Simon C. Leemann • LEG Project Meeting • May 2, 2005
P A U L S C H E R R E R I N S T I T U T
May 2, 2005
Status Report100 keV DC Gun Test Stand
Simon C. Leemann • LEG Project Meeting • May 2, 2005
Gun Test Stand Schedule
• Presently• Bunker and LAC are ready• Electrical installations and cabling completed• Solenoid field measurement completed
• Ongoing• Zoom optics resolution testing• The Holy Grail: UHV cleaned components should arrive this week (?)• Cabling of diagnostic module and connection to control system• EPICS drivers/software & optical link to hot deck
• Outlook• HV testing• Pumpdown and bakeout• Electron bombardment with a single-tip modified FEA• Commissioning & first measurements
Simon C. Leemann • LEG Project Meeting • May 2, 2005
Test Stand Bunker Right Now...
Simon C. Leemann • LEG Project Meeting • May 2, 2005
Hot Deck & Pulser
19” Rack100 kV
Ion Pump500 l/h
Isolating Transf.230 V
ExperimentSupport
Simon C. Leemann • LEG Project Meeting • May 2, 2005
LAC Installed
Simon C. Leemann • LEG Project Meeting • May 2, 2005
In-Vacuum Solenoid Magnet
Simon C. Leemann • LEG Project Meeting • May 2, 2005
Solenoid Field Measurement Setup
Solenoid
Hall probe
3D mover
Solenoid temperaturereadout
Hall probe readout
Simon C. Leemann • LEG Project Meeting • May 2, 2005
SLS-TME-TA-2005-0264-› http://slsbd.psi.ch/pub/
Solenoid Field Measurement Results (1)
0
20
40
60
80
100
120
140
160
180
200
0 0.5 1 1.5 2 2.5 3 3.5
B [m
T]
I [A]
At solenoid center: s = 24 mm
linear no saturation
!Bz (Isol)
Simon C. Leemann • LEG Project Meeting • May 2, 2005
Solenoid Field Measurement Results (2)
SLS-TME-TA-2005-0264-› http://slsbd.psi.ch/pub/
0
20
40
60
80
100
120
-60 -40 -20 0 20 40 60 80 100
B [m
T]
s [mm]
I = 2 AOff axis scan at I = 2 A
Solenoid
homogeneous
longitudinal symmetry
azimuthal symmetry
!Bz (s)
Simon C. Leemann • LEG Project Meeting • May 2, 2005
Gun Test Stand Schedule
• Presently• Bunker and LAC are ready• Electrical installations and cabling completed• Solenoid field measurement completed
• Ongoing• Zoom optics resolution testing• The Holy Grail: UHV cleaned components should arrive this week (?)• Connecting diagnostics cabling• EPICS drivers/software & optical link to hot deck
• Outlook• HV testing• Pumpdown and bakeout• Electron bombardment with a single-tip modified FEA• Commissioning & first measurements
Simon C. Leemann • LEG Project Meeting • May 2, 2005
Zoom Optics Resolution Measurement
Lenses
Screen
Light
Sample
Controller
Camera
Simon C. Leemann • LEG Project Meeting • May 2, 2005
Connecting Diagnostics Cabling...
Simon C. Leemann • LEG Project Meeting • May 2, 2005
Gun Test Stand Schedule
• Presently• Bunker and LAC are ready• Electrical installations and cabling completed• Solenoid field measurement completed
• Ongoing• Zoom optics resolution testing• The Holy Grail: UHV cleaned components should arrive this week (?)• Cabling of diagnostics and connection to control system• EPICS drivers/software & optical link to hot deck
• Outlook• HV testing• Pumpdown and bakeout• Electron bombardment with a single-tip modified FEA• Commissioning & first measurements