SAMARA REGION IS ONE OF THE MOST ECONOMICALLY DEVELOPED REGIONS OF THE RUSSIAN FEDERATION
UPDATED: MARCH 2015
INVESTMENT POTENTIAL
SAMARA REGION RATINGS
MOSCOW
SAMARA
AREA
53 600
WWW.SAMREGION.RUSamara Region Government
02
SQ. KM
POPULATION
3.2MLN
10TH PLACE IN RUSSIA CREDIT RATING
BB+CREDIT RATING
RUAA+ CREDIT RATING
BA2CREDIT RATING
NATIONAL INTERNATIONAL STANDARD & POOR’SEXPERT RA
HIGH INVESTMENT POTENTIAL – 2ND LEVEL
IC2 GROUP
NATIONAL RATING AGENCY MOODY’S
AA1.RU
GROSS REGIONALPRODUCT (2013 FORECAST)
1 035.4BLN RUB. IRKUTSK
KHABAROVSK
NOVOSIBIRSK
SAINT PETERSBURG
MURMANSK
SAMARA REGION
KAZAN
ULYANOVSK
ORENBURG
UFA
SARATOV
TOGLIATTI IS ONE OF THE LARGEST CITIES IN THE RUSSIAN FEDERATION
UPDATED: MARCH 2015
WWW.TGL.RUOffice of the Mayor City of Togliatti
03
AREA
284.3 SQ. KM
RAILWAY
719 100 POPULATION
OTRADNY
CHAPAEVSK
NOVOKUIBYSHEVSKKINEL
ZHIGULEVSK
SAMARA
SYZRAN
M5 FEDERAL HIGHWAY
RIVER HARBOUR
INTERNATIONAL AIRPORT «KURUMOCH»
INDUSTRIAL GIANTS
TOGLIATTI
ADVANTAGEOUS LOCATIONUPDATED: MARCH 201504
SAINT PETERSBURG 1 763 KM
IZHEVSK 629 КМ
NABEREZHNYE CHELNY 431 КМ
CHELYABINSK 907 КМ
NIZHNIY NOVGOROD 667 КМ
MOSCOW 1 016 КМ
KALUGA 1 019 КМ
SAMARA 90 КМ
RADIUS POPULATION
500 КМ 20.4 MLN
1 000 КМ 71.2 MLN
RADIUS POPULATION
TOGLIATTI
MIDDLE AGE
Togliatti
Number of specialists which annually graduate with:
39 YEARS
Samara region
40.3 YEARS
27 213 RUB. 28 278 RUB.AVERAGE MONTHLY SALARY
6 BRANCHES OF OTHER RUSSIAN INSTITUTIONS
HIGHER EDUCATION INSTITUTIONS
COLLEGES AND TECHNICAL SCHOOLS
COLLEGES AND TECHNICAL SCHOOLS
HIGHER EDUCATION INSTITUTIONS10 28 BRANCHES
OF OTHER RUSSIAN INSTITUTIONS31
12 72
MORE THAN 8.3 THS. MORE THAN 27.5 THS.
MORE THAN 3.7 THS. MORE THAN 10.2 THS.
HIGHER EDUCATION INSTITUTIONS / BRANCHES OF OTHER RUSSIAN INSTITUTIONS
HIGHER EDUCATION
SAMARA REGION IS ONE OF THE TOP-10 RUSSIAN REGIONS IN TERMS OF LABOR POTENTIAL
UPDATED: MARCH 201505
COLLEGES AND TECHNICAL SCHOOLS
SECONDARY EDUCATION
WWW.SAMARASTAT.GKS.RU
WWW.TGL.RUWWW.EDUCAT.SAMREGION.RU
Sources:
STAVROPOLSKY DISTRICT
TOGLIATTI
INDUSTRIAL SPECIAL ECONOMIC ZONE «TOGLIATTI»
UPDATED: MARCH 2015
AREA OF SEZ ON THE TERRITORY OF STAVROPOLSKY DISTRICT
660 HA 53.1 %
5.7 %
41.2 %
DECLARED INVESTMENTS
FEDERAL BUDGET
SAMARA REGION BUDGET
PRIVATE FINANCING OF ENERGY SUPPLY COMPANIES
13.6BILLION RUB.
06
N
ST
STAVROPOLSKY DISTRICT
TOGLIATTI
SOCIAL INFRASTRUCTUREUPDATED: MARCH 2015
WWW.Z-VALLEY.CIK63.RUWebsite of «Zhiguli Valley»
700 m
07
N
ST
CALL-CENTER
SOCIAL AND BUSINESS CENTER
OFFICES AND LABORATORIES (4 BUILDINGS)
TECHNICAL SUPPORT CENTER
PROFESSIONAL TRAINING CENTER
CONFERENCE HALL(300 PEOPLE)
HOTEL(37 ROOMS)
PARKING AREA (600 CARS)
CANTEEN (500 PEOPLE)
1 2
3 4
5 6
7
9
8
RESIDENTS OF SEZ «TOGLIATTI» UPDATED: MARCH 2015
16 RESIDENTS
DECLARED INVESTMENTS
18 487MLN RUB.
4 271WORK PLACES TO BE CREATED
LLC «HI-LEX RUS»
LLC «TPV RUS»
LLC «GKN DRIVELINE TOGLIATTI»
LLC «ATSUMITECTOYOTA TSUSHO RUS»
LLC «MUBEA SUSPENSION
COMPONENTS RUS»
LLC «NOBEL AUTOMOTIVE RUSYA»
LLC «TOGLIATTI PAPER MILL»
LLC «JV SYSTEMS» LLC «AZ POWERTRAIN»
LLC «SANOH VOLGA»
LLC «MANN+HUMMEL TOGLIATTI»
LLC «EDSCHATOGLIATTI»
LLC «CIE AUTOMOTIVE RUS»
LLC «OZON PHARM»
LLC «PRAXAIR SAMARA»
LLC «SOLOFILMS»
RUSSIARUSSIA
TURKEYJAPAN
JAPAN
GERMANY
GERMANY
RUSSIA
SPAIN
GERMANY
UKINDIA – RUSSIAUSA – RUSSIA
RUSSIA
USA
JAPAN
Design works
Construction
Production
08
PREFERENCES FOR INVESTORS UPDATED: MARCH 2015
PROFIT TAX
2%
GOVERNMENTWARRANTIES
ACCELERATED PROCEDURE FOR THE RECOGNITION OF R & D EXPENSES
ACCELERATED DEPRECIATION
5%
PROPERTY TAX
0%10 YEARS
LAND TAX
0%5 YEARS
TRANSPORT TAX
0 RUB.
5 YEARS
RIGHT TO BUY LAND
«ONE STOP SHOP» SYSTEM
EXEMPTION FROM DUTIES ON IMPORT OF EQUIPMENT, RAW MATERIALS AND COMPONENTS TO THE TERRITORY OF SEZ
EXEMPTION FROM DUTIES ON EXPORTOF FINISHED GOODS OUTSIDE OF THE CUSTOMS UNION (RE-EXPORT)
0% import duties
0% VAT
0% import duties
VAT compensation
FOREIGN COUNTRIES
RUSSIA, KAZAKHSTAN, BELARUS
SEZ «TOGLIATTI»
GAS SUPPLY
1 615MLN М3/YEAR
ELECTRICAL POWER SUPPLY
180MW
WATER SUPPLY
7 300М3/YEAR
SEWAGE
7 300 М3/YEAR
STORM WATER
1 657THS. М3/YEAR
SEZ «TOGLIATTI»
FOREIGN COUNTRIES
RUSSIA, KAZAKHSTAN, BELARUS
VAT and duties to be paid
0% customs duties (foreign product)
VAT and customs duties to be paid
2012 - 2018
2019 - 2020
9% 2021 - 2024
15.5% 2025 AND FURTHER
UP TO 30% SAVINGS ON CAPITAL CONSTRUCTION
FREE CONNECTION
SPECIAL ADMINISTRATIVE REGIME FREE CUSTOMS ZONE
INDUSTRIAL INFRASTRUCTURETAX BENEFITS
1
2
3
09
PARAMETER
LAND RENT IN SEZ
GAS SUPPLY
ELECTRICAL POWER SUPPLY
DRINKING WATER
436 HA
55 366 RUB./HA 5.5 RUB./М2
138 415 RUB./HA 13.84 RUB./М2
42 000 RUB./М2 (average cost)
250 090.9 М3/HOUR
180 MW
7 300 М3/DAY
7 300 М3/DAY
40 260 М3/DAY
35 620 М3/DAY
4 245.3 RUB./1000 М3
4.03 RUB./KWH
20 RUB./М3
25 RUB./М3
15 RUB./М3
10 RUB./М3
4 360 000 М2LAND VALUE IN SEZ
CONSTRUCTION OF A STANDARD INDUSTRIAL BUILDING
SEZ AREA FOR RESIDENTS’ CONSTRUCTION RATE/TARIFF
TECHNICAL WATER
SEWAGE
STORM WATER
The values are indicated without VAT applicable within the territory of Stavropolsky district, Samara region
* Construction of a standard industrial building
PRESENTED TARIFFS ARE INDICATIVE AND UNOFFICIAL
WWW.AVKVODA.RU
WWW.SAMARAREGIONGAZ.RU
Tariffs to be checked on websites of energy companies:
KEY COST PARAMETERS
UPDATED: MARCH 2015
TOTAL CAPACITY IN SEZ * RATE/TARIFFPARAMETER
1 HA = 2.5 ACRES
1 HA = 10 000 M3
10
REGISTER WITHIN THE TERRITORY OF STAVROPOLSKY DISTRICT
PREPARE BUSINESS PLAN AND SUPPORTING DOCUMENTS
GET THE INVESTMENT PROJECT APPROVED BY THE RUSSIAN MINISTRY OF ECONOMIC DEVELOPMENT
CONCLUDE AGREEMENT ON CONDUCTING INDUSTRIAL ACTIVITIES
INVEST NOT LESS THAN120 MLN RUB. IN PRODUCTION
HOW TO BECOME A RESIDENT OF SEZ?UPDATED: MARCH 2015
3
2
1
4
5
11
WELCOME TO SAMARA REGION!
CONTACTS JSC «SEZ «Togliatti»Russia, Samara region,Togliatti, Str. Frunze, 8, office 508Tel. +7 (8482) 555-179Fax +7 (8482) 555-178
Alexey [email protected]
Alena Mezina Head of Investor Relations Division [email protected]
12