Page 1: Status of ATLAS Resources

Status of ATLAS Resources

Presentation to RRB 22.10.2007Markus Nordberg

ATLAS Resources Coordination

CERN-RRB-2007- 074

Page 2: Status of ATLAS Resources

Introduction to Funding Agency Tables

– To remind, the primary purpose of the Funding Agency (FA) tables is to show received or planned income

– The M&O, C&I and CC tables also show the total payments made by the Project– Cost to Completion (CtC)= Commissioning & Integration (C&I) + Construction

Completion (CC)• Category A = Common items• Category B = System-specific items

– To read the tables• Baseline and CC-A

– ‘Contributions by Funding Agencies’ = income received from FAs– ‘Commitments’ by FAs = commitments requested from the FAs, also

beyond the budget year• M&O, CtC (=C&I+CC)

– ‘Contributions by Funding Agencies’ = income received from FAs – ‘Other income’ = contribution advancements for the future; deferral funds;

contributions, transfers from baseline– ‘Total (actual) payments’ = payments made by the Project– ‘Balance’ = total contributions + other income – total payments

• The Table numbering refers to those in Documents 071 and 073, respectively

Page 3: Status of ATLAS Resources

Note: TDAQ re-baselined in accordance with CERN-RRB-2004-017 (initial detector)

#071: Baseline Commitments Evolution (%)

Page 4: Status of ATLAS Resources

Baseline Payments Evolution (MCHF), EoY 2007

Page 5: Status of ATLAS Resources

2007 Baseline Report (Tables 1 - 3), MCHF

Note: Assumes all due CF contributions received by EoY 2007. For global budget balance, see Table 7

Common Projects include CC-A

Page 6: Status of ATLAS Resources

2007 C&I Income & Payments (Table 4), kCHF

Note: Balance achieved by using cash deferrals within global cash-flow management shown in Table 7.

Page 7: Status of ATLAS Resources

2007 CC-B Income & Payments (Table 5), kCHF

Note: Balance achieved by using cash deferrals within global cash-flow management shown in Table 7.

Page 8: Status of ATLAS Resources

2008 Baseline (Tables 8 - 10), MCHF

Note: This assumes all due contributions from 2007 will be paid. In reality, a funding gap of up to 7 MCHF is projected at this point in time. The global cash-flow situation is summarized in Table 7.

Page 9: Status of ATLAS Resources

Status of Remaining Contributions (Annex 2, August 31, 2007), kCHF

Note: CtC refers to 2002 financial plan and CtC(2) to correction made in 2006

Page 10: Status of ATLAS Resources

Projected Budget Balance (Table 7), MCHF

Page 11: Status of ATLAS Resources

– Baseline & Common Fund• Some requested baseline & CF contributions will not arrive in

2007– Russia + JINR 4.0 MCHF– Canada 1.5 MCHF– US 1.5 MCHF (but in progress of being

paid)– Due MS fees 0.2 MCHF

– Note: Cost of ID repairs and delays not included• Technical problems encountered in the Inner Detector (heaters,

electronics) not expected to result in (net) overcosts• April RRB plan assumed beam-pipe closure by end of August,

2007.The cost of keeping the commissioning crews until start of operation is ca. 250 kCHF/month. Too early to estimate a global figure for ATLAS, will return to this in April 2008

– Advanced contributions from several FAs is gratefully

acknowledged!

Why These Budget Balance Problems?

Page 12: Status of ATLAS Resources

• #073: Table 1 2008 M&O-A Budget Estimates in kCHF

– Category A (14.1

MCHF)• Cost drivers

– Technical services (4.0 MCHF)

– Magnet operation(2.9 MCHF)

– Core computing I&S (1.8 MCHF)

– On-line comp. (2.3 MCHF)

– Energy (2.2 MCHF)

Page 13: Status of ATLAS Resources

• #073: Table 1 • 2008 M&O-B

Budget Estimates in kCHF – Category B (6.9 MCHF)

• Cost drivers– Technical services,

manpower (3.0 MCHF)

– Electronics replacements, rental (1.7 MCHF)

– Operation of SR1 (0.7 MCHF)

– 98 FTE core computing effort as in-kind

• Note: gases & coolants moved into Category A

Page 14: Status of ATLAS Resources

Evolution of M&O 2002 – 2010, MCHF

Page 15: Status of ATLAS Resources

• The following two new in-kind contributions are for approval:– Surveyors (165kCHF, JINR)– Core computing (I&S); 870 kCHF, multiple Funding

Agencies (see next slide)

#073: M&O in-kind Contributions 2008

Page 16: Status of ATLAS Resources

• The following in-kind contributions are planned for 2007– Czech Rep: 0.4 FTE x 88 kCHF/FTE = 35 kCHF– IN2P3: 1.0 FTE x 88 kCHF/FTE = 88 kCHF– BMBF: 0.9 FTE x 88 kCHF/FTE = 79 kCHF– MPI: 0.3 FTE x 88 kCHF/FTE = 22 kCHF– Israel: 0.2 FTE x 88 kCHF/FTE = 18 kCHF– INFN: 1.8 FTE x 88 kCHF/FTE = 158 kCHF– Poland: 0.1 FTE x 88 kCHF/FTE = 9 kCHF– Russia: 0.3 FTE x 88 kCHF/FTE = 22 kCHF– JINR: 0.4 FTE x 88 kCHF/FTE = 35 kCHF– Taipei: 0.1 FTE x 88 kCHF/FTE = 9 kCHF– UK: 1.5 FTE x 88 kCHF/FTE = 132 kCHF– US: 3.0 FTE x 88 kCHF/FTE = 264 kCHF

TOTAL: 9.9 FTE x 88 kCHF/FTE = 870 kCHF

Core Computing (I&S) in-kind 2008

Page 17: Status of ATLAS Resources

• Status of M&O Signatures (Table 3) Sept 25, 2007– 38 of 40 Funding Agencies

have signed– Waiting for: Argentina, Brazil

Page 18: Status of ATLAS Resources

• The following contributions (Categories A + B) are due EoY 2006 (or earlier) by August 31, 2007:– Italy 71 kCHF– Armenia 27 kCHF– Belarus 122kCHF– Georgia 28 kCHF– Morocco 33 kCHF– Portugal 22 kCHF– Russia 1178 kCHF– JINR 161 kCHF– TOTAL: 1642 kCHF

• Global plans are in place to restore the balance (in some cases, expected to take some time)

Status of Due M&O Contributions (<2007)

Page 19: Status of ATLAS Resources

• Take note of the 2007 budget status (baseline & CtC)• Approve the 2008 construction and M&O budgets

RRB Invited to