Subsea Sampling on the Critical Path of Flow Assurance

Shailesh Rathood

Product Champion, Schlumberger

Hua Guan

Flow Assurance Consultant, OneSubsea

Devex 2016, 16-17 May, Aberdeen UK

Page 2: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

2

Outline

• Flow assurance along the fluid journey

• Fluid PVT and importance of representative samples

• Subsea sampling system

• Subsea sampling demo

• Project example – subsea sampling application for scale squeeze optimization

Page 4: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

4

Pressure

& Liquid

Mgmt

Wax &

AsphaltenesHydrates

Heavy

OilScale

PVT & Fluid

Behavior

Corrosion

& ErosionOperability

Integrated

Solutions

Production

Optimization

Thermo

Hydraulics

Production

System

Architecture

PVT

Sampling

Wellbore

Sim.

Production

chemicals

Fluid

Analysis &

Modelling

Steady

State MP

Flow Sim.

Riser & Flowline

Monitoring

Solids Prec.

& Depos.

Topside

Process

Sim.

Production

Operations

& Opt.

Forecasting,

Risks, and

Sensitivities

Processing

/ Boosting

The Fluid Journey

SS

Surveill.

Subsea

Archi-

tecture

Transient

MP

Flow Sim.

Interv.MP Flow

Metering

Inflow

Performance

Completion

Exploration PG1 Feasibility PG2Concept

Selection PG3 Definition PG4Execution/

Implement.PG5 Operation

The Project Development Timeline

Interacts with All Disciplines Across the Fluid Journey

Page 5: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

5

PVT & Fluid Behavior

WaxAsphaltene

Gas Hydrate

Athabasca Bitumen r>1

Organic ScaleInorganic scale

Page 6: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

6

PVT & Fluid Behavior

Temperature

Pre

ssu

re

Hyd

rate

Curv

e

Facility

Reservoir P&T

Start

Reservoir P&T

Long-Term

Look-a-head

Page 7: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

7

Integrated Modeling to Diagnose and Optimize FA Problems

Schlumberger Tools Third Party

ScaleChem MultiScale

OLI Analyzer StudioProsper / GAP

PVT Analysis Scale Analysis

Corrosion Analysis Wells / Pipelines

Economic Analysis Process Simulation

HYSYS

Wells / Pipelines

Steady State

Wells / Pipelines

Dynamic

Reservoir Simulation Integrated Modeling

PVT Specialized Flow

Assurance

Page 8: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

8

Subsea Production Trends and Sampling Drivers

Page 9: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

9

Multiphase Representative Sampling

©OneSubsea ● Proprietary Information ● Do Not Duplicate or Distribute

• Strategically chosen, phase-rich sampling points

• Each phase is enriched and captured individually

• Isothermal and isobaric

Page 10: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

10

Subsea Sampling Hardware

Sampling Interface–Based on blind T, flexible access / retrievable

–Dual pressure barrier philosophy

Sampling Module–Isothermal and isobaric sampling

–Phase detection and phase enrichment

–ROV deployed skid

–Remotely controlled system

–Transportable sample receptacles

Topside Equipment

Subsea Sampling Services

Subsea Sampling System

Page 11: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

11

OneSubsea Sampling System - Demo

©OneSubsea ● Proprietary Information ● Do Not Duplicate or Distribute

Page 12: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

12

Offshore Scale Squeeze

Procedure–Injection of inhibitors and retention

–Inhibitor flowback for protection

Sampling and Analysis–Inhibitor residual -> Re-squeeze

when < MIC

Design Requirement

Water Depth: 1100 m

P/T: 10,000 psi and 121 degC

Access: horizontal

Samples: 4 x 600 cc

Project A – Subsea Sampling for Scale Squeeze Optimization

0.1

1

10

100

1000

10000

0 1000 2000 3000 4000 5000 6000

cummulative water production (x1000 bbls)

Inh

ibit

or

co

nc

en

tra

tio

n (

pp

m)

field return concentration (ppm)

new modelled return concentration (ppm)

previous modelled return concentration (ppm)

Page 13: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

13

Subsea Sampling

Representative Samples–Isobaric / isothermic

–Subsea units in place

Reliable Analysis–Enable accurate estimate of re-sqz time

Scale Squeeze Optimization

Integrated modelling for accurate prediction

Reliable scale control -> prevention

Reduce intervention frequency

OPEX saving and increased up-time

Project A - Benefits

Page 14: Subsea Sampling on the Critical Path of Flow · PDF fileSubsea Sampling on the Critical Path of Flow Assurance Shailesh Rathood Product Champion, Schlumberger Hua Guan Flow Assurance

14

Integrated Subsea Sampling and FA Risk Analysis

Sample extraction

QA, condition,

segregate,

restoration, and

transfer

Analysis and

reporting

Modelling, EoS,

Uncertainty, and

decisions

Chain of

Custody

Sampling interface

Production

management

workflows