DISCLAIMER
Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.
TROLL-PILOT FIELD LAYOUTFIELD LAY-OUT
ISU
4 Well Template
Flow Lines
4 Welt Template
& control umbilical
ABB Oil, Gas and Petrochemicals AMU\32203002\ADMIf*PnESENrA\Bla01300.RPT
SUBSIS - TROLL-PILOT - water injection module
HIGH VOLTAGE SUBSEA MATEABLE CONNECTOR ~
POWERCABLE
EL- MOTOR&MM& ms r?SSilSIf®1’
OIL Ml WATER SAMPLING
PUMP
ABB Oil, Gas and Petrochemicals AilL\3220300»ADMII*PRESem'A\Bie01300.PFr
FROM MULTI-CABLE TO SINGLE CABLE
ABB Oil, Gas and PetrochemicalsL:\32203015\ADMIN\PRESENTA\BI800200.PPT ABB
, DISTRIBUTION AND CONTROL
ABB Oil, Gas and PetrochemicalsL:\32203015\ADMIN\PRESENTA\BI800200.PPT
ASS
Conclusions
a
injection
□
# ,,„cre„.o,lprod„c,,.„,r.cov.^o,^«
5j|SB<|5|!|
can reduce future development costs significantly, and indeed make these Mcfe> •conomlcalto develop
ABB Oil, Gas and Petrochemicals ABBL\32203002W)MIMvPRB8ENTA\BI802000,PFT 10
Conclusions
atechnology
Q The first SUBSIS project i.e. Troll Pilot, will he installed mid 1999 . ,
□ Subsea power distribution (SEPDIS) is m; water depth within 1999
□ SEPDIS ready for installation in 2000
□ The MSS production system is being qualified for 2000 m water depth, andIs at 1700 m in Brasil
ABB Oil, Gas and Petrochemicals AMlA3220d006MDMIPAPnE8ENTA\BI602000.PPT