Sports Facilities
Miami Dolphins Sun Life Stadium
Cleaning and coating of condensers, refurbishment of air handling units in football, rugby and American football stadiums.
Air handling unit renovation, duct cleaning, corrosion protection andchemical-technical cleaning of HVACequipment at sports facilities.
Cleaning and coating of condensers at aquatic centres around the world. The atmosphere at swimming pools, saturated with chlorine, is highly corrosive, especially for the HVAC equipment.
O2 Arena London
Gold Coast Aquatic Centre
Gym / sports centre
A SELECTION OF OUR WORK
•FCUtrechtGalgenwaardStadium
•MiamiDolphinsSunLifeStadium
•GoldCoastAquaticCentre
•ArsenalEmiratesStadium
•PSVEindhovenPhilipsStadium
•ChelseaStamfordBridgeStadium
•FloridaAtlanticUniversityBasketballArena
•KNVB/RoyalDutchFootballAssociation
SPORTS IN OPTIMAL CONDITION
Facilitymanagers forsports facilities facedifferentchallenges.Someinstallationsonlyhave
extremepeakloadsduringbigsportingevents,othersoperate24/7foron-goingsportactivities.
The need for optimal efficiency, lowmaintenance and high reliability is therefore eminent.
Heatexchangersplayakeyroleinallair-conditioningsystemswithrespecttoefficiencyand
performance.Theseheatexchangersaresubjecttocorrosionandpollutionmuchmorethan
any other part of the installation. Blygold heat exchanger protection significantly increases
thereliabilityofcoolingequipment.Lifetimeextension,reductionofefficiencylossandlower
maintenance frequencyhaveconvincedmany facilitymanagersofsomeof theworld’smost
famoussportingarenastoworkwithBlygold.
CONTACT
BlygoldInternationalB.V.
POBox44,3990DAHoutenTheNetherlands
Phone:+31306344344–Fax:+31306344300
E-mail:[email protected]–www.blygold.com
YOUR LOCAL BLYGOLD APPLICATOR
COOLING WITH HIGH EFFICIENCY & RELIABILITY
TheBlygoldheatexchangerprotectiondoesnothaveanimpactonthe
heattransfercapacityofaninstallation.Througharemarkableapplication
techniquethetotalheat-exchangingsurfaceisprotectedwithathinbut
dense coating layer. Thismeans that not only the lifetimeof the heat
exchangerswillbeextended,thecoolingcapacitywill remain intactas
well.Theriskofbreakdownswillbemuchlower,andrelatedcostscan
beavoided.Hugesavingscaneasilybeobtainedsimplybyhaving the
heatexchangerstreatedbyaBlygoldcertifiedapplicatorbeforeorafter
installation.
PRACTICAL EXAMPLE
Cooler without Cooler with Blygold coating Blygold coatingCondensationtemperature 56˚C 48˚C
Energyconsumption 119kW 113.4KW
Runninghoursperannum
(598MWcoolingcapacity) 2000 1834
Energyconsumption 238000kWH 207775kWH
ENERGY SAVINGS 13%
ContactyourlocalBlygoldapplicator
forextensivetestreports
Sports Facilities