Page 1: Stonehaven FAS Expected Temporary Works€¦ · Stonehaven FAS Expected Temporary Works The background provides a list of associated activities. See separate sheets for depictions

Zone ReferenceAssociated

Waters

Length (if

applicable

Approx Height Above

Ground (if applicable)

Approx 10 figure NGR

(if applicable)

Licence type required for

SEPAControlled Activity SEPA Comment

4AT1Carron

Water

65m or

therebyN/A NO 87500 85733

CAR Licence not

required

4AT2Carron

Water

2m or

therebyN/A NO 87517 85733 Marine Scotland Marine Scotland Marine Scotland

4AT3Carron

Water

5m or

therebyN/A NO 87459 85748 Temporary Bridge Registration

CAR Licence not

required

4AT4Carron

Water

5m or

therebyN/A NO 87515 85739 Marine Scotland Marine Scotland Marine Scotland

4AT5Carron

Water

20m or

therebyN/A NO 87520 85733 Marine Scotland Marine Scotland Marine Scotland

1BT1Carron

Water

150m or

therebyN/A NO 87314 85756

CAR Licence not

required

1BT2Carron

Water

120m or

therebyN/A NO 87439 85743

CAR Licence not

required

1BT3Carron

Water

5m or

therebyN/A NO 87307 85755 Temporary Bridge Registration

CAR Licence not

required

1BT4Carron

Water

70m or

therebyN/A NO 87388 85738

CAR Licence not

required

1C 1CT1Carron

Water

115m or

therebyN/A NO 87274 85758

CAR Licence not

required

1DT1a+bCarron

Water

120m or

therebyN/A NO 87200 85716

CAR Licence not

required

1DT2Carron

Water

80m or

therebyN/A NO 87100 85657

CAR Licence not

required

1DT3Carron

Water

5m or

therebyN/A NO 87106 85655 Temporary Bridge Registration

CAR Licence not

required

1DT4Carron

Water

5m or

therebyN/A NO 87192 85701 Temporary Bridge Registration

CAR Licence not

required

1DT5Carron

Water

5m or

therebyN/A NO 87068 85644 Temporary Bridge Registration

CAR Licence not

required

1DT6Burn of

Glaslaw

5m or

therebyN/A NO 87086 85640 Temporary Bridge Registration

CAR Licence not

required

1ET1Carron

Water

140m or

therebyN/A NO 87048 85641

CAR Licence not

required

1ET2Carron

Water

2m or

therebyN/A NO 86926 85647 Temporary Bridge Registration

CAR Licence not

required

2GT1Burn of

Glaslaw

60m or

therebyN/A NO 87006 85467

CAR Licence not

required

2GT2Burn of

Glaslaw

50m or

therebyN/A NO 87025 85469

CAR Licence not

required

2GT3Burn of

Glaslaw

90m or

therebyN/A NO 87077 85580

CAR Licence not

required

2GT4Burn of

Glaslaw

2m or

therebyN/A NO 87086 85623 Temporary Bridge Registration

CAR Licence not

required

2GT5Burn of

Glaslaw

75m or

therebyN/A NO 87054 85530

CAR Licence not

required

2GT6Burn of

Glaslaw

20m or

therebyN/A NO 87015 85469

CAR Licence not

required

2GT7Burn of

Glaslaw

5m or

therebyN/A NO 87017 85469 Temporary Bridge Registration

CAR Licence not

required

2GT8Burn of

Glaslaw

5m or

therebyN/A NO 87036 85497 Temporary Bridge Registration

CAR Licence not

required

Temporary construction vehicle access bridge over river flow <5m wide

Temporary barrier to separate works from river flow to facilitate works. End of

barrier adjusts to switch water to opposite side to accommodate works on

opposing banks when necessary.

Temporary barrier to separate works from river flow to facilitate works. End of

barrier adjusts to switch water to opposite side to accommodate works on

opposing banks when necessary.

Temporary construction vehicle access bridge over river flow.

Temporary construction vehicle access bridge over river flow < 5m wide.

Temporary construction vehicle access bridge over river flow < 5m wide.

Temporary bridge diversion of utilities above channel to faciliate bridge and

channel works <5m wide.

Temporary construction vehicle access bridge over river flow < 5m wide.

Stonehaven FAS Expected Temporary

WorksThe background provides a list of associated activities. See separate sheets for depictions of temporary works

Description

2G

1E

Temporary barrier to separate works from river flow to facilitate works. End of

barrier adjusts to switch water to opposite side to accommodate works on

opposing banks when necessary.

Temporary construction vehicle access bridge over river flow <5m wide

Temporary barrier to separate works from river flow to facilitate works. End of

barrier adjusts to switch water to opposite side to accommodate works on

opposing banks when necessary.

Temporary diversion of flow in culvert. Culvert to contain two resting pools at

approximately 40m centres.

Temporary barrier to separate works from river flow to facilitate works. End of

barrier adjusts to switch water to opposite side to accommodate works on

opposing banks when necessary.

Temporary channel diversion along extent to facilitate works. This may be

created by a temporary barrier to separate the works from the river flow. End

of barrier adjusts to switch water to opposite side to accommodate works on

opposing backs when necessary.

Temporary barrier to separate works from river flow to facilitate works. End of

barrier adjusts to switch water to opposite side to accommodate works on

opposing banks when necessary.

Temporary channel diversion and/or overpumping of water along extent to

facilitate channel works.

Temporary barrier to separate works from river flow to facilitate works. End of

barrier adjusts to switch water to opposite side to accommodate works on

opposing banks when necessary.

4A

1B

1DTemporary construction vehicle access bridge over river flow < 5m wide.

Temporary construction vehicle access bridge over river flow < 5m wide.

Temporary barrier to separate works from river flow to facilitate works. End of

barrier adjusts to switch water to opposite side to accommodate works on

opposing banks when necessary.

Temporary bridge diversion of utilities above channel to faciliate bridge and

channel works <5m wide.

Temporary bridge (2m wide, 15m span), to allow pedestrian access for the

public during raising of existing bridge and provide a diversion route for

utilities.

Temporary construction vehicle access bridge over river flow < 5m wide.

Temporary flood defence barrier during construction, to maintain flood

defence standard once existing wall removed.

Temporary overpumping of water to allow for culvert replacement

Temporary reprofiling of slope to allow access to carry out works, including

tree removal.

Page 2: Stonehaven FAS Expected Temporary Works€¦ · Stonehaven FAS Expected Temporary Works The background provides a list of associated activities. See separate sheets for depictions

4AT1

4AT2 - Temporary Bridge

1AT3

4AT51AT4

Page 3: Stonehaven FAS Expected Temporary Works€¦ · Stonehaven FAS Expected Temporary Works The background provides a list of associated activities. See separate sheets for depictions

1BT1

1BT2

1BT31BT4

Page 4: Stonehaven FAS Expected Temporary Works€¦ · Stonehaven FAS Expected Temporary Works The background provides a list of associated activities. See separate sheets for depictions

1CT1

1DT4

1DT1a1DT1b

Page 5: Stonehaven FAS Expected Temporary Works€¦ · Stonehaven FAS Expected Temporary Works The background provides a list of associated activities. See separate sheets for depictions

1DT3

1DT2

1DT1a

2GT3

2GT4 1DT1b

1DT5

1DT6

Page 6: Stonehaven FAS Expected Temporary Works€¦ · Stonehaven FAS Expected Temporary Works The background provides a list of associated activities. See separate sheets for depictions