00
/* 40 %% ea(' .00
/*i 0 %% ea(' 57.00
/*ii 5 %% ea(' 140.00
/*iii 60 %% ea(' 146.00
/i 100 %% ea(' 156.00
Renewing P.V.8. (lip wit' ne(e""a)y "()ew".
/i 1 %% ea(' 10.00
/ii 20 %% ea(' 12.00
/iii 2 %% ea(' 16.00
/i* 2 %% ea(' 21.00
/* 40 %% ea(' 2.00
/*i 0 %% ea(' 26.00
/*ii 5 %% ea(' 6.00
5 Opening out lea&y wate) "upply pipe and %a&ing t'e oint" wate) tig't
in(luding (utting t')ead" w'e)e ne(e""a)y.
/i @pto 40 %% dia. ea(' 50.00
/ii 0 %% dia. ea(' 70.00
/iii 5 %% to 100 %% dia. ea(' 114.00
7 Renewing i)on a%nut wit' wa"'e).
/i 1 %% ea(' 1.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
31/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
/ii 20 %% ea(' 1.00
/iii 2 %% ea(' 17.00
6 8utting out pipe and %a&ing t')ead".
/i @pto 20 %% dia. ea(' .00
/ii $o*e 20 %% upto 2 %% dia. ea(' 1.00
/iii $o*e 2 %% upto 0 %% dia. ea(' 2.00
/i* $o*e 0 %% upto 60 %% dia. ea(' .00
/* $o*e 60 %% upto 10 %% dia. ea(' 4.00
Pe)fo)ating !.I. pipe of all dia%ete)" y d)illing in(luding ta&ing !.I. pipe"to wo)&"'op and a(& if )eui)ed.
Do++en 56.00
10 3a&ing end;off"et in !.I. pipe y 'eat.
/i @pto 0 %% dia. ea(' 5.00
/ii $o*e 0 %% upto 60 %% dia. ea(' .00
/iii $o*e 60 %% upto 10 %% dia. ea(' 1.00
11 8utting out "e(tion of !.I. wate) %ain pipe upto 100 %%. ea(' 40.00
12 Di"%antling and )efiing i (o(& o) "top (o(&.
/i 1 %% ea(' 1.00
/ii 20 %% ea(' 15.00
1 Rewa"'e)ing "top (o(&; i (o(&; pu"' (o(&; pilla) (o(& in(luding gland
pa(&ing if ne(e""a)y.
/i 1 %% ea(' 14.00
/ii 20 %% ea(' 16.00
/iii 2 %% ea(' 1.00
/i* 40 %% ea(' 27.00
14 Renewing )a"" "pindle and *al*e of "top (o(&;i (o(&;pu"' (o(&;pilla)
(o(&.
/i 1 %% ea(' 64.00
/ii 20 %% ea(' 107.00
1 Di"%antling and )efiing "'owe) )o"e afte) (leaning. ea(' 12.00
15 Renewing ()o%iu% plating of
()i (o(&; "top (o(&; pilla) (o(&; wa"te fitting". ea(' .00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
32/110
PWD SOR Vol-II wef-01.07.2014
(A)-(II) G.I. PIPE WORKS AND FITTINGS
Item No. Description of Item Unit (Rs)
SE*TION (A) - P+U,ING WORKSA"" Districts of West
en!"
(&)9low a(tion i; pilla) tap. ea(' 7.00
17 8utting out ei"ting !.I.
8/10/2019 Sor Spw 2014 Vqeqeeolume II
33/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(III) CISTERN, G.I. TANKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
(') O!&!#'% Wos
1 Supplying, fitting and fiing 10 lit!e po!"elain low-down "i#te!n of
app!o$ed %a&e wit' eit'e! #ide o! (otto% inlet, #ide o$e!flow, (!a"&et#"o%plete wit' all inte!nnal PV) fitting#.
W'ite ea"' 2*+7.00
2 Supplying, fitting and fiing 10 lit!e P.V.). low-down "i#te!n "onfo!%ing to
I.S. #pe"ifi"ation wit' P.V.). fitting# "o%plete,).I. (!a"&et# in"luding two
"oat# of painting to (!a"&et et".
ea"' 111.00
Supplying, fitting and fiing 10 lit!e po!"elain low-down "i#te!n of
app!o$ed %a&e wit'out fitting# and (!a"&et#.
W'ite ea"' 1740.00
o! ite% 1 / a(o$e fo! u#ing "olou!ed Po!"elain -
.. )i#te!n# t'e !ate will en'an"ed o$e! t'e "o!!e#ponding ite% of w'ite
Po!"elain "i#te!n a# follow#.
3a S&y (lue, Venetian, 5in. g!een, 6u!uoi#e, )it!u# yellow , )'a%page,
Sap'i!e - y *08
3( Ro%an (!own, e!n g!een, 5i#ty lila", O!ange, Sienna gold, Sil$e! g!ey,
Sepia, 9lpine, )o!nil #o!$into (lue - 1008
3" u!gandy, :%e!ald g!een "olou!ed - 2008
4 Supplying, fitting and fiing "on"ealed "i#te!n of app!o$ed %a&e wit' fla#'
plate )ute;1*7.00
3ii 1+4 lit!e "apa"ity ea"' 174.00
3( Wit' 1.+ %% t'i"& ?.I. #'eet
3i >0 lit!e "apa"ity ea"' 10727.00
3ii *40 lit!e "apa"ity ea"' 10+.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
34/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(III) CISTERN, G.I. TANKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
+ Supplying P.V.). wate! #to!age tan& of app!o$ed uality wit' "lo#ed top
wit' lid 3la"& - 5ultilaye!
3a *00 lit!e "apa"ity ea"' 07+.00
3( 1000 lit!e "apa"ity ea"' +110.00
3" 1*00 lit!e "apa"ity ea"' >4.00
3d 2000 lit!e "apa"ity ea"' 1247.00
3e 2*00 lit!e "apa"ity ea"' 1**0.00
3f 000 lit!e "apa"ity ea"' 1+>.00
3g 4000 lit!e "apa"ity ea"' 2427.00
3' *000 lit!e "apa"ity ea"' 224+.00
7 Supplying, fitting and fiing "a#t i!on !ai#ed !ain p!oof tan& "o$e! 4*0%%. ea"' 11>.00
Supplying, fitting and fiing "a#t i!on !ai#ed !ain p!oof tan& "o$e! *00 %%
dia. wit' lo"&ing a!!ange%ent# 3weig'ing not le## t'an 12 &g.
ea"' 14>*.00
> =oi#ting ?.I. tan& 3upto and in"luding 112 lit!e "apa"ity.
3a 1#t #to!y f!o% ?.7.00
3( :t!a fo! ea"' additional #to!y ea"' 44.00
3ii 9(o$e 1*00 lit!e upto *000 lit!e "apa"ity.
3a @pto 1#t #to!y f!o% ?.
8/10/2019 Sor Spw 2014 Vqeqeeolume II
35/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(III) CISTERN, G.I. TANKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
11 .00
3$i !a"&et# 3pai! ea"' 4>.00
3$ii )P lu#' end 3lo"al (e#t uality
a O!!i#a / Indian Patte!n W) :a"' *1.00
( :. W.). / 9nglo-Indian W.). :a"' 2.00
2 Renewing (olt# and nut# fo! "i#te!n. :a"' Set 41.00
Renewing (!a## #"!ew# in auto "i#te!n. :a"' Set 2.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
36/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(III) CISTERN, G.I. TANKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
4 )'anging t'e lat'e! only of #yp'on of auto%ati" "i#te!n in"luding ta&ing
out and !efiing ne"e##a!y pa!t#.
:a"' Set >.00
* Renewing 'ig' p!e##u!e polyt'ene (all "o"& of app!o$ed uality wit'polyt'ene (all and alu%iniu% le$e! "o%plete fo! pipe of dia.
3i 2 %% ea"' 1>*.00
3ii 2* %% ea"' 142.00
3iii 20 %% ea"' 100.00
3i$ 1* %% ea"' 2.00
+ Renewing polyt'ene (all of app!o$ed uality fo! pipe of dia.
3i 2 %% ea"' 1*4.00
3ii 2* %% ea"' 112.00
3iii 20 %% ea"' .00
3i$ 1* %% ea"' 4.00
7 Di#%antling ?.I. tan& in"luding di#"onne"ting pipe "onne"tion. ea"' 11+.00
iing ?.I. tan& in po#ition in"luding !efitting pipe "onne"tion. ea"' 11+.00
> Dewate!ing and !epai!ing ?.I. tan& a(o$e 1000 lit!e and upto 2000 lit!e
"apa"ity wit' ?.I. wa#'e!, (olt#, nut# and "e%ent "on"!ete at (otto% a#
ne"e##a!y.
ea"' 20.00
10 Dewate!ing and !epai!ing ?.I. tan& upto 1000 lit!e "apa"ity wit' ?.I.
wa#'e!, (olt# and nut# and wa#'e!.
ea"' 210.00
11 Pun"'ing 'ole# in tan&3?.I.. ea"' >.00
12 )leaning and !e%o$ing %ud upto 2000 lit!e Wate! 6an& in"luding %a#on!y
!e#e!$oi!.
ea"' 111.00
1 )leaning and !e%o$ing %ud a(o$e 2000 lit!e Wate! 6an& in"luding
%a#on!y !e#e!$oi!.
)u% +.00
14 )leaning and di#infe"ting upto 2000 lit!e Wate! 6an& in"luding %a#on!y
!e#e!$oi!.
ea"' 1*7.00
1* )leaning and di#infe"ting a(o$e 2000 lit!e Wate! 6an& in"luding %a#on!y
!e#e!$oi!.
)u% >.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
37/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(III) CISTERN, G.I. TANKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
1+ Repai!ing da%aged ?.I. tan& of any "apa"ity afte! lowe!ing on !oof (y
!epla"ing wit' new 2 %% t'i"& ?.I. #'eet (y !i$etting wit' ne"e##a!y
pa"&ing, painting new po!tion#, !efiing t'e ei#ting ).I. tan& "o$e! (y
!i$etting in new po#ition, if ne"e##a!y, afte! ta&ing out old "o$e! $e!y"a!efully et". "o%plete 3e"luding t'e "o#t of di#%antling and !efiing tan&
(ut in"luding t'e "o#t of "utting out wo!n out po!tion (y #uita(le %ean# to
!egula! #'ape. 3Pay%ent will (e %ade on t'e (a#i# of a!ea of da%aged
po!tion !epla"ed.
#. %. 1>>.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
38/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(IV) BASIN AND SINKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
(') O!&!#'% Wos
1 Wash basin vitreous hina of a!!rove" #a$e %without fittin&s'
su!!lie"(fitte" an" fi)e" in !osition on 7*## + 7* ## + 7* ## woo"
blo$s an" ,.I. bra$ets inlu"in& two oats of !aintin& of ,.I. bra$ets.
%i' 4*0 ## + 00 ## sie eah 174.00
%ii' **0 ## + 400 ## sie eah 1/71.00
%iii' /0 ## + 4*0 ## sie eah 040.00
%iv' n&le ba$ wash basin 400 ## + 400 ## eah 144*.00
%v' Sur&eons wash basin /*0 ## + 4*0 ## eah 43/.00
%vi' S!itton for Dental Sur&eon eah 02.00
2 Su!!lin&( fittin& an" fi)in& white vitreous hina best 5ualit a!!rove"
#a$e wash basin with ,.I. bra$ets on 7* ## + 7* ## woo"en blo$s(
,.P. waste fittin&s of 2 ## "ia.( one a!!rove" 5ualit brass ,.P. !illar
o$ of 1* ## "ia.( ,.P. hain with rubber !lu& of 0 ## "ia.( a!!rove"5ualit P.V.,. waste !i!e with ,.P. nut 2 ## "ia.( 300 ## lon& a!!rove"
5ualit P.V.,. onnetion !i!e with heav brass ,.P. nut inlu"in& #en"in&
&oo" all "a#a&es an" !aintin& the bra$ets with two oats of a!!rove"
!aint.
%i' 4*0 ## + 00 ## sie eah 2207.00
%ii' **0 ## + 400 ## sie eah 2*04.00
%iii' /0 ## + 4*0 ## sie eah 7.00
%iv' n&le ba$ wash basin 400 ## + 400 ## sie eah 227.00
Su!!lin&( fittin& an" fi)in& !e"estal of a!!rove" #a$e for wash basin
%white'
eah 1311.00
4 6est 5ualit sin$ in #osai in silver &re olourwith ,.P. waste an" other
fittin&s( rubber !lu& an" hain( ,.I. heav bra$ets with two oats of
a!!rove" !aint.
%i' /00 ## + 4*0 ## + 200 ## eah 301.00
%ii' /00 ## + 4*0 ## + 2*0 ## eah 32*.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
39/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(IV) BASIN AND SINKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
%iii' 7*0 ## + 4*0 ## + 2*0 ## eah 113.00
* Su!!lin&( fittin& an" fi)in& White Vitreous ,hina Sin$ in !osition on ,.I.
bra$ets inlu"in& two oats of !aintin& of bra$ets.
%a' Plain e"&e sin$ with overflow
%i' /10 ## + 4*0 ## + 200 ## eah /237.00
%ii' /10 ## + 4*0 ## + 2*0 ## eah /3/.00
%b' aborator sin$ with ri# an" overflow
%i' 4*0 ## + 00 ## + 1*0 ## eah 2377.00
%ii' *00 ## + 00 ## + 1*0 ## eah 4*.00
%' aborator table sin$ inlu"in& uttin& of laborator table as re5uire".
4*0 ## + 00 ## + 1*0 ##
eah 212.00
8.6. 9or usin& oloure" 6asin( Sin$( Pe"estal et. th rates of the
orres!on"in& rates of white viterous !orelain olour will be enhane" b
as followes:
%a' S$ blue( Venetian( ;in. &reen(
8/10/2019 Sor Spw 2014 Vqeqeeolume II
40/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(IV) BASIN AND SINKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
%ii' /00## + 400 ## + 2*0 ## eah 4712.00
%iii' /00 ## + 4*0 ## + 200 ## eah 4/0/.00
Su!!lin&( fittin& an" fi)in& Drain boar"s for sin$s with bra$ets in
!osition.
%a' Porelain flute" "rain boar" of a!!rove" #a$e
%i' *0 ## + 4*0 ## eah 2147.00
3 Su!!lin&(fittin& an" fi)in& a!!rove" bran" P.V.,. ,O88>,ah Set /.00
%iii' 40 ## "ia. of !lu& >ah Set /3.00
%iv' 4* ## "ia. of !lu& >ah Set 73.00
%v' *0 ## "ia. of !lu& >ah Set 2.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
41/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(IV) BASIN AND SINKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
12 Su!!lin&( fittin& an" fi)in& ,.P. hain 1200 ## lon& with rubber !lu& /*
## "ia.
>ah Set 200.00
1 Su!!lin&( fittin& an" fi)in& ,.P. hain or sta for wash basin eah 1.00
14 Su!!lin&(fittin& an" fi)in& rubber !lu&.
%i' 2* ## "ia. eah 10.00
%ii' 2 ## "ia. eah 12.00
%iii' 40 ## "ia. eah 1/.00
%iv' 4* ## "ia. eah 17.00
%v' *0 ## "ia. eah 22.00
1* Su!!lin&( fittin& an" fi)in& o#!lete 6ottle waste tra! %@eav Aualit'
%a' ,hro#iu# !late" 6ottle tra! 2 ## with 130 ## lon& onnetin& !i!e
an" wall flan&e %>5uivalent to ,o"e 8o. *4* B ;o"el - SS,O or si#ilar bran"'.
>ah 0.00
%b' P
8/10/2019 Sor Spw 2014 Vqeqeeolume II
42/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(IV) BASIN AND SINKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
1 Su!!lin&( fittin& an" fi)in& ,.I. bra$et inlu"in& two oats of !aintin&.
%a' Wash basin( Dental s!itton eah 1/7.00
%b' Sin$( Drain boar" eah 1*.00
%' Sur&eons basin eah 173.00
%"' ,istern eah 114.00
%e' lu#iniu# bra$ets eah 31.00
13 Su!!lin&( fittin& an" fi)in& !illar o$ of a!!rove" #a$e.
a' %i' ,P Pillar ,o$ - 1* ##. %>5uivalent to ,o"e 8o. *07 B ;o"el -
SS,O or si#ilar bran"'.
>ah 71.00
a' %ii' ,P Pillar ,o$ Su!er Delu)e with erator - 1* ##. %>5uivalent to
,o"e 8o. *0 B ;o"el 8o. SS,O or si#ilar
bran"'.
>ah 7/0.00
b' P8 of
FAR or e5uivalent'.
>ah 110*.00
"' Polthene Piller ,o$ %>;,O C 5uivalent to ,o"e 8o.
*1/7%6' B ;o"el - 9OR>8 of FAR or si#ilar bran"'.
>ah 1.00
e' %ii' ,P Wall ;i)ture without s!out but with !rovision for onnnetion to
8/10/2019 Sor Spw 2014 Vqeqeeolume II
43/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(IV) BASIN AND SINKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
20 Su!!lin&( fittin& an" fi)in& ,.P. >)tension Pi!e >ah 1.00
21 Su!!lin&( fittin& an" fi)in& ,.P. Offset >ah 2.00
22 Su!!lin&( fittin& an" fi)in& ,.P. Wall 9lan&e >ah 1.00
2 Su!!lin&( fittin& an" fi)in& "o#e sha!e" ,.P. waste &ratin& for urinals.
%i' 2 ## eah 21.00
%ii' *0 ## eah 27.00
() Re"'! Wos
1 Dis#antlin& wash basin with bra$ets with or without waste fittin&s. eah *.00
2 Refi)in& wash basin with bra$ets with or without waste fittin&s. eah 71.00
Dis#antlin& Sur&eons washC Dental s!itton with bra$ets with or without
waste fittin&s.
eah *.00
4 Refi)in& Sur&eons washC Dental s!itton with bra$ets with or withoutwaste fittin&s.
eah 73.00
* Dis#antlin& sin$ with bra$ets with or without waste fittin&s.
%i' !to 4*0 ## len&th eah 41.00
%ii' bove 4*0 ## an" u!to /00 ## len&th eah *.00
%iii' bove /00 ## an" u!to 7*0 ## len&th eah *3.00
%iv' bove 7*0 ## len&th eah 7/.00
/ Refi)in& sin$ with bra$ets with or without waste fittin&s.
%i' !to 4*0 ## len&th eah 7/.00
%ii' bove 4*0 ## an" u!to /00 ## len&th eah 7/.00
%iii' bove /00 ## an" u!to 7*0 ## len&th eah 7/.00
%iv' bove 7*0 ## len&th eah 11.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
44/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(IV) BASIN AND SINKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
7 Renewin& woo"en blo$ of a!!rove" variet of sie 1*0 ## + 100 ## +
7* ## with nails an" srews for fi)in& bra$ets for sin$sC basins.
eah *4.00
Renewin& woo"en santlin& 4*0 ## + 2* ## + 12 ## un"er the table
for fi)in& laborator sin$ in !ro!er !osition with nails an" srews
o#!lete.
eah *.00
3 ,uttin& table for sin$. eah 43.00
10 Dis#antlin& !illar o$ of wash basin. eah 3.00
11 Refi)in& !illar o$ of wash basin. eah 3.00
12 Dis#antlin& "rain boar". eah 1/.00
1 Refi)in& "rain boar". eah 1.00
14 9i)in& bra$ets for wash basinC sin$C "rain boar"C istern. eah 2*.00
1* Renewin& ,hina sto!!er for wash basin. eah 10.00
1/ Dis#antlin& bath tub. eah 100.00
17 Refi)in& bath tub eah 147.00
1 ,leanin& wash basinC sin$ with ai". eah 1/.00
13 ,leanin& sin$ with so"a an" soa!. eah 12.00
20 ,leanin& bath tub with ai". eah 40.00
21 Renewin& a! an" linin& of heav 5ualit ,.P. over brass.
%i' 1* ## eah 4.00
%ii' 20 ## eah /4.00
%iii' 2* ## eah 1.00
%iv' 2 ## eah 30.00
%v' 40 ## eah 100.00
%vi' 4* ## eah 117.00
%vii' *0 ## eah 12/.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
45/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(IV) BASIN AND SINKS WITH PARTS
Item No. Desc!"t!o# o$ Item U#!t A%% D!st!cts o$
West Be#&'%
22 Renewin& 2 ## 8.P. waste fittin&s for wash basin inlu"in& ou!lin& ,.P.
hain an" rubber !lu&.
eah 12.00
2 Renewin& si#la a! an" linin& brass union( heav t!e best In"ian #a$e.
%i' 1* ## eah *2.00
%ii' 20 ## eah *.00
24 Retifin& lea$a&e of be" !an sin$( renewin& rubber washer full o#!lete
with E.I. nuts an" bolts.
eah /.00
2* Renewin& brass ne$ onl of swan ne$ o$. eah 12/.00
2/ Renewin& bottle Get of be" !an sin$. eah 4*.00
27 Dis#antlin& an" refi)in& Sur&eons #i)in& valve after re!airs. eah 23/.00
2 Dis#antlin& an" ta$in& out lea" C !olthene waste !i!e an" refi)in& the
sa#e after re#ovin& ho$a&e inlu"in& neessar ben"in&sC offsets an"
strai&htenin& an" re!lae#ent of "a#a&e" !arts( if an.
eah 4.00
23 ,leanin& an" refi)in& "is!lae" laborator sin$ in !ro!er !osition an"
#a$in& the e"&es of sin$s !erfetl water ti&ht b renewin& !a$in& an"
!utt Goints an" settin& with rubber sheetin&.
eah *1.00
0 Dis#antlin& an" re-fi)in& Swan 8e$ Piller ,o$ after neessar re!airin&(
!a$in&( washerin& o#!lete.
eah /.00
1 Dis#antlin& an" re#ovin& heav !orelain C ena#elle" bath tub for
re!airin& the sa#e or for re!airin& the floor un"erneath an" !lain& thesa#e in its ori&inal !osition.
eah 22/.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
46/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(V) TUBE WELL
Item No. Descr!to" o# Item U"t A$$ Dstrcts o#
West Be"%&$
(&) Or%"&$ Wor's
1 Labour for boring tube well of require ia. b! water "et #!#te$ t%roug%
an! t!&e of #oil #trata in'luing %ire an labour '%arge# for boring &i&e#(
#'affoling( tool# an &lant# a# ne'e##ar! an ta)ing out t%e$ an
lowering &i&e#( #trainer#( blin &i&e et'. an fitting an fi*ing t%e #a$e
'o$&lete in'luing bu')et wa#%ing an ot%er in'iental wor)# in t%e
'onne'tion. +%e tube well #%oul %a,e a $ini$u$ 0 $$ ga& in between
t%e out#ie of t%e tubewell &i&e an t%e bore.
a/ or e&t% u&to 10 $etre.
i/ 40 $$ ia. boring et'. $etre 1.00
ii/ 0 $$ ia. boring et'. $etre 10.00
iii/ 0 $$ ia. boring et'. $etre 1.00
b/ or e&t% $ore t%an 10 $etre.
i/ 40 $$ ia. boring et'. be!on 10 $etre $etre 112.00
ii/ 0 $$ ia. boring et'. be!on 10 $etre $etre 13.00
iii/ 0 $$ ia. boring et'. be!on 10 $etre $etre 21.00
'/ or e&t% u&to 10 $etre for 40 $$ ia. +ube well wit% to&
enlarge$ent of 0 $$ ia.
i/ 40 $$ ia. boring et'. $etre 14.00
ii/ 0 $$ ia. boring et'. to& enlarge$ent $etre 20.00
/ or e&t% u&to 10 $etre for 0 $$ ia. tube well wit% to&
enlarge$ent of 100 $$ ia.
i/ 0 $$ ia. boring et'. $etre 20.00
ii/ 100 $$ ia. boring et'. to& enlarge$ent $etre 40.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
47/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(V) TUBE WELL
Item No. Descr!to" o# Item U"t A$$ Dstrcts o#
West Be"%&$
e/ or e&t% u&to 10 $etre for 0 $$ ia. tube well wut% to&
enlarge$ent of 10 $$ ia.
i/ 0 $$ ia. boring et'. $etre 20.00
ii/ 10 $$ ia. boring et'. to& enlarge$ent $etre 32.00
f/ or e&t% $ore t%an 10 $etre for 0 $$ ia. tube well wit% to&
enlarge$ent of 100 $$ ia.
i/ 0 $$ ia. boring et'. be!on 10 $etre $etre 21.00
ii/ 100 $$ ia. boring et'. to& enlarge$ent $etre 40.00
Note - +o arri,e at labour 'o#t for boring( lowering of a tube well of 0 $$
ia. wit% to& enlarge$ent of 100 $$ ia. of e&t% 0 $etre %a,ing a total
e&t% of boring #a! 200 $etre fro$ 5.L.6 i/ 0 $ fii/ 8 120 $ i/ 8 0
$ fi/ 9 R#.1020.00 8 R#.27720.00 8 R#. 700.00 9 R#.43740.00
2 Labour for boring t%roug% an! t!&e of #oil for #in)ing tube well of require
ia. wit% to& enlarge$ent b! rig boring #!#te$ eit%er b! re#er,e
'ir'ulation or b! ire't rotar! $et%o/ in'luing %ire '%arge# an labour
for rig $a'%ine( tool# an &lant#( #taging( for'e &u$&ing #et an $a)ing
arrange$ent for water require for boring et'. 'o$&lete an lowering of
&i&e#( #trainer#( blin &i&e# et'. 'o$&lete.
a/ or e&t% u&to 20 $etre for 100 $$ ia. +ube well wit% to&
enlarge$ent of 200 $$ ia.u&to 0 $etre/.
i/ ir#t 0 $etre $etre 1023.00
ii/ :e*t 0 $etre $etre 4.00
iii/ :e*t 0 $etre $etre 1037.00
i,/ Re#t 100 $etre $etre 1104.00
b/ or e&t% u&to 20 $etre for 10 $$ ia. +ube well wit% to&
enlarge$ent of 20 $$ ia.u&to 0 $etre/.
i/ ir#t 0 $etre $etre 107.00
ii/ :e*t 0 $etre $etre 1030.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
48/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(V) TUBE WELL
Item No. Descr!to" o# Item U"t A$$ Dstrcts o#
West Be"%&$
iii/ :e*t 0 $etre $etre 1231.00
i,/ Re#t 100 $etre $etre 107.00
'/ or e&t% u&to 20 $etre for 10 $$ ia. +ube well wit% to&
enlarge$ent of 00 $$ ia.u&to 0 $etre./
i/ ir#t 0 $etre $etre 100.00
ii/ :e*t 0 $etre $etre 107.00
iii/ :e*t 0 $etre $etre 123.00
i,/ Re#t 100 $etre $etre 1434.00
:ote6 i/ or ite$ no. 2( $ea#ure$ent will be ta)en below 5.L. ta)ing 5.L.
a# ;ero for &a!$ent. ii/ or ite$ no. 1 < 2 for bore e&t% w%ere no
lowering of &i&e i# in,ol,e t%e 'orre#&oning rate# woul be reu'e b!
0=.
Su&&l!ing bra##-#trainer wit% bra## #o')et of a&&ro,e $a)e. >ea,!t!&e/
i/ 40 $$ ia. $etre 4.00
ii/ 0 $$ ia. $etre 142.00
iii/ 7 $$ ia. $etre 13.00
i,/ 100 $$ ia. $etre 210.00
4 Su&&l!ing 5.I. &i&e #trainer wit% bra## net < "a')ette of a&&ro,e qualit!.
>ea,! +!&e/
i/ 40 $$ ia. $etre 1132.00
ii/ 0 $$ ia. $etre 1721.00
iii/ 0 $$ ia. $etre 223.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
49/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(V) TUBE WELL
Item No. Descr!to" o# Item U"t A$$ Dstrcts o#
West Be"%&$
Su&&l!ing %ig% en#it! &ol!t%ene #trainer of a&&ro,e $a)e wit% aa&ter
'onfor$ing to I.S. #&e'ifi'ation#.
i/ 40 $$ ia. $etre 44.00
ii/ 0 $$ ia. $etre 34.00
iii/ 0 $$ ia. $etre 7.00
i,/ 100 $$ ia. $etre 17.00
3 Su&&l!ing PV? #trainer of a&&ro,e $a)e wit% aa&ter 'onfor$ing to
I.S.121# e'ifi'ation#.
i/ 40 $$ ia. $etre 4.00
ii/ 0 $$ ia. $etre 47.00iii/ 0 $$ ia. $etre 7.00
i,/ 100 $$ ia. $etre 0.00
,/ 10$$ ia $etre 13.00
7 Su&&l!ing( fibre gla## reinfor'e @&o*! re#in #lotte of 1 $$ #lot wit% in
3.1$ lengt% of a&&ro,e $a)e an a# &er ire'tion of t%e @ngineer - in -
?%arge
a/ 100 $$ no$inal ia
i/ 3.00 $$ wall t%i')ne## $etre 1.00
b/ 10 $$ no$inal ia
i/ 3.0 $$ wall t%i')ne## $etre 221.00
ii/ 7.00 $$ wall t%i')ne## $etre 0.00
'/ 200 $$ no$inal ia
i/ 3.0 $$ wall t%i')ne## $etre 43.00
ii/ 7.00 $$ wall t%i')ne## $etre 443.00
Su&&l!ing A.S. $ale B fe$ale ao&ter of a&&ro,e $a)e an bran for
'ou&ling of A.S. &i&e an fibre gla## #trainer#( a# &er ire'tion of t%e
@ngineer - in - ?%arge.
i/ 100 $$ $etre 14.00
ii/ 10 $$ $etre 1.00
iii/ 200 $$ $etre 407.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
50/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(V) TUBE WELL
Item No. Descr!to" o# Item U"t A$$ Dstrcts o#
West Be"%&$
Su&&l!ing( fitting an fi*ing #teel 'utter &ie'e u&to 40 $$ long wit%
#o')et#.
i/ 40 $$ ia. ea'% 147.00
ii/ 0 $$ ia. ea'% 22.00
iii/ 7 $$ ia. ea'% 40.00
10 Su&&l!ing( fitting an fi*ing &lug of a&&ro,e $a)e 'onfor$ing to I.S.
#&e'ifi'ation#.
i/ 40 $$ ea'% 31.00
ii/ 0 $$ ea'% 4.00
iii/ 7 $$ ea'% 1.00
11 Su&&l!ing( fitting an fi*ing '%e'% ,al,e ,erti'al/ 5.A. te#te to 21 )g &er
#q. '$.
i/ 1 $$ ea'% 2.00
ii/ 20 $$ ea'% 3.00
iii/ 2 $$ ea'% 47.00
i,/ 2 $$ ea'% 1.00
,/ 40 $$ ea'% 1011.00
,i/ 0 $$ ea'% 172.00
12 Su&&l!ing(fitting an fi*ing '%e') ,al,e %ori;ontal/ 5.A. te#te to 21 )g
&er #q. '$.
i/ 1 $$ ea'% 1.00
ii/ 20 $$ ea'% 3.00
iii/ 2 $$ ea'% 771.00
i,/ 2 $$ ea'% 1214.00
,/ 40 $$ ea'% 173.00
,i/ 0 $$ ea'% 2327.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
51/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(V) TUBE WELL
Item No. Descr!to" o# Item U"t A$$ Dstrcts o#
West Be"%&$
1 Su&&l!ing( fitting an fi*ing #&e'ial %an &u$& no. 3 of a&&ro,e $a)e
for 0 $$ or 40 $$ ia. tube well/.
ea'% 442.00
14 Su&&l!ing( fitting an fi*ing &o&ular Aa!a &u$& no-3 or #i$ilar.
i/ or 40 $$ ia. tube well ea'% 17.00
ii/ Do$e#ti' Pu$& of a&&ro,e $a)e of 40B0 $$ ia. ea'% 144.00
1 Su&&l!ing( fitting an fi*ing 3 $$ ia. ee& well bra## '!liner wit%
ne'e##ar! fitting# an a''e##orie#.
ea'% 227.00
13 Su&&l!ing( fitting an fi*ing 1 $$ ia. gal,. A.S. 'onne'ting ro wit%#o')et#.
$etre 4.00
17 Su&&l!ing( fitting an fi*ing %ea,! t!&e bell $out% reu'ing #o')et.
i/ 0 $$ 100 $$ ea'% 40.00
ii/ 7 $$ 10 $$ ea'% 72.00
iii/ 100 $$ 10 $$ ea'% 72.00
i,/ 100 $$ 200 $$ ea'% 102.00
,/ 200 $$ 20 $$ ea'% 177.00
1 Su&&l!ing( fitting an fi*ing 5.I. 'a& at to&
i/ 100 $$ ea'% 13.00
ii/ 10 $$ ea'% .00
iii/ 200 $$ ea'% 33.00
i,/ 00 $$ ea'% .00
1 Su&&l!ing( fitting an fi*ing A.S #o')et ring
i/ 100 $$ ea'% 123.00
ii/ 10 $$ ea'% 240.00
iii/ 200 $$ ea'% 10.00
i,/ 00 $$ ea'% 4.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
52/110
PWD SOR Vol-II wef-01.07.2014SECTION (A) - PLUMBING WORKS
(A)-(V) TUBE WELL
Item No. Descr!to" o# Item U"t A$$ Dstrcts o#
West Be"%&$
20 Wa#%ing an e,elo&ing tube well wit% air 'o$&re##or &u$& an engine
for eig%t/ %our# 'ontinuou# &u$&ing &er a! wit% ne'e##ar!
arrange$ent# for te#ting t%e !iel in gallon# &er %our wit% CVC not'%
in'luing %ire an labour '%arge# for all tool# an &lant# an #'affoling a#
require.
a! 731.00
21 Surging of e*i#ting tube well wit% '%e$i'al treat$ent an bu')et wa#%
&rior to u#e of 'o$&re##or $a'%ine/ an e,elo&ing t%e tube well wit%
'o$&re##or $a'%ine at lea#t t%ree/ a!# at eig%t/ %our# &er a! till
t%e !iel i# obtaine at lea#t b! 7= of t%e total #&e'ifie !iel of t%e tube
well $ea#ure b! CVC not'% tan)/ an raw own i# wit%in t%e &er$i##ible
li$it of 10= ,ariation an water #o obtaine after #u'% wa#%ing an
e,elo&ing will be free fro$ #an an ba'teria for w%i'% te#t re&ort fro$
t%e Publi' nal!#t i# to be obtaine. +%e rate i# in'lu#i,e of all labour an
$aterial# in'luing %ire '%arge# of tool# an &lant# an 'o#t of $aterial#./
a/ or tube well fro$ 40 $$ to 100$$ to& enlarge to %a,e !iel fro$
100 to 000 gallon# &er %our a# &er #i;e an !iel.
ea'% 171.00
b/ or tube well of #i;e bigger t%an 100$$ ia. wit% to& enlarge$ent to
%a,e !iel of 3000 gallon# &er %our.
ea'% 2140.00
'/ or aitional &erio Per Da! 2.00
:.E. +%i# ite$ i# to be e*e'ute wit% t%e #&e'ial a&&ro,al of t%e @ngineer-
in-'%arge.
22 Labour for $a)ing arrange$ent for #%owing ,erti'alit! te#t in'luing t%e
'o#t for %ire '%arge# of tool# an &lant#( #'afoling( labour et'. all
'o$&lete.
L.S. 23.00
2 ?olle'ting #a$&le of water for ba'teriologi'al an '%e$i'al te#t fro$ an!
e&t% at an! ti$e uring e*e'ution of wor) in'luing %ire an labour
'%arge# for tool# an &lant# an #terili#ing t%e equi&$ent#( &a!ing all
'%arge# an fee#( te#ting et'. 'o$&lete in all re#&e't a# &er ire'tion.
L.S. 124.00
24 Pa')ing t%e annular #&a'e between t%e out#ie of t%e tube well &i&e# o# A /un$tion
i3 226 %% e!$ 6(1.00
ii3 160 %% e!$ 612.00
iii3 100 %% e!$ 24.00
$3 Stonew!#e *oule > o# A /un$tion
i3 160 %% e!$ 667.00
ii3 100 %% e!$ 4'7.00
1( Supplying, fitting !n* fixing .I. #oun* g#!ting.
i3 100 %% e!$ 7.00
ii3 160 %% e!$ 100.00
iii3 226 %% e!$ 141.00
1' Supplying, fitting !n* fixing .I. "5u!#e /!lli.
i3 100 %% e!$ (+.00
ii3 160 %% e!$ 120.00
iii3 226 %% e!$ 1+(.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
65/110
PWD SOR Vol-II wef-01.07.2014SECTION (B) - SANITARY AND DRAINAGE WORKS
(B)-(II) SOIL PIPE AND FITTINGS
Item No. Descritio! o" Item #!it A$$ Districts o"
West Be!%&$
i3 00 %% e!$ 21'.00
3 460 %% e!$ +4.00
20 Supplying, fitting !n* fixing y!#* gully wit !pp#oe* :..I. g#!ting
$o%plete.
i3 226 %% < 160 %% wit 20 %% g#!ting" e!$ 6((.00
ii3 160 %% < 100 %% wit 160 %% g#!ting" e!$ 6.00
21 Supplying, fitting !n* fixing S.W. %!"te# t#!p.
i3 160 %% < 160 %% e!$ 1112.00
ii3 226 %% < 226 %% e!$ +7''.00
22 !"t I#on fitting" fo# "oil pipe line $onfo#%ing to I.S. 172')1'70 in$lu*ing
/ointing !n* fitting !n* fixing in po"ition !n* p!inting two $o!t" to te
expo"e* "u#f!$e $o%plete in$lu*ing $o"t of !ll %!te#i!l" &
l!ou#.P!y%ent of p!iting will e p!i* "epe#!tly.3
!3 Single /un$tion of 160 %%.< 100 %%. *i! wit *oo#
i3 Wit !l!%oi* /oint in$lu*ing "e!ling te top wit $e%ent %o#t!# 413 e!$ 1+70.00
ii3 Wit le!* $!ule* /oint" e!$ 1++1.00
3 Doule /un$tion of 160 %%.*i! < 100 %%.*i! < 100 %%. wit *oo#
i3 Wit !l!%oi* /oint" in$lu*ing "e!ling te top wit $e%ent %o#t!# 413 e!$ 1+'(.00
ii3 Wit le!* $!ule* /oint" e!$ 1(('.00
$3 Doule =A= /un$tion of 160 %%.*i! < 100 %%.*i! < 100 %%.*i! wit
*oo#
i3 Wit !l!%oi* /oint" in$lu*ing "e!ling te top wit $e%ent %o#t!# 413 e!$ 1+20.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
66/110
PWD SOR Vol-II wef-01.07.2014SECTION (B) - SANITARY AND DRAINAGE WORKS
(B)-(II) SOIL PIPE AND FITTINGS
Item No. Descritio! o" Item #!it A$$ Districts o"
West Be!%&$
ii3 Wit le!* $!ule* /oint" e!$ 1(10.00
.8. 9o# !ny /un$tion witout *oo# te #!te fo# !oe ite%" will e
#e*u$e* y R". 60.00
2 Supply of BPV pipe" 8 >ype3 & fitting" $onfo#%ing to IS-16'2-1''2
;3 i3 Single So$ete* ete# Cengt
!3 76 %% %et#e 24.00
3 110 %% %et#e 4(.00
$3 1+0 %% %et#e +61.00
ii3 Doule So$ete* ete# Cengt
!3 76 %% %et#e 261.00
3 110 %% %et#e 76.00
$3 1+0 %% %et#e 71.00
iii3 Single So$ete* 1.( ete# Cengt
!3 76 %% %et#e 24.00
3 110 %% %et#e 60.00
i3 Doule So$ete* 1.( ete# Cengt
!3 76 %% %et#e 261.00
3 110 %% %et#e 7(.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
67/110
PWD SOR Vol-II wef-01.07.2014SECTION (B) - SANITARY AND DRAINAGE WORKS
(B)-(II) SOIL PIPE AND FITTINGS
Item No. Descritio! o" Item #!it A$$ Districts o"
West Be!%&$
3 Doule So$ete* 1.2 ete# Cengt
!3 76 %% %et#e 2+2.00
3 110 %% %et#e (4.00
i3 Doule So$ete* 0.' ete# Cengt
!3 76 %% %et#e 270.00
3 110 %% %et#e (7.00
ii3 Doule So$ete* 0.+0 ete# Cengt
!3 76 %% %et#e 2(1.00
3 110 %% %et#e 402.00
83 9itting"
i3 ouple#
!3 76 %% ?!$ 66.00
3 110 %% ?!$ 101.00
$31+0 %% ?!$ 12.00
ii3 Pl!in >ee
!3 76 %% ?!$ '6.00
3 110 %% ?!$ 1(2.00
$3 1+0 %% ?!$ +04.00
iii3 Doo# >ee
!3 76 %% ?!$ 120.00
3 110 %% ?!$ 2.00
$3 1+0 %% ?!$ +1.00
i3 Doo# >eeC:3 & R:3
8/10/2019 Sor Spw 2014 Vqeqeeolume II
68/110
PWD SOR Vol-II wef-01.07.2014SECTION (B) - SANITARY AND DRAINAGE WORKS
(B)-(II) SOIL PIPE AND FITTINGS
Item No. Descritio! o" Item #!it A$$ Districts o"
West Be!%&$
!3 76 %% ?!$ 212.00
3 110 %% ?!$ 72.00
3 Pl!in A
!3 76 %% ?!$ 122.00
3 110 %% ?!$ 24+.00
$3 1+0 %% ?!$ +'6.00
i3 Doo# A C:3 & R:3
!3 76 %% ?!$ 1+7.00
3 110 %% ?!$ 2'.00
ii3 Doule A
!3 76 %% ?!$ 17'.00 3 110 %% ?!$ 27.00
iii3 Doule A wit Doo#
!3 76 %% ?!$ 26+.00
3 110 %% ?!$ 411.00
ix3 8en* 46
!3 76 %% ?!$ +4.00
3 110 %% ?!$ 10+.00
$3 1+0 %% ?!$ 4'.00
x3 8en* (7.6
!3 76 %% ?!$ 7.00
3 110 %% ?!$ 14.00
$3 1+0 %% ?!$ 40.00
xi3 Doo# 8en* >.S.3
!3 76 %% ?!$ ''.00
3 110 %% ?!$ 17+.00
$3 1+0 %% ?!$ 441.00
xii3 Doo# 8en* C:3 & R:3
!3 76 %% ?!$ 14'.00
3 110 %% ?!$ '.00
xiii3 #o"" >ee
!3 76 %% ?!$ 17.00
3 110 %% ?!$ 222.00
xi3 #o"" >ee wit Doo#
!3 76 %% ?!$ 267.00
3 110 %% ?!$ 2(6.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
69/110
PWD SOR Vol-II wef-01.07.2014SECTION (B) - SANITARY AND DRAINAGE WORKS
(B)-(II) SOIL PIPE AND FITTINGS
Item No. Descritio! o" Item #!it A$$ Districts o"
West Be!%&$
x3 Vent owl
!3 76 %% ?!$ 0.00
3 110 %% ?!$ '.00
$3 1+0 %% ?!$ +(.00
xi3 Pipe lip
!3 76 %% ?!$ 1'.00
3 110 %% ?!$ 26.00
$3 1+0 %% ?!$ 62.00
xii3 W.. onne$to# 160 %% long3 126 < 110W)W Ring3
76 %% ?!$ 1+'.00
xiii3 W.. onne$to# 460 %% long3 W ) lip#ing
76 %% ?!$ 0.00
xix3 W.. onne$to# 8en* W ) lip#ing
76 %% ?!$ 1'0.00
xx3 126)110 P >#!p wit W.. Ring
76 %% ?!$ 40+.00
xxi3 110 < 110 P >#!p
76 %% ?!$ 6.00
xxii3 126)110 S >#!p wit W.. Ring
76 %% ?!$ +6(.00
xxiii3 110)110 S >#!p
76 %% ?!$ 61(.00
xxi3 126)110 E >#!p wit W.. Ring
76 %% ?!$ 6+.00
xx3 110)110 E >#!p
76 %% ?!$ 411.00
xxi3 Re*u$e# 110 < 76 %%76 %% ?!$ '6.00
xxii3 Re*u$ing >ee 110 < 76 %%3
76 %% ?!$ 170.00
xxiii3 Re*u$ing >ee 1+0 < 110 %%3
76 %% ?!$ 4(.00
xxix3 P!""oe#
!3 76 %% ?!$ 40.00
3 110 %% ?!$ 4(+.00
xxx3 le!ning Pipe
!3 76 %% ?!$ 111.00
3 110 %% ?!$ 217.00
8/10/2019 Sor Spw 2014 Vqeqeeolume II
70/110
PWD SOR Vol-II wef-01.07.2014SECTION (B) - SANITARY AND DRAINAGE WORKS
(B)-(II) SOIL PIPE AND FITTINGS
Item No. Descritio! o" Item #!it A$$ Districts o"
West Be!%&$
$3 1+0 %% ?!$ 64(.00
xxxi3 Pl!in 9loo# >#!p wit >op tile & St#!ine#
76 %% ?!$ 171.00
xxxii3 Pl!in 9loo# >#!p witout >op tile & St#!ine#
76 %% ?!$ 171.00
xxxiii3 ulti 9loo# >#!p wit >op tile & St#!ine#
76 %% ?!$ 204.00
xxxi3 ulti 9loo# >#!p witout >op tile & St#!ine#
76 %% ?!$ 20'.00
xxx3 So$et Plug
76 %% ?!$ 60